Attachment 1(a) - Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 697DCK-25-R-00028
About this file
This document is a set of drawings related to a federal contract opportunity for an FAA project to install a water treatment system and replace humidifiers at the Anchorage Air Route Traffic Control Center (ARTCC) in Anchorage, Alaska. The project includes demolishing the existing water treatment system in Mechanical Room 61, replacing 13 existing humidifiers, installing reverse osmosis treated water lines to new and existing humidifiers, and installing new electrical and control devices. The estimated cost of the project is between $500,000 and $750,000. The solicitation has no set-aside and is open to all businesses. Key dates include a site visit on November 12, 2024 and offers due by December 3, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFO 697DCK-25-R-00028.pdf | ||
| Attachment 6 - FAA-STD-019f Chg 3 20200401.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| Attachment 2 - DB WD No. AK20240001 dated 9-13-2024.pdf | ||
| Attachment 4 - Past Performance Survey.doc | DOC document | |
| Attachment 3 - BIL Data Report Template.xlsx | XLSX spreadsheet | |
| Attachment 5 - FAA-C-1217H Chg 2_10072022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLD DAVIS HIGHWAY
A D
M
I N I S T R A T
I O N
N
OI
TAIVALAREDE
F
DE
PA
RT
MENT OF TRANSPORTATION
UN I T ED STAT ES OF AMER
I C
A
ANCHORAGE, ALASKA (ZAN)
AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC)
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS, CONS.
CANADA
RUSSIA
ARCTIC OCEAN
ALASKA
PRUDHOE BAY
COLD BAY
BEAUFORT SEA
NOME
JUNEAU
ANCHORAGE
FAIRBANKS
GULF OF ALASKA
BERING SEA
CORDOVA
THIS
PROJECT
NOT TO SCALE
LOCATION MAP
PROJECT
LOCATION
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUT/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-G001
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
COVER SHEET
za n-
0-g0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
NOT TO SCALE
VICINITY MAP
DRAWING NO.
DRAWING INDEX
DESCRIPTION
ZAN-1303170-G001 COVER SHEET
ZAN-1303170-G002 DRAWING INDEX
ZAN-1303170-D001 BASEMENT FLOOR MECHANICAL DEMO PLAN
ZAN-1303170-D002 FIRST FLOOR MECHANICAL DEMO PLAN
ZAN-1303170-D003 SECOND FLOOR MECHANICAL DEMO PLAN
ZAN-1303170-D004 DEMO PLAN MECHANICAL ROOMS 64/AF LAB 63, B10, B02 AND 43
ZAN-1303170-D005 DEMO PLAN MECHANICAL ROOMS 245A, 245B AND F08
ZAN-1303170-D006 DEMO PLAN MECHANICAL ROOMS S20, S06 AND 61
ZAN-1303170-D007 MECHANICAL ROOM 61 DEMO PLAN (ELECTRICAL)
ZAN-1303170-M001 ABBREVIATIONS, SYMBOLS LEGEND AND MECHANICAL NOTES
ZAN-1303170-M002 EQUIPMENT SCHEDULES
ZAN-1303170-M003 BASEMENT FLOOR MECHANICAL NEW WORK PLAN
ZAN-1303170-M004 FIRST FLOOR MECHANICAL NEW WORK PLAN
ZAN-1303170-M005 SECOND FLOOR MECHANICAL NEW WORK PLAN
ZAN-1303170-M006 NEW WORK PLAN MECHANICAL ROOMS 64/AF LAB 63, B10, B02 AND 43
ZAN-1303170-M007 NEW WORK PLAN MECHANICAL ROOMS 245A, 245B, AND F08
ZAN-1303170-M008 NEW WORK PLAN MECHANICAL ROOMS S20, S06 AND 61
ZAN-1303170-M009 MECHANICAL DETAILS
ZAN-1303170-M010 CONCEPTUAL NEW WATER TREATMENT SYSTEM DIAGRAM
ZAN-1303170-E001 ELECTRICAL ABBREVIATION AND GENERAL NOTES
ZAN-1303170-E002 MECHANICAL ROOM 61 NEW WORK ELECTRICAL PLAN
ZAN-1303170-E003 MECHANICAL ROOM 61 EQUIPMENT SCHEDULE
ZAN-1303170-E004 MECHANICAL ROOM 61 PANEL SCHEDULES
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-G002
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
DRAWING INDEX
za n-
0-g0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SEE MECH RM B02
ENLARGED PLAN
ON SHEET
ZAN-1303170-D004
SEE MECH RM B10
ENLARGED PLAN
ON SHEET
ZAN-1303170-D004
SEE LAN EQUIPMENT
RM 64/AF LAB 63
ENLARGED PLAN
ON SHEET
ZAN-1303170-D004
SEE MECH RM 43
ENLARGED PLAN
ON SHEET M401
ZAN-1303170-D004
SEE MECH RM 61
ENLARGED PLAN
ON SHEET ZAN-1303170-D006
COPPER PIPING FROM RO WATER
SYSTEM TO BE DEMOLISHED IN ITS ENTIRETY.
PEX PIPING TO REMAIN FOR REUSE
EXISTING 3/4" CW PIPING TO
REMAIN FOR REUSE.
LOCATED IN SPACE BELOW
FLOOR.
EXISTING 3/4" RO PEX PIPING
TO REMAIN FOR REUSE.
LOCATED IN SPACE BELOW
FLOOR.
EXISTING 3/4" PEX PIPING UP
TO FLOOR ABOVE TO REMAIN
FOR REUSE (TYP.)
EXISTING 3/4" PEX PIPING TO
REMAIN FOR REUSE (TYP.)
EXISTING 3/4" PEX PIPING TO
REMAIN FOR REUSE (TYP.)
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-D001
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
BASEMENT FLOOR MECHANICAL
DEMO PLAN
za n-
0-d0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON
THE DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS,
LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING, AND
DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE BUILDING
OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER, CONTRACTOR
SHALL HAUL OFF AND PROPERLY DISPOSE OF REMOVED EQUIPMENT.
SCALE: 3/32" = 1'-0"
BASEMENT FLOOR MECHANICAL DEMO PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
8' 0 8' 24'
SCALE: 3/32" = 1'-0"
16'
KEY PLAN
EXISTING 3/4" PEX PIPING THAT CONNECTS
WITH EXISTING IW PIPING TO REMAIN
EXISTING 3/4" PEX PIPING
TO REMAIN FOR REUSE (TYP.)
SEE MECH RM F08
ENLARGED PLAN
ON SHEET
ZAN-1303170-D005
REMOVE EXISTING CW PIPING
SERVING HUMIDIFIERS BACK TO
MAIN PIPING AND CAP IN
CONCEALED OCATION
EXISTING 3/4" COPPER UP TO
MECH RM 245 TO BE REMOVED IN
ITS ENTIRETY AS REQUIRED TO
REPLACE WITH PEX
EXISTING 3/4" PEX DN TO FLOOR
BELOW TO REMAIN FOR REUSE
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-D002
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
FIRST FLOOR MECHANICAL
DEMO PLAN
za n-
0-d0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON
THE DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS,
LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL WORK
THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH
EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING, AND
DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE BUILDING
OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER, CONTRACTOR
SHALL HAUL OFF AND PROPERLY DISPOSE OF REMOVED EQUIPMENT.
SCALE: 3/32" = 1'-0"
FIRST FLOOR MECHANICAL DEMO PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
KEY PLAN
8' 0 8' 24'
SCALE: 3/32" = 1'-0"
16'
SEE MECH RM S20
ON SHEET
ZAN-1303170-D006
SEE MECH RM 245
ENLARGED PLAN
ON SHEET
ZAN-1303170-D005
SEE MECH RM S06
ENLARGED PLAN ON
SHEET ZAN-1303170-D006
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-D003
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
SECOND FLOOR MECHANICAL
DEMO PLAN
za n-
0-d0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM
RECORD DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF
THE FACILITY. ACTUAL SYSTEMS MAY VARY FROM THE
INFORMATION INDICATED ON THE DRAWINGS. CONTRACTOR TO
FIELD VERIFY EXISTING CONDITIONS, LOCATIONS, AND SIZES
BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED
TO MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING,
PIPING, AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE
DURING REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE
BUILDING OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER,
CONTRACTOR SHALL HAUL OFF AND PROPERLY DISPOSE OF
REMOVED EQUIPMENT.
SCALE: 3/32" = 1'-0"
SECOND FLOOR MECHANICAL DEMO PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
KEY PLAN
8' 0 8' 24'
(E)AHU-101
(E)AHU-102
(E)HU-101
(E)HU-102
DEMOLISH CONDENSATE DRAIN PIPING
RUNNING FROM THE DISPERSION TUBES AND
HUMIDIFIERS TO THE FLOOR DRAIN (TYP.)
DEMOLISH STEAM PIPING RUNNING
FROM THE HUMIDIFIER UNIT TO THE
DISPERSION TUBES (TYP.)
PIPING AND
HUMIDIFIERS OFFSET
FOR CLARITY
(E)CRU-64
(E)CRU-63
EXISTING CRU UNITS TO
REMAIN FOR REUSE (TYP.2)
NOTE: PIPING SHOWN IS IN FLOOR SPACE BELOW
EXISTING 3/4" CW TO
REMAIN FOR RUSE
EXISTING FLOOR SINK TO
REMAIN FOR RUSE
EXISTING BACKFLOW PREVENTER
TO REMAIN FOR REUSE
EXISTING 3/4" PEX RO PIPING
TO REMAIN FOR REUSE (TYP.)
DEMO ALL EXISTING COPPER
PIPING AS REQUIRED TO REPLACE
WITH PEX AND STAINLESS STEEL
(E)HU-09
(E)HU-10
NOTE: NO WORK TO BE DONE IN
MECHANICAL ROOM 43. ALL EQUIPMENT
AND PIPING TO REMAIN. SHOWN FOR
REFERENCE PURPOSES ONLY.
EXISTING RO WATER PEX
PIPING TO REMAIN FOR
REUSE (TYP.)
(E) AHU-109
(E) AHU-110
(E)AHU-105
(E)AHU-104
(E)AHU-103
(E)HU-104
(E)HU-103
(E)HU-105
DEMOLISH CONDENSATE DRAIN PIPING
RUNNING FROM THE DISPERSION TUBE
TO THE FLOOR DRAIN (TYP.)
DEMOLISH STEAM PIPING RUNNING
FROM THE HUMIDIFIER UNIT TO THE
DISPERSION TUBES (TYP.)
EXISTING
INDUSTRIAL
WATER PIPING TO
REMAIN (TYP.)
DEMOLISH CONDENSATE PIPING
RUNNING FROM THE HUMIDIFIER UNIT
TO FLOOR DRAIN (TYP.)
EXISTING FLOOR
DRAIN TO REMAIN
FOR REUSE (TYP.)
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-D004
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
DEMO PLAN MECHANICAL ROOMS
64/AF, B10, B02 AND 43
za n-
0-d0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
KEY NOTES:
REMOVE/DEMOLISH EXISTING HUMIDIFIER AND ASSOCIATED PIPING,
VALVES, FITTINGS, AND CONTROLS. CAP EXISTING IW PIPING AT WALL
PENETRATION.
REMOVE ALL COPPER PIPING DELIVERING RO WATER TO (E)CRU-63/64 AND
CONDENSATE PIPING ROUTED TO FLOOR SINK AS REQUIRED TO REPLACE
WITH PEX OR STAINLESS STEEL PIPING WHERE NECESSARY. COORDINATE
(E)CRU-63/64 DOWNTIME WITH RO SYSTEM UPGRADE AND FACILITY
PERSONAL.
EXISTING PEX PIPING TO RO SYSTEM TO REMAIN FOR RE-USE.
REMOVE/DEMOLISH EXISTING HUMIDIFIERS AND ASSOCIATED PIPING,
VALVES, FITTINGS, AND CONTROLS.
DISCONNECT AND REMOVE EXISTING STEAM AND CONDENSATE PIPING
FROM DISPERSION TUBES AS REQUIRED TO REPLACE WITH NEW.
DISPERSION TUBES TO REMAIN FOR REUSE.
DEMOLISH CW SUPPLY PIPING SERVING HUMIDIFIERS BACK TO MAIN
PIPING. CAP PIPING IN A CONCEALED LOCATION.
HUMIDIFIER AND ASSOCIATED PIPING TO REMAIN FOR REUSE.
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON
THE DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS,
LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL WORK
THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH
EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING, AND
DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE BUILDING
OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER, CONTRACTOR
SHALL HAUL OFF AND PROPERLY DISPOSE OF REMOVED EQUIPMENT.
6. EXISTING DISPERSION TUBES TO REMAIN IN PLACE FOR REUSE.
SCALE: 1/4" = 1'-0"
EQUIPMENT ROOM 64/AF LAB 63 DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH RM B10 DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH RM B02 DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH ROOM 43 DEMO PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
(E)AHU-204
(E)AHU-203
(E)HU-203
(E)HU-204
3/4" IW UP. REMOVE PIPING IN ITS ENTIRETY
TO FLOOR ABOVE. SEE SHEET ZAN-1303170-D006
FOR CONTINUATION.
REMOVE CW PIPING BACK
TO MAIN. CAP IN
CONCEALED LOCATION
3/4" CW
DEMOLISH CONDENSATE DRAIN PIPING
RUNNING FROM THE HUMIDIFIER TO THE FLOOR
DRAIN (TYP.)
DEMOLISH STEAM PIPING RUNNING
FROM THE HUMIDIFIER UNIT TO THE
DISPERSION TUBES (TYP.)
REMOVE BACKFLOW PREVENTER AND
ASSOCIATED PIPING AND APPURTENANCES
EXISTING FLOOR DRAIN TO
REMAIN FOR REUSE
DEMOLISH CONDENSATE
DRAIN PIPING RUNNING
FROM THE DISPERSION
TUBES TO THE FLOOR DRAIN
(TYP.)
(E)AHU-245A
(E)HU-245A
EXISTING COPPER PIPING SERVING
HUMIDIFIERS TO REMAIN TO SERVE
EXISTING TRAP PRIMERS
DEMOLISH CONDENSATE DRAIN
PIPING RUNNING FROM THE
CONDENSATE COOLER TO THE
FLOOR DRAIN (TYP.)
PIPING DOWN THROUGH FLOOR TO
LEVEL BELOW TO REMAIN TO KEEP
SERVING EXISTING TRAP PRIMERS IN
MECHANICAL ROOM
(E)AHU-245B
(E)HU-245B
EXISTING COPPER PIPING
SERVING HUMIDIFIERS TO
REMAIN TO SERVE EXISTING
TRAP PRIMERS
DEMOLISH STEAM PIPING RUNNING
FROM THE HUMIDIFIER UNIT TO THE
DISPERSION TUBES (TYP.)
DEMOLISH CONDENSATE DRAIN
PIPING RUNNING FROM THE
CONDENSATE COOLER TO THE
FLOOR DRAIN (TYP.)
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-D005
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
DEMO PLAN MECHANICAL ROOMS
245A, 245B AND FO8
za n-
0-d0
.d w g
ENROUTE FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
KEY NOTES:
REMOVE/DEMOLISH EXISTING HUMIDIFIERS AND ASSOCIATED
PIPING, VALVES, FITTINGS, AND CONTROLS IN THEIR ENTIRETY.
DISCONNECT AND REMOVE EXISTING STEAM AND CONDENSATE
PIPING FROM DISPERSION TUBES AS REQUIRED TO REPLACE
WITH NEW. DISPERSION TUBES TO REMAIN FOR REUSE.
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE
FACILITY. ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION
INDICATED ON THE DRAWINGS. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF
WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING
REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE
BUILDING OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER,
CONTRACTOR SHALL HAUL OFF AND PROPERLY DISPOSE OF
REMOVED EQUIPMENT.
6. EXISTING DISPERSION TUBES TO REMAIN IN PLACE FOR REUSE.
SCALE: 1/4" = 1'-0"
MECH RM 245A DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH RM 245B DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH RM F08 DEMO PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
4' 0 4' 8'
(E)AHU-302
(E)AHU-301 (E)HU-301
(E)HU-302
3/4" IW FROM BELOW. REMOVE PIPING IN ITS
ENTIRETY TO FLOOR BELOW. SEE SHEET
ZAN-1303170-D005 FOR CONTINUATION.
DEMOLISH STEAM PIPING RUNNING
FROM THE HUMIDIFIER UNIT TO THE
DISPERSION TUBES (TYP.)
DEMOLISH CONDENSATE
DRAIN PIPING RUNNING
FROM THE DISPERSION TUBE
TO THE FLOOR DRAIN (TYP.)
DEMOLISH CONDENSATE DRAIN
PIPING RUNNING FROM THE
DISPERSION TUBES AND
HUMIDIFIERS TO THE FLOOR
DRAIN (TYP.)
EXISTING FLOOR DRAIN TO
REMAIN FOR REUSE (TYP.)
(E)AHU-303
(E)HU-303
(E)AHU-304
(E)HU-304
3 3
DEMOLISH STEAM PIPING RUNNING
FROM THE HUMIDIFIER UNIT TO THE
DISPERSION TUBES (TYP.)
DEMOLISH CONDENSATE DRAIN
PIPING RUNNING FROM THE
HUMIDIFIER TO THE FLOOR
DRAIN (TYP.) EXISTING BACKFLOW
PREVENTER TO REMAIN
DEMOLISH CONDENSATE DRAIN
PIPING RUNNING FROM THE
DISPERSION TUBES TOT HE
FLOOR DRAIN (TYP.)
EXISTING
FLOOR DRAIN
TO REMAIN
FOR REUSE
(TYP.)
(E)RO SYSTEM 1
3/4" CW SUPPLY AND 3/4"PEX PIPING SERVING
RO SYSTEM TO REMAIN AN BE RECONNECTED
TO NEW SYSTEM.5
EXISTING FLOOR SINK TO REMAIN FOR REUSE.
ALL DRAINS FROM EXISTING RO SYSTEM TO BE
DEMOLISHED.
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-1303170-D006
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
DEMO PLAN MECHANICAL ROOMS
S20, S06, AND 61
za n-
0-d0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
KEY NOTES:
DEMO EXISTING RO SYSTEM IN ITS ENTIRETY. INCLUDING BUT NOT
LIMITED TO PIPING, FITTINGS, FILTERS, PUMPS, AND STORAGE TANKS.
COORDINATE DEMOLITION WITH FACILITY SERVICES TO MINIMIZE
DOWNTIME AND IMPACT ON THE FACILITY.
DISCONNECT AND REMOVE EXISTING STEAM AND CONDENSATE PIPING
FROM DISPERSION TUBES AS REQUIRED TO REPLACE WITH NEW.
DISPERSION TUBE TO REMAIN FOR REUSE.
REMOVE/DEMOLISH EXISTING HUMIDIFIERS AND ASSOCIATED PIPING,
VALVES, FITTINGS, AND CONTROLS. HUMIDIFIER IS SERVED FROM
EXISTING CW LINES. DEMO AND CAP CW BRANCH PIPING SERVING
HUMIDIFIERS IN A CONCEALED LOCATION.
DEMOLISH COPPER PIPE SERVING EXISTING RO SYSTEM IN ITS
ENTIRETY AS REQUIRED TO REPLACE WITH PEX PIPING.
EXISTING 3/4"CW AND 3/4"RO PEX PIPING TO REMAIN TO BE
RECONNECTED AND REUSED WITH NEW SYSTEM. PIPE ROUTES
THROUGH WALL AND BENEATH FLOOR OF ADJACENT SPACES.
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE
FACILITY. ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION
INDICATED ON THE DRAWINGS. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF
WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING
REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE
BUILDING OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER,
CONTRACTOR SHALL HAUL OFF AND PROPERLY DISPOSE OF
REMOVED EQUIPMENT.
6. EXISTING DISPERSION TUBES TO REMAIN IN PLACE FOR REUSE.
SCALE: 1/4" = 1'-0"
MECH RM S20 DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH RM S06 DEMO PLAN
SCALE: 1/4" = 1'-0"
MECH RM 61 DEMO PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
4' 0 4' 8'
(D) CONTROL POWER BOX
(D) CONTROLS 208VAC
HEATER CONTROLS
(D) EXIST WATER
PANEL 61B)
(ROUTED WITHIN WALL TO
(D) EXIST SOFTNER OUTLET
TYP.
TYP.
CONTROLS
(D) EXIST RO POWER
TYP. OF 3
(D) EXIST RO OUTLET
PANEL 61B
CONT ACROSS RM TO
(DEMO BY OTHERS)
EXIST VIKING PANEL
(SEE KEY NOTE 2)
EXISTING VIKING PANEL
(SEE KEY NOTE 2)
EXIST TRAP PRIMER
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/0
/2
:3
:0
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
z a n -1
-d
.d w g
8 234567
H
G
F
E
D
C
A
B
(E)RO SYSTEM
PANEL E61APANEL E61B
IS
S
U E
D F
O R
E D
M
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-D007
ARTCC
INSTALL WATER TREATMENT SYSTEM
MECHANICAL ROOM 61
ELECTRICAL DEMO PLAN
z a n -1
-d
.d w g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N S
T R
U C
T
IO
N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PROJECT ENGINEER
1303170
AK
MECH RM 61 ELECTRICAL DEMO FLOOR PLAN
SCALE: 3/4" = 1'-0"D007
1' 0 1' 3'
SCALE: 3/4" = 1'-0"
2'
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON THE
DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS,
LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL WORK THAT
ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH EXISTING.
COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL EXISTING EQUIPMENT, CONTROL AND POWER WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL.
4. DO NOT ROUTE ANY CONDUIT IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE BUILDING
OWNER. IF NOT DESIRED TO BE KEPT BY THE OWNER, CONTRACTOR SHALL
HAUL OFF AND PROPERLY DISPOSE OF REMOVED EQUIPMENT.
6. MAINTAIN REQUIRED CLEARANCES FOR NEW AND EXISTING EQUIPMENT PER
NFPA 70 (NEC). COMPLY WITH FAA ORDER 1217F FOR ALL INDOOR ELECTRICAL
WORK.
7. COORDINATE OUTAGES WITH FAA. ONLY FAA PERSONAL MAY BE
ENERGIZE/RE-ENERGIZE CIRCUIT BREAKERS AND OPERATE VALVES. SEE
ZAN1303170-E004 FOR PANEL SCHEDULES.
NEW ROUTING.
SHUT OFF VIKING PANEL AND TRAP PRIMER CIRCUITS. SEE ZAN-1303170-E002 FOR
COORDINATE OUTAGE WITH FAA AND FIRE ALARM CONTRACTOR HONEYWELL TO
CONDUCTORS FOR POWER AND CONTROLS.
INCLUDING BUT NOT LIMITED TO OUTLETS, JUNCTION BOXES, CONDUIT AND
DEMO EXISTING ELECTRICAL EQUIPMENT FEEDING EXISTING RO SYSTEM,
KEY NOTES:
MECH RM 61 ELECTRICAL DEMO ELEVATION PLAN
NOT TO SCALED007
PANEL
EXISTING VIKING
PRIMER
EXIST TRAP
Jordan Batac COMMENT Text Box
JORDAN BATAC
Jordan Batac COMMENT Text Box
STEVEN SCHREFFLER
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M001
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
ABBREVIATIONS, SYMBOL LEGEND
MECHANICAL NOTES
za n-
0-m
1.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
ABBREVIATIONS
REDUCER
TEE DOWN
PIPE CONTINUATION
PIPE PENETRATION
PIPE UP
PIPE DOWN
FLOW DIRECTION
CHECK VALVE
ISOLATION VALVE
3-WAY CONTROL VALVE
SOLENOID VALVE
FLOW CONTROL VALVE
UNION
M
S
STRAINER
BALANCE VALVE
FLEXIBLE PIPING
AUTOMATIC AIR VENT
W/ ISOLATION
TEMPERATURE GAUGE
PRESSURE GAUGE
PIPING SYMBOLS
ANNOTATIONSGENERAL SYMBOLS
ROOM NAME/
NUMBER DESIGNATOR
MECH. RM.
EXISTING EQUIPMENT(E)CP-1
NEW EQUIPMENTCP-1
1.
FLUID FLOWTHERMOSTAT
HUMIDISTAT
SENSOR FLOOR DRAIN
FLOOR SINK
PIPING
OTHER HVAC SYMBOLS
NOTE SPECIFIC TO
LOCATION INDICATED
NOTE APPLIES TO
ENTIRE SHEET.
AAV AUTOMATIC AIR VENT
AFF ABOVE FINISH FLOOR
AG ABOVE GROUND
AHU AIR HANDLING UNIT
ARCH ARCHITECT OR ARCHITECTURAL
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BTU BRITISH THERMAL UNIT
BV BALANCING VALVE
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEANOUT
CU COPPER
CUH CABINET UNIT HEATER
CW COLD WATER
DB DRY BULB
ø DIAMETER OR PHASE
DEMO DEMOLISH
DN DOWN
DWG DRAWING
(E) EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG ETHYLENE GLYCOL
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
FCO FLOOR CLEANOUT
F.D. FIRE DAMPER
FD FLOOR DRAIN
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY OR FUSIBLE OIL SAFETY
FSD FIRE SMOKE DAMPER
FTR FINNED TUBE RADIATION
G LOW PRESSURE GAS
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HC HEATING COIL
HP HORSEPOWER
HR HOUR
HTG HEATING
HGR HEATING GLYCOL RETURN
HGS HEATING GLYCOL SUPPLY
HWC HOT WATER CIRCULATION
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HW HOT WATER
HX HEAT EXCHANGER
IW IRRIGATION WATER
LAT LEAVING AIR TEMPERATURE
LF LINEAL FOOT
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSANDS BTU PER HOUR
MFR MANUFACTURER
MIN MINIMUM OR MINUTES
MUA MAKE UP AIR
NC NORMALLY CLOSED
N.I.C. NOT IN CONTRACT
NO NORMALLY OPEN
NPT NATIONAL PIPE THREAD
NSF NATIONAL SANITATION FOUNDATION
NTS NOT TO SCALE
OA OUTSIDE AIR
PG PROPYLENE GLYCOL
PH PHASE
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PEX RO WATER PIPING
INDUSTRIAL COLD WATER PIPING
STEAM PIPING
1. THE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL DESIGN AND ARRANGEMENT OF PIPES, EQUIPMENT, SYSTEMS, ETC. INFORMATION SHOWN IS DIAGRAMMATIC AND DOES NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET OR FITTING. MINOR DEVIATIONS FROM DRAWINGS MAY BE REQUIRED TO AVOID CONFLICTS WITH EXISTING
WORK OR TO PROVIDE BETTER ACCESSIBILITY TO EQUIPMENT.
2. THE CONTRACTOR WILL INSTALL ALL MECHANICAL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
3. STORE PIPES TO BE USED DURING INSTALLATION SUCH THAT THEY ARE PROTECTED FROM DUST, DEBRIS, AND
MOISTURE. KEEP PIPE ENDS SEALED UNTIL JUST BEFORE JOINING.
4. INSTALL EQUIPMENT SO THAT SERVICE AND ELECTRICAL CLEARANCES AS DEFINED BY MANUFACTURER ARE
MAINTAINED.
5. INSTALL ALL PIPING AND TUBING IN A NEAT, WELL ORGANIZED MANNER WITH SERVICES RUNNING PARALLEL WITH
PRIMARY LINES OF THE BUILDING CONSTRUCTION.
6. PRESSURE TEST NEW PLUMBING LINES IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE (IPC).
7. SLOPE ALL DRAIN TUBING 1/4" PER FOOT TOWARDS DRAIN OR SINK.
MECHANICAL NOTES
EXISTING WORK
DEMOLITION/NEW WORK
CONNECT TO EXISTING
RA RETURN AIR
RCP RADIANT CEILING PANEL
REQD REQUIRED
RL RAIN LEADER
RO REVERSE OSMOSIS
RPM REVOLUTION PER MINUTE
SA SUPPLY AIR
SD SMOKE DETECTOR
SL SOUNDLINING
SP STATIC PRESSURE
SSTL STAINLESS STEEL
T, TEMP TEMPERATURE
TAB TEST, ADJUST & BALANCE
TP TRAP PRIMER
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UF UNDER FLOOR
UG UNDERGROUND
UH UNIT HEATER
US UNDERSLAB
V VENT OR VOLTS
VAC VOLTAGE ALTERNATING CURRENT
VAV VARIABLE AIR VOLUME
VTR VENT THRU ROOF
W WASTE
WB WET BULB
W/ WITH
WC WATER CLOSET
W.C. WATER COLUMN
WCO WALL CLEANOUT
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
1.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
CONDENSATE DRAIN PIPING
COMPUTER ROOM AIR CONDITIONING UNIT SCHEDULE (EXISTING, FOR INFORMATION ONLY)
TAG LOCATION
AREA
SERVED
OPERATIN
MODE
FAN COOLING DATA REHEAT DATA HUMIDIFIER FILTER ELECTRICAL DATA
# OF
WHEELS
CFM RPM
ESP
(IN.
W.G.)
TSP
(IN.
W.G.)
MOTOR
HP
CAPACITY AIR WATER
MIN.
ROWS
WPD
(FT.
W.G.)
MAX.
FACE
VEL.
(FPM)
CAP.
(MBH)
AIR WATER
MIN.
ROWS
WPD
(FT.
W.G.)
KW LBS/HR TYPE
MERV
RATING
V PH HZ
TOTAL
(MBH)
SENS.
(MBH)
EDB
(°F)
EWB
(°F)
LDB
(°F)
LWB
(°F)
EWT
(°F)
LWT
(°F)
GPM
EDB
(°F)
LDB
(°F)
EWT
(°F)
LWT
(°F)
GPM
(E)CRU-63 ROOM 63
ROOMS 62
& 63
NORMAL 1 3500 690 1.0 2.3 5.0 75.8 75.8 74.4 58.5 52.5 49.3 44.0 54.0 16.8 4 8.6 300 94.5 60 85.0 200 165 5.0 2 10.8 4.8 11.0 TYPE B MERV 7 460 3 60
EMERGENCY 1 5700 1125 1.0 2.8 5.0 112.8 112.8 74.0 58.5 55.2 50.6 44.0 54.0 25.4 4 18.6 500 94.5 60 75.0 200 165 5.0 2 10.8 4.8 11.0 TYPE B MERV 7 460 3 60
(E)CRU-64 ROOM 64
ROOMS 64
& 65
NORMAL 1 3500 690 1.0 2.3 5.0 75.8 75.8 74.4 58.5 52.5 49.3 44.0 54.0 16.8 4 8.6 300 94.5 60 85.0 200 165 5.0 2 10.8 4.8 11.0 TYPE B MERV 7 460 3 60
EMERGENCY 1 5700 1125 1.0 2.8 5.0 112.8 112.8 74.0 58.5 55.2 50.6 44.0 54.0 25.4 4 18.6 500 94.5 60 75.0 200 165 5.0 2 10.8 4.8 11.0 TYPE B MERV 7 460 3 60
HUMIDIFIER SCHEDULE
TAG LOCATION AHU SERVED AREA SERVED TYPE
MAXIMUM STEAM
CAPACITY
(LB/HR)
ELECTRICAL DATA
BASIS OF DESIGN
HUMIDIFIER
TO BE REPLACED
CURRENTLY
SERVED BY RO
SYSTEM
NOTES
TOTAL POWER
(KW)
V PH AMPS
MANUFACTURER MODEL
HU-101 ROOM B10 AHU-101 TECH/OPS ELECTRIC 91.2 32 480 3 38.5 DRISTEEM VLC-32-2 YES NO SEE NOTE 1
HU-102 ROOM B10 AHU-102 TECH/OPS ELECTRIC 91.2 32 480 3 38.5 DRISTEEM VLC-32-2 YES NO SEE NOTE 1
HU-103 ROOM B02 AHU-103 TECH/OPS ELECTRIC 119.7 42 480 3 50.5 DRISTEEM VLC-42-2 YES NO SEE NOTE 1
HU-104 ROOM B02 AHU-104 TECH/OPS ELECTRIC 119.7 42 480 3 50.5 DRISTEEM VLC-42-2 YES NO SEE NOTE 1
HU-105 ROOM B02 ANU-105 TECH/OPS ELECTRIC 119.7 42 480 3 50.5 DRISTEEM VLC-42-2 YES NO SEE NOTE 1
HU-203 ROOM F08 AHU-203 TECH/OPS ELECTRIC 91.2 32 480 3 38.5 DRISTEEM VLC-32-2 YES NO SEE NOTE 1
HU-204 ROOM F08 AHU-204 TECH/OPS ELECTRIC 91.2 32 480 3 38.5 DRISTEEM VLC-32-2 YES NO SEE NOTE 1
HU-301 ROOM S06 AHU-301 TECH/OPS ELECTRIC 71.3 25 480 3 30.1 DRISTEEM VLC-25-1 YES NO SEE NOTE 1
HU-302 ROOM S06 AHU-302 TECH/OPS ELECTRIC 71.3 25 480 3 30.1 DRISTEEM VLC-25-1 YES NO SEE NOTE 1
HU-303 ROOM S20 AHU-303 TECH/OPS ELECTRIC 91.2 32 480 3 38.5 DRISTEEM VLC-32-2 YES NO SEE NOTE 1
HU-304 ROOM S20 AHU-304 TECH/OPS ELECTRIC 91.2 32 480 3 38.5 DRISTEEM VLC-32-2 YES NO SEE NOTE 1
HU-245A ROOM 245 AHU-245A
BASEMENT &
FIRST FLOOR
ELECTRIC 63 21 480 3 25.3 DRISTEEM VM-21 YES YES SEE NOTES 1,2
HU-245B ROOM 245 AHU-245B
FIRST & SECOND
FLOOR
ELECTRIC 42 14 480 3 16.8 DRISTEEM VM-14 YES YES SEE NOTES 1,2
(E)HU-09 ROOM 43 AHU-09 BASEMENT VAV ELECTRIC 48 16 480 3 19.2 DRISTEEM VM-16 NO YES
EXISTING TO REMAIN FOR
REUSE
(E)HU-10 ROOM 43 AHU-10 FIRST FLOOR VAV ELECTRIC 48 16 480 3 19.2 DRISTEEM VM-16 NO YES
EXISTING TO REMAIN FOR
REUSE
1. PROVIDE HUMIDIFIER WITH 4 LEG STANDS AND HARDWARE, VAPOR-LOGIC CONTROLLER WITH BACNET CAPABILITIES, AND CONTROL CABINET TO BE MOUNTED ON FRONT OR WITHIN 50' OF HUMIDIFIER UNIT.
2. PROVIDE WITH DRANE-KOOLER WATER TEMPERING DEVICE. FOLLOW ALL MANUFACTURER PROVIDED INSTALLATION INSTRUCTIONS/REQUIREMENTS.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M002
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
EQUIPMENT SCHEDULES
za n-
0-m
2.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
ORDER OF OPERATIONS/WORKFLOW
INSTALL TEMPORARY WATER LINES (HOSES OR PEX PIPING) CARRYING CITY WATER TO EXISTING HUMIDIFIERS
TO MAINTAIN HUMIDIFICATION DURING EXISTING RO SYSTEM DEMOLITION.
REMOVE AND REPLACE EXISTING WATER TREATMENT SYSTEM AND ANY EXISTING PIPING TO HUMIDIFIERS
THAT IS NOT TO REMAIN FOR REUSE.
START-UP WATER TREATMENT SYSTEM.
SWITCH TO TREATED WATER LINES AT EACH HUMIDIFIER. FINAL PERMANENT WATER LINES ARE TO ONLY CONTAIN TREATED WATER. COORDINATE WITH BUILDING PERSONNEL WHEN SWAPPING TO NEW WATER LINES AS AHU AND HUMIDIFIER OPERATION WILL NEED TO BE COORDINATED. ONLY ONE HUMIDIFIER PER SET OF REDUNDANT AHUS CAN BE SHUT DOWN AT A TIME. FULL VENTILATION AND HUMIDIFICATION OF THE BUILDING
MUST BE MAINTAINED AT ALL TIMES.
REPLACE EXISTING HUMIDIFIERS WHILE SWAPPING OVER TO NEW WATER LINES. SUCCESSFULLY OPERATE
NEW HUMIDIFIERS BEFORE CONTINUING TO REPLACE THE NEXT.
ANY EXISTING STAND-ALONE HUMIDIFIERS (WHERE NO REDUNDANT HUMIDIFIER/AHU IS PRESENT) SHALL BE INSTALLED LAST WHEN CONTRACTOR HAS THE WORKFLOW DIALED. THESE SHALL BE REPLACED ONE AT A
TIME AND SUCCESSFUL OPERATION VERIFIED BEFORE CONTINUING TO REPLACE THE NEXT.
AIR HANDLING UNIT SCHEDULE (EXISTING, FOR INFORMATION ONLY)
TAG LOCATION AREA SERVED
SUPPLY FAN DATA COOLING COIL DATA HEATING COIL ELECTRICAL DATA
SUPPLY
AIR
(CFM)
MINIMU
M OA
(CFM)
TSP
(IN.
W.G.)
ESP
(IN.
W.G.)
FAN
BHP
CAPACITY AIR WATER
ROWS
APD
(IN.
W.G.)
WPD
(FT.
W.G.)
CAP. AIR WATER
ROWS
APD
(IN.
W.G.)
WPD
(FT.
W.G.)
HP V PH
TOTAL
(MBH)
SENS.
(MBH)
EDB
(°F)
EWB
(°F)
LDB
(°F)
LWB
(°F)
EWT
(°F)
LWT
(°F)
GPM
TOTAL
(MBH)
EDB
(°F)
LDB
(°F)
EWT
(°F)
LWT
(°F)
GPM
AHU-101 ROOM B10 TECH/OPS 8900 875 --- 4.5 --- 238.0 --- 76.0 61.0 52.3 51.4 44.0 54.0 53 6 0.46 4.3 768.9 --- 92.2 200 180 79.9 2 0.05 4.1 10 460 3
AHU-102 ROOM B10 TECH/OPS 8900 875 --- 4.5 --- 238.0 --- 76.0 61.0 52.3 51.4 44.0 54.0 53 6 0.46 4.3 768.9 --- 92.2 200 180 79.9 2 0.05 4.1 10 460 3
AHU-103 ROOM B02 TECH/OPS 35000 --- --- 5.5 --- 1000.0 --- 76.0 61.0 56.1 53.3 44.0 54.0 200 8 0.68 10.8 --- --- --- --- --- --- --- --- --- 50 460 3
AHU-104 ROOM B02 TECH/OPS 35000 --- --- 5.5 --- 1000.0 --- 76.0 61.0 56.1 53.3 44.0 54.0 200 8 0.68 10.8 --- --- --- --- --- --- --- --- --- 50 460 3
AHU-105 ROOM B02 TECH/OPS 35000 --- --- 5.5 --- 1000.0 --- 76.0 61.0 56.1 53.3 44.0 54.0 200 8 0.68 10.8 --- --- --- --- --- --- --- --- --- 50 460 3
AHU-203 ROOM F08 TECH/OPS 8900 1140 --- 4.6 --- 288.0 --- 76.0 61.0 52.9 51.4 44.0 54.0 60 4 0.29 12.2 654.0 --- 78.7 200 180 66.0 2 0.05 4.1 10 460 3
AHU-204 ROOM F08 TECH/OPS 8900 1140 --- 4.6 --- 288.0 --- 76.0 61.0 52.9 51.4 44.0 54.0 60 4 0.29 12.2 654.0 --- 78.7 200 180 66.0 2 0.05 4.1 10 460 3
AHU-301 ROOM S06 TECH/OPS 15000 1140 --- 5.6 --- 463.0 --- 75.8 60.9 52.3 51.6 44.0 54.0 93 6 0.50 2.6 535.0 --- 78.0 200 180 54.0 2 0.05 4.1 20 460 3
AHU-302 ROOM S06 TECH/OPS 15000 1140 --- 5.6 --- 463.0 --- 75.8 60.9 52.3 51.6 44.0 54.0 93 6 0.50 2.6 535.0 --- 78.0 200 180 54.0 2 0.05 4.1 20 460 3
AHU-303 ROOM S20 TECH/OPS 9990 1500 --- 3.5 --- 156.0 --- 76.0 62.4 56.1 53.3 44.0 54.0 31.2 6 0.30 3.5 197.0 57.0 72.0 200 170 13.2 2 0.36 3.5 10 460 3
AHU-304 ROOM S20 TECH/OPS 9990 1500 --- 3.5 --- 156.0 --- 76.0 62.4 56.1 53.3 44.0 54.0 31.2 6 0.30 3.5 197.0 57.0 72.0 200 170 13.2 2 0.36 3.5 10 460 3
AHU-245
A
ROOM 245
BASEMENT &
FIRST FLOOR
4600 1470 4.4 3.0 --- 111.0 106.0 74.8 61.0 53.7 52.4 44.0 54.0 22.1 4 0.21 0.78 --- 24.3 62.4 200 180 11.6 1 0.09 0.80 7.5 460 3
AHU-245
B
ROOM 245
FIRST &
SECOND
FLOOR
4900 1100 4.6 3.0 --- 118.2 112.5 75.8 61.6 54.8 53.2 44.0 54.0 23.6 4 0.24 1.50 --- 26.5 68.3 200 180 10.0 1 0.09 0.21 10 460 3
AHU-09 ROOM 43
BASEMENT
VAV 5000 1500 4.88 2.00 5.97 110.9 101.4 73.9 61.2 54.0 52.8 44.0 54.0 22.2 4 0.56 6.90 53.9 37.5 50.0 180 160 29.8 1 0.10 0.90 7.5 460 3
AHU-10 ROOM 43
FIRST FLOOR
VAV 10000 2250 4.37 2.40 9.30 161.4 161.4 71.0 59.0 54.8 52.6 44.0 54.0 32.3 4 0.51 7.50 97.0 32.4 50.0 180 160 12.6 1 0.05 2.10 10 460 3
EXISTING 3/4"
PEX PIPING (TYP.)
SEE MECH RM 43
ENLARGED PLAN ON
SHEET ZAN-1303170-M006
SEE LAN EQUIPMENT
RM 64/AF LAB 63
ENLARGED PLAN
ON SHEET
ZAN-1303170-M006
SEE MECH RM B10
ENLARGED PLAN
ON SHEET
ZAN-1303170-M006
3/4" RO PEX
3/4" RO PEX PIPING
UP TO LEVEL ABOVE
3/4" RO PEX
SEE MECH RM 61
ENLARGED PLAN ON
SHEET ZAN-1303170-M008
3/4" RO PEX
CONNECT NEW
3/4"PEX PIPING
TO EXISITNG
ISOLATION
VALVE (TYP.)
3/4" RO PEX
SEE MECH RM B02
ENLARGED PLAN
ON SHEET
ZAN-1303170-M006
3/4" RO PEX
EXISTING 3/4" RO
PIPING BELOW FLOOR
EXISTING 3/4" CW
PIPING BELOW FLOOR
CORE DRILLING REQUIRED
FOR PIPE PENETRATION
THRU THIS WALL
USE EXISTING CABLE TRAY
PENETRATION TO ROUTE
PIPING THRU WALL
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M003
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM
BASEMENT FLOOR MECHANICAL
NEW WORK PLAN
za n-
0-m
3.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON
THE DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING
CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL.
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. INSTALL ISOLATION VALVES AT ALL JUNCTIONS AND WHERE THE PIPING
CHANGES FLOOR LEVELS. INSTALL VALVED HOSE BIBS AT ALL LOW
POINTS SO SYSTEM CAN BE DRAINED. ENSURE ALL VALVES ARE
INSTALLED IN ACCESSIBLE LOCATIONS.
SCALE: 3/32" = 1'-0"
BASEMENT FLOOR MECHANICAL NEW WORK PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
8' 0 8' 24'
SCALE: 3/32" = 1'-0"
16'
KEY PLAN
CONNECT NEW
3/4" PEX PIPING
TO EXISTING
3/4"RO PEX PIPING
UP TO MECH RM 245
ISOLATION
VALVE (TYP.)
3/4" RO PEX
3/4" RO PEX
PIPING UP/DN
SEE MECH RM F08
ENLARGED PLAN
ON SHEET
ZAN-1303170-M007
EXISITNG 3/4"
RO PIPING
EXISTING 3/4"
RO PIPING DN
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M004
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
FIRST FLOOR MECHANICAL
NEW WORK PLAN
za n-
0-m
4.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE
FACILITY. ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION
INDICATED ON THE DRAWINGS. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF
WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING
REMODEL.
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. INSTALL ISOLATION VALVES AT ALL JUNCTIONS AND WHERE THE PIPING
CHANGES FLOOR LEVELS. INSTALL VALVED HOSE BIBS AT ALL LOW
POINTS SO SYSTEM CAN BE DRAINED. ENSURE ALL VALVES ARE
INSTALLED IN ACCESSIBLE LOCATIONS.
SCALE: 3/32" = 1'-0"
FIRST FLOOR MECHANICAL NEW WORK PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
KEY PLAN
8' 0 8' 24'
SEE MECH RM 245
ON SHEET
ZAN-1303170-M007
SEE MECH RM S06
ENLARGED PLAN
ON SHEET
ZAN-1303170-M0083/4" RO PEX
PIPING
DN TO LEVEL
BELOW
3/4" RO PEX
ISOLATION
VALVE (TYP.)
3/4" RO PEX
SEE MECH RM S20
ENLARGED PLAN
ON SHEET
ZAN-1303170-M008
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M005
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
SECOND FLOOR MECHANICAL
NEW WORK PLAN
za n-
0-m
5.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE
FACILITY. ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION
INDICATED ON THE DRAWINGS. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF
WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING
REMODEL.
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. INSTALL ISOLATION VALVES AT ALL JUNCTIONS AND WHERE THE PIPING
CHANGES FLOOR LEVELS. INSTALL VALVED HOSE BIBS AT ALL LOW
POINTS SO SYSTEM CAN BE DRAINED. ENSURE ALL VALVES ARE
INSTALLED IN ACCESSIBLE LOCATIONS.
SCALE: 3/32" = 1'-0"
SECOND FLOOR MECHANICAL NEW WORK PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
KEY PLAN
8' 0 8' 24'
(E)AHU-101
(E)AHU-102
HU-101
HU-102
1 1
3/4"RO PEX
HUMIDIFIERS TO BE
STACKED. SHOWN
OFFSET FOR CLARITY
SEE ZAN-1303170-M003 FOR
PIPING CONTINUATION
NOTE: PIPING AND HUMIDIFIERS SHOWN OFFSET FOR
CLARITY. HUMIDIFIERS TO BE STACKED TO MATCH
ORIGINAL INSTALLATION CONFIGURATION AND PIPING IS
TO BE NEATLY ROUTED ALONGSIDE AHUs TO FLOOR DRAIN.
(E)CRU-64
(E)CRU-63
EXISTING CRU UNIT (TYP.2)
NOTE: PIPING SHOWN IS IN FLOOR SPACE BELOW
EXISTING 3/4" CW
EXISTING FLOOR SINK
EXISTING BACKFLOW PREVENTER
EXISTING 3/4" PEX RO PIPING
SEE ZAN-1303170-M003 FOR
PIPING CONTINUATION
(E)AHU-110
(E)HU-09
(E)HU-10
NOTE: NO WORK TO BE DONE IN
MECHANICAL ROOM 43. ALL EQUIPMENT
AND PIPING TO REMAIN. SHOWN FOR
REFERENCE PURPOSES ONLY.
EXISTING RO WATER PEX
PIPING (TYP.)
(E)AHU-109
SEE ZAN-1303170-M003 FOR
PIPING CONTINUATION
(E)AHU-105
(E)AHU-104
(E)AHU-103
HU-103
HU-104
3/4" RO PEX
HU-105
3/4" RO PEX
EXISTING
INDUSTRIAL WATER
PIPING (TYP.)
CAP PIPING (TYP.)
SEE ZAN-1303170-M003 FOR
PIPING CONTINUATION
1-1/4" D
1-1/4" D
1-1/4" D
2" STM
2" STM
2" STM
3/4" RO PEX
1-1/4" D
1-1/4" D
1-1/4" D
EXISTING BACKFLOW
PREVENTER
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M006
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
NEW WORK PLAN MECHANICAL ROOMS
64/AF LAB 63, B10, B02, AND 43
za n-
0-m
6.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
KEY NOTES:
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM
RECORD DRAWINGS AND NON-DESTRUCTIVE
WALK-THROUGHS OF THE FACILITY. ACTUAL SYSTEMS MAY
VARY FROM THE INFORMATION INDICATED ON THE
DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING
CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF
WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO
REMODEL WORK THAT ARE TO REMAIN SHALL BE PATCHED
AND REPAIRED TO MATCH EXISTING. COORDINATE WITH
ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING,
PIPING, AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE
DURING REMODEL.
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. BRANCH PIPING TO HUMIDIFIERS TO MATCH UNITS
CONNECTION SIZE.
6. BRANCH PIPE ROUTING TO MATCH PREVIOUS ROUTING
WHEREVER POSSIBLE.
SCALE: 1/4" = 1'-0"
EQUIPMENT ROOM 64/ AF LAB 63 NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH RM B10 NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH RM B02 NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH ROOM 43 NEW WORK PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
INSTALL HUMIDIFIER IN SAME LOCATION AS REMOVED
EXISTING UNIT. REFER TO MANUFACTURERS INSTALLATION
INSTRUCTIONS. SEE 4/ZAN-1303170-M009 FOR DETAIL.
ROUTE STEAM PIPING FROM ASSOCIATED HUMIDIFIER AND
CONNECT TO EXISTING DISPERSION TUBE. CONNECT AND
EXTEND CONDENSATE PIPING TO NEAREST DRAIN. ALL
STEAM AND CONDENSATE PIPING TO BE STAINLESS STEEL.
PROVIDE 1" MINIMUM AIR GAPS FOR ALL HUMIDIFIER
CONDENSATE PIPING. MATCH HUMIDIFIER
CONNECTION SIZE UP UNTIL AIR GAP, THEN UPSIZE TO
1-1/4" AS SHOWN IN THE ENLARGED PLANS.
CONNECT AND EXTEND PEX PIPING TO SERVE
EXISTING CRU-63/64. USE STAINLESS STEEL PIPING
WHEREVER PLASTIC PIPING CANNOT BE USED OR
WHERE PEX CANNOT BE CONNECTED TO CRU UNITS.
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
5 REPLACE AND ROUTE DRAIN PIPING FROM
(E)CRU-63/64 TO EXISTING FLOOR SINK. PIPING TO BE
PEX AND TO MATCH UNIT CONNECTION SIZE. PROVIDE
WITH MINIMUM 1" AIR GAP AT FLOOR SINK.
6 PROVIDE 1" MINIMUM AIR GAP TO FLOOR DRAINS.
(E)AHU-204
(E)AHU-203
HU-203
HU-204
3/4" RO PEX
1-1/4" D
2" STM
1-1/4" D
2" STM
1-1/4" D
1-1/4" D
ISOLATION VALVE
(TYP.)
3/4" RO PEX
(E)AHU-245A
HU-245A
3/4" RO PEX
PIPING DN
1-1/4" D
1-1/4" D
2" STM
3/4" RO PEX
3/4" RO PEX
EXISTING COPPER PIPING SERVING
EXISTING TRAP PRIMERS
PIPING DOWN THROUGH FLOOR TO
LEVEL BELOW
(E)AHU-245B
HU-245B
1-1/4" D
3/4" RO PEX
1-1/4" D
2" STM
EXISTING FLOOR
DRAIN (TYP.)
EXISTING COPPER PIPING
SERVING HUMIDIFIERS TO
REMAIN TO SERVE EXISTING
TRAP PRIMERS
EXISTING COPPER PIPING SERVING
EXISTING TRAP PRIMERS
CAP PIPING
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M007
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
NEW WORK PLAN MECHANICAL ROOMS
245A, 245B AND F08
za n-
0-m
7.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
KEY NOTES:
INSTALL HUMIDIFIER IN SAME LOCATION AS REMOVED EXISTING
UNIT. REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS.
SEE 4/ZAN-1303170-M004 FOR DETAIL.
PROVIDE 1" MINIMUM AIR GAPS FOR ALL HUMIDIFIER
CONDENSATE PIPING. MATCH HUMIDIFIER CONNECTION SIZE UP
UNTIL AIR GAP, THEN UPSIZE TO 1-1/4" AS SHOWN IN THE
ENLARGED PLANS. ROUTE HUMIDIFIER CONDENSATE DRAIN PIPING
TO NEAREST FLOOR DRAIN.
ROUTE STEAM PIPING FROM ASSOCIATED HUMIDIFIER AND
CONNECT TO EXISTING DISPERSION TUBE. CONNECT AND EXTEND
CONDENSATE PIPING TO NEAREST DRAIN. PROVIDE 1" MINIMUM AIR
GAP TO FLOOR DRAIN.
RECONNECT EXISTING CW PIPING TO NEW 'DRANE KOOLER' WATER
TEMPERING DEVICE. CONNECT NEW CONDENSATE PIPING FROM
HUMIDIFIER AND DISPERSION TUBE. ROUTE DRAIN PIPING TO
NEAREST FLOOR DRAIN.
PROVIDE MINIMUM 1" AIR GAP TO FLOOR DRAIN.
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE
FACILITY. ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION
INDICATED ON THE DRAWINGS. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS, LOCATIONS, AND SIZES BEFORE START OF
WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING,
AND DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING
REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS
OTHERWISE INDICATED.
5. BRANCH PIPING TO HUMIDIFIERS TO MATCH UNITS CONNECTION
SIZE.
6. BRANCH PIPE ROUTING TO MATCH PREVIOUS ROUTING WHEREVER
POSSIBLE.
SCALE: 1/4" = 1'-0"
MECH RM 245A NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH RM 245B NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH RM F08 NEW WORK PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
4' 0 4' 8'
(E)AHU-302
(E)AHU-301
HU-301
HU-302
5 5
3/4" PEX RO
2" STM
1-1/4" D
2" STM
1-1/4" D
1-1/4" D
ISOLATION VALVE
(TYP.)
3/4" RO PEX
1-1/4" D
(E)AHU-303 (E)AHU-304
HU-303 HU-304
5 5
4 4
EXISTING INDUSTRIAL
WATER PIPING (TYP.)
3 3
3/4" RO PEX
CAP PIPING (TYP.)
EXISTING BACKFLOW
PREVENTER
1-1/4" D 1-1/4" D
2" STM 2" STM
3/4" RO PEX
1-1/4" D 1-1/4" D
SEE ZAN-1303170-M005 FOR
PIPING CONTINUATION
BRINE
TANK
SOFTENER
STORAGE
TANK
POST-UV FILTER
REVERSE OSMOSIS
AND PRE-RO FILTERS
3/4" RO PEX
44"
85"
EXISTING FLOOR SINK TO REMAIN FOR REUSE.
ALL DRAINS FROM EXISTING RO SYSTEM TO BE
DEMOLISHED. 6 2
SEE ZAN-1303170-M003 FOR
PIPING CONTINUATION
USE EXISTING WALL PENETRATION TO ROUTE
RO PIPING TO COORIDOR
ISOLATION VALVE (TYP.) 3/4" RO PEX
3/4" RO PEX
3/4" RO PEX
1" RO PEX
72"
9.5"
10"
74"
93"
RO SKID
ELEVATOR CLEARANCE
DIMENSIONS
85"
44"
NOTE: DIAGRAM SHOWS SKID ORIENTATION REQUIRED
IN ELEVATOR AT MAXIMUM ALLOWABLE DIMENSIONS.
RO SKID MANUFACTURER/CONTRACTOR TO VERIFY
PRODUCT WILL FIT IN ELEVATOR.
IS
SU
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M008
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
NEW WORK PLAN MECHANICAL ROOMS
S20, S06, AND 61
za n-
0-m
8.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
KEY NOTES:
CONNECT RO SKID TO EXISTING CW SUPPLY PIPING. REFER TO
CONCEPTUAL RO SKID P&ID ON SHEET ZAN-1303170-M10
ROUTE DRAIN PIPING FROM RO SKID TO EXISTING FLOOR SINK.
INSTALL HUMIDIFIER IN SAME LOCATION AS REMOVED EXISTING UNIT.
REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS. SEE
4/ZAN-1303170-M009 FOR DETAIL.
HUMIDIFIER CONDENSATE DRAIN PIPING TO BE ROUTED TO NEAREST
FLOOR DRAIN. PROVIDE WITH MINIMUM 1" AIR GAP TO FLOOR DRAIN.
ROUTE STEAM PIPING FROM ASSOCIATED HUMIDIFIER AND CONNECT
TO EXISTING DISPERSION TUBE. CONNECT AND EXTEND CONDENSATE
PIPING TO NEAREST DRAIN. PROVIDE WITH MINIMUM 1" AIR GAP TO
FLOOR DRAIN.
CONNECT EXISTING 3/4" RO PEX PIPING TO NEW PIPING FROM RO SKID.
CONNECT EXISTING 3/4" IW PIPING TO NEW RO SKID.
PROVIDE MINIMUM 1" AIR GAP TO FLOOR DRAIN FOR ALL CONDENSATE
PIPING.
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON
THE DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS,
LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL
WORK THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO
MATCH EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING, AND
DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. BRANCH PIPING TO HUMIDIFIERS TO MATCH UNITS CONNECTION SIZE.
6. BRANCH PIPE ROUTING TO MATCH PREVIOUS ROUTING WHEREVER
POSSIBLE.
SCALE: 1/4" = 1'-0"
MECH RM S20 NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH RM S06 NEW WORK PLAN
SCALE: 1/4" = 1'-0"
MECH RM 61 NEW WORK PLAN
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
SCALE: NOT TO SCALE
ELEVATOR DIMENSIONS
ED
F
O R
ED
M
10/09/2024
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-1303170-M009
PJB
PJB
ARTCC
INSTALL WATER TREATMENT SYSTEM & HUMIDIFIERS
MECHANICAL DETAILS
za n-
0-m
9.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
1303170
AK
AIR HANDLING UNIT
EQUIPMENT PAD
UNION
H
EI
G H
T 2"
D
EE
PE
R
T H
AN
FA
N T
O
TA
L
ST
AT
IC
P R
ES
SU
R E
SE
E
AH
U
S C
H
ED
U
LEPITCH DOWN TO FLOOR
SINK (SEE FLOOR PLAN)
1 1/4" MINIMUM
DRAIN SIZE
2" STEAM HOSE WITH
CONNECTORS PROVIDED
WITH HUMIDIFIER (TYP.)
MANUAL INTERLOCKING
CIRCUIT BREAKER
L1 L2 L3
460 V, 3 PHASE
DRAIN
WATER INLET
MASTER HUMIDISTAT, INSTALL
IN SAME LOCATION AS EXISTING
REMOVED DURING DEMO
AHU DUCT
HI-LIMIT HUMIDISTAT
STEAM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .