Attachment 11 JBA Demonstration Seed Project.pdf
PDF 2 MB Posted
- Solicitation number
- FA286020R0005
About this file
This solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide base engineering requirements services at Joint Base Andrews and Joint Base Anacostia Bolling. The government will award one firm-fixed price IDIQ contract for an eight-year and eight-month base period with two one-year option periods. Services will include tasks such as carpentry, road and parking lot repair, roofing, excavating, electrical, plumbing, sheet metal, painting, demolition, concrete, masonry and welding. The contractor will furnish all materials, equipment and personnel to design, manage and accomplish individual projects. Task order periods of performance may range from 30 to 365 days. Liquidated damages will be identified at the task order level. The magnitude of construction will be determined at the task order level. Evaluation criteria are set forth in the solicitation. A site visit will be conducted on March 4-5, 2020. Questions are due by email by a specified date. Funds are not currently available and no award will be made until funds become available.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
11TH CONTRACTING SQUADRON (AFDW)
JOINT BASE ANDREWS, MARYLAND 20762
February 19, 2020
MEMORANDUM FOR: Joint Base Andrews Demonstration Seed Project
FROM: 11 CONS/PKA
1349 Lutman Drive Joint Base Andrews, MD 20762
SUBJECT: Joint Base Andrews (JBA) Demonstration Seed Project: Request for Proposal for project number AJXF 20-1507, Repair OSI Bldg. 3285
1. Please review the attached JBA Demonstration Seed Project Statement of Work (SOW). You are responsible for verifying the SOW and ensuring there are no discrepancies between this SOW and the SABER specifications. It is your responsibility to ensure all items required to perform this task are priced in your proposal. Please provide the above referenced project number in your proposal.
2. Notice to Offeror(s)/Supplier(s): In Accordance With (IAW) 52.232-18 Availability of Funds. Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an Offeror for any costs. In addition, the Air Force reserves the right to cancel this RFP, either before or after the closing date and has no obligation to reimburse an Offeror for any costs.
3. The Government estimated period of performance is one hundred twenty (120) calendar days following receipt of Notice to Proceed. If you do not agree with this period of performance please state your proposed performance time in your proposal. You are to include all anticipated material delays and/ or long lead items in your proposed performance time. Provide proposed phasing, if applicable.
4. When the Task Order is awarded, it will be a firm-fixed priced order in accordance with the requirements of the SOW. The Building Wage Rate will apply.
5. If you have any questions concerning the SOW, the SABER specifications, or any aspect of this project, please submit them in writing immediately to Mr. John Barr. Include with your proposal all drawings and a defined SOW, as applicable. All questions are due No Later Than (NLT) 11 Mar 2020, Noon, Eastern Standard Time (EST).
6. If you have any questions or require additional information, please contact the undersigned at 240-612-5627 or Mr. John Barr at 240-612-5646.
LISA A. PIZARRO, DAF, NH-03
Contracting Officer Attachments:
1. SOW AJXF 20-1507
2. AF Form 66
3. Reference 1 Roof Report
4. Reference 2 Demo Plan and Equipment Disposal
5. Reference 3 Building Requirements
6. Reference 4 HVAC
Buy ~ Fight ~ Win
JBA DEMONSTRATION SEED PROJECT
STATEMENT OF WORK
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
STATEMENT OF OBJECTIVES: Provide all necessary work needed to renovate the facility to meet current mission requirements as outlined in this Statement of Work (SOW). Work includes:
(1) Roof and gutter repair, (2) Demolition of interior walls and disposal of equipment, (3) Installation of two Sound Transmission Class (STC) 45+ rated rooms, (4) Installation of a 10 person administrative area, (5) Expansion of the waiting room with new storage area, repair/relocation of existing water fountain and replacement of hot water heater, (6) Bathroom expansion and renovation, (7) HVAC upgrades and rebalancing of existing system, (8) Electrical upgrades and communications install, (9) Structural repairs of exterior doors (x2) and windows (x3) and installation of two exterior lighting packs, Remove obsolete wiring and equipment within mechanical room and provide new storage cabinets for all electrical and communication nodes. (10) Relocate and upgrade existing fire panel and notification systems as outlined from base Fire Protection Engineer, (11) Upgrade of Siemens controls, (12) Provide a minimum of 35% design drawing prior to work start date and provide 100% competed as-built drawings upon completion of work. (13) Provide CONEX storage for existing furniture along with assembly/disassembly labor.
Exclusions: This is a private facility and does not need to meet current Americans with Disabilities Act (ADA) compliance. Per Base Fire Protection Engineer; this facility does not require a sprinkler fire suppression system. Square footages and room sizes on the attached drawings are desired but can be adjusted during final design and construction.
GENERAL: The Contractor shall provide all supervision, plant labor, transportation, equipment, and materials and perform all necessary engineering and operations to accomplish the following:
• (1) Roof and gutter repair. Includes (a) replacing the damaged and missing gutters on the north side of the building (~40 linear feet), (b) fasten all loose gutter straps, (c) clean all gutters and downspouts (d) and provide necessary protections from water infiltration to the facility, (e) ensure water from roof drains away from facility foundation, (f) remove obsolete ventilator stack from roof. Refer to Reference 1 for additional information and images.
• (2) Demolition of interior walls and disposal of equipment. Demo walls identified in the attached Demo plan (Reference 2). Remove and dispose of metal interview module.
• (3) SOW Item Area 3 - Installation of two Sound Transmission Class (STC) 45+ rated rooms. Each room should be climate controlled or be able to maintain consistent ambient temperature. Install walls in accordance with the attached Build Requirements (Reference 3). Room 2 will have a small 3x3 one way glass observation window. All rooms will have sound dampening for HVAC vents along with temperature monitoring.
Recommend walls be three layers of 5/8 " fireblock AGX type 1 gypsum, Ceiling – 5/8 " fireblock AGX type 1 gypsum (recommend 3-layers), provide insulation above ceiling (R-19 encapsulated), Paint – Recommend Sherwin Williams Promar 400 wall and ceiling fed. Stnd. #27780 (or equivalent) Recommend Cove base - burke #564 4" tall or
ATTACHMENT 1
STATEMENT OF WORK
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19 equivalent. Interview rooms will require a wired drop for the microphone, as well as a single standard power outlet for a camera.
• (4) SOW Item Area 4 - Installation of a 10 person administrative area. Install walls in accordance with the attached Build Requirements (Reference 3). This area will be standard drywall construction with LED lighting. Proposed outlet and COMM schematics are located on slide 3. Standard drop ceiling recommended.
• (5) SOW Item Area 5 - Expansion of waiting room with new storage area, repair/relocation of existing water fountain and replace hot water heater. Install walls in accordance with the attached Build Requirements (Reference 3). Waiting area will contain a water fountain, direct access to interview room 1 and access to single stalled (unisex) bathroom. This area will also contain the access to storage area. Standard drop ceiling recommended.
• (6) SOW Item Area 6 - Bathroom expansion and renovation, Install walls in accordance with the attached Build Requirements (Reference 3). Current restroom (1) contains single toilet, vanity/sink, shower and vent. All fixtures, toilet, sink and shower will be replaced. Tile finishes recommended along with drop ceiling. New restroom (2) will contain single toilet, sink and vent. Tile finishes recommended along with drop ceiling.
• (7) HVAC upgrades and rebalancing of existing system, Current HVAC units are 10 years old. Replace both units and provide separate HVAC zones per Reference 4. The facility will have two separate zones that can be controlled from within the facility. See reference 4 for desired zones. Provide HVAC assessment of existing system and determine proper sizing of HVAC units to meet the requirements of the facility prior to construction. Existing flex ducts can be repurposed if feasible.
• (8) Electrical upgrades and communications install. Upgrade existing electric panel and add sub panel for interview rooms. Ensure new layout has the appropriate dedicated circuits for usage. Install all communications wiring per reference 3. Perform load study for proper power requirements. Remove obsolete wiring and equipment within mechanical room and provide new storage cabinets for all electrical and communication nodes.
• (9) Structural repairs and replacement of exterior doors (x2) and windows (x3). Replace existing doors and windows and perform repairs as needed to ensure proper installation.
Install exterior lighting packs at both door locations (x2).
• (10) Upgrade existing fire panel and notification systems as outlined from base Fire Protection Engineer. General information: The building is a 1 story non-combustible structure that is approximately 2500sqft. It is utilized as office space for polygraph examination. The building is fitted with a Firelite Mini-Scan hard wired fire alarm control panel. Heat detectors are provided throughout the space, which are connected to the fire alarm panel. Current fire alarm notification appliances are inadequate. There appears to be only one horn/strobe in the entire building. The building is not provided with mass notification. The building is not sprinklered. The building fire alarm system is past it’s expected useful life. In addition, fire alarm notification is inadequate. The project should include replacement of the existing fire alarm system including code compliant fire alarm notification (horns/strobes). Project must include installation of code
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19 compliant fire alarm notification throughout the building. Notification appliance types are horns & strobes. Note that the building is fitted with several soundproof rooms.
These rooms must be provided with fire alarm horns & strobes. Horns and strobes are also required in bathrooms and conference rooms. New fire alarm control panel should be located at the main entrance to the building and shall be monitored per JBA Fire Protection Standards. Heat detectors are currently installed in several areas throughout the building. Heat detectors are not considered a life safety device as defined by the code and are not required. Mass notification is not required in this building. The building is not required to be sprinklered. New construction shall be non-combustible. Renovations must comply with JBA Fire Protection Standards as well as UFC 3-600-01. Fire standard specs.
• (11) Upgrade Siemens controls. Siemens is a sole source provider of HVAC controls.
• (12) Provide a minimum of 35% design drawing prior to work start date and provide
100% competed as-built drawings upon completion of work.
• (13) Provide CONEX storage for existing furniture along with assembly/disassembly labor. Consists of removal of approximately 14 office desks, shredder and 20 chairs.
The contractor shall provide the following in accordance with SABER Specification Section 3.1.1, Routine Requirement: The PM shall attend a Pre-Proposal Site Visit (Job Walk) to clarify any project requirements, and/or further define the project scope of work.
The contractor shall submit the following documentation:
• Statement of Work (technical description of the task).
• AF Form 3064, Contract Progress Schedule.
• Detailed cost estimate
• Justification for any non-pre-priced items
• Construction Work Schedule
• Material Approval Submittals
• Drawings, layout and as-builts of work being accomplished
• Manufacturer’s or technical drawings/schematics for fabrication and assembly of structural elements
• Form fit and attachment details for installation of materials/equipment
The statement of work must be thorough enough to allow the government and contractor to estimate pre-priced and non-pre-priced items, the government to monitor the work, and the contractor to execute the work. The statement of work includes attached AF Forms 66, Schedule of Material Submittals.
Provide manufacturers catalog data, technical data, shop drawings, and a sample for the following items IAW the contract required submittals:
Note: All submittals shall be approved by the SABER Project Manager.
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
The Contractor shall provide the following submittals within 30 days of contract award:
• Project Drawings and Specifications (35%)
• Material Approval Submittals
• Verified As-Built Drawings (if available)
• Manufacturer’s or technical drawings/schematics for fabrication and assembly of structural elements
• Form fit and attachment details for installation of materials/equipment
Design documentation shall include (at the CO’s discretion) shop drawings and sufficient calculations to support the adequacy of equipment/materials proposed for the project and the proposed assembly of structural components.
Project Drawings. The project drawings shall comply with Section 3.2.1.4 of the contract specifications. At a minimum, drawings shall include the following plan sheets: Title Sheet, Mechanical Plans to include Mechanical Plans and Equipment Schedules and Mechanical Equipment Diagrams, and Electrical Plans.
Specifications. The project specifications shall be developed and provided in accordance with Section 3.2.1.1 of the contract specifications.
Shop Drawings. The drawings must have sufficient detail to enable both the contractor and the government to accomplish independent estimates. For the purpose of this requirement, the term drawings includes actual shop drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract.
Calculations. To substantiate appropriate equipment or material selection/sizing and component assembly, the contractor shall supply the following calculations at the request of the CO.
Record Drawings. Prior to the start of any work on a project, the contractor shall obtain two copies of the appropriate record drawings, if available, from the SABER office. Drawings may be subject to security restrictions and could potentially be not available for use.
Accuracy of Record Drawings. The government does not guarantee the complete accuracy of these drawings. As part of the design process, the contractor shall verify the as-built conditions of the site. To indicate verification, the contractor shall sign one copy of the record drawings and include this copy in the submittal package. The verification applies ONLY to those features that are readily verifiable. It does NOT apply to hidden or buried components. The government will not pay for modifications associated with existing site conditions due to the contractor’s failure to verify those conditions as part of the design effort.
STATEMENT OF WORK
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
Codes, Standards, and Instructions. All design documentation and subsequent construction practices shall comply with Federal, State, and Local codes. International Building Codes (IBC) has established the basic building code standards for construction, renovation, repair, and maintenance. These standards, commonly referred to as IBC Codes, shall constitute the minimum acceptable levels of design, function, and safety for all projects.
WORK IN SECURITY CONTROLLED/RESTRICTED AREAS/FACILITIES: The contractor shall comply with security regulations imposed by the installation commander and/or the agency responsible for the project location. Projects in a secured area may require a local agency check of the contractor, his/her employees, and all sub-tier contractors through the base security police prior to commencement of on-site work. Contractor personnel must provide two forms of identification (at least one picture I.D.) for access to controlled/restricted areas. The contractor shall schedule work, requiring escorts, to include site visits for project estimating purposes, ten (10) calendar days prior to starting work unless the CO waives this requirement.
Due to specific mission requirements inherent in the nature of these restricted areas, the government may direct the contractor to leave the restricted area at any given time.
ETL ENGINEERING TECHNICAL LETTER 12/02: The contractor shall adhere to and perform all work in accordance with the Joint Base Andrews Communication requirements for building and site renovations.
JBA ENVIRONMENTAL STANDARDS: The contractor shall adhere to and perform all work in accordance with required Federal and Joint Base Andrews Environmental standards.
BASE FIRE PROTECTION STANDARDS, JOINT BASE ANDREWS: The contractor shall adhere to and perform all work in accordance with the Joint Base Andrews Fire Protection Standards.
The contractor shall complete the following:
1.0 GENERAL REQUIREMENTS: Contractor shall perform the following general requirements as necessary for project completion:
1.1 Perform daily cleanup of construction site.
1.2 Provide protection of existing government facility and equipment during construction.
1.3 Provide protection for personnel working in the area.
1.4 Provide protection for communications equipment during work activities.
1.5 Provide dust protection.
1.6 Provide 35% design prior to construction
1.7 Provide as-built drawings after construction
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
2.0 EXISTING CONDITIONS/SITE WORK/DEMOLITION: Contractor shall perform the following site work and demolition requirements as necessary for project completion:
2.1 Remove all construction debris from the work site daily and/or as approved by the Base Project Manager (PM) or Contracting Officer (CO).
2.2 Remove and dispose of metal interview module
2.3 Demolition of interior walls
2.4 Remove obsolete ventilator stack from roof
2.5 Remove antiquated electrical wires, panels
2.6 Remove existing duct work
2.7 Repair any roofing impacted by replacement
3.0 CONCRETE: Contractor shall perform the following site work and demolition requirements as necessary for project completion:
3.1 Remove all construction debris from the work site daily and/or as needed.
4.0 MASONRY: Contractor shall perform the following site work and demolition requirements as necessary for project completion:
4.1 Remove all construction debris from the work site daily and/or as needed.
5.0 METALS: Contractor shall perform the following site work and demolition requirements as necessary for project completion:
5.1 Remove all construction debris from the work site daily and/or as needed.
5.2 Replace damaged and missing gutters on the north side of the building
5.3 Fasten all loose gutter straps
5.4 Clean all gutters and downspouts
6.0 WOOD, PLASTICS AND COMPOSITS: Contractor shall perform the following site work and demolition requirements as necessary for project completion:
6.1 Remove all construction debris from the work site daily and/or as needed.
7.0 THERMAL & MOISTURE PROTECTION (ROOFING, SIDING): Contractor shall perform the following thermal and moisture protection requirements as necessary for project completion:
7.1 Apply thermal/moisture protection to new and existing ducts
7.2 Apply necessary protections to exterior penetrations
7.3 Provide necessary protections from water infiltration to the facility
7.4 Ensure water from roof drains away from facility foundation
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
8.0 OPENINGS (DOORS, OPENINGS, SKYLIGHTS): Contractor shall perform the following thermal and moisture protection requirements as necessary for project completion:
8.1 Replace two exterior doors
8.2 Replace three exterior windows
9.0 FINISHES (FLOORING, WALLS, CEILINGS): Contractor shall perform the following finishing requirements as necessary for project completion:
9.1 Touchup any interior and exterior imperfections caused by construction to match existing.
9.2 Installation of two Sound Transmission Class (STC) 45+ rated rooms each with climate control. Install walls in accordance with the attached Build Requirements (Reference 3).
Room 2 will have a small 3x3 one way glass observation window. All rooms will have sound dampening for HVAC vents along with temperature controls. Recommend walls be three layers of 5/8 " fireblock AGX type 1 gypsum, Ceiling – 5/8 " fireblock AGX type 1 gypsum (recommend 3-layers), provide insulation above ceiling (R-19 encapsulated), Paint
– Recommend Sherwin Williams Promar 400 wall and ceiling fed. Stnd. #27780 Cove base
- burke #564 4" tall. Interview rooms will require a wired drop for the microphone, as well as a single standard power outlet for a camera.
9.3 Installation of a 10 person administrative area. Install walls in accordance with the attached Build Requirements (Reference 3). This area will be standard drywall construction with LED lighting. Proposed outlet and COMM schematics are located on slide 3. Standard drop ceiling recommended.
9.4 Expansion of waiting room with new storage area, repair/relocation of existing water fountain and replace hot water heater. Install walls in accordance with the attached Build Requirements (Reference 3). Waiting area will contain a water fountain, direct access to interview room 1 and access to single stalled (unisex) bathroom. This area will also contain the access to storage area. Standard drop ceiling recommended.
13.0 SPECIAL CONSTRUCTION: Contractor shall perform the following finishing requirements as necessary for project completion:
13.1 Touchup any interior and exterior imperfections caused by construction to match existing.
13.2 Provide CONEX storage for existing furniture along with assembly/disassembly labor.
21.0 FIRE SUPPRESSION: Contractor shall ensure that the following Fire Suppression construction is adhered to as necessary for the completion of the project:
21.1 Upgrade existing fire panel and notification systems as outlined from base Fire Protection Engineer. General information: The building is a 1 story non-combustible
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19 structure that is approximately 2500sqft. It is utilized as office space for polygraph examination. The building is fitted with a Firelite Mini-Scan hard wired fire alarm control panel. Heat detectors are provided throughout the space, which are connected to the fire alarm panel. Current fire alarm notification appliances are inadequate. There appears to be only one horn/strobe in the entire building. The building is not provided with mass notification. The building is not sprinklered. The building fire alarm system is past it’s expected useful life. In addition, fire alarm notification is inadequate. The project should include replacement of the existing fire alarm system including code compliant fire alarm notification (horns/strobes). Project must include installation of code compliant fire alarm notification throughout the building. Notification appliance types are horns & strobes.
Note that the building is fitted with several soundproof rooms. These rooms must be provided with fire alarm horns & strobes. Horns and strobes are also required in bathrooms and conference rooms. New fire alarm control panel should be located at the main entrance to the building and shall be monitored per JBA Fire Protection Standards. Heat detectors are currently installed in several areas throughout the building. Heat detectors are not considered a life safety device as defined by the code and are not required. Mass notification is not required in this building. The building is not required to be sprinklered.
New construction shall be non-combustible. Renovations must comply with JBA Fire Protection Standards as well as UFC 3-600-01.
22.0 PLUMBING: Contractor shall ensure that the following Plumbing construction is adhered to as necessary for the completion of the project:
22.1 Bathroom expansion and renovation - Install walls in accordance with the attached Build Requirements (Reference 3). Current restroom (1) contains single toilet, vanity, shower and vent. All fixtures, toilet, sink and shower will be replaced. 22.2 New restroom (2) will include installation of a new single toilet, sink and vent. Provide all drains, pumps, and fixtures required for standard single unisex bathroom.
23.0 HVAC: Contractor shall provide and/or perform the following HVAC requirements as necessary for project completion:
23.1 HVAC upgrades and rebalancing of existing system,
23.2 Replace existing heat pump system and provide separate HVAC zones per Reference 4.
23.3 Provide HVAC assessment of existing system and determine proper sizing of HVAC units to meet the requirements of the facility prior to construction.
23.4 Provide restroom exhaust
23.5 Provide new duct, supply, controls and returns
23.2 Upgrade of Siemens controls and all necessary work needed for a complete and usable facility.
26.0 ELECTRICAL: Contractor shall provide and/or perform the following electrical requirements as necessary for project completion:
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
26.1 Upgrade electrical systems. Upgrade existing electric panel
26.2 Add sub panel for interview rooms. Ensure new layout has the appropriate dedicated circuits for usage.
26.3 Install all electrical sockets and wiring per reference 3.
26.4 Install exterior lighting packs at both door locations (x2).
26.5 Remove obsolete wiring and equipment within mechanical room and provide new storage cabinets for all electrical and communication nodes.
27.0 COMMUNICATIONS: Contractor shall provide and or perform the following communication requirements as necessary project completion:
27.1 Provide all communications infrastructure per reference 3. Leave approximately 5 feet of wire at terminal.
31.0 EARTHWORK: Contractor shall provide and/or perform the following electrical requirements as necessary for project completion: NA
32.0 Exterior Improvements: Contractor shall perform the following as necessary for project completion: NA
32.1 Remove all construction debris from the work site daily and/or as needed.
32.2 Ensure water from roof drains away from facility foundation.
33.0 UTILITIES: Contractor shall provide and/or perform the following electrical requirements as necessary for project completion:
33.1 No exterior utilities are required.
Provide manufacturers catalog data, technical data, shop drawings, and a sample for the following items IAW the contract required submittals:
Note: Required submittals are included in the attached AF Form 66.
Locations:
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
Pictures:
AJXF 12-1507 RENOVATE OSI BLDG 3285
16 Dec 19
AF Form 66
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
APPROVED DISAPPROVED
1 HVAC Calculations 3 3 2 Electrical Calculations 3 3 3 Material SubmittalS 3 3 3 3 3 3 4 35% Design 3 3 3 3 3 3 3 3 3 5 Final Inspection Report 3 3 3 3 6 As-Built drawings 3 7 Manuals/Instructions 3 3 3 3
SCHEDULE OF SUBMITTALS SOLICITATION CONTRACT NO:
FA286020R0005
PROJECT TITLE
REPAIR OSI BLDG 3285
PROJECT NUMBER
AJXF 20-1507
SU
BM
IT
TA
L N
U M
BE
RS
DATE CONTRACTOR
NOTIFIED
CO
N
TR
AC
TO
R
RE
SU
BM
IT
TA
L
FI
N
AL
A
PP
RO
VA
L
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
RE
TU
RN
S
U
SP
EN
SE
D
AT
E
FI
EL
D R
EP
O
RT
S
M
AN
U
FA
CT
U
RE
R'
S W
AR
RA
N
TY
CA
TA
LO
G
D
AT
A
O
PE
RA
TI
N G
IN
ST
RU
CT
IO
N
S
SC
H
ED
U
LE
RS
L
IS
TI
N
G S, R
EP
O
RT
S, P
LA
N
S
TE
CH
N
IC
AL
D
AT
A
TE
ST
R
EP
O
RT
S
M
AN
U
FA
CT
U
RE
R'
S
RE
CO
M
M
EN
D
AT
IO
N
Lin e
N um be r
NUMBER OF COPIES REQUIRED
RE
Q
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
RE
CE
IV
ED
IN
C O
N
TR
AC
TI
N G
CE
RT
FI
CA
TI
O
N O
F
CO
M
PL
IA
N
CE
SH
O
P D
RA
W
IN
G
S
SA
M
PL
ES
CO
LO
R
SE
LE
CT
IO
N
ATTACHMENT 2
Reference 1 Roof Report Attachment 3
United States Air Force - Andrews Air Force Base
GENERAL INFORMATION
Roof Name
Service Activity Type
Service Activity Date
Job Number
Information Source
Year of Installation
Roof Leaks
Leak Sensitivity
Roof Size
# of Stories
Is Ladder Required?
Asset Value
Total Asset Value
Overall Roof Condition
Inspection Comments
Technician
ROOF CONSTRUCTION
Steep Roof Type
Base Sheet
Deck Type
DRAINAGE AND SLOPE
Drainage
Slope
Roof A
TremCare Gold
May 17 2019
164571
Visual
2000 (Estimate)
No
Medium
2,240 sq. ft.
Yes
70 -Amber
Gutters are missing multiple hangers.
Vent stack is capped and obsolete.
About 60 % of the roof surface shows signs of hail damage.
Gutter on north side of building is missing or damaged.
J
Standing Seam Metal
1 ply Organic, Nailed
Plywood
Gutters
5 inch( es) per foot
PERIMETER, WALL AND COPING
Perimeter Type
Perimeter Wall and Flashing Type
Projection Flashings Type
Tremco Incorporated
Type
Flat Metal Edge
Gutter
Metal
Metal
Rubber Boots
Condition(s)
Good Condition
Damaged
Missing
Good Condition
Good Condition
Good Condition
Building #3285 AFOSI Office Roof A
A
Magnitude
Less than% of roof
Less than% of roof
Severity
United States Air Force - Andrews Air Force Base
ROOF CONDITIONS
Defect(s)
Hail Damage
MAINTENANCE SUMMARY
Work Performed
Magnitude
Less than % of roof
Building #3285 AFOSI Office Roof A
Severity
TremCare Completed inspection checking all details and membranes.
OUTSTANDING BUDGET
Work Beyond Scope of Maintenance Agreement (Customer Responsibility)
Task Year
Gutters & Downspouts 2019
Gutters & Downspouts 2019
Repairs Required, Minor 2019
Tremco Incorporated
Project$
Task Description
Recommend replacing the damaged and missing gutters on the north side of building. Approx. 40 linear feet.
*end refastening the loose gutter straps.
Recommend removing the obsolete ventilator stack from the roof.
*Quote available upon request.
Reference 2 Demolition Plan and Equipment Disposal Attachment 4
Demolition Plan Current Layout
Demo Plan – Red indicates removal
Bldg 3285 Renovation
Total Occupants: 14 Current authorized: 12
CURRENT PROPOSED
Reference 3 Building Requirements
Attachment 5
Bldg 3285 Renovation
Total Occupants: 14 Current authorized: 12
CURRENT PROPOSED
Installation Plan and Room Requirements
SOW Item Area 3:
Room 2 will have a small 3x3 one way glass observation window. All rooms will have sound dampening for HVAC vents along with temperature controls.
Walls – 5/8 " fireblock agx type 1 gypsum (3 layers) Ceiling – 5/8 " fireblock agx type 1 gypsum 3-layers, insulation above ceiling -r-19 encapsulated Paint - Sherwin Williams Promar 400 wall and ceiling fed. Stnd. #27780 Cove base - burke #564 4" tall SOW Item Area 4: This area will be standard drywall construction with LED lighting. Proposed outlet and COMM schematics are located on slide 3.
SOW Item Area 5: Waiting area will contain a water fountain, direct access to interview room 1 and access to single stalled (unisex) bathroom. This area will also contain the access to storage area.
SOW Item Area 6: Current restroom (1) contains single toilet, vanity, shower and vent. All fixtures, toilet, sink and shower will be replaced. New restroom
(2) will contain single toilet, sink and vent. Tile finish preferred.
PROPOSED
SOW Item Area 3
SOW Item Area
SOW Item Area 5
SOW
Item Area
Quad Outlet c/p = ceiling power outlet (single) AD = Afnet Drop C/N = com node/rack
Staff members EACH have a computer, scanner and two monitors. These are used for visual analysis, which is 90% of our administrative work.
At minimum, each work station requires four outlets;
with two requiring additional to power secure phones.
Ceiling outlet (single) required to power the cameras for recording interviews.
MICROPHONE
CAMERA (POWERED)
Identified interview rooms will require a wired drop for the microphone, as well as a single standard power outlet for the camera
AFSOI is providing the microphone/cameras. Statement of work should only include the wiring from each point, to the Case Cracker system with 5 feet of extra wiring at each end.
Camera w/ single power outlet
Microphone
Wall behind the observation desk, holding case crackers; mounted to board
-audio amps occasionally need to be replaced, or require manual adjustment, so access is required. USER is providing ALL components EXCEPT wiring!!!!
At endpoint, please leave 5 FEET of wire coming out of the wall (for Audio and Video) Audio (Green) and Video (Blue) need to exit the wall near each other (see diagram) The Casecracker system will located on the rear wall of the bull pen area.
Audio Amp
Audio Amp
Audio Amp
TO CASECRACKER CPUs
POWER
POWER
POWER
Cable (Audio) out of walls from rooms (Green)
Video Wires
DS= Door Sweep, Heavy Door KL = Key Lock CY = Cyber Lock
DS
DS
DS
DS
DS
DS
= Quiet zone. We need to reduce the sounds coming from into these areas. Our recommendation is a hard/true suspended ceiling with 3 sheets of sheetrock, with a sound damping solution applied between each sheet (https://www.greengluecompany.com/Installation We are attempting to get an STC rating of 45; not completely soundproof, but enough to keep conversations containing PII/HIPA from escaping the room. Each room will also have a camera/microphone drop to record interviews.
**Once polygraph leaves, these rooms will be great single space offices for different organizations during emergency center stand up.
https://www.greengluecompany.com/Installation
Reference 4 HVAC
ATTACHMENT 6
HVAC Zones
Zone 2 is the common workspace, and if required can be on the base A/C and heat schedule.
Zone 1 are the interview spaces. This area must have independent A/C heat controls, as the flight has instruments that require individuals undergoing testing to be in homeostatic state when collecting data.
Because of seasonal changes, the flight must maintain control over this zone
Existing HVAC Units
Existing Duct work
| Record Drawings. Prior to the start of any work on a project, the contractor shall obtain two copies of the appropriate record drawings, if available, from the SABER office. Drawings may be subject to security restrictions and could potentially be not... |
| Accuracy of Record Drawings. The government does not guarantee the complete accuracy of these drawings. As part of the design process, the contractor shall verify the as-built conditions of the site. To indicate verification, the contractor shall si... |
| Codes, Standards, and Instructions. All design documentation and subsequent construction practices shall comply with Federal, State, and Local codes. International Building Codes (IBC) has established the basic building code standards for construction... |
| ETL ENGINEERING TECHNICAL LETTER 12/02: The contractor shall adhere to and perform all work in accordance with the Joint Base Andrews Communication requirements for building and site renovations. |
| The contractor shall complete the following: |
| ADP5C9F.tmp |
| Slide Number 1 |
| Slide Number 2 |
| ADPC25C.tmp |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| ADPB818.tmp |
| Slide Number 1 |
| Existing HVAC Units |
| Existing Duct work |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| SCHEDULE OF SUBMITTALSRow1: | |
| PROJECT TITLE REPAIR OSI BLDG 3285: | |
| SCHEDULE OF SUBMITTALSRow2: | |
| SCHEDULE OF SUBMITTALSRow3: | |
| SCHEDULE OF SUBMITTALSRow3_2: | |
| SCHEDULERS LISTINGS REPORTS PLANS: | |
| ITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE TYPE OF SUBMITTALRow1: | |
| ITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE TYPE OF SUBMITTALRow2: | |
| ITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE TYPE OF SUBMITTALRow3: | |
| ITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE TYPE OF SUBMITTALRow4: | |
| ITEM OR DESCRIPTION OF ITEM CONTRACT REFERENCE TYPE OF SUBMITTALRow5: | |
| HVAC Calculations: | |
| APPROVED: | |
| DISAPPROVED: | |
| Electrical Calculations: | |
| 3: | |
| APPROVED_2: | |
| DISAPPROVED_2: | |
| CERTFICATION OF COMPLIANCEMaterial SubmittalS: | |
| 3_2: | |
| 33: | |
| CERTFICATION OF COMPLIANCE35 Design: | |
| 3_3: | |
| CERTFICATION OF COMPLIANCEFinal Inspection Report: | |
| 3_4: | |
| CERTFICATION OF COMPLIANCEAsBuilt drawings: | |
| 3_5: | |
| 3_6: | |
| 3_7: | |
| 3_8: | |
| 3_9: | |
| 7Row1: | |
| ManualsInstructionsRow1: | |
| Row2: | |
| APPROVED_3: | |
| DISAPPROVED_3: | |
| APPROVED_4: | |
| DISAPPROVED_4: | |
| APPROVED_5: | |
| DISAPPROVED_5: | |
| APPROVED_6: | |
| DISAPPROVED_6: | |
| APPROVED_7: | |
| DISAPPROVED_7: | |
| APPROVED_8: | |
| DISAPPROVED_8: | |
| Type: | |
| Conditions: | |
| Magnitude: | |
| Severity: | |
| Defects: | |
| Magnitude_2: | |
| Severity_2: | |
| Work Performed: | |
| Tremco Incorporated: | |
| 3_10: | |
| Tremco Incorporated_2: | |
| 4: | |
| La out: | |
| undefined: | |
| h4 I r: | |
| 5IHhFFJhi Unnamed spacl 307ft: | |
| CURRENT: | |
| undefined_2: | |
| h4 I r_2: | |
| Safes: | |
| Bullpen 679ft Hallway 98ft: | |
| undefined_3: | |
| CURRENT_2: | |
| undefined_4: | |
| h4 I r_3: | |
| Safes_2: | |
| Bullpen 679ft Hallway 98ft_2: | |
| undefined_5: | |
| Video Wires: | |
| Audio AmpRow1: | |
| POWERRow1: | |
| undefined_6: | |
| HVAC Zones: | |
| undefined_7: | |
| Existing HVAC Units: | |
| 15i: | |
| undefined_8: | |
| XL 15i: | |
| 2020-02-19T10:56:11-0500 | |
| PIZARRO.LISA.A.1015354727 |
File details come from the government source that posted it. Updated .