This document contains an experience information sheet attachment and a federal contract opportunity announcement for a design-build project. The experience information sheet is a template for offerors to provide details on past relevant projects to be considered for evaluation. The federal contract opportunity is being solicited by the US Army Corps of Engineers Europe District to award a design-build contract for construction of the National Malaria Reference Laboratory located in Lakka, Sierra Leone. Offerors must be SAM registered and submit both price and non-price proposals by the deadline in order to be eligible for award. The project involves design and construction services with basic design criteria provided. A pre-proposal site visit is scheduled for November 30, 2022 and offerors must pre-register. The solicitation number is W912GB23R0007 and provides instructions for response and SAM registration requirements.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 13
Experience Information Sheet
CONTRACTOR PAST EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed Outside the Continental United States (OCONUS). Note: project performed within the European Union will be considered more relevant, while projects in Germany, Belgium, Poland, Romania, or Estonia will be considered most relevant: ___________________________________
2. The day, month, and year work was completed; work must not be earlier than 2013: _______________
3. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for projects in at least one of the following categories:
| a. | Design-Build construction projects |
| b. | New Construction or Renovations of Buildings that demonstrate experience with Sensitive Compartmented Information Facilities (SCIFs) in compliance with ICD 705 standards; |
| d. | Replacement to include major building systems (electrical, mechanical, structural, etc) repaired or replaced; |
NOTE: The prime contractor must have performed at least three (3) of the five (5) projects submitted for Factor 1 AND two (2) of the five (5) projects submitted must be SCIF construction. This aspect is a pass/fail element. In case of a Joint Venture, the work must have been performed by at least one of the JV partners. Offerors who do not meet this minimum requirement are not eligible for award.
(Continue typing if required to provide more information)
ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.
6. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals: