Attachment 2 70Z08023R15006B00
OFFEROR’S PROPOSED DELIVERY SCHEDULE
| CLIN |
| DESCRIPTION |
| WITHIN DAYS AFTER |
| 1-O |
| Labor to receive the engine and uncrate; prepare a Receiving Inspection Report with photographs, SOW 3.2(a). |
| Submit Appendix (A) ___ days after receipt of engine |
| 2-O |
| Disassemble the engine, separate the transmission and return to SFLC and inspect engine, report findings, SOW 3.2(b). |
| Submit Appendix (B) ___ days after submission of appendix A |
| 3-O |
| Parts and Labor to overhaul, test, paint, preserve, package, shipment, commission, and warranty, SOW 3.2(c)-(g), 3.3, 5.1-5.5. |
| Submit within ___ days of written approval of appendix (B) |
Submit Appendix (C) ___ days after dynamometer testing
Provide Technical representative to commission engine seven (7) days after written notification.
Submit Appendix (E) ____ days upon completion of engine commissioning
| 4-O |
| Technical Support, SOW 3.4 |
| Remote technical support within ___ hour(s) upon notification |
On-site technical support within ___ hours of written approval
| 5-O |
| Root Cause Failure analysis, SOW 3.5 |
| Submit ____ days after receipt of engine |
| 6-O |
| Re-preservation of an engine, including dynamometer testing, SOW 3.7 |
| Complete within ____ days after receipt of engine |
| Notification of Coast Guard witness testing, SOW 3.1.9. |
| Fourteen (14) day notice required |
| Check Sheet for Preservation, SOW 3.2(e). |
| Submit with check sheet with dynamometer testing report |
| Cumulative Tracking Report, SOW 3.2(h). |
| Submit Appendix (D) 15th of each month |
| Project Manager and Alternate Project Manager resume, SOW 3.1.16. |
| Due at contract award |