Attachment 1 - ZAN Elevator Rehab (final) - Specifications.pdf

PDF 4 MB Posted

Attached to
Elevator Rehabilitation - Anchorage ARTCC, Anchorage, AK
Solicitation number
697DCK-22-R-00517
Issued by

About this file

This solicitation package describes an elevator rehabilitation project for the Anchorage Air Route Traffic Control Center located in Anchorage, Alaska. The project scope involves modernizing Passenger/Service Elevator No. 1, replacing the elevator power unit and controller, and updating finishes, lighting, and controls. The estimated construction cost is between $500,000 and $1,000,000. A site visit is scheduled for September 15, 2022, with requests for information due by September 22. Offers for the project are due by September 29, 2022 and shall be emailed to the point of contact provided. The solicitation details the project location, scope, and response requirements for interested contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elevator Rehabilitation Project

Task Order

Final Submittal Specifications

Anchorage ARTCC (ZAN) Anchorage, AK

August 2022

THIS PAGE LEFT INTENTIONALLY BLANK

Anchorage ARTCC (ZAN) 29 April 2022 Elevator Rehabilitation Project Anchorage, Alaska Final Submittal

TABLE OF CONTENTS TOC - 1

Division Section Title

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 07 Seals Page

SPECIFICATIONS GROUP

General Requirements Subgroup

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 Covid-19 Special Contract Requirement – (Construction Only) 01 11 00 Summary of Work 01 14 00 Work Restrictions 01 25 00 Substitution Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 35 13 Special Project Procedures 01 35 29 Health, Safety, and Emergency Response Procedures 01 35 53 Security Procedures 01 42 00 References 01 45 00 Quality Control 01 50 00 Temporary Facilities and Controls 01 61 00 Common Product Requirements 01 66 00 Product Storage and Handling Requirements 01 73 00 Execution 01 74 19 Construction Waste Management 01 74 23 Final Cleaning 01 77 00 Closeout Procedures 01 78 39 Project Record Documents

Facility Construction Subgroup

DIVISION 02 - EXISTING CONDITIONS

02 41 19 Selective Demolition

DIVISION 05 - METALS

05 50 00 Metal Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 13 Penetration Firestopping 07 84 43 Joint Firestopping 07 92 00 Joint Sealants

DIVISION 09 - FINISHES

09 65 19 Resilient Tile Flooring 09 91 23 Interior Painting

Anchorage, Alaska Final Submittal

TABLE OF CONTENTS TOC - 2

DIVISION 10 - SPECIALTIES

10 44 16 Fire Extinguishers

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 Hydraulic Elevators

Facility Services Subgroup

DIVISION 21 - FIRE SUPPRESSION

21 05 17 Sleeves and Sleeve Seals for Fire-suppression Piping 21 05 23 General-Duty Valves for Water-based Fire-suppression Piping 21 13 13 Wet-Pipe Sprinkler Systems

DIVISION 22 - PLUMBING

22 05 13 Common Motor Requirements for Plumbing Equipment 22 05 19 Meters and Gages for Plumbing Piping 22 05 23.14 Check Valves for Plumbing Piping 22 05 23.15 Gate Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 08 00 Commissioning of Plumbing 22 13 16 Sanitary Waste and Vent Piping 22 13 19 Sanitary Waste Piping Specialties 22 13 19.13 Sanitary Drains 22 14 29 Sump Pumps

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 13 Common Motor Requirements for HVAC Equipment 23 05 19 Meters and Gauges for HVAC Piping 23 05 23.12 Ball Valves for HVAC Piping 23 05 29 Hangers and Supports for HVAC Piping and Equipment 23 05 48 Vibration and Seismic Controls for HVAC 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of HVAC 23 09 23 Direct Digital Control (DDC) System for HVAC 23 09 23.11 Control Valves 23 09 23.23 Pressure Instruments 23 21 13 Hydronic Piping 23 21 16 Hydronic Piping Specialties 23 82 19 Fan Coil Units

DIVISION 26 - ELECTRICAL

26 05 00 Common Work Results for Electrical 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 23 Control-voltage Electrical Power Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems

Anchorage, Alaska Final Submittal

TABLE OF CONTENTS TOC - 3

26 05 33 Raceways and Boxes for Electrical Systems 26 05 48.16 Seismic Controls for Electrical Systems 26 05 53 Identification for Electrical Systems 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 51 00 Interior Lighting

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 46 21.11 Addressable Fire-alarm Systems

END OF TABLE OF CONTENTS

Anchorage, Alaska Final Submittal

SEALS PAGE 00 01 07 - 1

DOCUMENT 00 01 07 - SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect:

1. William Michael Stevens.

2. Commonwealth of Virginia - 16412.

3. Responsible for Divisions 01-14 Sections except where indicated as prepared by other design professionals of record.

B. Fire-Protection Engineer:

1. Jacob I. Watkins.

2. State of Maryland - 44038.

3. Responsible for Division 21 and 28 Sections.

C. Plumbing/ HVAC Engineer:

1. Aaron Strudivant.

2. State of North Carolina - 043286.

3. Responsible for Division 22-23.

D. Electrical Engineer:

1. Wellesley Le Young Lynn.

2. Commonwealth of Virginia - 040205569334.

3. Responsible for Division 26.

END OF DOCUMENT 00 01 07

Anchorage ARTCC (ZAN)

Anchorage, Alaska

29 April 2022

Final Submittal

COVID-19 SPECIAL CONTRACT REQUIREMENT

(CONSTRUCTION ONLY)

01 00 00 - 1

SECTION 01 00 00 – COVID-19 SPECIAL CONTRACT REQUIREMENT –

(CONSTRUCTION ONLY)

PART 1 - GENERAL

1.1 SUMMARY

A. This supplemental document provides requirements that the Contractor must take to reduce the spread and/or exposure of COVID –19 on FAA contracts at Federal Aviation Administration (FAA) facilities.

1.2 COVID-19 PRECAUTIOINS

A. The COVID Precautions must include, but are not limited to, the following:

1. COVID-19 Wellness Self-Check (See Sample), this is a sample Wellness Self-check questionnaire. Refer to CDC and local guidance for latest symptoms self-check list.

a. Contractor employees, sub-contractors and visitors must conduct and complete the wellness self-check form prior to reporting to the FAA facility and/or jobsite. The Contractor superintendent/COVID Safety Officer must review each form.

b. The person responsible for completing Wellness Self-Check has the authority to deny anyone entering the job site who displays any symptoms prior to entering the facility as well as authority to remove person showing symptoms after the beginning of the shift.

c. Complete the Wellness Self-Check immediately prior to accessing the site.

d. Contractor shall take same precaution for any deliveries entering FAA premises regardless of driver exiting truck or not.

B. COVID Exposure Reduction:

1. Face Covering: When required by Facility Management, all Contractor employees, sub-Contractors and visitors must wear a face covering while on the jobsite and/or within a FAA facility. All face coverings, at a minimum, must adhere to the following:

a. Cover the nose and mouth

b. Fit snugly, but comfortably, against the side of the face

c. Be secured with ties or ear loops

d. Allow for breathing without restrictions

e. Include multiple layers of fabric

(CONSTRUCTION ONLY)

01 00 00 - 2

1.3 SITE ACCESS/EGRESS

A. The Contractor must meet with the FAA Contracting Officer Representative (COR) and local FAA management prior to the start of the project to establish the Contractors’ access and egress for the facility and/or job site.

B. If a Contractor employee, sub-Contractor or visitor is not feeling well for any reason and COVID-19 symptoms exist, the individual will be denied access to the FAA facility and/or work site. The Contractor is expected to notify the FAA Contracting Officer (CO) and/or Contracting Officer’s Representative (COR) immediately of the situation and inform the FAA of any concerns regarding the work that was expected to be performed by that Contractor employee.

1.4 FAA NOTIFICATIONS

A. Contractor is required to notify the agency immediately when a suspected or confirmed case of COVID-19 involves an employee, sub-Contractor or visitor who has visited the FAA facility and/or job site in last 14 days, been in contact with someone that may have visited a FAA facility, and/or had contact with a FAA employee and/or another agency Contractor. Reporting must be submitted immediately and include the information outlined below to allow the Agency to make a timely and appropriate response. Report any cases to the CO and COR. The report must include, for each affected employee, the date of self-quarantine and whether the case is suspected or confirmed. Also, please indicate where the individual visited (building address) or with whom they met and the date of latest contact. To ensure privacy information is protected, please do not include specific information about the employee through email. Once received, a FAA official will contact you directly to obtain additional information regarding the case(s) to coordinate a proper response.

B. Medical documentation by an authorized medical professional that the Contractor/sub- Contractor no longer poses a transmission risk and is safe to re-enter the workplace.

1.5 SUBMITTALS (NOT USED)

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 IMPLEMENTATION

A. Shared use of trailer between FAA and Contractor personnel is not allowed.

B. All meetings shall take place virtually where practicable.

(CONSTRUCTION ONLY)

01 00 00 - 3

C. FAA is using the CDC Community Level to determine masking requirements for facilities. The Community Level Data is updated once weekly, by 8:00PM Thursdays, and can be found at https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html. If the situation takes a turn for worst, Contracting Officer may issue Stop Work Notice.

3.2 NOTE:

A. Any breach to COVID-19 requirements listed in this document will result in removal of the person and/or issuing Stop Work Notice by Contracting Officer.

END OF SECTION 01 00 00

https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html

(CONSTRUCTION ONLY)

01 00 00 - 4

Sample of daily questioner Symptoms Yes No Fever Shortness of Breath Difficulty Breathing Chest Pain Chills Body aches Sore Throat Headache Diarrhea Nausea/Vomiting Runny Nose New Loss of Taste/Smell

(CONSTRUCTION ONLY)

01 00 00 - 5

Anchorage, Alaska

29 April 2022

Final Submittal

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. These Contract Documents cover the requirements of the Federal Aviation Administration (FAA), hereinafter referred to as the Government, for the work associated with the Anchorage Air Route Traffic Control Center (ARTCC) Elevator Rehabilitation Project, located at 700 N.Boniface Parkway, Anchorage, Alaska.

1.2 SUMMARY OF WORK

A. Modernization of Passenger/Service Elevator No. 1 (Tech-Ops) at Anchorage ARTCC (ZAN). Replace Elevator Power Unit (including valves, pump, motor and ancillary components), and Controller. Update the elevator car's finishes, lighting, and controls.

Update electrical, mechanical, fire protection components in the elevator pit, and elevator machine room for code compliance.

B. The Project Area is comprised of the following areas:

1. Passenger Elevator No. 1 in Tech-Ops Wing of the ARTCC facility.

2. Elevator Machine Room B07, Mechanical Equipment Room B10.This summary does not cover all aspects of the work. See other specification sections and the drawings for more detailed information.

1.3 SUBMITTALS

A. Serial Letter Log.

1.4 INTENT OF CONTRACT DOCUMENTS

A. These Contract Documents (specifications and drawings) indicate the work to be performed for the project. All material, labor, equipment, tools, layout, and supervision must be furnished by the Contractor to complete the work and provide complete operating systems. The Contractor is responsible for the supervision, health and safety, inspection, and quality control of its own work, workers, work areas, and lower tiered subcontractors. Work shall be performed to ICC, NFPA, FAA codes and standards, and manufacturers’ recommendations. All work performed and all materials and equipment used will be subject to approval by the Contracting Officer. This must include, but not be limited to, construction, testing, inspection, scheduling, reporting, and submittals.

SUMMARY OF WORK 01 11 00 - 1

Anchorage, Alaska

29 April 2022

Final Submittal

B. Titles: Titles to divisions and sections of the specifications and notes and titles on drawings referring to subcontractors, division of work by trade, or type of work are used for convenience and do not imply any separate contractual arrangements of work assignments. Such separations into titles, divisions, sections, or notes should not be construed to establish limits between the Contractor and its subcontractors.

C. Reference to known standards within the Contract Documents means the latest edition in effect on the date of solicitation, unless specified otherwise.

D. Where Contract Documents refer to “Related Work in Other Sections” or “Related Requirements”, the Contractor should not consider the list of specification divisions/sections to be all-inclusive. These lists are provided as a convenience for cross-reference and coordination.

E. Order of Preference: Generally, the specifications take precedence over the drawings.

Figures marked on drawings should be followed in preference to scale measurements.

Large scale drawings should govern small scale drawings. The Contractor should not use dimensions scaled from the drawings. All dimensions shown on the drawings must be verified by the Contractor by actual measurements in the field. Any discrepancy between the drawings and specifications and the existing conditions must be referred to the Contracting Officer for resolution before any work affected is performed. The Contractor must compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have avoided thereby.

1.5 CONTRACT DOCUMENTS

A. Copies of Specifications and Drawings: Two (2) hard copy sets and one (1) electronic set of the Contract Documents will be furnished to the Contractor without charge, with the exception of applicable publications incorporated into the technical specifications by reference.

B. Specification and Drawing Review: The Contractor is responsible for complete knowledge and understanding of the Contract Documents throughout the life of the Contract. The Contractor must check the Contract Documents immediately upon their receipt and promptly notify the Contracting Officer of any discrepancies.

C. Contracting Officer: The Contracting Officer (CO) is the person designated to act on behalf of the Government in the performance of this contract. The Contracting Officer's Representative (COR) is the Contracting Officer’s authorized representative.

The COR is the point of contact for all work on site between the Contractor and Government. The Contractor will coordinate all work through the COR or will keep the COR informed when dealing directly with the Contracting Officer, and the Government will coordinate through the COR to the Contractor, except in case of urgency or emergency.

SUMMARY OF WORK 01 11 00 - 2

Anchorage, Alaska

29 April 2022

Final Submittal

1.6 MEASUREMENT AND PAYMENT

A. The contract price constitutes full compensation for furnishing all plant, labor, materials, appurtenances, and incidentals, and performing all operations necessary to construct and complete the items in accordance with these Contract Documents performed by the Contractor. Payment for each item will be considered as full compensation, notwithstanding that all features may not be mentioned herein. No separate payment will be made for the work, services, or operations required by the Contractor, as specified in Division 1 General Requirements, to complete the project in accordance with these specifications; all costs thereof will be considered as incidental to the work.

1.7 CORRESPONDENCE

A. All correspondence must be addressed and delivered electronically to the Contracting Officer and the COR and must be serially numbered commencing with number one (1), with no numbers missing or duplicated. All files/documents must be legible.

Enclosures attached or transmitted with the correspondence must also be furnished electronically with copy to the COR. Each serial correspondence must include the contract number and project name and must have only one subject. The Contractor must create and maintain a serial letter log that shows the serial letter number, date, topic, and disposition if applicable. The Contractor must submit the updated serial letter log monthly.

PART 2 - PRODUCTS (Not used)

PART 3 - EXECUTION (Not used)

END OF SECTION 01 11 00

SUMMARY OF WORK 01 11 00 - 3

Anchorage, Alaska

29 April 2022

Final Submittal

SECTION 01 14 00 – WORK RESTRICTIONS

PART 1 - GENERAL

1.1 COORDINATION and access to site

A. The work is at a critical facility site which must remain operational 24 hours a day 7 days a week. The Contractor must not interfere with or disrupt air traffic operations.

The work shall not discharge static electricity, damage, or interfere with other equipment at the facility, and security shall not be compromised.

B. General Area Requirements: The Contractor must confine operations, activities, storage of materials, and employee parking within the project boundaries and the approved staging and loading/unloading areas. Any additional space the Contractor deems necessary must be submitted to the COR for review and approval, or be obtained off site, at no additional cost to the Government.

C. Security Requirements: This project is on a restricted entry site and no compromise of the security system in any nature or of any duration may be made without prior approval of the Contracting Officer. Generally, such compromises, when approved, will be less than 24 hours in duration.

D. Facility Access Badges: See attachment A at the end of this sectionSome areas in the facility are classified as controlled areas that require government escort of Contractor’s personnel. Contractor’s personnel must not violate any security regulations pertaining to the facility. The Contracting Officer has the authority to remove anyone from the site, including anyone who is determined to be a security risk. This authority extends to the entire complex, not just the buildings.

E. Facility Security Requirements:

1. Current procedures at FAA facilities include the “right to search”. Access to the site constitutes consent to search. If in the judgement of the FAA Security Guard a cause to search a vehicle or the person of personnel exists, such search will be made.

2. Contractor’s personnel shall not violate any security regulations pertaining to the ARTCC facility. Violators may be removed from the premises with the right to re-enter revocable.

3. All persons entering or delivering to this federal facility must have valid government issued identification.

4. Valid issued government identification is:

a. ID issued by the federal, state, county, or city government or by the military.

b. Must have the person’s legal name.

c. Must have a unique ID number.

d. Must have an expiration date.

e. Must have a picture of the individual.

WORK RESTRICTIONS 01 14 00 - 1

Anchorage, Alaska

29 April 2022

Final Submittal

f. Must have the name of the agency issuing it. (examples: state issued driver’s license or IDs, passports, or military ID.)

5. Persons entering on to federal property (including visitor parking lot) are prohibited from having on their person or in their vehicle:

a. Guns

b. Knives with blades over 3 inches except for valid tools.

c. Projection devices, bow and arrows, paint ball weapons, blow guns, etc…

d. Clubs, batons, collapsible batons, or saps.

e. Stun guns or tazers.

f. Chemical agents, mace, or pepper sprays.

g. Martial arts weapons of any kind.

h. Weapons of any kind.

i. Alcohol

j. Illegal drugs

k. Animals with the exception of a verified service animal

l. Family members, friends, children, minors, anyone not authorized on the

FAA visitor list.

F. Work hours: Normal work hours are 7:30 a.m. to 4:00 p.m., Monday through Friday.

No work will be performed outside these hours without prior approval of the COR. If the Contractor intends to work other than normal work hours, the Contractor must notify the COR at least 24 hours in advance, or 48 hours prior to night, weekend, or holiday work. The Contractor shall notify the FAA if personnel will not report to the job site on a normal workday so that the COR and FAA staff can plan accordingly.

G. FAA Maintenance Moratoriums: Unless allowed otherwise by the FAA, no work shall be scheduled or take place during the week of and weekends preceding and following the Thanksgiving, Christmas, and New Year’s holidays. Only emergency work to restore critical services to the Facility without an approved waiver by the FAA is allowed. Otherwise, a waiver is required to work during moratoriums and must be submitted and approved by FAA. The moratorium period will not be counted against the contract construction duration of the project. Verify exact dates with COR and include moratorium dates in Contractor’s Construction Schedule (refer to Section 01 32 00).

H. The Contractor’s foreman or superintendent, or another responsible individual temporarily assigned to act as the foreman or superintendent, must be present on site at all times whenever work is being done, even if the only work being performed is by a subcontractor or is a delivery.

I. Contractor's use of premises: The Contractor must allow the Government complete access to all portions of the work site at any time.

J. Staging and parking: No parking or material storage will be allowed within 20 feet of any exterior fence. The Contractor’s staging area is limited to the area designated by the COR. This will be reviewed and agreed on prior to site mobilization. The Contractor is responsible for providing temporary security fencing of their staging area if desired. See Section 01 50 00, “Temporary Facilities and Controls.”

WORK RESTRICTIONS 01 14 00 - 2

Anchorage, Alaska

29 April 2022

Final Submittal

K. Vehicle engines of parked vehicles must not be left idling near air intakes for longer than ten minutes for gasoline engines or two minutes for diesel engines.

L. Special Tool Restrictions: Powder-driven fasteners, tools, and devices are not allowed on facility property. Not including vehicle engines, fuel (including natural gas, propane, gasoline, or diesel) powered tools and devices are only allowed with prior approval and scheduling with the COR. At least 48-hours’ notice must be given prior to any proposed use of fuel-powered tools or devices. This restriction includes fuel-powered pumps, generators, welders, and air compressors, including those mounted on vehicles but with their own engines.

M. Outages: The Contractor must request in writing and coordinate any mechanical, water, sewer, or electrical outage at least three working days in advance with the COR.

Outages must be kept to a minimum. Outages could require the Contractor to work during other than normal hours at no additional cost to the Government.

N. Only the FAA will turn off, lock out, and tag out systems, not the Contractor, including to facility equipment, valves, and breakers. The FAA will lock out and tag out systems, and the Contractor may add their lock out and tag out on top of the FAA’s.

The Contractor shall positively verify de-energization before working on individual systems.

O. The Contractor must provide safety cones, barricades, and flag off exclusion areas, such as overhead work or around openings. Refer to Sections 01 35 29 Health, Safety and Emergency Response Procedures, and 01 45 00 Quality Control.

P. Testing: The Contractor must notify the COR in writing at least three working days in advance of any testing.

Q. Silica Exposure Control: Work tasks that will generate dust containing silica shall comply with 29 CFR 1926.1153 Respirable Crystalline Silica and incorporate the engineering, work practice, and respiratory requirements identified in Table 1 of the regulation. Tasks may include, but are not limited to, jackhammering, cutting, sanding, sawing, grinding, drilling, rig-mounted core drills, dowel drilling rigs, or any vehicle- mounted drilling rigs, or any general demolition of concrete material or masonry. For specific work tasks not identified in Table 1 or tasks that cannot full comply with the controls listed, alternative exposure control methods shall be implemented to ensure personnel exposures are limited to less than the permissible exposure limit (PEL). Contractors shall submit exposure assessment records, where required, and a written Exposure Control Plan identifying tasks and a description of the engineering controls, work practices, housekeeping measures, and respirator protection needed to limit employee exposures. A competent person shall be identified in the Exposure Control Plan and will be available on the project site while tasks generating silica dust are performed.

WORK RESTRICTIONS 01 14 00 - 3

Anchorage, Alaska

29 April 2022

Final Submittal

1.2 SUPPLEMENTARY REQUIREMENTS

A. Damage to the Site: Damage caused by the Contractor's activities to existing facility paving, lawns, curbs, sidewalks, utilities, or buildings must be repaired or replaced by the Contractor. After the Notice to Proceed and prior to the start of construction, the Contractor and COR must conduct joint inspections of the existing areas affected by the construction. Existing site damage/defects in these areas must be noted by the Contractor in writing and photographed and will be used as the basis for determination of any damages caused by the Contractor's operations.

B. Photography Permit: Photography is allowed on site only by permit from the facility, as obtained by the COR. Photographs are generally restricted to documenting the work and progress and should not show any FAA employees or employees’ automobile/vehicle license plates. Photographs from the facility are for official Government use only and cannot be used on Contractor promotional material or without the expressed written consent from the FAA.

C. The following items are strictly prohibited on the faculty:

1. Any unsafe act.

2. Explosives.

3. Guns or weapons.

4. Pets or animals.

5. Blocking facility driveways or entrances (see drawings).

6. Allowing fumes or odors from the work to enter the facility (see Article 1.2.F.

below).

7. Working on energized electrical circuits.

8. Fires or burning.

9. Use of forklifts, manlifts, loaders or other self-propelled equipment unless equipped with a fire extinguisher.

10. Dripping or leaking vehicles or equipment.

11. Refueling of vehicles or equipment while hot.

12. Bringing any material of health, safety or environmental concern on site without

Safety Data Sheets (SDSs) being readily available on the work site, and without spill containment materials in place and ready to catch spills, including while fueling or servicing vehicles or equipment.

13. Open flame, torching, or other welding without a fire watch, fire extinguisher, and daily hot-work permit from the COR.

14. Performing any work on site without properly providing warning signs, safety cones, barricades and flagging off exclusion areas, such as for overhead work or around openings.

15. Performing any work on site without proper personal protective clothing and equipment, such as hard hats, safety glasses, hearing protection, high visibility vests, gloves, protective boots, et cetera.

16. Performing any work on electrical or mechanical systems before positively verifying that the facility has de-energized and locked it out.

17. Use of any tools or equipment without proper inspection before use, including at least daily inspections of equipment.

WORK RESTRICTIONS 01 14 00 - 4

Anchorage, Alaska

29 April 2022

Final Submittal

18. Use of any tools, equipment, or vehicles unless trained, experienced, and certified (if applicable), and authorized by the Contractor, including to operate manlifts or forklifts.

19. Use of any electrical equipment or extension cords in wet conditions or if not in good condition, properly maintained, grounded, and with ground fault circuit interruption (GFCI) protection.

20. Working in an area unless there is at least one 2-A:20-B:C minimum portable fire extinguisher in plain sight and within 50 feet of the work.

21. Working in an area if there is a risk of fire blocking the exit unless a second means of escape is provided in case of emergency.

22. Smoking except in designated areas that have safe receptacles for smoking materials, and that are located more than 50 feet from building entrances.

23. Consumption of alcohol on the site.

D. Prevention of Transference of Construction Noise, Dust and Odors: All areas outside the project work areas in the facility will remain occupied and operational (24 hours a day 7 days a week) throughout the entire period of performance of construction. The Contractor is to establish, to the satisfaction of the COR, and maintain provisions to prevent the transference of construction noise, dust and odors from construction areas and activities to the occupied areas of the facility. Such provisions ought to include sealing of existing and new openings in walls, floors and ceilings within the work areas, negative air system, et cetera. The Contractor is to submit to the COR for FAA review and approval proposed methodology for preventing transference.

E. Contractor’s Responsibility for Testing: All testing identified in these documents and/or otherwise required for implementation and completion of the project is the responsibility of the Contractor at no additional cost to the Government.

F. High Performance Standards for Buildings (HPSB): Applicable portions of the FAA’s 2016 Guiding Principles for Sustainable Federal Buildings for New Construction and Modernization have been incorporated into the project’s design and documents. These include specifications of certain products based on compliance with local availability and/or recycled content, special procedures for collecting and disposing of construction waste (refer to Section 01 74 19), et cetera.

G. Security Systems and Components: Contractor shall subcontract with FAA’s national Security Systems Design and Integration (SSDI) Contractor Honeywell for all security system and component work, including temporary relocation or removal of existing security components required to complete the work.

H. Fire Alarm Systems and Components: Contractor shall subcontract with FAA’s national Fire Alarm Contractor Honeywell for all fire alarm system and component work, including temporary relocation or removal of existing fire alarm components required to complete the work.

1.3 SUBMITTALS

A. Contractor employee list for facility access.

B. Existing site damage/defects report.

WORK RESTRICTIONS 01 14 00 - 5

Anchorage, Alaska

29 April 2022

Final Submittal

C. Methodology for preventing construction noise, dust, and odors from transferring for work areas to occupied areas of the facility.

D. Silica exposure assessment records, where required, and a written Exposure Control Plan identifying tasks and a description of the engineering controls, work practices, housekeeping measures, and respirator protection needed to limit employee exposures.

A competent person shall be identified in the Exposure Control Plan and will be available on the project site while tasks generating silica dust are performed.

PART 2 - PRODUCTS (Not used)

PART 3 - EXECUTION (Not used)

END OF SECTION 01 14 00

WORK RESTRICTIONS 01 14 00 - 6

Anchorage, Alaska

29 April 2022

Final Submittal

SECTION 01 25 00 – SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Contractor's option in selection of products.

B. Request for substitution of products.

1.2 OPTIONS

A. Products specified by reference standards or by description only: Any product meeting those standards as approved by the COR.

B. Products specified by naming one or more manufacturers with a provision for substitutions: Provide submittal for substitute material as outlined in this Section.

C. Submittals Format: Unless noted otherwise, all submittals are to be provided to the FAA in electronic format. Five (5) hard copies of submittals where colors choices are being submitted for selection or validated are to also be provided along with the electronic copy.

PART 2 - PRODUCTS

2.1 GENERAL

A. In general, manufacturer’s names, brand names, or model numbers may be specified for items as a basis of design a schedule, detail or in a list of approved products. This is not meant to be proprietary and the words "or equal" are implied if not expressly stated after every manufacturer's name, brand name, or model number stated in the Specifications. Where manufacturer's names, brand names, or model numbers are specified for items, they set a standard for quality, function, and performance. Products of other manufacturers are not automatically precluded provided they are:

1. Equal or superior in construction, efficiency, utility, or function to the product(s) specified.

2. Of a similar profile, shape, size, style, and configuration and can be incorporated into the Work in the space allocated in a reasonable manner reflective of good design and engineering practices.

SUBSTITUTION PROCEDURES 01 25 00 - 1

Anchorage, Alaska

29 April 2022

Final Submittal

3. Accepted by the Architect/Engineer of Record, Contracting Officer (CO) and

Contracting Officer’s Representative (COR), in writing, as meeting the specified criteria and fit (both physical and functional) within the project. Certain product’s manufacturer warranties may also require other related products be produced by the same manufacturer, or by a manufacturer approved by the product’s manufacturer.

4. Submitted for approval as a substitution.

B. The Contractor's submittal for approval of material or products of higher quality than that specified will not obligate the Government to pay any additional costs that may be associated with furnishing and installing the substitute material. The Contractor must, in such transmittals, state that there will be no additional costs borne by the Government as a result of the substitution.

C. The Contractor, when submitting for approval of materials which are other than that cited in the Contract Documents, must submit the necessary scale drawings, product data, and performance and test data of both the materials specified and the proposed substitution materials, so that a proper evaluation of the substitution request may be made, including illustrating how the proposed substitution fits within the allocated space in a reasonable manner reflective of good design and engineering practices.

D. The contractor bears all responsibility for the adjustment of affected drawings as a result of any FAA-approved material or equipment 'as equal' substitutions by the contractor and the costs to execute incidental work arising from the substitution to complete FAA design intent. This will include any necessary adjustments of connections, piping or wiring, equipment pad resizing, finishing of exposed areas as a result of the substitution, the need to coordinate with the function and compatibility of other equipment for the full intended function of all individual pieces towards the desired design functional goal, and any other newly required incidental work or changes to the provided design in accordance with this Section 01 25 00, "Substitution Procedures."

PART 3 - EXECUTION (Not used)

END OF SECTION 01 25 00

SUBSTITUTION PROCEDURES 01 25 00 - 2

Anchorage, Alaska

29 April 2022

Final Submittal

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. A. This Section includes administrative provisions for coordinating construction operations on the Project including, but not limited to, the following:

1. General project coordination procedures.

a. Conservation.

b. Submittals and Coordination Drawings.

c. Schedule of Values.

d. Administrative and supervisory personnel.

e. Project meetings.

1.2 COORDINATION

A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.

Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

a. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.

b. Make adequate provisions to accommodate items scheduled for later installation.

B. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Contracting Officer’s Representative (COR) and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1

Anchorage, Alaska

29 April 2022

Final Submittal

a. Preparation of the Schedule of Values.

b. Installation and removal of temporary facilities and controls.

c. Delivery and processing of submittals.

d. Progress meetings.

e. Preinstallation conferences.

f. Project closeout activities.

D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.

1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work.

a. Comply with Section 01 74 19 with regard to construction waste management and disposal.

1.3 SUBMITTALS

A. Coordination Drawings: Prepare and submit for review and approval by the COR Coordination Drawings to illustrate maximum utilization of space for efficient installation of different components or where coordination is required for installation of products and materials fabricated by separate entities.

1. Indicate relationship of components shown on separate Shop Drawings.

a. Indicate required installation sequences.

b. Refer to the actual specification sections for specific Coordination and/or

Shop Drawing requirements.

B. Staff Names: Within 15 days of starting construction operations, submit a list of principal staff assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.

C. Utility Service Interruptions: The Project is located at an FAA facility with a 24 hour, 7 day a week operation and prohibits any interruption of electrical, natural gas or water services. For minor interruptions in these services, provide not later than 10 calendar days prior to the first planned interruption a utility service interruption plan, followed by confirmed and approved scheduled shut-down notices at least 3 calendar days prior to each interruption.

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2

Anchorage, Alaska

29 April 2022

Final Submittal

D. Schedule of Values (SOV): The Contractor must submit a draft Schedule of Values (SOV) within two weeks after the award, and upon receipt of comments, make revisions and submit a final SOV prior to the Pre-Construction Conference. The purpose of the Schedule of Values is to subdivide the contract amount into line items that can be readily estimated and tracked for monthly progress payment. The SOV must be linked to the Construction Schedule and be separated into hierarchical groupings using the divisions and sections listed in these specifications.

1. The SOV must have a summary showing the whole project totals, each separate division’s subtotals, and then each section within each division’s subtotals. The SOV summary must have columns listing the amount of payments received, current payment requested, and amount still remaining on the contract for each hierarchical subdivision.

a. Large dollar amount sections must be further subdivided into activities within the section, as determined by the Contractor. Line items should be of roughly similar value to the extent possible.

b. The SOV must be updated and re-submitted with each pay request and when changes are proposed and have been made to the contract price.

Progress SOVs must be agreed to by the COR in advance of pay requests.

1.4 ADMINISTRATIVE AND SUPERVISORY PERSONNEL

A. General: In addition to Project superintendent, provide other administrative and supervisory personnel as required for proper performance of the Work.

1. Include special personnel required for coordination of operations with other contractors.

B. Safety and Health Officer: Provide a safety and health officer whose duties shall consist of developing and implementing safety and health programs specified in Section 01 35 29 "Health, Safety and Emergency Response Procedures."

1.5 ON-SITE PERSONNEL

A. Whenever work is performed on site, the Contractor must have a company-designated superintendent or foreman, Site Safety and Health Officer (SSHO), Quality Control (QC) Officer, at least one worker with current CPR and First Aid certifications, and at least one Contractor telephone for emergency use. For this job, the SSHO and QC Officer positions could be held by one or more qualified workers other than the superintendent or foreman, as designated by the Contractor’s management. Each position should have a designated alternate in case the primary person is not available.

B. The superintendent or foreman, SSHO, and QC Officer must have at least three years of experience in the type of work being performed and each must be designated by the Contractor’s management as being a qualified, competent person in their assignment.

The site safety and health officer must also meet the qualifications required in Section 01 35 29, “Health, Safety and Emergency Response Procedures”.

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3

Anchorage, Alaska

29 April 2022

Final Submittal

C. All workers, including subcontractors, except for brief occasional visitors, such as delivery drivers who shall be escorted by the Contractor, must read, understand, and sign-off on the Contractor’s Safety Plan before working on site.

D. Site Safety and Health Officer (SSHO). In addition to assuring implementation and monitoring of the Contractor’s Safety Plan and project safety requirements in accordance with Section 01 35 29, “Health, Safety, and Emergency Response Procedures,” the Contractor’s SSHO will:

1. Conduct initial safety briefings to all workers before they start work on site, except for brief occasional visitors, such as delivery drivers who must be escorted by the Contractor.

a. Conduct at least weekly safety briefings on site when work is being performed. Notes about the weekly safety briefing, including topics and issues covered, will be attached to the daily report for that day, along with the signature list of attendees.

b. Maintain lists of workers who have read and signed-off on the safety plan, attended an initial safety briefing, and attended weekly on-site safety briefings.

1.6 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify COR of scheduled meeting dates and times.

a. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

b. Minutes: Record significant discussions and agreements achieved.

Distribute the meeting minutes to everyone concerned, including COR even if he/she did not attend the meeting, within 3 days of the meeting.

B. Preconstruction Conference. Attend a preconstruction conference before starting construction, at a time convenient to Contracting Officer and Contractor prior to the start of construction. The conference will be held at Project site or another convenient location. The Contracting Officer will conduct the meeting to review responsibilities and personnel assignments.

1. Attendees: Authorized representatives of FAA, Contractor, and its superintendent; major subcontractors and other concerned parties shall attend the conference. The Contractor will submit their list of attendees, including subcontractors, five days before the meeting in accordance with Section 01 14

00. All participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 4

Anchorage, Alaska

29 April 2022

Final Submittal

a. Agenda: The Contracting Officer or the COR will distribute the agenda and discuss items of significance that could affect progress, including the following:

b. Tentative construction schedule.

c. Safety and Health Checklist items (Obtain proper form from COR for

Reporting).

d. Phasing.

e. Critical work sequencing.

f. Designation of responsible personnel.

g. Procedures for processing field decisions and Change Orders.

h. Procedures for processing Applications for Payment.

i. Distribution of the Contract Documents.

j. Submittal procedures.

k. Preparation of Record Documents.

l. Use of the premises.

m. Badging and access.

n. Responsibility for temporary facilities and controls.

o. Parking availability.

p. Office, work, and storage areas.

q. Equipment deliveries and priorities.

r. First aid.

s. Security.

t. Progress cleaning.

u. Working hours.

v. FAA Asbestos Work Permit, if required.

w. COVID or other special condition criteria.

C. Preinstallation Conferences: Conduct a Preinstallation Conference at the Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers (if determined necessary) involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise COR of scheduled meeting dates.

a. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

b. Contract Documents.

c. Options.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility problems.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written recommendations.

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 5

Anchorage, Alaska

29 April 2022

Final Submittal

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of Authorities Having Jurisdiction.

t. Testing and inspecting requirements.

u. Required performance results.

v. Protection of construction and personnel.

w. COVID or other special condition criteria.

2. Record significant conference discussions, agreements, and disagreements.

a. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress and Coordination Meetings: Conduct Progress and Coordination Meetings at weekly intervals. Coordinate dates of meetings with preparation of payment requests.

Weekly Progress and Coordination Meetings are in addition to specific meetings held for other purposes such as Preinstallation Meetings.

1. Attendees: In addition to representatives of the FAA and the Contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

a. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress.

Include topics for discussion as appropriate to coordinate the work.

b. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule.

Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

c. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Three-Week Look-Ahead Schedule

3) Sequence of operations.

4) Status of submittals.

5) Deliveries.

6) Off-site fabrication.

7) Access.

8) Site utilization.

9) Temporary facilities and controls.

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 6

Anchorage, Alaska

29 April 2022

Final Submittal

10) Work hours.

11) Activity Hazards Analysis Forms (Obtain forms from COR).

12) Progress cleaning.

13) Quality and work standards.

14) Change Orders.

15) Documentation of information for payment requests.

2. Reporting: Distribute minutes of the meeting to the COR, each party present, and other interested parties as determined by the Contractor. Include a brief summary, in narrative form, of progress since the previous meeting and report.

a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

E. Safety Meetings: A daily work place safety meeting shall be held prior to commencing work each morning. A daily workplace safety meeting to be held prior to commencing work each morning.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 GENERAL COORDINATION PROVISIONS

A. Inspection of Conditions: Prior to installations, require the installer of each major component to inspect both the substrate and conditions under which work is to be…