Attachment 16_Present Past Performance Information PPI.pdf

PDF 45 KB Posted

Attached to
Joint Base Andrews (JBA) and Joint Base Anacostia Bolling (JBAB) Simplified Acquisition of Base Engineering Requirements (SABER)
Solicitation number
FA286020R0005
Issued by

About this file

This solicitation is for a Simplified Base Engineering Requirements (SABER) Indefinite Delivery Indefinite Quantity (IDIQ) contract at Joint Base Andrews and Joint Base Anacostia Bolling. The Air Force seeks to award a single firm-fixed price IDIQ contract with a four year, eight month base period and two one-year option periods. The successful offeror will perform a wide range of construction tasks including carpentry, road and parking lot repair, roofing, excavating, electrical, plumbing, sheet metal work, painting, demolition, masonry and welding. Task orders issued under the contract will have performance periods between 30 to 365 days and may include liquidated damages. Offerors will be evaluated based on past performance, technical approach, and price. The pre-proposal site visit will take place on March 4-5, 2020 and questions regarding the solicitation must be submitted in writing by the dates specified.

View the file

Other files

File Type Posted
Attachment 11 JBA Demonstration Seed Project.pdf PDF
Attachment 18_Present Past Performance Questionnaire.pdf PDF
Attachment 1_Wage Determination DC20200002 Building.pdf PDF
Attachment 10_Wage Determination MD20200046 AA Highway.pdf PDF
Attachment 20_Section M Evaluation Criteria For Award.pdf PDF
Attachment 12_Section B Bid Schedule.pdf PDF
JBA-JBAB SABER Solicitation FA286020R0005.pdf PDF
Attachment 13_Price Evaluation Worksheet.xlsx XLSX spreadsheet
Attachment 6_Wage Determination MD20200074 PG Highway.pdf PDF
Attachment 2_Wage Determination DC20200001 Heavy and Highway.pdf PDF
Attachment 7_Wage Determination MD20200066 PG Residential.pdf PDF
Attachment 8_Wage Determination MD20200039 AA Building.pdf PDF
Attachment 19_Subcontractor Teaming Partner Consent Letter.pdf PDF
Attachment 9_Wage Determination MD20200012 AA Heavy.pdf PDF
Attachment 4_Wage Determination MD20200044 PG Building.pdf PDF
Attachment 17_Present Past Performance Questionnaire (PPPQ) Cover Letter.pdf PDF
Attachment 15 Section L - Instructions, Conditions and Notices to Bidders.pdf PDF
Attachment 14_Section C SABER SOW.pdf PDF
Attachment 3_Wage Determination DC20200003 Residential.pdf PDF
Attachment 5_Wage Determination MD20200021 PG Heavy.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 16

PRESENT PAST PERFORMANCE INFORMATION (PPPI)

Provide the information requested in this form for each contract/program being described. Provide frank, concise comments regarding your performance on the contracts you identify. Provide a separate completed form for each contract/program submitted. Limit the number of past efforts submitted IAW Section L, paragraph L.4.2.1 and the length of each submission IAW Section L, paragraph L.4.2. of this solicitation. All PPI must by TYPED in the form below. Type size for text shall not be smaller than Microsoft Word, Times New Roman, 10 point.

A. Offeror Name (Company/Division): ____________________

CAGE Code:____________________

DUNS Number:____________________

B. Program Title:________________________________________________________________

C. Contract Specifics:

1. Contracting Agency or Customer _____________________________________________

2. Contract Number/Delivery/Task Order Number__________________________________

3. Contract Type __________________________

4. Period of Performance __________________________

5. Original Contract $ Value _________________ (Do not include unexercised options)

6. Current Contract $ Value _________________ (Do not include unexercised options)

7. If Amounts for 5 and 6 above are different, provide a brief description of the reason

D. Brief Description of Effort as __Prime or __Subcontractor

Instructions:

1. Provide description of actual work performed, most relevant to current acquisition,

2. If submitting a reference for a subcontractor, teaming partner, joint venture, or a corporate division related to the Prime, describe the nature and portion (percentage) of the work to be performed by the company referenced on the PPI sheet, and clearly define the relationship.

3. Indicate place(s) of performance:

E. Completion Date:

1. Original date: ____________________

2. Current Schedule: ____________________

3. Estimate at Completion: ____________________

4. How Many Times Changed: ____________________

5. Primary Causes of Change: _______________________________________________________

F. Primary Customer Points of Contact: (For Government contracts provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles).

1. Program Manager and/or Site Manager:

Name ______________________________________

Office ______________________________________

Address______________________________________

Telephone____________________________________

E-mail_______________________________________

2. Contracting Officer:

Name ______________________________________

Office ______________________________________

Address______________________________________

3. Administrative Contracting Officer:

Name ______________________________________

Office ______________________________________

Address______________________________________

G. For each of the applicable sub-factors under the Technical factor in Section M, illustrate how your experience on this program applies to that sub-factor.

H. Specify, by name, any key individual(s) who participated in this program and are proposed to support the instant acquisition. Also, indicate their contractual roles for both acquisitions.

I. Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting.

J. Identify whether a subcontracting plan was required by the contract you are submitting. If one was required, identify, in percentage terms, the planned versus achieved goals during contract performance. If goals were not met, please explain.

File details come from the government source that posted it. Updated .