This solicitation package describes an elevator rehabilitation project for the Anchorage Air Route Traffic Control Center located in Anchorage, Alaska. The Federal Aviation Administration's En Route Construction Branch is seeking offers for elevator repairs and upgrades with an estimated construction value between $500,000 and $1,000,000. Interested firms must RSVP by September 13th to attend an optional site visit on September 15th. Any questions arising from the site visit must be submitted by September 22nd. Offers are due by September 29th and shall be emailed with total file size under 10MB due to FAA system limitations. The soliciting agency is the Department of Transportation Federal Aviation Administration for this elevator rehabilitation opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Transportation

Federal Aviation Administration

COVER SHEET

G001

Anchorage, Alaska

Anchorage Air Route Traffic Control Center

Elevator Rehabilitation Project

April 2022

W. STEVENS

W. STEVENS

E. ROLAF

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

DESCRIPTIONREV.

REVIEWED BY

SUBMITTER'S TITLE APPROVER'S TITLE

REV.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ANCHORAGE AIR ROUTE TRAFFIC CONTROL CENTER

1706170

INDEX OF DRAWINGS GENERAL NOTES

G001

G002

G003

COVER SHEET

DO NOT SCALE DRAWINGS.

A.

B.

C.

D.

E.

OTHERWISE NOTED.

LINES AND FACE OF MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS

DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM COLUMN CENTER

G004

ABBREVIATIONS

G005

GENERAL

ARCHITECTURAL

LTR

REV

NUMBER

DRAWING

DRAWING TITLE

N

C

C

C

C

A001

A002

OPERATIONS WING

TECHNICAL/

A101

A601

A000

EXTENSION

THREE BAY

LOCATION MAP

VICINITY MAP - ANCHORAGE AK

SERVICE WING

UTILITY BAY

C

LOCATION

PROJECT

Anchorage, Alaska

700 N. Boniface Parkway, R D

P O

S T

MNT. VIEW DR.

AVE

AVE5TH

AVE6TH

K N I

K

A R

M

T O

R P

O R

T

INT. AIRPORT RD.

H I

G H

W A

Y N

E W

S

W A

R D

O L

D

W A

H

G H

W A

Y

JOINT BASE

CREEKSHIP

C R

E E

K

CHESTER

CREEK

CAMPBELL

P O

F

N

C H

O R

A G

C

B R

A G

A W

E L

M O

R E

FIELD

BENSON BLVD

R O

A D

M U

L D

O O

N

HIGHWAYGLENN

P A

R K

W A

Y B

O N I

F A

C E

AVENUE

LIGHTS

DEBARR

BOULEVARD

TUDOR ROAD

3RD

P A

R K

W A

Y

AVENUE

NORTHERN

15TH

S T

R E

E T

AVE

36TH

L A

K E

ROADDOWLING

C

O T I

S

MERRILL

JOINT BASE

GLENN HIGHWAY

INTERSTATE A1

ELMENDORF-RICHARDSON

JOINT BASE

N

B O

N

IF

A

P

R K

W A

Y

MOUNTAIN VIEW DRIVE

1.

2.

3. CONSTRUCTION TYPE:

REGULATIONS:

APPLICABLE CODES AND

NFPA 101, EXISTING BUSINESS

IBC, GROUP B

4.

NFPA 101 - LIFE SAFETY CODE, 2021 EDITION

INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION

TYPE II B IBC

BUILDING CODE ANALYSIS

CLASSIFICATION:

OCCUPANCY

KEY PLAN

ADMINISTRATIVE WING

GENERAL, ARCHITECTURAL, STRUCTURAL - LEGENDS

ELMENDORF-RICHARDSON

ELMENDORF-RICHARDSON

MECHANICAL

COMPONENT CATEGORY:

SEISMIC DESIGN CRITERIA FOR DESIGN AND ANCHORAGE OF NON-STRUCTURAL

BUILDING CODE ANALYSIS

INDEX OF DRAWINGS, GENERAL NOTES, LOCATION MAP &

LOCATION MAP & BUILDING CODE ANALYSIS

INDEX OF DRAWINGS, GENERAL NOTES,

G002

NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION

NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

INTERNATIONAL MECHANICAL CODE, 2018 EDITION

INTERNATIONAL FIRE CODE, 2018 EDITION

NFPA 70 (NATIONAL ELECTRICAL CODE (NEC), 2020

(29 CFR 1910 AND 1926 - CURRENT ISSUE)

GENERAL INDUSTRY SAFETY & HEALTH STANDARDS

OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA)

ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)

P.

R.

Q.

S.

ELEVATOR DEMOLITION PLANS

FIRST FLOOR PLAN - GUIDE PLAN

SECOND FLOOR PLAN - GUIDE PLAN

SEISMIC DESIGN CATEGORY (SDC): DE.

Sds = 1.0D.

SITE SOIL CLASSIFICATION: DC.

USE lp: 1.50

REMAIN OPERATIONAL AFTER A DESIGN EARTHQUAKE

EXCEPT FOR LIFE SAFETY SYSTEMS THAT MUST

COMPONENT IMPORTANCE FACTOR. USE lp=1.0 B.

RISK CATEGORY: IVA.

OPS SUPPORT WING

N

ELEVATOR FLOOR PLANS AND SECTION

FIRE PROTECTION

F201

F101

F001

BASEMENT FLOOR PLAN FIRE SUPPRESSION

BASEMENT FLOOR PLAN FIRE ALARM

FIRE PROTECTION LEGENDS, ABBREVIATIONS AND GENERAL NOTES

ELECTRICAL

E201

E101

E001

BASEMENT PARTIAL LIGHTING AND POWER PLAN NEW WORK

BASEMENT PARTIAL LIGHTING AND POWER PLAN - DEMOLITION

ELECTRICAL LEGENDS, ABBREVIATIONS AND GENERAL NOTES

NOT BE LEFT IN OCCUPIED AREAS.

CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT MUST

FLOORS, CEILINGS AND ROOFS) BEFORE ANY DEMOLITION OR CONSTRUCTION.

EXISTING CONDITION OF BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS,

BUILDINGS WHICH ARE PART OF THE FACILITY, COORDINATE WITH COR TO VERIFY

APPROVED U.L. SYSTEM. WHERE WORK IS REQUIRED ON OTHER PORTIONS OF THE

AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN

ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES

MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS,

AND/OR FIRE RATED ASSEMBLIES TO MATCH EXISTING TO SATISFACTION OF COR.

CONCEALED SYSTEMS TO BE DEMOLISHED. PATCH AND REPAIR DAMAGED FINISHES

REMOVING EXISTING PARTITIONS AND ENCLOSURES TO ENABLE DEMOLITION OF

REFER TO OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION REQUIRED. COORDINATE

AVOID DISTURBING AIR TRAFFIC OPERATIONS.

OPERATIONS NEAR OR WITHIN THIS ROOM. COORDINATE WITH COR THE WORK TO

NOISE, DUST, LIGHT, VIBRATIONS AND WATER ARE DISRUPTIVE TO AIR TRAFFIC

THE OPERATIONS/CONTROL ROOM OPERATES 24-HOURS A DAY, 7-DAYS A WEEK,

F.

DESCRIBES OPEN SHAFT SAFETY PROCEDURES, BARRICADES, AND FALL PROTECTION.

TO THE SITE, SUBMIT A WORK AND SAFETY PLAN FOR APPROVAL THAT

PROTECTION IS REQUIRED NEAR AND IN AN OPEN SHAFT. BEFORE MOBILIZING

THAT THE ELEVATOR SHAFT IS OPEN, INCLUDING OVER NIGHT. FALL

AND ITEMS FROM FALLING INTO THE ELEVATOR SHAFT. MINIMIZE THE DURATION

AN UNBARRICADED OPEN ELEVATOR SHAFT IS PROHIBITED. PREVENT PEOPLE G.

H.

J.

K.

L.

M.

N.

CONSTRUCTION PLAN AND NOTES

VTEHWE-4

VTEPIT-3

VTEEMR-2

VTEHW-1

ELEVATOR NO. 1 HOISTWAY SECTION ELEVATION

ELEVATOR NO. 1 PIT PLAN

ELEVATOR NO. 1 MACHINE ROOM PLAN

ELEVATOR NO. 1 HOISTWAY PLAN

ELEVATOR CONSULTANT (FOR INFORMATION ONLY)

BASEMENT PLAN - GUIDE PLAN

W. STEVENS

W. STEVENS

E. ROLAF

S101

S201

S501

S001

STRUCTURAL

STRUCTURAL ABBREVIATIONS AND GENERAL NOTES

BASEMENT PLAN - UTILITY BAY DEMOLITION

BASEMENT PLAN - UTILITY BAY

STRUCTURAL DETAILS

ARE RESOLVED TO SATISFACTION OF COR.

COR OF CONFLICTS. NO DEMOLITION WORK CAN PROCEED UNTIL CONFLICTS

BUILDING SYSTEMS. COORDINATE DEMOLITION WITH THE WORK AND NOTIFY

FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OF

PATCHED AND REPAIRED TO MATCH EXISTING FINISHES.

FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK MUST BE

AND REQUIREMENTS.

OPERATIONS, TYP. ACCOMMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE

PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA

AREA. PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO

THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN OR NEAR THE WORK

OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK

EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT MUST REMAIN

PERFORMANCE OF WORK.

APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS IN ADVANCE OF

PERMANENT, TEMPORARY OR PARTIAL OUTAGES MUST BE SCHEDULED AND

UNSCHEDULED INTERRUPTIONS SHALL NOT BE TOLERATED. WORK REQUIRING

FOR ITEMS TO BE REMOVED.

SHOWN ON ARCHITECTURAL DRAWINGS, REFER TO MECHANICAL, ELECTRICAL AND CIVIL

AND FIRE PROTECTION SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA

VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL, ELECTRICAL

CAUSE RISKS/CONCERNS TO FAA OPERATIONS.

THE COR AT LEAST FOUR WEEKDAYS IN ADVANCE OF ACTIONS THAT COULD

TO ADDRESS THESE CONCERNS. IN MITIGATION PROCEDURES, INCLUDE NOTIFYING

FROM THEIR CRITICAL WORK. DESCRIBE AND PROVIDE MITIGATION PROCEDURES

DISTRACT AIR TRAFFIC CONTROLLERS AND WORKERS IN THE CONTROL ROOM

POSSIBLY FROM ELEVATOR MACHINE FLUIDS, AND NOISE CAN IN PARTICULAR

COULD ADVERSELY AFFECT FAA OPERATIONS. NOTE THAT UNUSUAL ODORS, SUCH AS

DESCRIBES POTENTIAL ACCESS, NOISE, DUST, ODOR, AND OTHER CONCERNS THAT

TO THE SITE, SUBMIT A WORK AND MITIGATION PLAN FOR COR APPROVAL THAT

OPERATIONS , INCLUDING FROM ACCESS, NOISE, DUST, AND ODORS. BEFORE MOBILIZING

MEANS OF EGRESS. COORDINATE THE WORK WITH COR TO AVOID DISRUPTING FAA

THE BUILDING WILL BE OCCUPIED BY FAA DURING CONSTRUCTION. DO NOT BLOCK

DATES IN REQUEST.

LEAST SIX WEEKS IN ADVANCE. INCLUDE OUTAGE START, DURATION, AND END

FLOOR. SUBMIT REQUEST TO COR TO TAKE THE ELEVATOR OUT OF SERVICE AT

ONLY ACCESSIBLE ACCESS TO THE UTILITY BAY AND TECH OPS WING SECOND

ELEVATORS THAT PROVIDE ACCESSIBLE ACCESS TO THE BASEMENT AND IS THE

IS OUT OF SERVICE. THE UTILITY BAY ELEVATOR IS ONE OF ONLY TWO

SCHEDULE AND PERFORM WORK TO MINIMIZE THE DURATION THAT THE ELEVATOR

CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN HOW WORK MUST PROCEED.

TO EXIST IN AREAS OF THE WORK. IF SUSPECTED HAZMAT IS ENCOUNTERED,

CONTAINING MATERIALS OR LEAD BASED PAINT. NO HAZMAT IS KNOWN

BUILDING CONTAINS HAZARDOUS MATERIALS (HAZMAT), SUCH AS ASBESTOS

FIRE PROTECTION.

EQUIPMENT. COORDINATE SIZE & LOCATION WITH MECHANICAL, ELECTRICAL AND

FOR PROVISION OF ARCHITECTURAL, MECHANICAL, ELECTRICAL & FIRE PROTECTION

PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY AND CONCRETE)

REPLACEMENT WITH COR.

DE-ENERGIZING AND ENERGIZING OF ANY PANELBOARD FOR CIRCUIT BEAKER

CLOSE (ENERGIZE) ANY CIRCUIT BREAKER OR PIPE VALVE. COORDINATE

BREAKER OR PIPE VALVE OPERATION. DO NOT OPEN (DE-ENERGIZE) OR

REQUEST PERMISSION IN WRITING FROM FAA IN ADVANCE FOR EACH CASE OF

ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES.

M601

M503

M502

M501

M301

M201

M002

M001

MECHANICAL SCHEDULES AND DDCS POINT FUNCTION SCHEDULE

MECHANICAL DETAILS AND CONTROL DIAGRAMS

HVAC SEISMIC DETAILS

HVAC SEISMIC DETAILS

BASEMENT PLAN - UTILITY BAY HVAC SECTION

BASEMENT PLAN - UTILITY BAY HVAC PLAN - NEW WORK

MECHANICAL CONTROLS AND INSTRUMENTATION ABBREVIATIONS AND SYMBOLS

MECHANICAL ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ABBREVIATIONS

A

B

C

D

G

F

E

M

L

K

J

I

H

N

O

P

R

S V

U

Y

X

W

POV PRIVATELY OWNED VEHICLE

STRUC, STR

AIR ROUTE TRAFFIC CONTROL CENTER

ACP ACOUSTICAL CEILING PANEL

CONTRACTING OFFICER'S REPRESENTATIVE

BKR BREAKER

BLDG BUILDING

BLKG BLOCKING

BM BENCH MARK OR BEAM

BRG BEARING

BTU BRITISH THERMAL UNIT

CONDUIT

CAB CABINET

BOTTOM

BOD

BOP

BOTTOM OF DUCT

BOTTOM OF PIPE

BPU BREAKER PROGRAMMING UNIT

BHP BRAKE HORSE POWER

BLO BLOWER

BLV

BWP BACK WATER PREVENTER

BWV

BALANCING VALVE

BTU/H

BV

BRITISH THERMAL UNIT PER HOUR

BALL VALVE

BACK WATER VALVE

CA

BSMT BASEMENT

BOT, BOTT

COMBUSTION AIR

C

ATS

AUX AUXILIARY

AWG

B BOILER

BD

BEL BELOW

BF BLIND FLANGE

ATB AIR TERMINAL BOX

AUTOMATIC TRANSFER SWITCH

ACID VENT

AVG

AV

AVERAGE

AMERICAN WIRE GUAGE

DAMPER, BLOWDOWN

BOARD, BACK-DRAFT

BAT CHGR BATTERY CHARGER

BC BARE COPPER

BFP

BFV

BFW

BACK FLOW PREVENTER

BUTTERFLY VALVE

BOILER FEED WATER

& AND

@ AT

AWR AUTOMATION WING REHABILITATION

AWP ACOUSTICAL WALL PANEL

ALT ALTERNATE

APPROX APPROXIMATELY

ARCH ARCHITECT(URAL)

ARTS

AT AMPERE TRIP

ARTCC

AUTOMATED RADAR TERMINAL SYSTEM

AMP METERAM

AO

AMM AMMETER

ANN ANNUNCIATOR

ANALOG OUTPUT

AP ANNUNCIATOR POINT

AS AIR SEPARATOR

APC ACOUSTICAL PANEL CEILING

ASSY ASSEMBLY

AAV AUTOMATIC AIR VENT

AC

A/C AIR CONDITIONING

AD

ADJ ADJACENT OR ADJUSTABLE

ADR ACCESS DOOR

AFF ABOVE FINISH FLOOR

AIC

AL ALUMINUM

AF

CONC OR AIR COMPRESSOR

ALTERNATING CURRENT, ASPHALT

AMPERES INTERRUPTING CAPACITY

ACC AIR COOLED LIQUID CHILLER

AA AIR COOLED

ACU

ACT ACCESS CONTROL TERMINAL

AIR CONDITIONING UNIT

ACD ADDRESSABLE CONTROL DEVICE

AFMS AIR FLOW MEASURING STATION

AID ADDRESSABLE INTERFACE DEVICE

AIF AIR INTAKE FILTER

AREA DRAIN, ACCESS DOOR

ADTN

NETWORK

ADMINISTRATIVE DATA TRANSMISSION

AMPERE FRAME, AIR FLOW SENSOR

AH/AHU AIR HANDLING UNIT

AFD AIR FILTRATION DEVICE

AMPERE, AIR, COMPRESSED AIR LINE

ACM ASBESTOS CONTAINING MATERIALS

A

DBL DOUBLE

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DISC DISCONNECT

DISP DISPENSER

DIST DISTRIBUTION

DL DEAD LOAD

DN DOWN

DP

DGP DATA GATHERING PANEL

DI

DB

DDCP DIRECT DIGITAL CONTROL PANEL

DOM DOMESTIC

DC DIRECT CURRENT

DIGITAL INPUT

POSITION INDICATOR,

DROP INLET, DAMPER

DM DEMAND METER

DO DIGITAL OUTPUT

DPDT

DPNL

DPST

DOUBLE POLE DOUBLE THROW

DISTRIBUTION PANEL

DOUBLE POLE SINGLE THROW

PRESSURE SWITCH

DUSTPROOF PARTITION, DIFFERENTIAL

DIRECT BURIAL, DRY BULB

DEG DEGREE(S)

CT

CTR

CU CONDENSING UNIT

CV

CYD CUBIC YARD

CTS COOLING TOWER WATER SUPPLY

CU

CW

CWR

CWS

CWV

CONDENSING UNIT

DOMESTIC COLD WATER

CHILLER WATER RETURN

CHILLER WATER SUPPLY

COMBINATION WASTE AND VENT

TERMINAL

CONTROL VALVE, CONSTANT VOLUME

DAMPER

DRAIN, DELTA CONNECTION, DIFFUSER,

RETURN

CENTER, COOLING TOWER WATER

D

CONC CONCRETE

COND

CONN CONNECTION

CONST CONSTRUCTION

CONT

CONTR CONTRACTOR

CONTINUOUS OR CONTINUATION

CP

COR

CS

CPT

CPC CRITICAL POWER CENTER

CPU CENTRAL PROCESSING UNIT

CR

CONTROL SWITCH

CONTROL PANEL, CIRCULATING PUMP

CEILING REGISTER, CONTROL RELAY

CONDITION, CONDENSATE

CRU COMPUTER ROOM UNIT

CC COOLING COIL

CFM

CFT CUBIC FOOT

CH CHILLER

CI

CIP

CKT CIRCUIT

CENTER LINE

CLG CEILING

CLR CLEAR

CMP

CMU

CO

COL COLUMN

COMB

COMP

CONCRETE MASONRY UNIT

CORRUGATED METAL PIPE

CL,

CENT CENTRIFUGAL

SYSTEM

CENTRAL CONTROL AND MONITORING

CAST IRON PIPE, CAST IN PLACE

CD

CFH CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CG

CIR CIRCULATING

CLF CURRENT LIMITING FUSE

CLEANOUT, CONDUIT ONLY

COMBUSTION AIR

COMBINATION, COMBINE,

COMM COMMUNICATIONS

CURB INLET, CAST IRON

CCMS

CONDENSATE DRAIN

CONTROL DAMPER, CEILING DIFFUSER,

COMPRESSIBLE, COMPRESSED

CIRCUIT BREAKERCB

FM

FEET

GA

GALV GALVANIZED

GEN GENERATOR

GFM

GL GLASS

GND

GPM

GR

GALLONS PER MINUTE

GFE

GOVERNMENT FURNISHED MATERIAL

GOVERNMENT FURNISHED EQUIPMENT

G GAS

FOR

FOS

FUEL OIL RETURN

FUEL OIL SUPPLY

FT,'

GRILLE

FS FLOW SWITCH

FZ FREEZESTAT

FTR FINNED TUBE RADIATION

FRP FIBER GLASS REINFORCED PLASTIC

FEET PER MINUTEFPM

FUEL OIL VENTFOV

FOL FUEL OIL LEVEL

FV FULL VOLTAGE

FPU

FOT

FIELD PROGRAMMING UNIT

FIBER OPTIC TERMINAL

FO FIBER OPTIC

FLUOR FLUORESCENT

GROUND, GROUND CONNECTOR

GPH GALLONS PER HOUR

GAGE, GUAGE

FD

FE FIRE EXTINGUISHER

FEC

FIN FINISH

FIXTURE

FLOOR

FIRE EXTINGUISHER CABINET

FCV FLOW CONTROL VALVE

FIRE DAMPER OR FLOOR DRAIN

FEPC FRONT END PERSONAL COMPUTER

FFE FINISHED FLOOR ELEVATION

FLEXIBLE DUCTFLEX

FHC FIRE HOSE CABINET

FI

FC FAN COIL UNIT

FLG FLANGE

FD/SD

FDR FEEDER

COMBINATION FIRE AND SMOKE DAMPER

FCO FLOOR CLEANOUT

FLA FULL LOAD AMPERES

FA FAN COOLED

FLANGE INSULATION, FLOW INDICATOR

FIX, FIXT

FL, FLR

FAA FEDERAL AVIATION ADMINISTRATION

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXISTING

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

EWH ELECTRIC WATER HEATER

EP EXHAUST PIPE

ES EXHAUST SILENCER

ER EXHAUST REGISTER

ERMS

ET ELECTRIC HEAT TRACE

EXIST, EX

FILTER, FIRE LINE

EF

EG

ELEC ELECTRIC(AL)

EMD ESTIMATED MAXIMUM DEMAND

EHC ELECTRIC HEATING COIL

EMERG EMERGENCY

EMT ELECTRICAL METAL TUBING

EL, ELEV

EXHAUST FAN

EH

EAT ENTERING AIR TEMPERATURE

ECP ENGINE CONTROL PANEL

EDAM

AND MONITORING

ELECTRICAL DATA ACQUISITION

ENGINE GENERATOR, EXHAUST GRILLE

EACH, EXHAUST AIREA

EFF EFFICIENCY

ELECTRICAL METAL TUBINGENT, ENTR

ELECTRIC HEATER

ELEVATION, ELEVATOR

DR DOOR

DRAWING(S)DWG(S)

KW KILOWATTS

LF LINEAR FEET

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LP LOW POINT

LT LIGHT

LTG LIGHTING

MOTOR

MAS MASONRY

MAT MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MET METAL

MG MOTOR GENERATOR

MO MASONRY OPENING

LCP LOCAL CONTROL PANEL

MANUFACTURER

LPS LOW PRESSURE STEAM

POUNDS

LCV LEVEL CONTROL VALVE

LG LEVEL GAUGE

LS LEVEL SWITCH

MFGR, MFG

MOD MODIFICATION

MCC MOTOR CONTROL CENTER

MIL MILLIMETER

LAN LOCAL AREA NETWORK

MIN MINIMUM

LBS, #

M

HZ HERTZ

INSIDE DIAMETER

INCH

INSUL INSULATION

INT INTERIOR

JUNCTION

JB JUNCTION BOX

KVA KILOVOLT AMPERE

INV INVERT

KCMIL THOUSAND CIRCULAR MILS

INSIDE FACE OR INTERIAL FILTER

HWS

HWR HOT WATER RETURN

HOT WATER SUPPLY

INST INSTRUMENT

IN,"

IEWH

WATER HEATER

INSTANTANEOUS ELECTRIC

HWY HIGHWAY

ISB/ISF INTERIM SUPPORT BUILDING OR FACILITY

J

IF

ID

HM HOLLOW METAL

HORIZ HORIZONTAL

HP

HPT HIGH POINT

HR HOUR

HS

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC

HPS

HTP HOT TAP (W/STOPPLE FITTING)

HERM HERMETIC

HEATING/VENTILATING/AIR CONDITIONING

HPL HIGH PRESSURE LAMINATE

HIGH STRENGTH, HUMIDITY SENSOR

HU HUMIDIFIER

HWL HIGH WATER LEVEL

HW DOMESTIC HOT WATER

HIGH PRESSURE STEAM

HIGH PRESSURE SODIUM,

HORSE POWER, HEAT PUMP, HIGH PRESSURE

HEPA HIGH EFFICIENCY PARTICULATE AIR

H

HB HOSE BIBB

HC HEATING COIL

HDW HARDWARE

HE HEAT EXCHANGER

GS GAS SENSOR

HUMIDISTAT

GRV GRAVITY VENT

GV GATE VALVE

GWB GYPSUM WALLBOARD

GW GLYCOL WASTE

HAZMAT HAZARDOUS MATERIALS

GWH GAS WATER HEATER

HCS HOST COMPUTER SYSTEMS

NAM NEGATIVE AIR MACHINE

SW SWITCH

SYM SYMMETRICAL

UH UNIT HEATER

UV UNIT VENTILATOR

UPS

UON UNLESS OTHERWISE NOTED

UNINTERRUPTIBLE POWER SYSTEM

T&B TOP AND BOTTOM

T&G

TK TANK

TOS TOP OF STEEL

TOW TOP OF WALL

TRANS TRANSVERSE

TONGUE AND GROOVE

TEMP TEMPERATURE

TIC

TC

TI

TEMPERATURE CONTROL SWITCH

TEMPERATURE INDICATOR

TEMPERATURE INDICATING CONTROLLER

TYP TYPICAL

TS

THERMOSTAT

TELCO

COMPANY LINE

TELECOMMUNICATION, TELEPHONE

TOC TOP OF CONCRETE

TM&O

UBC UNIFORM BUILDING CODE

UL UNDERWRITER'S LABORATORIES, INC.

AND OPERATIONS

TELECOMMUNICATIONS MANAGEMENT

TEMPERATURE SENSOR, TAMPER SWITCH

TBD TO BE DETERMINED

UTIL UTILITY

T

SQ SQUARE

SRF

SSTL STAINLESS STEEL

STA STATION

STD STANDARD

STE STANDARD TAPERED END

STL STEEL

STOR STORAGE

SUSP SUSPENDED

ST

SUCT SUCTION

SAFETY RUBBER FLOOR TILE

STATIC PRESSURE INDICATOR

SUMP PUMP/SEWAGE PUMP,

STC SOUND TRANSMISSION CLASS

STGP SIGNAL TRANSPORT GROUND PLANE

STEAM, STREET

SRG SIGNAL REFERENCE GRID

SPECIFICATIONSSPEC

STRUCTURAL, STRUCTURE

SSDI SECURITY SYSTEM DESIGN AND INTEGRATION

SP

VCT VINYL COMPOSITION TILE

VC VERTICAL CURVE

VD VOLUME DAMPER

VERT VERTICAL

VF

VP

WATT

W/ WITH

WD WOOD

WG WATER GAGE

W/O WITHOUT

WP

WT WEIGHT

XFMR TRANSFORMER

TRANSFER

VFD VARIABLE FREQUENCY DRIVE

VENTILATION FAN

VERTICAL FEET OR

VACUUM PRODUCER

VELOCITY PRESSURE,

YD YARD

YH YARD HYDRANT

WYE CONNECTION

VIF VERIFY IN FIELD

VB VINYL BASE

VINYL BASE & TRIM COMPONENTSVBT

VGWB

WALL BOARD

VINYL SURFACED GYPSUM

VIBRATION SWITCHVS

XFER, XFR

Y

W

V VOLT

VAT VINYL ASBESTOS TILE

VAV VARIABLE VOLUME TERMINAL

SC SEALED CONCRETE

RB

CABLE TRAY, COOLING TOWER, CERAMIC TILE

FLOOR MAT

FLOW METER, FIRE MAIN, FACTORY MUTUAL,

ENVIRONMENTAL REMOTE MONITORING SYSTEM

POINT OF TANGENCY, PAINT

RETURN FAN, RUBBER FLOOR

RX REQUEST TO EXIT

MTG MOUNTING OR MOUNTED

NUMBER

NOM NOMINAL

NIC NOT IN CONTRACT

NPT

OA OUTSIDE AIR

OC ON CENTER

OD

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

MS MOISTURE SENSOR

NARACS

SYSTEM

NATIONAL RADIO COMMUNICATIONS

NFPA

OSHA

OSW OPERATIONS SUPPORT WING

ADMINISTRATION

OCCUPATIONAL SAFETY & HEALTH

OH OPPOSITE HAND

OUTSIDE DIAMETER, OPEN DRAIN

NTS NOT TO SCALE

NATIONAL PIPE THREAD

NATIONAL FIRE PROTECTION ASSOCIATION

PCF

PHC PREHEAT COIL

PI

PIV POST INDICATOR VALVE

PL PROPERTY LINE OR PLATE

PLF

PNL PANEL

PRV

PSF

PSI

PT

PTVC

PVC POLYVINYL CHLORIDE

PVI

PVT

RA RETURN AIR

RADIUS

PRESSURE REDUCING VALVE

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POUNDS PER LINEAR FOOT

RISER

RAD, R

POINT OF VERTICAL TANGENCY

PCB POLYCHLORINATED BIPHENYLS

POINT OF VERTICAL INTERSECTION

POINT OF VERTICAL CURVATURE

POUNDS PER CUBIC FOOT

PD PRESSURE DIFFERENTIAL

PHASE

PSM POWER SYSTEMS MODIFICATION

PC PRESSURE CONTROL SWITCH

PDI

PDS

PRESSURE DIFFERENTIAL INDICATOR

PRESSURE DIFFERENTIAL SENSOR

PRESSURE INDICATOR

POINT OF INTERSECTION,

PS PRESSURE SENSOR

R

PRIVATE BRANCH EXCHANGEPBX

POC POINT OF CONNECTION

PVDS PORTABLE VISUAL DISPLAY SYSTEM

PH

RCP REFLECTED CEILING PLAN

PUMP, PHASE OR POLEP

REF REFERENCE

REINF REINFORCING

REQ'D REQUIRED

RF

REV

RGS

RHC REHEAT COIL

RM ROOM

RO ROUGH OPENING

RV

RIGID GALVANIZED STEEL

REG REGISTER

REFRIGERANT VENT

RECEPTACLE

REVERSE, REVISION

RCRA

AND RECOVERY ACT

RESOURCE CONSERVATION

RPTS

RECEPT

SA SUPPLY AIR

SCHEDULE

SD SMOKE DAMPER

SEC SECTION

SF

SHT SHEET

SIG SIGNAL

SM SPRINKLER MAIN

SIM SIMILAR

SAN SANITARY

S SMOKE DETECTOR

SUPPLY FAN, SQUARE FEET

SCH, SCHED

SAP SOUND ABSORBING PANEL

T

DWP DECORATIVE WALL PANEL

CARPET/CARPET TILE/RAISED FLOOR

CEILING GRILLE, CORNER GUARD

GT GROUT

MWB MARKERBOARD WALL COVERING

SSP STAINLESS STEEL PLATE

PLAM PLASTIC LAMINATE

WEATHERPROOF, WALL PROTECTION

RUBBER WALL BASE

SOLID SURFACE MATERIALSS

ACF ACCESS FLOOR SYSTEM

G003

ABBREVIATIONS

NO., NO, #

W. STEVENS

W. STEVENS

E. ROLAF

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

FIN FLR

EL. 89'-6"

C-C

B101A

EARTH

CONC

STEEL STRUCT STL

1A

PLYWOOD BLKG

ARCHITECTURAL LEGENDGENERAL LEGEND

REFERENCE: REFERENCE (CONT):

SYMBOLS

MATERIALS:

A701

A401

A401

A301

E1

E1

E4 A701

E3

E2

A201

EXISTING NEW

1,2,3

COLUMN LINE GRID DESIGNATION

BREAK LINES

ELEVATION SYMBOL

DETAIL TITLE REFERENCE

DETAIL DESIGNATION

DETAIL REFERENCE

SECTION DESIGNATION

SECTION CUT

SECTION IS CUT

SHEET ON WHICH

SECTION DESIGNATION

PARTIAL SECTION CUT

ELEVATION DESIGNATION

ELEVATION REFERENCE

GRAPHIC SCALE

NORTH ARROW

ROOM NAME & NUMBER

ELECTRONIC EQUIPMENT ROOM

WOOD

GYPSUM

METALS

CONCRETE

EARTH

PARTITION TYPE

DOOR NUMBER

WATER CLOSET

URINAL

LAVATORY

FIRE EXTINGUISHER

AIR FLOW PANEL

PERFORATED

RECESSED

SHEET NOTE NUMBER

DETAIL NUMBER

ELEVATION NUMBER

N

DP DP

C8

DETAIL DESIGNATION

C8

SECTION IS CUT

SHEET ON WHICH

ELEVATION IS DRAWN

SHEET ON WHICH

FINISH SCHEDULE

AND/OR INTERIOR WALL

ELEVATION DESIGNATION

ELEVATION SHOWN

DARKENED ARROW INDICATES

IS DRAWN OR SCHEDULED

SHEET ON WHICH DETAIL

ABOVE OR BEYOND

OUTLINE OF OBJECT

W/ FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

PARTITION WITH DOOR

TEMPORARY DUSTPROOF

(AWP)

ACOUSTICAL WALL PANEL

MOUNTED

SURFACE

DETAIL IS DRAWN

SHEET ON WHICH

FIRE RATING

NUMBER INDICATES

PARTITION TYPE

LETTER INDICATES

(ON FLOOR PLANS)

ACCESS FLOOR PANELS

(ON REFLECTED CEILING PLANS)

CEILING SYSTEM GRID

SUSPENDED ACOUSTICAL PANEL

MATCHLINE SYMBOL

MATCHLINE

REFER TO A202

PARTITION / WALL

0 8' 16'4'

1/8" = 1'-0"

1,2

FE

G004

GENERAL, ARCHITECTURAL, STRUCTURAL - LEGENDS

W. STEVENS

W. STEVENS

E. ROLAF

HAZMAT NOTE, ASBESTOS & PCB

1 DEMOLITION SHEET NOTE NUMBER

MOUNTED EQUIPMENT SYMBOLS

REFER TO MECHANICAL, ELECTRICAL AND FIRE PROTECTION FOR CEILING

NOTE:

DEMOLITION, UON

DEMOLITION, UON

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

A V

IS

IG

H W

A Y

ADMINISTRATIVE WING

BONIFACE PARKWAY

OLD GATE HOUSE

VISITOR PARKING

WING

TECHNICAL/OPERATIONS

BAY

UTILITY

WING

SERVICE

SECURITY FENCE

PROPERTY LINE

SERVICE YARD

SECURITY GATE

MAIN ENTRANCE

NORTH ENTRANCE

ENTRANCE

MAIN BUILDING

GUARD HOUSE

C

C

C

C

C

C

C

C

SECURITY FENCE

F. CONSTRUCTION OFFICE

F.1

F.2

F.3

G. CONSTRUCTION TOILET FACILITIES

G.1

G.2

H. DEMOLITION AND CONSTRUCTION HOURS

H.1

I. PARKING LOT AND DRIVEWAY REPAIR

INCLUDING ANY PAVEMENT STRIPING, AT THE CONSTRUCTION STAGING AREA(S).

UPON COMPLETION OF WORK, CONTRACTOR MUST REPAIR PAVED SURFACES TO ORIGINAL CONDITION, J. EQUIPMENT PROTECTION

J.2

J.3

J.1

I.2

I.1

E. CONSTRUCTION DEBRIS

D.1

C.5

C.4

C.3

C.2

D.2

INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.

REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT

THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL

A. CONSTRUCTION ACCESS

B. CONTRACTOR PARKING

B.1

A.5

A.4

A.3

A.2

A.1

A.6

A.7

STAGING AREA. COORDINATE WITH COR.

PROVIDE SIGNAGE REQUIRING SLOW TRAFFIC ALONG EAST AND NORTH LOOP ROADS AND TO CONSTRUCTION

PERSONS NEAR CONSTRUCTION AREAS.

SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT

PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON

C. FAA SECURITY REQUIREMENTS

C.1

D. CONSTRUCTION MATERIAL STORAGE AND CONSTRUCTION STAGING AREA

D.3

OTHER ITEMS IDENTIFIED BY COR.

TRAILERS. THIS INCLUDES SNOW REMOVAL, SANDING, SWEEPING, FENCING, SIGNAGE, TRASH REMOVAL, AND

GENERAL CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE ASSOCIATED WITH CONSTRUCTION STAGING AREA AND

E.1

E.2

E.3

SCHEDULING OF SERVICE.

AS REQUIRED AT THE TEMPORARY CONSTRUCTION STAGING AREA. COORDINATE WITH THE COR FOR

PORTABLE CHEMICAL TOILETS MUST BE PROVIDED, PAID FOR AND MAINTAINED BY THE CONTRACTOR

WASH STATIONS MUST BE EQUIPPED WITH LIGHTS AND HEAT DURING WINTER MONTHS.

PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS AT CONSTRUCTION STAGING AREA. TOILETS AND

C

GATE

C

NORTH PARKING LOT

WEST PARKING LOT

C

C

ENTRANCE

LOADING DOCK

UTILITY BAY

LOOP ROAD

LOOP ROAD

C

C

C

ZANNEX

DUMP AREA

FAA SNOW

C

WEST ENTRANCE

C

WARM STORAGE BUILDING

STORAGE SHED

DUMP AREA

REMOTE SNOW

G005

A8

SCALE : NOT TO SCALE

CONSTRUCTION STAGING PLAN

G005

A.8 DO NOT BLOCK ACCESS TO FAA'S SNOW DUMP AREA. COORDINATE WITH COR.

N O

R

A D

EAST LOOP ROAD

S O

U

A D

C

C

STORAGE.

FOR USE AS

CONTAINERS

SHIPPING

LOCATION OF

PROPOSED

WEST LOOP ROAD

WING

OPS SUPPORT

LOADING DOCK

THE PARKING UPGRADE PROJECT.

COORDINATE WITH COR ABOUT OTHER PLANNED CONSTRUCTION PROJECTS AT SITE, INCLUDING BUT NOT LIMITED TO

STAGING AREA

CONSTRUCTION

ENPZV

POWER PANEL

RESTORED TO ORIGINAL CONDITION BY CONTRACTOR TO THE SATISFACTION OF COR.

DISTURBED LAWNS AND LANDSCAPING INCLUDING, BUT NOT LIMITED TO SIDEWALKS AND CURBS, MUST BE

C

USE OF CELL PHONES ARE BANNED.

COORDINATE USE OF MOBILE CELL PHONE AT FACILITY WITH COR. IN CERTAIN AREAS OF THE FACILITY, THE

3-BAY ENTRANCE

CONTRACTOR ACCESS TO THE FACILITY COULD BE LIMITED BY FEDERAL AND FACILITY HEALTH MANDATES.

ACTIVITY WITH COR SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ARTCC.

ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY AND IT IS REQUIRED TO COORDINATE CONSTRUCTION

CONSTRUCTION PLAN AND NOTES

FOR TEMPORARY CONSTRUCTION TRAILER

PROPOSED LOCATION

DELIVERIES.

THE FAA OR AN ASSIGNED DESIGNEE WILL ESCORT ALL CONTRACT PERSONNEL WITH VISITOR BADGES AND

FAA VISITORS BADGES MUST BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE SECURITY FENCE.

CONSTRUCTION PLAN AND NOTES

W. STEVENS

W. STEVENS

E. ROLAF

VISITOR PARKING SPACES AT ARTCC ARE OFF-LIMITS FOR CONTRACTOR PARKING.

ARE NOT SECURED NOR PATROLLED AND THEIR USE IS AT THE VEHICLE OWNERS RISK. ALL OTHER EXISTING AND

MUST BE ON NORTH SIDE OF DAVIS HIGHWAY OR AT REMOTE SNOW DUMP AREA WHEN NOT IN USE. THESE AREAS

CONTRACTOR CORPORATE VEHICLE PARKING MUST BE LIMITED TO CONSTRUCTION STAGING AREA. POV PARKING

REFER TO DIVISION 1 FOR MORE DETAILED REQUIREMENTS.

RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL WHILE ON SITE. CONTRACTORS VEHICLES MUST BE MARKED.

BADGES ARE REQUIRED FOR CONSTRUCTION PERSONNEL. CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE

AN ADVANCE LIST AND DAILY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO COR. TEMPORARY VISITOR

OTHER PORTIONS OF THE FACILITY MUST BE COORDINATED WITH COR.

SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS. ACCESS TO

DOCK ENTRANCE.

CONTRACTOR'S ACCESS TO BUILDING MUST BE LIMITED TO: UTILITY BAY LOADING DOCK ENTRANCE, AND LOADING

CONTRACTOR MUST KEEP LOADING DOCKS ACCESSIBLE AT ALL TIMES FOR OTHER USES.

CONTRACTOR MUST BE PRESENT TO ESCORT AND ACCEPT DELIVERIES.

BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLE MUST NOT BE ALLOWED ON SITE.

11:00AM-12:30PM, AND 3:00-4:30PM, VERIFY TIMES WITH COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS

EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT: 6:00-8:30AM, DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN FAA

VEHICLE IN CASE OF EMERGENCY.

OTHER EMERGENCY VEHICLES. TEMPORARILY PARKED VEHICLES IN ROAD MUST HAVE DRIVER PRESENT TO MOVE

DO NOT BLOCK ANY ROAD OR ENTRANCE TO ALLOW EMERGENCY ACCESS OF FIRE TRUCKS, AMBULANCES, AND

WORK MUST BE COORDINATED WITH COR. DISRUPTION OF THIS FACILITY MUST NOT BE PERMITTED.

CONTRACTOR MUST USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS FACILITY.

IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES.

SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS. CONTRACTOR MUST NOTIFY COR

FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE

CONTRACT. CONTRACTOR MUST BE RESPONSIBLE FOR CONTINUOUS PROTECTION OF EQUIPMENT

EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS

BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.

DISCRETION OF COR. CONTRACTOR MUST DO NO DIGGING WITHOUT PRIOR PERMISSION FROM COR.

NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED BY THE CONTRACTOR AT THE

STAGING AREA. CONTRACTOR MUST PROVIDE SECURE CONTAINERS FOR TOOLS AND MATERIALS. MATERIALS MUST BE

STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE MUST BE LIMITED TO THE CONSTRUCTION

DEBRIS DUMPSTERS MUST BE REMOVED BY CONTRACTOR WHEN FULL OR REQUIRED BY COR.

DUMPSTERS MUST BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION.

CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. COORDINATE LOCATIONS WITH COR. AREAS AROUND

COVERED OR ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED BY

CONTRACTOR MUST NOT USE FAA DUMPSTERS. COORDINATE DUMPSTER LOCATIONS WITH THE FAA COR.

BE EQUIPPED WITH CLOSABLE LIDS TO PREVENT WILD LIFE ENCOUNTERS AND CONTAIN ODORS.

FOOD WASTE AND TRASH MUST BE SEGREGATED FROM GENERAL BUILDING DEBRIS. REFUSE CONTAINERS MUST

CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 7:00 AM TO 5:00 PM, AND AS DIRECTED BY COR.

CONTRACTOR MUST NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY. DEMOLITION AND

ADVANCE OF PERFORMANCE OF THE WORK.

COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN

NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, OPERATIONS.

MINIMUM OF 10 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK IF ACTIVITY INTERRUPTS NORMAL

PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY COR IN WRITING, A

CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING MUST BE ALLOWED ONLY AT

MUST BE PATCHED AND REPAIRED TO MATCH ADJACENT SURFACES AND FINISHES TO SATISFACTION OF COR.

PROTECT EXISTING FAA BUILDINGS, GROUNDS AND FACILITIES FROM DAMAGE. DAMAGE TO EXISTING FACILITIES

DRILLING.

INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, DEBRIS AND DUST, INCLUDING CORE

CONTRACTOR MUST PROTECT FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE BY THEIR WORK, COORDINATE WITH COR IF OTHER ENTRANCE GATE BY OLD GATE HOUSE IS AVAILABLE.

CONTRACTOR'S VISITORS AND DELIVERIES TO SITE MUST BE THROUGH THE MAIN ENTRANCE SECURITY GATE.

MUST APPROVED IN ADVANCE BY FAA AND MUST BE THE RESPONSIBILITY OF CONTRACTOR.

VERIFY WITH COR. POINT OF CONNECTION MUST BE DETERMINED AT PRE CONSTRUCTION CONFERENCE. HOOK-UPS

WITH COR. LIMITED TEMPORARY POWER MAY BE AVAILABLE AT ARTCC, IF REQUIRED FOR CONSTRUCTION PURPOSES.

MUST BE LOCATED IN CONSTRUCTION STAGING AREA. COORDINATE CONTRACTOR -PROVIDED TELEPHONE SERVICES

CONTRACTOR'S TRAILERS FOR OFFICES MUST BE LOCATED WHERE NOTED. MATERIALS AND EQUIPMENT STORAGE

CONNECTION FROM THE POWER PANEL TO THEIR CONSTRUCTION TRAILERS.

CONTRACTOR MUST VERIFY EXISTING CAPACITY. THE CONTRACTOR MUST BE RESPONSIBLE FOR ELECTRICAL

POWER MAY BE AVAILABLE AT THE POWER PANEL ENPZV AS INDICATED, VERIFY EXACT LOCATION W/ COR.

H.2

H.3

H.4

SIZE AND LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT PRECONSTRUCTION CONFERENCE.

BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS.

CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA MUST

OR CUTTING TO BE PERFORMED AT FACILITY 10 WORKING DAYS PRIOR TO USE.

PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. REVIEW WITH COR TYPE OF WELDING

NO WELDING EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING MUST NOT BE

COORDINATE LOCK OUT TAG OUT OPERATIONS WITH THE COR.

OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER OR VALVE AT ANY TIME.

VALVES. REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OR VALVE

IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS AND PIPE

SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE

AS SCHEDULED WITH COR. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCH OVER.

SHUTDOWNS AND SWITCH OVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

GENERAL SHEET NOTES:GENERAL SHEET NOTES:

A000

0 16'8' 32'

1/16" = 1'-0"

C.

B.

A.

FIRE RESISTANCE RATINGS:

1-HOUR FIRE RATED PARTITION

2-HOUR FIRE RATED PARTITION

BASEMENT PLAN - GUIDE PLAN

BASEMENT PLAN - GUIDE PLAN

A000 SCALE: 1/16" = 1'-0"

A8

KEY PLAN

W. STEVENS

W. STEVENS

E. ROLAF

CURRENTLY PROVIDE THE REQUIRED FIRE RATING.

THIS DRAWING DOES NOT REPRESENT THAT THESE EXISTING BARRIERS IN FACT

BARRIERS AS REQUIRED BY THE CODE AND FAA REQUIREMENTS/STANDARDS.

THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE RATED

FIRE STOP, OR BE ENCLOSED IN 1- HOUR FIRE RATED SHAFT.

PER CODE, FLOOR SLAB PENETRATIONS MUST HAVE 1-HOUR SMOKE AND

BUT NOT LIMITED TO

PRINCIPLE AREA OF WORK,

THE REQUIRED FIRE RATING.

THE EXISTING PARTITIONS THAT DO NOT CURRENTLY PROVIDE

THIS PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING

PENETRATIONS ARE CREATED BY THE REMOVAL OF EXISTING ITEMS.

WITH THE INDICATED RATINGS AT NEW PENETRATIONS, AND WHERE

THIS PROJECT SCOPE INCLUDES FIRE AND SMOKE STOPPING TO COMPLY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ANCHORAGE AIR ROUTE TRAFFIC CONTROL CENTER

1706170

20'-4" 20'-4" 20'-4" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 22'-1" 24'-10"

20'-4" 20'-4" 20'-4" 20'-4" 17'-3" 20'-9" 20'-7" 20'-3" 20'-3" 20'-3" 20'-3"

21'-10" 21'-10" 21'-10" 12'-10" 24'-0" 24'-0" 24'-0" 24'-0" 40'-0"

P9

N8

M N

0.6

0.7

0.8

0.9

8.1

Q

P1

N1

M9

M5

M4

L9

L8

L7

L5

L3

L2

L1

K2

J5

J2

H5

H3

G

F9

K5

AA

B

J

8.2

L4

6.9

B01

COMPUTER ROOM

B02

EQUIPMENT ROOM

MECHANICAL

STORAGE

SUPPLY

BUILDING

B03

CORRIDOR

B12

MENS

B13

WOMENS

B11

VEST

B06

CORRIDOR

COMM CLOSET

B10

EQUIPMENT

MECHANICAL

B09

STAIR 2

UP

UP

UP

B05

STORAGE

B04

STAIR #1

JAN

UTILI

DOR

CORRIDOR

TELCO CL.

EOF SPACE

STAIR-B

TECHNICAL STORAGE

LAN WORKROOM

LAN EQUIPMENT ROOM

AF LAB

NASTEP

MECHANICAL ROOM

TAPE STORAGE

DISK AND

SHELTER

NARCAS

TECHNICAL STORAGE

CORRIDOR

CORRIDOR

EOF OFFICE

B08

POWER CENTER

CRITICAL

SHAFT

SERVICE

CLOSET

STAIR-A

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

LOBBY

ELEVATOR

ROOM

MACHINE

ELEVATOR

JANITOR STORAGE

MECHANICAL ROOM

OFFICE

WOMEN

MEN

OFFICE

TRAINING ROOM

ELECTRICAL

TELCO

VESTIBULE

BREAK ROOM

SPACE

OFFICE/WORK

WELLNESS ROM

WOMEN

MEN28

LOOKERS

WOMEN'S

SHOWER

WOMEN'S

LOOKERS

MEN'S

SHOWER

MEN'S

OPEN OFFICE

30A

STORAGE

TO OFFICE

TO OFFICE

TO OFFICE

TO OFFICE

TO OFFICE

TELCO

ELECT/

CLOSET

JAN

B18

ROOM

COMPUTER

B07

MACHINE ROOM

ELEVATOR

GENERAL SHEET NOTES:

A.

GENERAL SHEET NOTES:

A001

0 16'8' 32'

1/16" = 1'-0"

C.

B.

FIRE RESISTANCE RATINGS:

1-HOUR FIRE RATED PARTITION

2-HOUR FIRE RATED PARTITION

FIRST FLOOR PLAN - GUIDE PLAN

FIRST FLOOR PLAN - GUIDE PLAN

A001 SCALE: 1/16" = 1'-0"

A8

KEY PLAN W. STEVENS

W. STEVENS

E. ROLAF

CURRENTLY PROVIDE THE REQUIRED FIRE RATING.

THIS DRAWING DOES NOT REPRESENT THAT THESE EXISTING BARRIERS IN FACT

BARRIERS AS REQUIRED BY THE CODE AND FAA REQUIREMENTS/STANDARDS.

THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE RATED

FIRE STOP, OR BE ENCLOSED IN 1- HOUR FIRE RATED SHAFT.

PER CODE, FLOOR SLAB PENETRATIONS MUST HAVE 1-HOUR SMOKE AND

THE REQUIRED FIRE RATING.

THE EXISTING PARTITIONS THAT DO NOT CURRENTLY PROVIDE

THIS PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING

PENETRATIONS ARE CREATED BY THE REMOVAL OF EXISTING ITEMS.

WITH THE INDICATED RATINGS AT NEW PENETRATIONS, AND WHERE

THIS PROJECT SCOPE INCLUDES FIRE AND SMOKE STOPPING TO COMPLY

BUT NOT LIMITED TO

PRINCIPLE AREA OF WORK,

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ANCHORAGE AIR ROUTE TRAFFIC CONTROL CENTER

1706170

20'-4" 20'-4" 20'-4" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 22'-1" 24'-10"

20'-4" 20'-4" 20'-4" 20'-4" 17'-3" 20'-9" 20'-7" 20'-3" 20'-3" 20'-3" 20'-3"

21'-10" 21'-10" 21'-10" 12'-10" 24'-0" 24'-0" 24'-0" 24'-0" 40'-0"

6.9 DN

UP

UP

DN

DN

UP

DN

UP

UTILIDOR

(BELOW GROUND)

STAIR TO

UTILIDOR

B04

STAIR #1

F02

CONTROL ROOM

F03

CORRIDOR

F06

CORRIDOR

F14

MENS

F15

VEST

F09

STAIR 2

F12

WOMENS

F11

VEST

F

J A

N

F07

CLOSET

COMM

F08

EQUIPMENT ROOM

MECHANICAL

F16

VESTIBULE

G01

BATTERY ROOM

F01B

STORAGE

F01A

OFFICE

F04

VEST

G10

GENERAL STORAGE

G09

SHIPPING/RECEIVING

G02

UPS ROOM

G08

BOILER EXPANSION

G03

MECH. RM.

G06A

ESU OFFICE G06

ESU SHOP AREA

G04

GENERATOR ROOM

G07

GARAGE

F

V A

L

M

F28

MENS

G07B

WOMENS

G07A

ENTRY COURT

MECHANICAL

STAIR-A

PUMP ROOM

CORRIDOR

CORRIDOR

CORRIDOR

ELEC. CL.

AT READY ROOM

AT OFFICE

AT OFFICE

AT OFFICE

AF SYS OPS/NOMS

AT OFFICE

AT STORAGE

AT STORAGE

AT STORAGE

AND CAPSTONE DEPOT

ATOP LOE, CAPSTONE

TELCO CL.

STORAGE

STAIR-B

C L

O S

E T

CONFERENCE ROOM

AT/OS

REVIEW

AT TAPE

LIBRARY

AT/OS

OFFICE

EAP/EEO

G05

CHILLER RM.

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

HALL

HALL

HALL

HALL

100A

VESTIBULE

LOBBY

STAIR-2

RECEPTION

OFFICE

ENV MGR

OFFICE

TRAINING OSS

MGR OFFICE

ZAN TO

OFFICE

SOC MGR

OFFICE

COMM MGR

OFFICE

AUTO MGR

OFFICE

OFFICE

IT OFFICE

ELECT

OFFICE

OSS OFFICE

OSS OFFICE

MAIL ROOM

OFFICE

TSC MGR

ELEC/TELCO

CONFERENCE ROOM

MEN

WOMEN

BREAK ROOM

RECEPTIONIST

OFFICE

DISTRICT MGR

OFFICE

OSS MGR

TSC OPEN OFFICE

MEN

WOMEN

LOCKERS

MEN'S

STORAGE

JANITOR CL

VEST.

VEST.

LOBBY

ELEVATOR

LOCKERS

WOMEN'S

NURSING

QUIET ROOM

VENDING

DINING

KITCHEN

VESTIBULE

CLOSET

F00

DYNAMIC SIMULATOR

F27

ROOM

EQUIPMENT

F01

DSR MAINTENANCE ROOM

MANAGERS OFFICE

AT AREA OPS

OFFICE

OFFICE

GENERAL SHEET NOTES:

A.

GENERAL SHEET NOTES:

A002

0 16'8' 32'

1/16" = 1'-0"

SECOND FLOOR PLAN - GUIDE PLAN

SECOND FLOOR PLAN - GUIDE PLAN

A002 SCALE: 1/16" = 1'-0"

A8

C.

B.

FIRE RESISTANCE RATINGS:

1-HOUR FIRE RATED PARTITION

2-HOUR FIRE RATED PARTITION

KEY PLAN

W. STEVENS

W. STEVENS

E. ROLAF

CURRENTLY PROVIDE THE REQUIRED FIRE RATING.

THIS DRAWING DOES NOT REPRESENT THAT THESE EXISTING BARRIERS IN FACT

BARRIERS AS REQUIRED BY THE CODE AND FAA REQUIREMENTS/STANDARDS.

THIS DRAWING ILLUSTRATES THE EXTENT AND LAYOUT OF FIRE RATED

FIRE STOP, OR BE ENCLOSED IN 1- HOUR FIRE RATED SHAFT.

PER CODE, FLOOR SLAB PENETRATIONS MUST HAVE 1-HOUR SMOKE AND

THE REQUIRED FIRE RATING.

THE EXISTING PARTITIONS THAT DO NOT CURRENTLY PROVIDE

THIS PROJECT SCOPE DOES NOT INCLUDE REPLACING OR UPGRADING

PENETRATIONS ARE CREATED BY THE REMOVAL OF EXISTING ITEMS.

WITH THE INDICATED RATINGS AT NEW PENETRATIONS, AND WHERE

THIS PROJECT SCOPE INCLUDES FIRE AND SMOKE STOPPING TO COMPLY

BUT NOT LIMITED TO

PRINCIPLE AREA OF WORK,

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ANCHORAGE AIR ROUTE TRAFFIC CONTROL CENTER

1706170

20'-4" 20'-4" 20'-4" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 21'-9" 22'-1" 24'-10"

20'-4" 20'-4" 20'-4" 20'-4" 17'-3" 20'-9" 20'-7" 20'-3" 20'-3" 20'-3" 20'-3"

21'-10" 21'-10" 21'-10" 12'-10" 24'-0" 24'-0" 24'-0" 24'-0" 40'-0"

6.9

AT SEC/RECPT

DN

DN

CORRIDOR CORRIDOR

C O

R R I

D O

R

DNUP

STAIR-A

WCG MGR

210A

STORAGE

CORRIDOR

S18

OFFICE

AOS MGR

S16

OFFICE

OS MGR

AT CARTOGRAPHER

AT AUTOMATION

AT CLASS ROOM

AT CLASS ROOM

AT CLASS ROOM

AT/QA

MANAGER

AT ASST.

MANAGERS

AT OPS

AT CONFERENCE ROOM

AT MANAGER

SPECIALIST

MANAGEMENT

PERSONNEL

S20

MECHANICAL/ELECTRICAL

S19

AOS OFFICE AREA

S19

AT OFFICE AREA

S15

OCSR TEAM AREA

STAIR #2

STAIR #1

READY ROOM

AT SUPPORT STAFF

S12

MEN

S09

VEST S03

CORRIDOR

S06

EQUIPT. RM.

MECHANICAL

S11

JAN

S10

WOMEN

S07

STAIR #2

S05

CLOSET

COMMS08

L

LOGISTICS DEPOT

STORAGE

LOGISTICS DEPOT

VESTIBULE

GALLERY

OBSERV.

ROOM

MECHANICAL

STAIR-B

TELCO CL

SUPPORT OFFICES

BELOW - OPERATIONS

CONFERENCE ROOM

OFFICES

TRAINING

TRAINING

CBI INST

S17

ROOM

CONFERENCE

OFFICE

ROOM

CONFERENCE

SHEET NOTES

W. STEVENSA101

BASEMENT ELEVATOR PLAN - DEMOLITION

SCALE: 1/4" = 1'-0"

A6

S07

STAIR #2

F06

CORRIDOR

B06

CORRIDOR

B07

MACHINE ROOM

ELEVATOR

COMM CLOSET

A101

SECOND FLOOR ELEVATOR PLAN - DEMOLITION

F6

A101

ELEVATOR DEMOLITION PLANS

0 4'2' 8'

1/4" = 1'-0"

B08

CENTER

POWER

CRITICAL

B09

STAIR #2

F09

STAIR #2

F08

ROOM

EQUIP.

MECH

S06

ROOM

EQUIP.

MECH

S03

CORRIDOR

REMOVE ELEVATOR EQUIPMENT. COORDINATE WITH OTHER DISCIPLINES.

REMOVE LOBBY POSITION INDICATOR.

REMOVE HALL LANTERNS.

A101

FIRST FLOOR ELEVATOR PLAN WITH CAR SHOWN - DEMOLITION

D6

TYP

A.

GENERAL SHEET NOTES

REMOVE TOP OF CAR RAILING.

THE PANEL

REMOVE CAR BUTTON STATION INCLUDING EMERGENCY COMMUNICATION LOCATED WITHIN

12 11

12 11

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

ADHESIVE. CAR FRAME AND PLATFORM ARE TO REMAIN.

REMOVE INTERIOR CAR FINISHES, INCLUDING WALL MOUNTED HANDRAILS, RESILIENT FLOORING AND

15 REMOVE HOISTWAY JAMB FLOOR DESIGNATIONS, TYPICAL.

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

CEILING PANELS AND OTHER CEILING FIXTURES TO REMAIN.

WORK. REFER TO MECHANICAL. CAREFULLY REMOVE AND PROTECT ACOUSTICAL

REMOVE AND SAVE FOR REUSE SUSPENDED CEILING SYSTEM TO ALLOW FOR THE

B.

START, DURATION, AND END DATES IN REQUEST.

TAKE THE ELEVATOR OUT OF SERVICE AT LEAST SIX WEEKS IN ADVANCE. INCLUDE OUTAGE

TO THE UTILITY BAY AND TECH OPS WING SECOND FLOOR. SUBMIT REQUEST TO COR TO

PROVIDE ACCESSIBLE ACCESS TO THE BASEMENT AND IS THE ONLY ACCESSIBLE ACCESS

OF SERVICE. THE UTILITY BAY ELEVATOR IS ONE OF ONLY TWO ELEVATORS THAT

SCHEDULE AND PERFORM WORK TO MINIMIZE THE DURATION THAT THE ELEVATOR IS OUT

C.

GUIDE RAILS OR OTHER MEANS, AND COORDINATE EFFORTS WITH COR.

TO ALLOW FOR THE WORK. COORDINATE SECURING ELEVATOR CAR TO EXISTING ELEVATOR

EXISTING ELEVATOR HOISTWAY DOES NOT HAVE A HOIST BEAM. SECURE CAR AS REQUIRED

REMOVE JACKING UNIT (PLUNGER/PISTON) AND SCAVENGER PUMP.

E. ROLAF

W. STEVENS

17 COORDINATE WITH STRUCTURAL AND MECHANICAL DEMOLITION WORK IN ELEVATOR PIT.

TYP BOTH SIDES

EXISTING ELEVATOR PIT LADDER TO REMAIN, PROTECT FROM DAMAGE

NEAR THE FIRST FLOOR ELEVATOR LANDING.

MAJOR CONCERN OF THE FAA IS TO NOT DISTURB AIR TRAFFIC OPERATIONS THAT OCCUR

MUST CONTROL NOISE, DUST PARTICLES, AND MIST USED TO CONTROL DUST PARTICLES. A

SCHEDULE NOISY DEMOLITION WORK DURING OFF-HOURS. DEMOLITION CONTROL MEASURES

CONCRETE DEMOLITION AND CONTROL MEASURES MUST BE SCHEDULED WITH COR.

TYP BOTH SIDES

D.

E.

WITH COR SPACE REQUIRED TO ALLOW FOR THE WORK.

FLOORS AND ACCESS TO THE EXTERIOR EGRESS DOORS ON FIRST FLOOR. COORDINATE

MAINTAIN EGRESS THROUGH CORRIDORS TO STAIR #2 ON BASEMENT, FIRST AND SECOND

MECHANICAL EQUIPMENT ROOMS.

DAMAGE SYSTEMS LOCATED IN, BUT NOT LIMITED TO, THE CRITICAL POWER CENTER, AND

DAMAGED BY THE WORK, PATCH AND REPAIR TO SATISFACTION OF COR. PROTECT FROM

UNLESS OTHERWISE NOTED, EXISTING FINISHES AND BUILDING SYSTEMS ARE TO REMAIN. IF

REMOVE HALL CALL BUTTONS.

TYP BOTH SIDES

TYP BOTH SIDES

PROTECT HOISTWAY DOORS FROM DAMAGE.

REMOVE HOISTWAY DOOR CLOSERS, SIGHT GUARDS AND SILLS TO ALLOW FOR THE WORK.

REMOVE ELEVATOR CAR DOORS, DOOR SILLS AND EQUIPMENT.

2'-11" CLEAR OPENING

EXISTING HM DOOR ASSEMBLY TO REMAIN, PROTECT FROM DAMAGE.

EXISTING HOISTWAY DOOR FRAME AND DOORS TO REMAIN, PROTECT FROM DAMAGE

EXISTING CAR RAILS TO REMAIN, PROTECT FROM DAMAGE.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ANCHORAGE AIR ROUTE TRAFFIC CONTROL CENTER

1706170

UPUP

DN

SHEET NOTES

E. ROLAF

9 EXISTING PARTITION. PATCH AND REPAIR TO MATCH ADJACENT SURFACES.

A601

BASEMENT ELEVATOR PLAN

A8

S07

STAIR #2

F06

CORRIDOR

B06

CORRIDOR

B07

MACHINE ROOM

ELEVATOR

COMM CLOSET

FIRST FLOOR ELEVATOR PLAN WITH CAR SHOWN

D8

SECOND FLOOR ELEVATOR PLAN

F8

A601

0 4'2' 8'

1/4" = 1'-0"

B08

CENTER

POWER

CRITICAL

B09

STAIR #2

F09

STAIR #2

F08

ROOM

EQUIP.

MECH

S06

ROOM

EQUIP.

MECH

S03

CORRIDOR

ELEVATOR FLOOR PLANS AND SECTION

ELEVATOR SECTION

A6

EL 177'-0"

BASEMENT FLOOR

EL194'-0"

FIRST FLOOR

EL 214'-0"

SECOND FLOOR

EL 172'-6"

ELEVATOR PIT SLAB

B07

MACHINE ROOM

ELEVATOR

F06

CORRIDOR

B09

STAIR #2

S07

STAIR #2

A6

A601

A6

A601

EXISTING CIP CONCRETE ELEVATOR SHAFT BELOW FIRST FLOOR

EXISTING HOISTWAY DOOR FRAME, PROTECT FROM DAMAGE

GENERAL SHEET NOTES

A.

ADDITION UTILITY BAY, DATED: 11-07-90.

CONSTRUCTION DOCUMENTS FROM THE TECHNICAL/OPERATIONS BUILDING

DRAWINGS ARE BASED ON FIELD SURVEY AND FAA PROVIDED

MACHINE ROOM TO ACHIEVE A 1-HOUR FIRE RATING.

SMOKE AND FIRESTOP PENETRATIONS IN ELEVATOR SHAFT AND ELEVATOR

B.

C.

EXISTING ROOF ASSEMBLY, PROTECT FROM DAMAGE.

VISIBILE.

EXISTING GYPSUM BOARD CEILING ASSEMBLY. NO HOIST BEAM WAS

EXISTING ELEVATOR HOISTWAY OPENING BEYOND.

TYP

TYP

TYP

TYP

EL 228'-0" AT LP

TOP OF ROOF DECK

PROVIDE LUMINOUS CEILING.

PROVIDE RESILLIENT (RUBBER) FLOOR TILE FLOOR FINISH.

EXISTING ELEVATOR CAR PLATFORM/FRAME TO REMAIN.

PROVIDE LOBBY POSITION INDICATOR

PROVIDE HALL LANTERNS

TYP

TYP

D. REFER TO SPECIFICATIONS FOR COMPLETE DESCRIPTION OF THE WORK.

COR.

WALL MOUNTED FIRE EXTINGUISHER. COORDINATE LOCATION WITH 24

25 EXISTING SUSPENDED CEILING SYSTEM

E R

H E

A D

V

IF

R T

Y P

ELEVATOR MACHINE ROOM EQUIPMENT.

KEY NORTH

N

CLOSET

COMM

ELECTRICAL EQUIPMENT, REFER TO ELECTRICAL, TYP

CEILING HUNG MECHANICAL EQUIPMENT, REFER TO MECH TYP

SHEET NOTES CONTINUED

MYDOORSIGN PART SE-2054.

ADHESIVE BACKING. COORDINATE SIGN LOCATION WITH COR. BASIS OF DESIGN:

TOP OF SIGN TO BE MOUNTED AT 5'-0" AFF. SIGN TO BE ATTACHED TO WALL WITH

STAIRS.

STATING THAT: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT

9 3/4" X 12 1/2" PICTORIAL SIGN WITH RAISED CHARACTERS AND GRADE 2 BRAILLE

WIDTH OPENING

EXISTING HM DOOR ASSEMBLY, PROTECT FROM DAMAGE. 2'-11" CLEAR

Y

IF

IS

T W

A Y

C

P

9'-0" CLR HOISTWAY

9'-0" VIF

E.

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

TYP BOTH SIDES

SHEET NOTES CONTINUED

TYP BOTH SIDES

TYP

TYP BOTH SIDES

20 9

TYP BOTH SIDES

31 PROVIDE CAR TOP GUARD SAFETY RAILS AND KICK-PLATES.

W. STEVENS

W. STEVENS

CLEAN AND REFURBISH CAR RAILS AS REQUIRED.

PROTECTIVE MATS

PROVIDE HOOKS TO MOUNT PROTECTIVE MATS AND A SET OF

LADDER TO BE PAINTED, AND PAINT TO MATCH EXISTING COLOR.

EXISTING ELEVATOR PIT LADDER, PROTECT FROM DAMAGE. PREPARE

COMMUNICATION SYSTEM.

REFER TO SPECIFICATIONS FOR CAR BUTTON STATIONS, AND EMERGENCY

CAR THEY ARE IN.

IT PER ABA AND ALLOW OCCUPANT TO IDENTIFY TO EMERGENCY RESPONDER WHICH

PLACE ELEVATOR CAR DESIGNATION INSIDE CAR WHERE OCCUPANT CAN READILY SEE

CALLOUT WITH COR.

IMMEDIATELY BELOW THE FLOOR DESIGNATION. COORDINATE CAR DESIGNATION

PROVIDE TACTILE CAR IDENTIFICATION ON BOTH JAMBS FOR EACH HOISTWAY FRAME

EACH HOISTWAY FRAME. FLOOR DESIGNATION MUST BE CENTERED AT 4'-6" AFF.

HOISTWAY FRAME. PROVIDE TACTILE STAR AT FIRST FLOOR ON BOTH JAMBS FOR

PROVIDE TACTILE FLOOR DESIGNATION WITH BRAILLE ON BOTH JAMBS FOR EACH

SPECIFICATIONS. PAINT PARTITIONS TO MATCH ADJACENT SURFACES.

BY THE WORK TO MATCH ADJACENT SURFACES AND AS DIRECTED IN

PATCH, AND REPAIR PARTITIONS, FLOORS, AND CEILING SYSTEMS DAMAGED

DOCUMENTATION, PARTITION HAS 6" CH STUDS.

EXISTING 1-HOUR GWB SHAFT WALL ASSEMBLY. PER FAA PROVIDED

ELEVATOR EQUIPMENT AND CAR ARE NOT SHOWN FOR CLARITY

NOTE:

TYP BOTH SIDES

PROVIDE JACK UNIT (PLUNGER/PISTON) AND SCAVENGER PUMP

TYP

SATISFACTION OF COR.

BASEMENT PLAN - GUIDE PLAN AND MECH. REINSTALL SUSPENDED CEILING SYSTEM TO

SMOKE AND FIRESTOP PENETRATIONS IN RATED PARTITIONS/WALLS. REFER TO

A601

A6

CAR AS SPECIFIED.

DOORS WALLS AND ELEVATOR CAR DOORS. PAINT TOP OF ELEVATOR

PROVIDE PLASTIC LAMINATE SIDEWALLS. PROVIDE STAINLESS STEEL: BASE,

ADDITIONAL WORK. PROVIDE INTERIOR ELEVATOR CAR FINISHES.

EXISTING ELEVATOR CAR PLATFORM, REFER TO SPECIFICATIONS FOR

PROVIDE HALL BUTTON STATIONS

PROVIDE HOISTWAY/CAR DOOR EQUIPMENT

SUMP PUMP PIT AND GRATED COVER, REFER TO STRUCTURAL AND MECHANICAL.

24 PROVIDE METAL WALL MOUNTED HANDRAILS

COMPATIBLE WITH SURFACES. COLOR TO BE SELECTED BY COR.

PAINT PIT FROM BASEMENT FLOOR LEVEL DOWN WITH PAINT SYSTEM

EXISTING CONCRETE ELEVATOR PIT. CLEAN AND PREP TO BE PAINTED.

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBMITTED BY

DRAWN BY

DESIGNED BY

CHECKED BY

ISSUED BY

APPROVED BY

DATE

DRAWING NO.

JCN:

JCN

DATE

REDLINE

APVD

DATE

APPROVED

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

AK

WESTERN SERVICE AREA

ZAN - D - ARTCC - ALASKA

ANCHORAGE,

ANCHORAGE ARTCC

ANCHORAGE ANCHORAGE (ZAN) ARTCC

RENTON, WA

R

SERVICES

ENGINEERING

4.29.22

ELEVATOR REHABILITATION PROJECT

ANCHORAGE AIR ROUTE TRAFFIC CONTROL CENTER

1706170

UPUP

DN

FIRE SUPPRESSION GENERAL NOTES FIRE ALARM GENERAL NOTES FIRE SUPPRESSION LEGEND FIRE SUPPRESSION ABBREVIATIONS

FIRE ALARM LEGEND FIRE ALARM ABBREVIATIONS

NEW SPRINKLER PIPE

BUTTERFLY VALVE

NOT BE LEFT IN OCCUPIED AREAS.

CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT SHALL F.

SATISFACTION AT NO COST TO THE GOVERNMENT.

DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE COR'S

EXISTING FINISHES. ANY FINISHES, BUILDING STRUCTURE, OR FURNITURE DAMAGED

FINISHES AFFECTED BY THE WORK SHALL BE PATCHED AND REPAIRED TO MATCH C.

ALLOWED.

HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT

DOCUMENTS, CODES, AND CRITERIA FOR THE HANDICAPPED ACCESSIBILITY ARE TO BE

MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ADA/ABA

CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS, IDENTIFIED IN

DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.) AND P.

REQUIREMENTS, 29 CFR 1910.146 AND 1926.21(B)(6).

WORK IN CONFINED SPACES OR AREAS SHALL BE DONE IN ACCORDANCE WITH OSHA N.

HOW TO PROCEED WITH WORK.

HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN

WORK AREA(S) AND BUILDING(S) CONTAIN HAZARDOUS MATERIALS (HAZMAT). IF I.

CIRCUIT BREAKERS.

ADVANCE OF PERFORMANCE OF WORK. ONLY FAA ESU PERSONNEL SHALL OPERATE

BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS IN

TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES SHALL

UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES SHALL NOT BE K.

COORDINATE WITH COR. COORDINATE FURNITURE INVENTORY WITH COR.

PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND

REMOVE AND REINSTALL, AS REQUIRED, FURNITURE THAT IS AFFECTED BY THE WORK. J.

OR NEW CONSTRUCTION.

EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND ROOFS) BEFORE ANY DEMOLITION

WITH COR TO VERIFY EXISTING CONDITION OF BUILDING SYSTEMS (INCLUDING

PROJECT SHALL BE SEALED WITH AN APPROVED U.L. SYSTEM. COORDINATE ALL WORK

ROOFS OR SMOKE BARRIERS. ALL PENETRATIONS CAUSED BY THE WORK OF THIS

MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, WALLS, CEILINGS, G.

DAILY. COORDINATE WITH COR NOT TO DISRUPT FAA OPERATIONS.

ACTIVE EQUIPMENT. IF REQUIRED BY THE COR, REMOVE AND CLEAN BARRIERS

DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO PROTECT

DISRUPTION TO EQUIPMENT OR PERSONNEL WITHIN THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .