Attachment 2- 22B0001_TechSpecs.pdf

PDF 2 MB Posted

Attached to
MNA Waste Water Upgrade and Connection to City of Umatilla Sewer System
Solicitation number
W912EF22B0001
Issued by

About this file

This solicitation is for a wastewater upgrade project connecting to the City of Umatilla sewer system. The solicitation includes plans, technical specifications, Davis Bacon wage determinations, and a pre-award survey. Key project details include upgrading wastewater systems at three locations, installing new sewer main piping and manholes, furnishing three new lift stations, providing electrical components, completing site work and finished grading, and furnishing a pre-engineered metal building. The solicitation also requires furnishing a temporary sewage handling system and disposing of wastewater from that system. The solicitation includes specifications for demolition, pipe and appurtenances, manholes, lift stations, electrical work, site work, a metal building, temporary facilities, and measurement and payment terms. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Walla Walla.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASTEWATER UPGRADE - CONNECTION TO CITY OF UMATILLA W912EF22B0001

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15.00 28 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

01 14 00.10 28 PROJECT SITE RESTRICTIONS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

01 22 00.00 28 MEASUREMENT AND PAYMENT

01 32 01.00 28 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.00 28 CONTRACTOR QUALITY CONTROL

01 51 00.00 28 TEMPORARY UTILITIES

01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20.00 28 ENVIRONMENTAL PROTECTION

01 78 00.00 28 CLOSEOUT SUBMITTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00.00 28 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00.00 28 CAST-IN-PLACE CONCRETE

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19.00 28 PRE-ENGINEERED METAL BUILDING SYSTEMS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.00 28 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 05 00.00 28 GENERAL ELECTRICAL WORK

26 05 19.00 28 INSULATED WIRE AND CABLE

26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33.10 28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 08 00.00 28 APPARATUS INSPECTION AND TESTING

26 20 00.00 28 INTERIOR DISTRIBUTION SYSTEM

26 24 16.91 28 PANELBOARDS

DI VI SI ON 31 - EARTHWORK

31 23 00.00 28 EXCAVATION AND FILL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 17.00 28 FLEXIBLE PAVEMENT REPAIR

32 11 23.00 28 AGGREGATE BASE COURSES

PROJECT TABLE OF CONTENTS Page 1

32 16 19.00 28 CONCRETE CURBS AND SIDEWALKS

32 31 13.00 28 CHAIN LINK FENCES

32 92 19.00 28 SEEDING

DI VI SI ON 33 - UTI LI TI ES

33 30 00.10 28 SANITARY SEWER MANHOLES

33 31 13.10 28 SANITARY SEWER FORCE MAIN PIPING

33 32 16.00 28 PACKAGED UTILITY WASTEWATER PUMPING STATIONS

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 94 43.01 28 PROCESS CONTROLLERS - PROGRAMMABLE LOGIC CONTROLLERS (PLC)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

1.2.1 Use Of Government Prepared Contract CAD Electronic Files

1.3 RESOURCE DRAWINGS (R)

-- End of Section Table of Contents --

DOCUMENT 00 01 15.00 28

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

SHEET

NUMBER

DESCRIPTION FILE NUMBER Revision Number

Date

GENERAL

G-001 COVER SHEET AND LOCATION MAPS MDG-1-0-0/663

G-002 INDEX SHEET AND LEGEND MDG-1-0-0/664

G-101 OVERALL SITE PLAN MDG-1-0-0/665

CIVIL

C-001 CIVIL OVERALL SITE PLAN, AND ALIGNMENT

TABLES

MDG-1-8-23/95

CD101 CIVIL DEMOLITION OVERALL PLAN MDG-1-8-23/96

CD102 DEMOLITION PLAN EXISTING SEWER AND

DRAINFIELD NEAR JUVENILE FISH FACILITY

MDG-1-8-23/97

CD103 DEMOLITION PLAN MAINTENANCE YARD MDG-1-8-23/98

CD104 DEMOLITION PLAN WEST PARK AREA MDG-1-8-23/99

CD501 DEMOLITION DETAILS SEWER LINE AND

SEPTIC TANK JUVENILE FISH FACILITY AREA

MDG-1-8-23/100

CD502 DEMOLITION DETAILS MAINTENANCE YARD MDG-1-8-23/101

CD503 DEMOLITION DETAILS WEST PARK MDG-1-8-23/102

C-101 CIVIL KEY PLAN MDG-1-8-23/103

C-102 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 0+00 TO STATION 4+00

MDG-1-8-23/104

C-103 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 4+00 TO STATION 8+00

MDG-1-8-23/105

C-104 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 8+00 TO STATION 12+00

MDG-1-8-23/106

C-105 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 12+00 TO STATION 16+00

MDG-1-8-23/107

C-106 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 16+00 TO STATION 20+00

MDG-1-8-23/108

C-107 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 20+00 TO STATION 24+00

MDG-1-8-23/109

C-108 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 24+00 TO STATION 28+00

MDG-1-8-23/110

C-109 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 28+00 TO STATION 32+00

MDG-1-8-23/111

C-110 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 32+00 TO STATION 36+00

MDG-1-8-23/112

C-111 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 36+00 TO STATION 40+00

MDG-1-8-23/113

C-112 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 40+00 TO STATION 44+00

MDG-1-8-23/114

C-113 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 44+00 TO STATION 48+00

MDG-1-8-23/115

C-114 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 48+00 TO STATION 52+00

MDG-1-8-23/116

C-115 PLAN AND PROFILE SEWER MAIN ALIGNMENT

STATION 52+00 TO STATION 56+00

MDG-1-8-23/117

C-116 PLAN AND PROFILE TURBINE STORAGE

BUILDING LATERAL STATION 0+00 TO

STATION 3+00

MDG-1-8-23/118

C-117 PLAN AND PROFILE TURBINE STORAGE

BUILDING LATERAL STATION 3+00 TO

STATION 5+00

MDG-1-8-23/119

C-118 PLAN AND PROFILE WEST PARK LATERAL

STATION 0+00 TO STATION 3+00

MDG-1-8-23/120

C-119 PLAN AND PROFILE WEST PARK LATERAL

STATION 3+00 TO STATION 6+00

MDG-1-8-23/121

C-120 PLAN AND PROFILE WEST PARK LATERAL

STATION 6+00 TO STATION 8+52.02

MDG-1-8-23/122

C-501 DETAILS OF LIFT STATION 1 (LS1) AT

JUVENILE FISH FACILITY PARKING LOT

MDG-1-8-23/123

C-502 DETAILS OF LIFT STATION 2 (LS2) AT

MAINTENANCE YARD

MDG-1-8-23/124

C-503 DETAILS OF LIFT STATION 3 (LS3) AT WEST

PARK

MDG-1-8-23/125

C-504 DETAILS OF CONNECTION TO CITY OF

UMATILLA SEWER SYSTEM

MDG-1-8-23/126

C-505 DETAILS OF TRENCHLESS PIPE CROSSING

UNDER RAILROAD

MDG-1-8-23/127

C-506 DETAILS OF TRENCHES MDG-1-8-23/128

C-507 MISCELLANEOUS CIVIL DETAILS 1 MDG-1-8-23/129

C-508 MISCELLANEOUS CIVIL DETAILS 2 MDG-1-8-23/130

C-509 MANHOLE DETAILS MDG-1-8-23/131

ARCHITECTURAL

A-401 EQUIPMENT SHELTER PLAN, ELEVATION AND

SECTION VIEWS

MDG-1-2-23/1

MECHANICAL

M-101 MECHANICAL KEY PLAN MDG-1-3-23/1

M-401 LIFT STATION 1 (LS1) PLAN JUVENILE FISH

FACILITY PARKING LOT

MDG-1-3-23/2

M-402 LIFT STATION 2 (LS2) PLAN MAINTENANCE

YARD

MDG-1-3-23/3

M-403 LIFT STATION 3 (LS3) PLAN WEST PARK MDG-1-3-23/4

M-501 DETAIL: AIR RELEASE VALVE MDG-1-3-23/5

M-601 PIPING AND IDENTIFICATION DIAGRAM MDG-1-3-23/5

ELECTRICAL

E-001 ELECTRICAL LEGEND MDG-1-6-23/1

ED501 DEMOLITION SEWAGE PUMP MOTOR CONTROL

PANELS JFF ELECTRICAL ROOM

MDG-1-6-23/2

ED601 DEMOLITION ONELINE DIAGRAM JFF

ELECTRICAL ROOM

MDG-1-6-23/3

ED602 DEMOLITION ONELINE DIAGRAM MAINTENANCE

YARD

MDG-1-6-23/4

ED603 DEMOLITION CABLE SCHEDULE JUVENILE

FISH FACILITY

MDG-1-6-23/5

E-101 SITE PLAN JUVENILE FISH FACILITY

PARKING LOT SEWAGE LIFT STATION

MDG-1-6-23/6

E-102 SITE PLAN MAINTENANCE YARD SEWAGE LIFT

STATION

MDG-1-6-23/7

E-103 PLAN VIEW TURBINE STORAGE BUILDING

ELECTRICAL PANEL WALL

MDG-1-6-23/8

E-104 PLAN VIEW TURBINE STORAGE BUILDING MDG-1-6-23/9

E-105 PLAN VIEW JUVENILE FISH FACILITY FIRST

FLOOR

MDG-1-6-23/10

E-106 SITE PLAN POWERHOUSE MAIN FLOOR SA

PANEL LOCATION

MDG=1-6-23/11

E-201 ELEVATION VIEW TURBINE STORAGE BUILDING

NORTH WALL

MDG-1-6-23/12

E-501 PANEL LAYOUT JFF ELECTRICAL ROOM MDG-1-6-23/13

E-502 PANEL LAYOUT MAINTENANCE YARD MDG-1-6-23/14

E-503 PANEL LAYOUT WEST PARK MDG-1-6-23/15

E-601 ONELINE DIAGRAM JFF ELECTRICAL ROOM MDG-1-6-23/16

E-602 ONELINE DIAGRAM TURBINE STORAGE YARD MDG-1-6-23/17

E-603 BLOCK DIAGRAM SEWAGE LIFT STATIONS MDG-1-6-23/18

E-604 CABLE SCHEDULE SEWAGE LIFT STATIONS MDG-1-6-23/19

E-605 GROUNDING DIAGRAM SEWAGE LIFT STATIONS MDG-1-6-23/20

1.2.1 Use Of Government Prepared Contract CAD Electronic Files

a. No Resource (R)("For Information Only") drawings are available on

CAD.

b. The Contractor assumes all risks associated in using electronic CAD drawings.

c. Electronic copies of CAD drawings are only available in Bentley DGN format.

d. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies.

The Government will not be responsible to correct the electronic CAD drawing.

1.3 RESOURCE DRAWINGS (R)

These R drawings are included with the drawings for information only. The Government does not warrant the accuracy of the R drawings. The Government recommends that the Contractor verify the accuracy of R drawings.

Resource (R) drawings are as follows:

SHEET

NUMBER

DESCRIPTION FILE

NUMBER

Revision Number

Date

RESOURCE

R-001 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-1

R-002 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-02

R-003 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-03

R-004 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-04

R-005 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-05

R-006 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-06

R-007 TOPOGRAPHIC/FEATURE SURVEY, UTILITY LOCATE,

&BOUNDARY SURVEY OF A PORTION OF THE MCNARY LOCK &

DAM PROJECT FOR WASTE WATER DESIGN/CONSTRUCTION

9907-07

R-008 CITY OF UMATILLA MCNARY INDUSTRIAL PARK

INTERCEPTOR IMPROVEMENTS - SCHEDULE A PLAN/PROFILE

R-009 CITY OF UMATILLA MCNARY INDUSTRIAL PARK

INTERCEPTOR IMPROVEMENTS - PHASE 1 CANAL CROSSING

R-010 CITY OF UMATILLA MCNARY INDUSTRIAL PARK

INTERCEPTOR IMPROVEMENTS - PHASE 1 CANAL CROSSING

DETAILS

R-011 B.P.A. SWITCHYARD ELECTRICAL UNDERGROUND DUCT

SYSTEM PLAN

MDG-2-6-3/1

R-012 B.P.A. SWITCHYARD ELECTRICAL UNDERGROUND DUCT

SYSTEM MANHOLE UNWATERING ELECTRICAL PLAN AND

DETAILS

MDG-2-6-3/2

R-013 B.P.A SWITCHYARD ELECTRICAL UNDERGROUND DUCT

SYSTEM - MANHOLE UN-WATERING MECHANICAL - PLAN AN

DSECTIONS

MDG-2-6-3/3

R-014 B.P.A. SWITCHYARD ELECTRICAL UNDERGROUND DUCT

SYSTEM MISCELLANEOUS DETAILS

MDG-2-6-3/4

R-015 JUVENILE FISH BYPASS OUTFALL PIPE RELOCATION

EXISTING IRRIGATION AND UTILITY PLAN EAST END OF

SITE

MDG-1-8-22/2

R-016 ELECTRICAL UNDERGROUND DUCT SYSTEM CABLE RACK

INSTALLATION DETAILS SHEET 1

MDG-2-6-3/6

R-017 WAREHOUSE AND WEST PICNIC AREA SEWER, SEPTIC TANK

AND DISPOSAL FIELD

MDG-1-8-23/2

R-018 GENERAL INFORMATION ACCESS FACILITIES AND

UTILITIES WEST AREA

MDG-1-0-5/8

R-019 PERMANENT WAREHOUSE UTILITIES MDH-1-7-57/13

R-020 WEST PICNIC AREA SPRINKLER SYSTEM MDG-9-0-12/4

R-021 HOUSING AND UTILITIES OREGON SHORE MDG-1-0-5/4

R-022 WEST PICNIC AREA LAVATORY MDG-9-2-11/1

R-023 OREGON SHORE UTILITIES EXTENSION OF WATER SERVICE

TO IMHOFF TANK AREA

MDH-1-8-57/2

R-024 OREGON SHORE UTILITIES CHLORINATION SYSTEM IMHOFF

TANK EFFLUENT

MDH-1-8-57/2.1

R-025 SEWAGE DISPOSAL PLANT PLAN MDH-1-8-8/8

R-026 SEWAGE DISPOSAL PLANT IMHOFF TANK DETAILS MDH-1-8-8/9

R-027 SEWAGE DISPOSAL PLANT SLUDGE BED & FENCING DETAILS MDH-1-8-8/10

R-028 PERMANENT JUVENILE FISH FACILITIES SITE PLAN PLAN

VIEW

MDF-1-9-9/5

R-029 PERMANENT JUVENILE FISH FACILITIES SEPTIC SYSTEM

DRAIN FIELD AND DETAILS

MDF-1-9-9/13

R-030 PERMANENT JUVENILE FISH FACILITIES SEPTIC SYSTEM

SEPTIC TANK & DETAILS

MDF-1-9-9/14

R-031 PERMANENT JUVENILE FISH FACILITIES SEPTIC SYSTEM

SEPTIC TANK REINFORCEMENT

MDF-1-9-9/15

R-032 PERMANENT JUVENILE FISH FACILITIES GENERAL

ELECTRICAL KEY PLAN

MDF-1-6-9/11

R-033 PERMANENT JUVENILE FISH FACILITIES SITEWORK

ELECTRICAL SEPTIC SYSTEM - PLAN

MDF-1-6-9/21

R-034 PERMANENT JUVENILE FISH FACILITIES IRRIGATION

ELECTRIC VALVE CONTROL WIRE - ROUTING AND DETAILS

MDF-1-6-9/91

R-035 SEWAGE TREATMENT MODIFICATIONS POWERHOUSE FORCE

MAIN & DISPOSAL FIELD

MDG-1-8-23/1

R-036 TURBINE STORAGE BUILDING OVERALL SITE PLAN MDG-1-7-28/3

R-037 TURBINE STORAGE BUILDING SITE PLAN MDG-1-7-28/4

R-038 TURBINE STORAGE BUILDING ELECTRICAL SITE PLAN MDG-1-6-28/36

R-039 TURBINE STORAGE BUILDING TELECOMMUNICATIONS SITE

PLAN

MDG-1-6-10/5

R-040 4160/480V STATION SERVICE REPLACEMENT PROJECT SWGR

GENERAL ARRANGEMENT INSTALLATION

SK-V3-008-E103

R-041 4160/480V STATION SERVICE REPLACEMENT PLAN VIEW

WAREHOUSE TRANSFORMERS USACE CONTAINMENT DESIGN

SK-V3-015-E105.1

R-042 4160/480V STATION SERVICE REPLACEMENT ONE-LINE

DIAGRAM PROJECT SWGR AND WELLHOUSE UPGRADES

SK-V3-030-E601B

R-043 4160/480V STATION SERVICE REPLACEMENT PROJECT

SWITCHGEAR & WELLHOUSE UPGRADES INSTALLATION

SK-V3-054-E101

R-044 PERMANENT WAREHOUSE AREA MAP & PLOT PLAN MDH-1-7-57/2

-- End of Document --

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 00 00.00 28

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran Employment Information http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act http://benefits.va.gov/vow/

Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material ht t ps: / / duckduckgo. com/ l / ?kh=- 1&uddg=ht t ps%3A%2F%2Fwww. ebenef i t s. va. gov%2Febenef i t s- por t al %2Fdownl oads%2Fvet er ans- hi r i ng- gui de- 2014. pdf

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 01.00 28

SUPPLEMENTARY REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 FIELD VERIFICATION OF SITE CONDITIONS

1.4 DEFINITIONS

1.5 CONNECTION TO CITY OF UMATILLA

1.6 REGULAR CLEANUP AND DEBRIS DISPOSAL

1.7 EQUIPMENT LIST

1.8 TESTING OF EQUIPMENT

1.9 DISPOSITION OF REMOVED MATERIALS AND EQUIPMENT

1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES

1.11 PRE-CONSTRUCTION ON-SITE INSPECTION

1.12 CONSTRUCTION PROGRESS PHOTOS

1.13 TRAINING

1.14 PROJECT TECHNICAL SUPPORT

1.15 PROJECT SUPERINTENDENT

1.16 KEY PERSONNEL SUBSTITUTION

1.17 POST AWARD MEETINGS

1.17.1 Pre-Work Meeting

1.17.2 Pre-Construction Meeting

1.17.2.1 Minutes

1.17.2.2 Demobilizing And Remobilizing

1.17.3 RMS Orientation Meeting

1.18 WEEKLY PRODUCTION MEETINGS

1.18.1 Minutes

1.19 ADDITIONAL MEETINGS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

ATTACHMENTS:

Weekly Meeting Agenda

-- End of Section Table of Contents --

SECTION 01 11 01.00 28

SUPPLEMENTARY REQUIREMENTS

PART 1 GENERAL

The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

Comply with the current edition and all changes posted on the web as of the effective date of this solicitation.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only.

Designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Equipment List ; I C

Pre-Construction On-Site Inspection report ; I C

Project Superintendent ; I C

SD-07 Certificates

Key Personnel Substitution ; G C

SD-11 Closeout Submittals

Training Manuals ; G C

1.3 FIELD VERIFICATION OF SITE CONDITIONS

Field verify all elevations, dimensions, and coordinates of existing features indicated on the contract drawings that affect new construction.

Any deviations shall be updated as per SECTION 01 78 00.00 28 , CLOSEOUT SUBMITTALS, paragraphs WORKING AS-BUILT DRAWINGS.

1.4 DEFINITIONS

a. Qualified Person.

As defined in EM 385-1-1 ; "DEFINITIONS", unless otherwise specified.

b. F.O.B.

An abbreviation for free on board, which means that a vendor or consignor will deliver goods on a railroad car, truck, vessel, or other conveyance without any expense to the purchaser or consignee.

1.5 CONNECTION TO CITY OF UMATILLA

Coordinate with the City of Umatilla for connection to existing sewer line. Provide notification to the Contracting Offider ten (10) government working days in advance of needing the connection completed.

1.6 REGULAR CLEANUP AND DEBRIS DISPOSAL

With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials shall become the property of the Contractor and shall be removed from the job site daily in accordance with Federal, State, and local regulations. The Contractor shall furnish waste containers. All small waste containers provided by the Contractor shall be emptied daily, large bin containers shall be emptied when full or once a week.

1.7 EQUIPMENT LIST

Furnish a complete list of all equipment to be used on the Project thirty

(30) calendar days prior to commencement of on-site work. Submit a revised list in the event of change of equipment. Lists shall include rented equipment as well as lease-purchase or sale-leaseback equipment. The initial list and the revised lists shall indicate dates equipment is assigned to or removed from the Project and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.8 TESTING OF EQUIPMENT

Before any machinery or mechanized equipment is put to use on the job, it shall be inspected and tested by a qualified person and determined to be in safe operating condition. Cranes shall be tested by the Contractor or a qualified testing agency in accordance with EM 385-1-1 . Equipment shall be large enough to safely handle proposed picks or tasks without exceeding the crane rating established by these tests.

1.9 DISPOSITION OF REMOVED MATERIALS AND EQUIPMENT

Unless otherwise specified in other sections of the specifications, all existing equipment removed and not reinstalled shall become the property of the Contractor, removed from the Project site, and disposed of in a legal manner. Materials that cannot be removed daily may be temporarily stored on-site at an approved area. Salvaged materials shall not be sold on the project site.

1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES

Reference FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984).

1.11 PRE-CONSTRUCTION ON-SITE INSPECTION

Prepare a Pre-Construction On-Site Inspection report of existing conditions, prior to start of on-site work, with the Contracting Officer.

Document existing site conditions prior to Construction by digital photographs, and/or videos along with descriptive narrative report to the Contracting Officer within five (5) calendar days after completion.

1.12 CONSTRUCTION PROGRESS PHOTOS

During on site construction activities, record construction progress with weekly progress photographs. Photographs provided are for unrestricted use by the Government.

a. Photos shall be submitted at the end of each work week.

b. Furnish digital photographs. Utilize JPEG file format for all photograph and image files.

c. Provide full-color photos with photo resolution of not less than 4 megapixels and not more than 12 megapixels. Photos shall show the sequence and progress of work.

d. Take a minimum of 20 digital photographs each week throughout the entire project.

e. Submit digital photographs weekly for use at the Weekly Production Meeting. See paragraph WEEKLY PRODUCTION MEETINGS for additional information.

Ensure that the photographs are digitally dated. Log shall be furnished for each photograph that records the following information:

a. Photograph number (the specific format should be tied to the filename of the electronic photograph).

b. Date the photograph was taken.

c. A brief description of the location, what the photograph depicts, and the orientation of the view.

1.13 TRAINING

Provide the services of authorized start-up engineers (Manufacturer's Representatives) as necessary to provide training in programming, operation and maintenance on the system. Provide training for operators and maintenance personnel prior to Project operation of the system.

Provide two (2), two (2)-hour class sessions. Each class session shall include approximately six (6) employees. The Government will provide for the training location. Submit training manuals and documentation for approval 30 calendar days prior to scheduled classes and furnish sufficient training materials at the training classes for all students, plus a minimum of three (3) copies for Project files. Where audio/visual materials are used in training classes, three (3) copies of such materials shall be furnished to the Project for use in future training. It shall be the Contractor's responsibility to coordinate the training sessions with the Project to ensure minimum conflicts with ongoing Project work.

1.14 PROJECT TECHNICAL SUPPORT

a. Provide 20 hours of project technical support after Government acceptance of the completed project. One or more Contractor personnel experienced in the operational requirements of all newly installed equipment, and control features shall be available for Technical Support during normal Government Work Schedule hours. See paragraph GOVERNMENT'S WORK SCHEDULE in SECTION 01 14 00.10 28 .

b. Support shall include site visits by Contractor personnel.

Contractor personnel shall be available at the project within 48 hours, or the next normal Government Work Schedule day following notification by the Government - whichever is later. Technical support shall be available for 60 days following Government acceptance of the newly installed equipment, or until final Operation and Maintenance Manuals and Parts Catalogs have been approved and received by the Government - whichever is later. See SECTION 01 78 00.00 28 CLOSEOUT.

c. Technical Support shall include all contractor Supervision, Safety and QC personnel required to maintain proper control of work in accordance with contract requirements

1.15 PROJECT SUPERINTENDENT

The Contractor's Project Superintendent shall be on the worksite during performance of work on this contract. The Project Superintendent is required on the worksite at all times work is being performed, until work on this contract is completed and accepted. Assign a competent superintendent as per FAR Clause 52.236-6 "Superintendence by the Contractor". Submit Superintendent name and contact information prior to start of on-site construction.

1.16 KEY PERSONNEL SUBSTITUTION

If the Contractor plans on replacing any key personnel (Project Superintendent, CQC System Manager, or CQC staff Members), they must have the approval of the Contracting Officer. Personnel shall possess the qualifications that meet or exceed those stated in this contract for the position of the individual they are replacing. Submit qualifications of new personnel at least 15 calendar days in advance of date of replacement.

1.17 POST AWARD MEETINGS

1.17.1 Pre-Work Meeting

Within thirty (30) calendar days after receipt of Notice to Proceed, attend a Pre-Work Meeting. Senior Level members of the Contractor's staff involved with this contract shall participate in this meeting to discuss the overall contract requirements. The Government will lead this meeting and take the meeting minutes.

1.17.2 Pre-Construction Meeting

Coordinate with the Contracting Officer and establish the date of the

Pre-Construction Meeting. The meeting will be held at the Project site at least one (1) week prior to mobilizing to the job site. Lead the Pre-Construction Meeting discussing the Contractor's plan on executing the work at the project site, schedule, required clearances and timeframe for them, and plan for implementing safety and quality control. The Government will have key members from the Project staff to discuss environmental and clearance issues. Key members of the contractor staff shall attend this meeting including the Quality Control (QC) System Manager, Site Safety and Health Officer (SSHO) and any other members determined by the Government to be required.

1.17.2.1 Minutes

Contractor is responsible for taking the meeting minutes and shall send them electronically within 48 hours of the meeting to the Government's Project Engineer, Quality Assurance Representative, and Resident Engineer.

1.17.2.2 Demobilizing And Remobilizing

Anytime the Contractor demobilizes from the site and remobilizes at a later date, another Pre-Construction Meeting shall be held and shall follow the requirements listed above.

1.17.3 RMS Orientation Meeting

a. An RMS (Resident Management System) Orientation Meeting will be held within Fifteen (15) calendar days after receipt of Notice of Award. See SECTION 01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for additional information. Orientation meeting will be at District Headquarters, and may occur in conjunction with, but not at the same time as, the Pre-Work meeting. Coordinate meeting date and time with the Contracting Officer a minimum of seven

(7) calendar days prior to the meeting.

b. At a minimum, the Contractor's RMS-CM Administrator and QC system manager shall attend the RMS Orientation meeting. A Government Representative will lead the orientation. Anticipate the following at the meeting:

1. Allow for a maximum 4 hour duration.

2. Cover the following topics, at a minimum, in RMS Contractor Mode (CM):

i. Contractor use of RMS (CM) system.

ii. Contractor Data.

iii. Quality Control Reports.

iv. Submittals.

v. RFIs.

vi. Payment.

3. Receive a follow-up handout/guide for reference on the above items.

c. Contractor employees shall bring a computer with Wi-Fi capability (to gain access to the Internet), with RMS pre-loaded.

d. The RMS Orientation Meeting is required for Contractors with no prior RMS experience. The RMS Orientation Meeting, is optional, but may be requested, for all other Contractors.

1.18 WEEKLY PRODUCTION MEETINGS

During all fabrication and onsite construction work, hold a weekly production meeting to brief the Government on the status of the project.

a. Use the attached "Weekly Meeting Agenda" and discuss all elements of this agenda.

b. Provide a three (3) week 'look ahead'.

1. Describe all planned construction activities, on-site and off-site over the next three (3) weeks.

2. ENSURE these activities align to the overall construction SCHEDULE submitted under SECTION 01 32 01.00 28 PROJECT SCHEDULE.

3. RECORD any changes to the Project Schedule AND INCLUDE IN the next scheduled update.

c. Key members of the Contractor's staff including the Quality Control System Manager and the SITE SAFETY AND HEALTH OFFICER shall attend.

d. The Quality Control System Manager shall discuss all QC aspects outlined in SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL.

e. The Government reserves the right to require any person from the Contractor's staff such as the Project Manager, Engineer, Scheduler or Key Subcontractor Personnel to attend the meeting.

f. Submit each meeting agenda, along with Construction Progress Photos, to the Contracting Officer 24 hours prior to the meeting. See paragraph CONSTRUCTION PROGRESS PHOTOS for additional information.

1.18.1 Minutes

The Contractor shall be responsible for taking the meeting minutes and shall send them electronically within 24 hours of the meeting to the Government's Project Engineer, Quality Assurance Representative, and Resident Engineer.

1.19 ADDITIONAL MEETINGS

Record the minutes of all meetings, including all conference calls, that occur between the Contractor and Government. Send minutes electronically within 24 hours of the meeting to the Contracting Officer for concurrence.

E-mail subject line shall include project name and meeting topic.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

This page intentionally left blank

Weekly Meeting agenda template

Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review

Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters

Coordination - Clearances required over the next week, include the following:

A description of the work to be performed under the Clearance.

Determine the correct energy isolation points needed to perform the work safely.

Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.

Determine the procedure and method of testing for stored energy if applicable.

The date and time the Clearance shall be required.

The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.

Coordination issues

Safety- Review of AHA’s for ongoing work Pending AHA’s

Required for new work Status of Gov’t approval

Safety issues

QC -

Preparatory meetings Held over last week- status of meeting minutes

Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log

SECTION 01 14 00.10 28

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 14 00.10 28

PROJECT SITE RESTRICTIONS

PART 1 GENERAL

1.1 SUBMITTALS

1.2 DELIVERY OF EQUIPMENT

1.3 ACCESS TO AUTOMATED INFORMATION SYSTEMS

1.4 FACILITY OCCUPANCY CLOSURE

1.5 WORK SCHEDULES

1.5.1 Contractor's Work Schedule

1.5.2 Government's Work Schedule

1.6 USE OF WALLA WALLA DISTRICT PARKS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

This page intentionally left blank

PROJECT SITE RESTRICTIONS

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only. A designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Contractor's Work Schedule ; G C

Access To Automated Information Systems ; G C

1.2 DELIVERY OF EQUIPMENT

Contractor shall be responsible for delivery and receipt of all materials and equipment. Government personnel will not be available to assist the Contractor in these activities. To the maximum extent possible, deliveries shall arrive on the same side of the river as the Contractor's work area.

1.3 ACCESS TO AUTOMATED INFORMATION SYSTEMS

All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract (to include grants, cooperative agreements and task orders) who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail, sensitive data areas such as the Control Room) shall, at a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. Have each applicable employee complete a SF-85P and 2 FBI form 258 Finger Print cards to submit to the Security Officer within three (3) working days after award of any contract or task order, and submitted prior to the individual being permitted access to an AIS.

Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Security Officer. For those Contractors that do not have a CAGE Code or Facility Security Clearance, the Security Office will process the investigation in coordination with the Contractor and contract employees.

The phone number for the Security Office is: 509.527.7141

The address for the Security Office is:

Security Officer Emergency Management Office Walla Walla District, COE

201 North Third Avenue Walla Walla, WA 99362

1.4 FACILITY OCCUPANCY CLOSURE

Streets, walks, and other facilities occupied and used by the Government shall not be closed or obstructed without written permission from the Contracting Officer.

1.5 WORK SCHEDULES

1.5.1 Contractor's Work Schedule

At the Pre-Work Meeting, furnish a schedule of number of working days per week, shifts per day, and hours per shift for contract work. Furnish notification of any change of schedule of regular work hours, overtime work hours, and shifts of work crews and personnel at the site. This notification shall be provided a minimum of 48 hours prior to any schedule change to allow suitable scheduling of Government personnel and inspection. Exception to this requirement may be allowed in case of schedule change due to emergency conditions.

1.5.2 Government's Work Schedule

a. The maintenance crews at the dam work from 6:30 a.m. to 5:00 p.m., Monday through Thursday. Crews and staff do not work on weekends and Federal holidays. If a Federal holiday falls on a Friday, the crews and staff do not work on the preceding Thursday. A powerhouse operator is at the site 24 hours a day, 7 days a week, including Federal holidays but is not available to assist the Contractor.

b. If the Contractor requires Government support or assistance outside of normal work hours, the Contractor must make a formal written request to the Contracting Officer at least one week prior to the date that support/assistance is needed. The Government will review this request, but there is no guarantee that Government support or assistance can be provided.

1.6 USE OF WALLA WALLA DISTRICT PARKS

Special consideration for the use of the Walla Walla District Camping Grounds wi l l not be given to the Contractor if camping at these sites.

The Contractor's crew may not use Government parking lots near the McNary Lock and Dam for RV parking.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used) -- End of Section --

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 14 00.90 28

INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 BIOGRAPHICAL INFORMATION SUBMITTAL

1.4 AT LEVEL 1 TRAINING

1.5 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

1.6 DOD FACILITY REQUIREMENTS (COMMON ACCESS CARD NOT REQUIRED)

1.7 SUSPICIOUS ACTIVITY REPORTING TRAINING (iWATCH, CORPS Watch, or

See Something, Say Something)

1.8 CONTRACTS THAT REQUIRE OPSEC TRAINING

1.9 EMPLOYEE ESCORT

1.10 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section Table of Contents --

SECTION 01 14 00.90 28

INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

PART 1 GENERAL

The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS. This contract does not require access to or handling of classified material.

This contract does not require access to secured and restricted areas, sensitive information, or equipment. Secured area is considered any location where on-site work is performed by Contractor employees.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY (DA)

AR 190-13 (2011) The Army Physical Security Program

Army Directive 2014-05 (2014) Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors

Website for Department of the Army Regulations:

http://armypubs.army.mil/

FEDERAL ACQUISITION REGULATIONS (FAR)

FAR 52.204-9 (2015) Personal Identity Verification of Contractor Personnel

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only. The designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Anti Terrorism (AT) Level 1 ; I, C iWATCH, CORPS Watch, or See Something, Say Something ; I, C

Level 1 OPSEC training ; I, C

Pre-Screen Candidates Using E-Verify Program ; I, C

Biographical Information ; G, C

1.3 BIOGRAPHICAL INFORMATION SUBMITTAL

Submi t Bi ogr aphi cal I nf or mat i on t o t he COR vi a emai l as a passwor d pr ot ect ed pdf f i l e or usi ng t he DoD SAFE si t e f or al l per sonnel r equi r i ng unescor t ed access or r equi r i ng access t o gover nment i nf or mat i on syst ems.

See par agr aph " ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES" f or addi t i onal i nf or mat i on and det ai l s on i t ems t o submi t .

1.4 AT LEVEL 1 TRAINING

All contractor employees, including all associated sub-contractor employees, requiring access to government facilities and controlled access areas shall complete Anti Terrorism (AT) Level 1 awareness training within 30 days after Notice of Award/, and annually thereafter until project completion. Submit certificates of completion for each employee to the contracting officer representative (COR) or to the contracting officer (if a COR is not assigned), within 5 calendar days after initial completion of training or annual refresher.

The contractor shall retain employee training certificates for the duration of the contract and maintain a current roster. The roster shall contain the names of employees who have completed the training along with their most recent training completion date. The contractor shall update the roster and resubmit to the contracting officer no later than 5 calendar days after completion of refresher training or a new employee completes certification.

AT Level I awareness training can be completed in approximately two (2) hours and is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html

1.5 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES

All contractor employees, including all associated sub-contractor employees, shall comply with all applicable facility access and security policies and procedures. Local facility policies and procedures shall be provided by a government representative.

The contractor shall provide all information required for background checks to meet facility access requirements. Background checks will be performed by Walla Walla District Security Office. Contractor workforce must comply with all personal identity verification requirements ( FAR 52.204-9 , Personal Identity Verification of Contractor Personnel:

http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=48:2.0.1.1.1.2.1.28 ) as directed by DOD and/or local policy.

For each i ndi v i dual t hat wi l l be wor ki ng at t hi s s i t e, submi t an excel spr eadsheet cont ai ni ng t he i ndi v i dual ' s f ul l name and dat e of bi r t h t o sat i sf y t he i nf or mat i on r equi r ed t o conduct t he backgr ound check . The COR will provide a copy of the excel spreadsheet to be used at the Pre-work meeting. Background check must be approved for an individual before they can access the site.

In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any facility change, the Government may require changes in contractor security matters or processes.

1.6 DOD FACILITY REQUIREMENTS (COMMON ACCESS CARD NOT REQUIRED)

Contractor employees, including all associated sub-contractor employees, shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index ( NCIC-III )and Terrorist Screening Database (TSDB) ( Army Directive 2014-05 / AR 190-13 ), applicable facility and area access security policies and procedures (provided by a government representative, as NCIC and TSDB are available).

1.7 SUSPICIOUS ACTIVITY REPORTING TRAINING ( iWATCH, CORPS Watch, or See Something, Say Something )

The contractor employees, including all associated sub-contractor employees, shall take one of the following trainings on the suspicious activity reporting program; iWATCH, CORPS WATCH, SEE SOMETHING, SAY SOMETHING. These trainings are available on the internet and the links to the training sites are shown below.

This training is to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the security representative. This training shall be completed within 30 calendar days of Notice of Award/ and within 30 calendar days of new employees commencing performance with the results reported to the COR or to the contracting officer (if a COR is not assigned), NLT 5 calendar days after the completion of the training.

a. iWATCH \ Website: http:://www.myarmyonesource.com/familyprogramsandservices/ iwatchprogram/default.aspx

b. CORPS WATCH Website:

http://www.spa.usace.army.mil/Missions/CivilWorks/Recreation/CorpsWatch.aspx

c. SEE SOMETHING, SAY SOMETHING Website: https://www.dhs.gov/see-something-say-something

1.8 CONTRACTS THAT REQUIRE OPSEC TRAINING

All new contractor employees, including all associated sub-contractor employees, will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all employees must complete annual OPSEC awareness training until project completion. The contractor shall submit Level 1 OPSEC training certificates of completion for each affected employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.

OPSEC awareness training is available at the following website:

https://securityawareness.usalearning.gov/opsec/index.htm or it can be provided by the OPSEC Officer in presentation form which will be documented via memorandum.

1.9 EMPLOYEE ESCORT

All contractor employees, including all associated sub-contractor employees, who are not in possession of the appropriate security clearance or access privileges, will be escorted in sensitive or restricted areas and/or areas where they may be exposed to classified and/or sensitive materials.

1.10 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

The Contractor must pre-screen Candidates using the E-verify Program ( http://www.uscis.gov/e-verify ) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system.

Additional time may be required for foreign nationals to pre-screen.

An initial list of verified/eligible Candidates must be provided to the contracting officer, no later than 30 business days after receipt of Notice of Award.

*When contracts are with individuals, the individuals will be required to complete a Form I-9 , Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

Submit pre-screening results to the COR via email as a password protected pdf file.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

-- End of Section --

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 RETAINAGE OF PAYMENT

1.2 CLIN 0001 DEMOLITION

1.3 CLIN 0002 FURNISH NEW PIPE AND APPURTENANCES

1.4 CLIN 0003 FURNISH NEW SEWER MANHOLES

1.5 CLIN 0004 FURNISH NEW LIFT STATIONS

1.6 CLIN 0005 FURNISH ELECTRICAL COMPONENTS

1.7 CLIN 0006 FINISHED GRADE

1.8 CLIN 0007 FURNISH PRE-ENGINEERED METAL BUILDING

1.9 CLIN 0008 FURNISH TEMPORARY SEWAGE HANDLING SYSTEM

1.10 CLIN 0009 DISPOSE OF WASTEWATER FROM TEMPORARY SEWAGE HANDLING

SYSTEM

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.

1.1 RETAINAGE OF PAYMENT

Retainage in the amount of 10 percent of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10 percent retainage for final submittals will be held until such time as the Contractor has earned 90 percent of the original contract value. See SECTION 01 78 00.00 28 "CLOSEOUT SUBMITTALS" for additional information.

a. Final Shop Drawings.

b. Final As-built Drawings.

c. Final Record Drawings.

d. Return of Government Issued Items.

e. Final Operation and Maintenance Manuals and Parts Catalogs.

f. Final Spare Parts submission.

g. Complete all required training.

1.2 CLIN 0001 DEMOLITION

Demolition will be measured for payment as a complete pay item (JOB).

Payment will be made at the lump sum price for CLIN No. 0001, "Demolition," which price and payment shall be full compensation for all demolition of the septic systems and septic vault and wet well, which shall include all work required for emptying, flushing, and demolishing the sewer lift stations, septic tank and wet well, and hauling hazardous and structural waste components off site, complete, as specified and approved.

1.3 CLIN 0002 FURNISH NEW PIPE AND APPURTENANCES

Furnish New Pipe and Appurtenances will be measured for payment as as a complete pay item (JOB). Payment will be made at the unit price for CLIN No. 0002, "Furnish New Pipe and Appurtenances," which price and payment shall be full compensation for all work required for trenching, installing new pipe and backfilling, and including all equipment and appurtenances complete, as specified and approved. Work including, but not limited to, air relief valves, vaults and cleanouts.

1.4 CLIN 0003 FURNISH NEW SEWER MANHOLES

Furnish New Sewer Manholes will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0003, "Furnish New Sewer Manholes," which price and payment shall be full compensation for all work required to install three (3) new sewer manholes,including backfilling, complete, as specified and approved.

1.5 CLIN 0004 FURNISH NEW LIFT STATIONS

Furnish New Lift Stations will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0004, "Furnish New Lift Stations," which price and payment shall be full compensation for all work required to furnish and install three (3) new lift stations, including all equipment and appurtenances and backfilling, complete, as specified and approved.

1.6 CLIN 0005 FURNISH ELECTRICAL COMPONENTS

Furnish Electrical Components will be measured for payment as a complete pay item (JOB). Payment will be made at the unit price for CLIN No. 0005, "Furnish Electrical Components," which price and payment shall be full compensation for all work required for providing and installing all electrical components and appurtenances, as specified and approved.

1.7 CLIN 0006 FINISHED GRADE

Finished Grade will be measured for payment as a complete pay item (JOB).

Payment will be made at the lump sum price for CLIN No. 0006, "Finished Grade," which price and payment shall be full compensation for all work required to complete the finished grade and surfacing, including all equipment and surfacing materials, as specified and approved. Work including, but not limited to, asphalt, seeding, gravel, topsoil, and fencing.

1.8 CLIN 0007 FURNISH PRE-ENGINEERED METAL BUILDING

Furnish Pre-Engineered Metal Building will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0007, "Furnish Pre-Engineered Metal Building," which price and payment shall be full compensation for all work required to furnish and install one (1) new pre-engineered metal building, including all equipment and appurtenances complete, as specified and approved.

1.9 CLIN 0008 FURNISH TEMPORARY SEWAGE HANDLING SYSTEM

Furnish Temporary Sewage Handling System will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0008, "Furnish Temporary Sewage Handling System," which price and payment shall be full compensation for all work required to furnish a temporary sewage handling system, including all equipment and appurtenances complete, as specified and approved.

1.10 CLIN 0009 DISPOSE OF WASTEWATER FROM TEMPORARY SEWAGE HANDLING SYSTEM

Dispose of Wastewater from Temporary Sewage Handling System will be measured for payment a complete pay item (JOB). Payment will be made at the lump sum price for CLIN No. 0009, "Dispose of Wastewater from Temporary Sewage Handling System," which price and payment shall be full compensation for all work required to dispose of the wastewater from the temporary sewage handling system, including all equipment and appurtenances complete, as specified and approved.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 32 01.00 28

PROJECT SCHEDULE

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 PROJECT SCHEDULER QUALIFICATIONS

PART 2 PRODUCTS

2.1 SOFTWARE

2.1.1 Government Default Software

2.1.2 Contractor Software

2.1.2.1 Primavera

2.1.2.