This is a USDA Forest Service technical specification for a 6,000-pound swivel hook designed for external helicopter cargo operations in wildland fire suppression activities. The specification (5100-506C, issued July 2026) establishes performance, design, and quality requirements for a complete assembly consisting of a shank-style hook, swivel body with permanently lubricated thrust-type ball or roller bearing, and a pear-shaped link.
The swivel hook must achieve a safe working load of 6,000 pounds with an ultimate strength of at least 22,500 pounds (3.75 load safety factor) and operate within temperatures of 0°F to 140°F. Key design requirements include a gate release mechanism with minimum 0.20-inch engagement, dimensional specifications per figures provided, assembly weight under 15.0 pounds, and free swivel rotation both unloaded (hook remains within 135 degrees of vertical at 10 rpm) and under load (no more than 9 foot-pounds of torque for one full revolution). The link attachment must use a threaded fastener with self-locking nut or equivalent safety system, include slip-indicator paint per Figure 5, and allow link replacement. All exposed metallic parts must be corrosion-resistant or treated accordingly with no dissimilar metals causing galvanic corrosion. Each unit requires permanent marking showing safe working load, manufacturer name, and manufacture date (minimum 0.12-inch text height). Contractors must perform first article inspection including ultimate strength testing and provide certificates of conformance for components and dissimilar metal compatibility. Lot acceptance sampling follows ANSI/ASQ Z1.4 at special inspection level S-3, with acceptance based on major and minor nonconformance classifications detailed in Table 1. Testing and inspection records must be available to the Government, which reserves the right to verify certifications and conduct independent testing at approved facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification 5100-506C
6,000 POUND SWIVEL HOOK,
EXTERNAL, HELICOPTER
Issue Date: July 2026
Supersedes: 5100-506B
July 2011
Distribution Statement A: Approved for public release; distribution is unlimited.
FSC 8365
Beneficial comments and suggestions related to this standard may be sent via electronic mail (SM.USDA-FS.NTDP.FAM@usda.gov) or U.S. mail to the USDA Forest Service National Technology and Development Center, 5785 Hwy 10 West, Missoula, MT 59808.
Record of revisions: This is a record of changes made to this revision only.
Date Revision summary
July 2026 Updated formatting for 508 compliance Added section 3.10 detailing swivel body to link attachment
[Future revisions] Capture changes that will be incorporated in a future revision (working drafts).
1. SCOPE
1.1. Purpose and applicability
1.2. Interpretations and definitions
2. APPLICABLE DOCUMENTS
2.1. Non-Government publications
2.2. Order of precedence
3. REQUIREMENTS
3.1. Acceptance
3.2. Performance
3.3. Parts and materials
3.4. Construction and workmanship
3.5. Product marking
3.6. Certificate of conformance
3.7. Hook
3.8. Link
3.9. Assembled dimensions and weights
3.10. Link attachment
3.11. Swivel bearing
3.12. Design
3.13. No load free rotation
3.14. Rotation under load
4. SAMPLING, INSPECTION, AND TEST PROCEDURES
4.1. General inspections and tests
4.2. Responsibility for compliance
4.3. Classification of inspection
4.4. Inspection and tests
4.5. Certification of conformance
4.6. Ultimate strength testing
4.7. Test results
4.8. Nonaccepted lots
4.9. Hook rotation test under load
4.10. Government lot acceptance
5. PACKAGING, PACKING, AND CONTAINER/SHIPMENT MARKING
5.1. Packaging, packing, and container/shipment marking
6. NOTES
6.1. Acquisition requirements
6.2. First article
6.3. Paint indicator durability
6.4. Superseding data
6.5. Metric equivalence
6.6. No load free rotation
6.7. Notice:
6.8. Preparing Activity
1. SCOPE
1.1. Purpose and applicability.
The 6,000 pound helicopter swivel hook covered herein is established as standard in the USDA Forest Service. This device is used to attach external loads to the cargo hook of a helicopter and is used in activities for the suppression of wildland fire. Additionally, the accessories covered in this specification are for cargo use only. Do not use items from this specification for any person-lifting application, i.e., short haul.
1.1.1. Intended use.
The item procured under this specification is intended to attach external loads to the cargo hook of a helicopter and used in the suppression of wildland fire or related activities. The wildland fire environment includes, but is not limited to, fire retardants, dust, moisture, pesticides, fuels (aviation, jet, gasoline, kerosene, diesel, etc.), hydraulic fluid and oils (aviation and automotive), herbicides, and lubricants (aviation and automotive).
1.2. Interpretations and definitions.
1.2.1. Interpretations.
To carry out the provisions of this document, the word “shall” is understood to be mandatory.
1.2.2. Definitions.
Nonconformity—A departure of a quality characteristic from its intended level or state that occurs with severity sufficient to cause an associated product or service not to meet a specification requirement (per ANSI/ASQ Z1.4).
2. APPLICABLE DOCUMENTS
2.1. Non-Government publications.
The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those in effect on the date of the solicitation or agreement. Non-Government standards and other publications normally are available from the organizations that prepare and distribute the documents. These documents also may be available in or through libraries or other informational services.
2.1.1. American Society for Quality (ASQ).
Copies are available from the American Society for Quality, PO Box 3005, Milwaukee, WI 53201- 3005, website www.asq.org.
Z1.4 - Sampling Procedures and Tables for Inspection by Attributes http://www.asq.org/
2.2. Order of precedence.
In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1. Acceptance.
Lot acceptance of like articles shall be performed on produced sample(s) in accordance with 4.4.1.
3.1.1. First article.
Unless otherwise specified, samples shall be subjected to first article inspection in accordance with
4.4.2. During the term of the contract the contractor shall be required to notify the contracting officer in writing when a component or the component supplier changes in any way, when a major manufacturing process changes in any way, or when a manufacturing location changes. The contracting officer may at any time require the contractor to submit new first article sample(s) when substantive changes occur during the term of the contract.
3.2. Performance.
The swivel hook covered by this specification shall be capable of performing as specified throughout the temperature range of 0 °F to 140 °F. A complete swivel hook assembly shall consist of a hook, swivel body, and a link. The swivel hook shall have a safe working load of 6,000 pounds. The swivel hook shall have an ultimate strength of at least 22,500 pounds, which corresponds to a 3.75 load safety factor.
3.3. Parts and materials.
3.3.1. Component parts.
All component parts (including metallic and nonmetallic parts) shall be new and not reprocessed or reworked. When modification is required of commercially available or standard parts, evidence of engineering data or laboratory tests shall be supplied to verify that the modified part(s) meets the requirements of this specification. Each component shall be appropriate for its intended function considering the nature and adverse conditions involved in helicopter operations, including firefighting (see paragraph 1.1.1).
3.3.2. Materials.
All exposed metallic parts used shall be corrosion resistant or treated for corrosion resistance.
Where more than one type of material is used in various components, there shall be no incompatibility between materials that may cause corrosion. The contractor shall provide a certificate of conformance confirming the product is free of dissimilar metals.
3.4. Construction and workmanship.
The swivel hook shall be manufactured by current standard production processes to provide a clean, finished, and quality product. Workmanship shall be equal to the best commercial practices consistent with the highest engineering standards in the industry and shall be free from any defect that may impair serviceability or detract from the appearance of the product. Further, workmanship shall ensure that no sharp edges, burrs, etc. exist on the finished product.
3.5. Product marking.
Each article of the lot shall be marked showing the safe working load, manufacturer name (not vendor), and date (month and year) of manufacture. All text size shall be a minimum of 0.12 inches in height, legible, and permanently stamped, embossed, cut, or etched on to the barrel portion of the swivel hook.
3.6. Certificate of conformance.
Where certificates of conformance are required, the Government reserves the right to verify by test any such item to determine the validity of the certification.
3.6.1. Certification.
The contractor shall provide individual certificates of conformance for the component where required in this specification. The contractor shall provide the following information on the certificate:
a. Item description, i.e., shank hook, pear link.
b. Item manufacturer’s name, address, and telephone number.
c. Manufacturer’s item part number.
d. Procuring document for the item (to include the quantity and date ordered).
e. Manufacturer’s lot number, if applicable.
f. Manufacturer’s statement, e.g., safe working load, ultimate strength for the item, dissimilar metal corrosion.
3.7. Hook.
The hook used in the swivel shall be a shank-style hook only. The hook used in the swivel shall have a safe working load of at least 6,000 pounds. The style and dimensions of the hook shall be as shown in figure 1. If first article testing is required, a certificate of conformance (see paragraph 3.6) for the hook shall be provided. Threading of the hook’s shank shall follow the manufacturer’s recommendations. A mechanical thread locking system shall be used to keep the jam nut from loosening on the hook’s threads during use. The thread locking system shall not use thread locking adhesives (either liquid or tape). A statement or drawing that defines the mechanical system shall be provided with the first article package, see paragraph 4.4.2.1.
Figure 1 - Shank hook dimensions
3.7.1. Gate release.
A gate release shall be incorporated in the hook and have a spring return to lock the gate closed.
The release lock and hook gate shall have a minimum engagement of 0.20 inches, as shown in Figure 2. (Note: The dashed lines in figure 2 are hidden lines.)
Figure 2 - Gate lock engagement
3.8. Link.
The link used in the swivel hook shall be a weldless steel or steel alloy and be pear shaped. The link used in the swivel shall have a minimum safe working load of 6,000 pounds. If first article testing is required, a certificate of conformance for the link shall be provided (see paragraph 3.6).
The dimensions of the link shall be in accordance with Figure 3. The “C” dimension in figure 3 shall be controlled by the “F” dimension in figure 4.
Figure 3 - Link dimensions
3.9. Assembled dimensions and weights.
The completed swivel hook assembly dimensions shall be as shown in figure 4. Dimension F in figure 4 is measured from the inner loading surface of the link to the top of the clevis of the swivel body. The completed assembly shall weigh less than 15.0 pounds.
Figure 4 - Swivel hook dimensions
3.10. Link attachment.
The device used to attach the link to the swivel body shall be a threaded fastener. The fastener shall use a self-locking nut or some other system that provides equivalent safety. The fastener system shall allow for replacement of the link. No cotter pins, roll pins, or similar devices shall be used as the safety device on the link attachment. If a bolt is used as the fastener system, it shall be a “low profile” style with the treads extending beyond the end of the nut. The threads, however, shall not extend more than 2 full threads.
3.10.1. Slip indicator paint.
The link attachment fastener system shall be painted or similar providing an indication that the fastener has begun to loosen. The paint shall be applied as shown in figure 5. The color of the paint shall be contrasting to the metal. For fastener systems other than a bolt and nut, a similar paint application shall be implemented. The paint indicator shall be permanent and durable, see paragraph 6.3.
Figure 5 - Slip indicator paint
3.11. Swivel bearing.
The swivel body shall incorporate a permanently lubricated and sealed thrust-type ball or roller bearing. Free swivel rotation shall be maintained for all loads up to the safe working load.
3.12. Design.
The swivel shall be designed in such a way as to eliminate sharp edges and points.
3.13. No load free rotation.
The hook shall freely rotate when unloaded. Free rotation is defined as holding the swivel body horizontally, fully opening the jaw of the hook, rotating the swivel body at 10 revolutions per minute (rpm) or less, and having the hook remain within 135 degrees of vertical throughout multiple revolutions (see figure 6). This shall be done in both directions. See paragraph 6.6.
Figure 6 - Free rotation
3.14. Rotation under load.
The hook shall rotate freely under the rated load. Free rotation under load is defined as requiring no greater than 9 foot-pounds of torque to rotate the hook for one full revolution in each direction.
See paragraph 4.9 for testing method.
4. SAMPLING, INSPECTION, AND TEST PROCEDURES
4.1. General inspections and tests.
The contractor shall be responsible for delivering quality products that meet the requirements of this specification. The contractor shall perform all inspections and test requirements of this specification prior to submission of items for Government acceptance and first article inspection.
The contractor’s test and inspection results shall be made available to the Government for both acceptance and first article inspection; for first article inspections (see 4.4.2), the contractor’s results shall be submitted in the first article inspection package (see 4.4.2.1). The contractor may utilize their own test facilities or any commercial laboratory acceptable to the Government.
Inspection records of the examination and tests shall be kept complete and available to the Government.
4.2. Responsibility for compliance.
The contractor’s inspection system shall ensure that all products submitted to the government for acceptance meet all requirements of this specification. The inspections set forth in this specification shall become a part of the contractor’s overall inspection system and quality program.
The absence of any inspection requirements in this specification shall not relieve the contractor of the responsibility of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements. However, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to accept defective material.
4.3. Classification of inspection.
The inspection requirements specified herein are classified as follows:
a. First article inspection (see 4.3.2).
b. Lot acceptance inspection (see 4.3.3).
4.3.1. Lot.
All like items presented together in one delivery will be considered one lot for the purposes of inspections.
4.3.2. First article.
The contractor shall make available to the Government items from which a first article(s) may be selected. The Government may select 1, 2, or 3 articles for inspection based on the number of items in the lot.
4.3.3. Sample for lot acceptance inspections/tests.
Sampling for lot acceptance inspection shall be in accordance with ANSI/ASQ Z1.4. The sample size shall be per special inspection level S-3.
4.4. Inspection and tests.
4.4.1. Lot acceptance.
When selected in accordance with 4.3.3, each sample item shall be inspected in accordance with table 1, to determine conformance with this specification. If the sample is found to have any major nonconformances, as identified in table 1, the lot shall not be accepted. Additionally, if the number of minor nonconformances (per table 1) in the sample exceeds an acceptable quality level of 1.5 percent nonconforming, the lot shall not be accepted.
Table 1 - Lot acceptance inspection Reference paragraph number
Nonconformance Class of nonconformance
3.2. The swivel hook is not a completed assembly. Major
3.3.2. All exposed metal parts are not corrosion resistant or treated for corrosion resistance.
Major
3.4. Workmanship is such that the item is not a clean, finished, quality product.
Minor
3.4. Sharp edges and/or burrs exist on the swivel. Major
3.5. Marking does not contain all of the required information. Major
3.5. Text is not at least 0.12 inches in height. Major
3.5. Any lettering is not legible. Major
3.5. Text is not embossed, stamped, cut or etched into the swivel body. Major
3.7. The hook on the swivel is not a shank style hook. Major
3.7. Any dimension of the hook is not per figure 1. Major
3.7.1. The minimum engagement of the gate and lock release is not greater than shown in figure 2.
Major
3.8. The link is not pear shaped. Major
3.8. The link does not meet the dimensions shown in figure 3. Major
3.9. Any of the completed swivel hook’s dimensions are not as shown in figure 4.
Major
3.9. The completed swivel weighs more than 15.0 pounds. Major
3.10. The device used to attach the link to the swivel body is not a threaded fastener.
Major
3.10. The fastener is not provided with a thread safety lock system. Major
3.10. Cotter pins, roll pins, or similar devices are used in the link attachment system.
Major
3.10. If a self-locking nut is used, it is not a low profile type. Major
3.10. The number of threads extending beyond the nut is not as required.
Major
3.10.1. The paint slip indicator is not as shown in figure 5, or similar. Major
3.13. The hook does not swivel freely. Major
4.4.2. First article inspection.
Unless otherwise specified (see 6.2), the first article(s) submitted in accordance with 3.1.1 shall be inspected as specified in 4.4.1 and table 2. The sample size shall be in accordance with 4.3.2.
Government inspection for compliance of the first article(s) may stop upon any single failure (regardless of classification) and the sample(s) not accepted. The contractor will be informed of the nature of the failure. Additionally, the Government is not obligated to continue with first article compliance inspection, unless it is considered in the best interest of the Government.
Table 2 - First acticle inspections Reference paragraph number
Nonconformance Class of nonconformance
3.2. The swivel hook assembly does not have an ultimate strength of at least 22,500 pounds.
Major
3.3.1. All of the components are not new, and engineering/test data have not been provided justifying the use of reworked/modified component(s).
Major
3.3.1. Each component is not appropriate when considering its intended function.
Major
3.3.2. A certificate of conformance was not provided verifying that no dissimilar metals were used
Major
3.7. A certificate of conformance for the hook containing all of the required data was not provided.
Major
3.8. A certificate of conformance for the link containing all of the required data was not provided.
Major
3.11. The bearing used is not a thrust type or roller bearing. Major
3.11. Information was not provided to verify the bearing as being permanently lubricated and sealed.
Major
3.12. Sharp edges and points exist in the swivel design. Major
3.14. The swivel does not freely rotate up to the safe working load. Major
4.4.2.1. First article inspection package.
The contractor shall submit to the Government along with the selected first articles, copies of:
a. Engineering analysis or test data for altered commercial products, if applicable, see paragraph 3.3.1.
b. All certificates of conformance, see paragraphs 3.6 and 3.3.2, 3.7, and 3.8.
c. Company inspection records, see paragraphs 4.1, 4.4.1 and 4.4.2.
d. All test results for the article(s), see paragraph 4.7.
e. Ultimate strength certificate, see paragraph 4.6.
f. All other information necessary to perform the inspections identified in table 2.
4.5. Certification of conformance.
Where certificates of conformance are required, the Government reserves the right to verify by test any such items to determine the validity of certification.
4.6. Ultimate strength testing.
The contractor shall perform testing to verify the completed swivel ultimate strength. Testing shall place the item under the ultimate strength load specified in 3.2 and held for 10 seconds. The applied force shall be a static tensile load applied in the direction the item will encounter in its intended use. The equipment used to apply the loading force shall be calibrated to a recognized State or Federal standard. The calibration of the equipment shall be current at the time of testing.
4.6.1. Ultimate testing inspection.
An item shall not fail or break. The item may yield, experience plastic deformation, or change its dimensional properties as a result of the ultimate test load, but shall not fail or break. All items subjected to ultimate testing shall be considered consumed by the testing. As such, they shall be marked as “non-Serviceable” and not delivered to the government for stock or supply.
4.6.2. Certification of ultimate test results.
The contractor shall prepare and provide as part of the first article inspection and upon request of any Government inspector, a certificate of conformance for the ultimate strength test. The certificate shall contain:
a. Product description.
b. Description of the test equipment involved and the metrology information.
c. Manufacturer’s name, address, and telephone number.
d. Manufacturer’s lot number.
e. Product’s date of manufacture.
f. Test company name, address, and telephone number.
g. Testing date.
h. Test technician’s name and title.
i. All characteristic test values, paragraph 4.7.
4.7. Test results.
The contractor shall have available copies of all test results performed to assure the quality or acceptability of the product submitted for acceptance. The test results shall also show the product’s acceptable range or expected test result and the item’s test value. All test equipment, which shall be used as media of inspection, shall be calibrated and current at the time of testing.
calibration shall be to a recognized State or Federal standard.
4.8. Nonaccepted lots.
Nonaccepted lots may be offered again for inspection in accordance with paragraph 6.4 of ANSI/ASQ Z1.4, except that Table ii-b – Single sampling plans for tightened inspection (master table) from ANSI/ASQ Z1.4 shall be used with the parameters of paragraph 4.3.3.
4.9. Hook rotation test under load.
The following test is one method of meeting the requirement of paragraph 3.14, but other suitable methods may exist. Link two swivels together (hook to hook) with their gates closed. Place the connected swivels into a tensile tester whose capacity is at least 6,000 pounds. Attach a tool to one of the hooks, such that the tool will allow the application of torque on the bearings of swivels.
Load the swivels to 6,000 pounds +/- 50 pounds. Attach a force meter (weight scale) to the torque application tool in such a manner as to be able to readily read the torque applied to cause rotation (attachment is suggested at 12 inches from the pivot point). Rotate the swivels in each direction for one full revolution, while monitoring the scale. The torque value shall not exceed 18 foot-pounds.
note: Since two swivels are involved it is assumed that the friction force is equal in both swivels.
Hence the measured value may be up to twice the requirement of paragraph 3.14.
4.10. Government lot acceptance.
The Government will conduct lot acceptance inspections and tests to determine compliance with the specification. The Government’s inspection will be in accordance with the requirements of section 4. If lot acceptance and tests are conducted at locations other than the manufacturing facilities, the contracting officer will specify location and arrangements. In the case of onsite inspections at the contractor facility, the contractor shall furnish the inspector all reasonable facilities for their work. During any inspection, the inspector may take from the lot one or more samples and submit them to an independent test laboratory approved by the Government or to a Government test facility for inspection and tests.
5. PACKAGING, PACKING, AND CONTAINER/SHIPMENT MARKING
5.1. Packaging, packing, and container/shipment marking.
The packaging, packing, and container/shipment marking shall be as specified in the contract or order.
6. NOTES
6.1. Acquisition requirements.
Acquisition documents should specify the following:
a. Title, number, and date of this specification.
b. If a first article sampling and inspection is not required.
c. Location of Government inspection, see paragraph 4.10.
d. Packaging, packing, and container marking, see paragraph 5.1.
6.2. First article.
When a first article sample(s) is required, it shall be inspected and approved in accordance with the first article clauses set forth in the solicitation. Specific instructions shall be included regarding arrangements for selection, inspection, and approval of the first article sample(s).
6.3. Paint durability.
The swivel hooks are stored together in boxes that allow for movement due to vibration and handling. Hence, the swivels knock into each other and thereby can cause chipping of the paint.
High viscous paints that create a thick coating are not appropriate for this use as they are more prone to chipping and breaking under this movement. Additionally, the swivels are handled roughly and dropped from helicopters, which increases the chance for chipping of thick coatings. Paint coating used, should be appropriate for the use of this equipment.
6.4. Superseding data.
This specification supersedes USDA Forest Service Specification 5100-506b, 6,000 Pound Swivel Hook, external, Helicopter.
6.5. Metric equivalence.
The following table provides the conversion factors to be used in creating metric equivalence for this specification.
Table 3 - Conversion factors English system Calculation To obtain metric equivalence Pounds 𝑙𝑙𝑙𝑙𝑙𝑙.× 0.453 Kilograms Inches 𝑖𝑖𝑖𝑖.× 2.54 Centimeters Inches 𝑖𝑖𝑖𝑖. × 25.4 Millimeters Foot 𝑓𝑓𝑓𝑓. × 0.305 Meters
Fahrenheit (℉− 32) × (5 ÷ 9) ℃entigrade Foot-pounds Ft-lbs x 1.357 Newton-Meters
6.6. No load free rotation.
This test is a quality measure of the assembly process and not a bearing test.
6.7. Notice:
When Government drawings, specifications and standards or other data are used for any purpose other than in connection with a definitely related Government procurement operation, the United States Government thereby incurs no responsibility nor any obligation whatsoever.
6.8. Preparing Activity.
USDA Forest Service, National Technology & Development Program, 5785 Hwy 10 West, Missoula, MT 59808.
| 1. SCOPE |
| 1.1. Purpose and applicability. |
| 1.1.1. Intended use. |
| 1.2. Interpretations and definitions. |
| 1.2.1. Interpretations. |
| 1.2.2. Definitions. |
| 2. APPLICABLE DOCUMENTS |
| 2.1. Non-Government publications. |
| 2.1.1. American Society for Quality (ASQ). |
2.2. Order of precedence.
| 3. REQUIREMENTS |
| 3.1. Acceptance. |
| 3.1.1. First article. |
| 3.2. Performance. |
| 3.3. Parts and materials. |
| 3.3.1. Component parts. |
| 3.3.2. Materials. |
| 3.4. Construction and workmanship. |
| 3.5. Product marking. |
| 3.6. Certificate of conformance. |
| 3.6.1. Certification. |
| 3.7. Hook. |
| 3.7.1. Gate release. |
| 3.8. Link. |
| 3.9. Assembled dimensions and weights. |
| 3.10. Link attachment. |
| 3.10.1. Slip indicator paint. |
| 3.11. Swivel bearing. |
| 3.12. Design. |
| 3.13. No load free rotation. |
| 3.14. Rotation under load. |
| 4. SAMPLING, INSPECTION, AND TEST PROCEDURES |
| 4.1. General inspections and tests. |
| 4.2. Responsibility for compliance. |
| 4.3. Classification of inspection. |
| 4.3.1. Lot. |
| 4.3.2. First article. |
| 4.3.3. Sample for lot acceptance inspections/tests. |
| 4.4. Inspection and tests. |
| 4.4.1. Lot acceptance. |
| 4.4.2. First article inspection. |
| 4.4.2.1. First article inspection package. |
| 4.5. Certification of conformance. |
| 4.6. Ultimate strength testing. |
| 4.6.1. Ultimate testing inspection. |
| 4.6.2. Certification of ultimate test results. |
| 4.7. Test results. |
| 4.8. Nonaccepted lots. |
| 4.9. Hook rotation test under load. |
| 4.10. Government lot acceptance. |
| 5. PACKAGING, PACKING, AND CONTAINER/SHIPMENT MARKING |
| 5.1. Packaging, packing, and container/shipment marking. |
| 6. NOTES |
| 6.1. Acquisition requirements. |
| 6.2. First article. |
| 6.3. Paint durability. |
| 6.4. Superseding data. |
| 6.5. Metric equivalence. |
| 6.6. No load free rotation. |
| 6.7. Notice: |
| 6.8. Preparing Activity. |