Attachment 12 - SBIS RFI-2 Comment and Question Matrix.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- FAASBS-AAQ-210
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comment Resolution Vendor Comment # Document Section Text Question / Comment / Discussion Recommendation, Suggested Text, or Rationale Criticality C = Critical S = Substantive A = Administrative
| Example comment: | |||||||
| Vendor, Inc. | 1 | Attachment 7 – SBIS ConOps Supplement | 5. FUTURE OPPORTUNITIES FOR INNOVATION | • A Centralized Service Monitoring application would provide the ability to evaluate surveillance at a service level in lieu of a system level. | Can the FAA provide additional details with respect to centralized service monitoring? | Please consider adding specific requirements for centralized service monitoring to the SBIS requirements. | S |
Lists for Dropdowns
| RFI-2 | C |
| Other Document Not Listed | S |
| Attachment 1 - SBS Services Description Document (Revision 4) | A |
| Attachment 2 - ConOps for SBS (SBS‐006‐06‐20120626) | |
| Attachment 3 – Gulf of Mexico | |
| Attachment 4 - SBS ADS‐B and ADS‐R Critical Services Specification (FAA‐E‐3011 Revision A) | |
| Attachment 5 - SBS Essential Services System Specification (FAA‐E‐3006 Revision B) | |
| Attachment 6 - WAM Critical Service Specification (FAA‐E‐3024_Revision A) | |
| Attachment 7 – SBIS ConOps Supplement | |
| Attachment 8 – SBIS Service_Volume_Description_Document_2021-05-03 | |
| SBIS_SCT_SV-T1_ADS-B_Coverage.kmz* | |
| Attachment 9 - Oceanic/Remote Service Specification (DRAFT) | |
| Attachment 10 - SBIS Implementation Considerations | |
| Attachment 11 - COST/ROM Template | |
| Attachment 12 - SBIS RFI-2 Comment and Question Matrix |
File details come from the government source that posted it. Updated .