Attachment 11A Quality Assurance Surveillance (QASP) Delivery Order 0001_10Aug2020.pdf
PDF 560 KB Posted
- Attached to
- Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production (SDP)
- Solicitation number
- W900KK-20-R-0020
About this file
This document provides a Quality Assurance Surveillance Plan (QASP) for an Army Ground Aerial Target Control System (AGATCS) Support, Development and Production (SDP) contract. The QASP outlines performance standards and acceptable quality levels for evaluating the contractor's performance in meeting requirements under Delivery Order 0001. Key metrics include the contractor's monthly progress reports, configuration management, management of government furnished property, and overall rating. Surveillance methods involve monitoring cost and schedule performance, reviews, and inspections. Performance is rated using the FAR definitions for exceptional, very good, satisfactory, marginal, and unsatisfactory. The QASP establishes procedures for documenting performance issues, conducting reviews, resolving disputes, and accepting services. It specifies reporting requirements such as the use of the Contractor Performance Assessment Reporting System and the Enterprise-Wide Contractor Manpower Reporting Application.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
(QASP)
For
ARMY GROUND AERIAL TARGET CONTROL
SYSTEM (AGATCS) SUPPORT,
DEVELOPMENT & PRODUCTION (SDP)
Contract # W900KK-20-R-0020
Delivery Order 0001
PREPARED BY:
Program Executive Office for Simulation Training & Instrumentation (PEO STRI)
U.S. ARMY CONTRACTING COMMAND – ORLANDO (ACC-ORL)
12211 SCIENCE DRIVE, ORLANDO, FL, 32826
ATTACHMENT 11A
Army Ground Aerial Target Control System (AGATCS) Support, Development and Production (SDP) Delivery Order 0001 Quality Assurance Surveillance Plan (QASP) ii
Table of Contents
1. Introduction
2. Purpose
3. Scope
4. Performance Measurement and Monitoring Approach
5. Methods of Surveillance
6. Surveillance
7. Surveillance Schedule
8. Surveillance Checklist
9. Surveillance Documentation
10. Customer Satisfaction
11. Formal Project Reviews
12. DO QASP Criteria Performance Metrics
13. Rating Definitions
14. Documenting Performance
15. Reviews and Resolution
16. Deduct Plan
17. Data Analysis
18. Acceptance of Services
19. COR Status Report
20. Enterprise-Wide Contractor Manpower Reporting Application (eCMRA)
21. Contractor Performance Assessment Reporting System iii
22. Combating Trafficking in Persons (CTIP)
23. COR/Quality Assurance Surveillance Files
24. QASP Changes
25. Document Revision History
Appendix A – Acronym List
Appendix B – Non Conformance Report (NCR)
1. Introduction The Army Ground Aerial Target Control System (AGATCS) Support, Development & Production (SDP) contract provides an Indefinite Delivery/Indefinite Quantity (ID/IQ) vehicle to PEO STRI PM Cyber Test & Training (CT2) Threat Systems Management Office (TSMO) for delivering target control systems in support of test and evaluation and training events for directed missions.
Delivery Order (DO) 0001 tasks contractor to complete the contract transition phase-in process and to conduct annual cyber security updates to the Army Target Control System as required in DO 0001 Statement of Work (SOW).
2. Purpose
This QASP describes a systematic method that will be used to evaluate the contractor’s performance under DO 0001.
This QASP sets forth the procedures and guidelines the Government staff will use in ensuring that contract performance standards are achieved through effective and ongoing monitoring of metrics and Acceptable Quality Levels (AQL). The performance standards associated with DO 0001 can be found in Table 1 of Section 12.
The QASP performance standards (metrics) established herein are applicable to achieving the functional and operational standards, thresholds, and contract performance objectives of the DO SOW as well as the contractor’s effective project management of the effort. This QASP is designed specifically to effectively monitor the contractor’s ongoing performance to deliver a successful end- product that meets cost, schedule, and quality requirements. This QASP shall not be construed as a substitute for, or relieve the contractor of, the Government’s rights under FAR clauses 52.246-2 Inspection of
Supplies—Fixed-Price or 52.246-3 Inspection of Supplies – Cost Reimbursement.
3. Scope
The contractor is responsible for the quality control of all work performed in accordance with the performance standards set forth in this DO QASP. The contractor measures that quality through their own approved Quality System Plan (QSP), while the Government’s role is ensuring proper Quality Assurance by measuring the performance standards of the QASP. The contractor’s QSP will be provided and accepted by the Government per the contract SOW and will be incorporated as a binding contractual requirement. As such, this QASP does not detail how the contractor will accomplish quality control in accordance with the performance standards provided herein. Rather it provides the performance standards and the Government’s approach to measurement and monitoring of those performance standards.
4. Performance Measurement and Monitoring Approach
The Government’s performance measurement and monitoring (i.e. surveillance) approach defined herein provides the Government’s intentions and plans to review and analyze information generated thorough contractor performance assessments throughout the term of DO 0001 according to this QASP. The following Government personnel shall oversee and coordinate surveillance activities:
a. Contracting Officer (KO) - The KO is the only person authorized to direct changes in any of the requirements under this contract. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority, and solely at the risk of the
Contractor. No changes in, or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.
Assigned KO: Jason Jerome
Organization or Agency: U.S. Army Contracting Command - Orlando
Telephone: 407-208-5868
Email: Jason.jerome3.civ@mail.mil
b. Contract Specialist (CS) - The CS acts as an acquisition consultant and serves as liaison between the requesting program office, the contractor, and the supporting contracting office.
Assigned CS: Rosa Rivera
Organization or Agency: U.S. Army Contracting Command - Orlando
Telephone: 407-208-3354 Email: rosa.i.rivera4.civ@mail.mil
c. Contracting Officer’s Representative - The COR will monitor all technical and performance aspects of the contract, and assist the (KO) in contract administration.
The COR is authorized to perform the following functions:
Assure that the Contractor performs the technical requirements of the contract
Perform inspections necessary in connection with contract performance
Maintain written and oral communications with the Contractor concerning technical and performance aspects of the contract
Issue written interpretations of technical requirements, including Government drawings, designs, and specifications
Monitor Contractor's performance and documents and notifies both the
Contracting Officer and Contractor of all deficiencies
Coordinate availability of Government furnished property
Provide site entry of Contractor
ACC doesn’t use other acronyms to refer to and describe a COR. Terms such as the “COTR, “Onsite COR”, “TM”, etc. will not be used. Some personnel may be assigned as Alternate CORs, but other than a statement to that effect and what mailto:Jason.jerome3.civ@mail.mil actions the KO expects that ACOR to take in the absence of the primary COR, there is no difference between a COR an Alternate COR, or other government surveillance personnel assigned to conduct contract oversight. Throughout the remainder of this QASP, The term “COR’ will be used to refer to all government surveillance personnel assigned to monitor the contractor’s performance on this contract.
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost, price, or delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
The Contracting Officer shall use the DoD Joint Appointment Module (JAM) to electronically track COR nominations, appointments, terminations, and training certifications for each COR appointed to conduct oversight on this contract. The
COR will upload their surveillance documents, such as COR Status Reports
(CSRs) COR trip reports, correspondence with the contractor, and other miscellaneous documents into the Surveillance and Performance Monitoring (SPM) module within the online contract file. JAM and SPM are available within the
Procurement Integrated Enterprise Environment (PIEE) suite of tools at:
https://piee.eb.mil.
Assigned COR: Barry Hatchett, Sr.
Organization or Agency: PM CT2 TSMO
Telephone: 256-842-6797
Email: Barry.m.hatchett.civ@mail.mil
d. The contractor has assigned the following contractor personnel to measure the contractor’s quality control against the performance standards of this QASP in accordance with the contractor’s QSP. In addition, they will serve as the contractor’s Program Manager and Task Manager for this contract.
Program Manager: TBD
Telephone: TBD
Email: TBD
Task Manager: TBD
Telephone: TBD
Email: TBD
Other Contractor Personnel: TBD
Title: TBD
Telephone: TBD
Email: TBD
The Government’s acceptance of the contractor’s performance and deliverables will be mailto:Barry.m.hatchett.civ@mail.mil based on analysis of factual data provided by the contactor and validated by the
Government in accordance with this DO QASP. Based on this analysis, project performance information is documented, communicated, and used for contractor corrective actions, as applicable, and can be used as support for other contractual remedies that may be imposed by the KO if performance is not maintained at acceptable levels in accordance with the performance standards of the DO QASP.
Because this DO QASP defines the criteria and performance standards (i.e. metrics and
AQLs) the contractor must continuously achieve for acceptable performance, it serves as the official basis for formal evaluation and rating of the contractor’s performance.
Accordingly, the QASP serves as the formal basis upon which the Contractor’s
Performance Assessment Reporting System (CPARS) evaluation ratings are assigned in accordance with FAR 42.15.
5. Methods of Surveillance
The primary methods of DO performance surveillance include, but are not limited to:
a. Monitoring of contractor’s cost and schedule performance through monthly progress and financial reporting.
b. Planned – Direct Observation. (Can be performed periodically or through 100% surveillance).
c. Periodic inspections of contractor facilities.
d. Direct observations of contractor work activities and deliverables.
6. Surveillance
The COR will perform monthly surveillance based on the quality and effectiveness of the contractor's data deliverables as well as the products provided. Regardless of the surveillance method, the COR shall always contact the contractor's quality manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, when designated, shall be responsible for monitoring the contractor's performance in meeting a specific performance standard/AQL.
7. Surveillance Schedule A Surveillance Schedule will be created each month. The schedule is “FOR OFFICIAL
USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Schedule will be completed at the beginning of each month during the Period of Performance (PoP) to schedule the upcoming month surveillance activity. Completed Surveillance Schedules will be filed in the online
Surveillance and Performance Monitoring (SPM) module located within
(https://piee.eb.mil) file for this contract, either as an attachment to the CSR or uploaded separately in the Miscellaneous Documents Section.
8. Surveillance Checklist
A Surveillance Checklist will be created each month. Locally generated equivalent is acceptable. The Checklist is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. Each Month’s Surveillance Checklist will be completed with the Surveillance Schedule. Completed Surveillance Checklist will be filed in the online SPM module located within (https://piee.eb.mil) file for this contract, either as an attachment to the CSR or uploaded separately in the Miscellaneous Documents
Section.
9. Surveillance Documentation Each months’ Completed Surveillance Documentation, to include the CSR must be filed in the online SPM module located within (https://piee.eb.mil) file for this contract. The CSR
(Smart Form) must be utilized with supporting documentation uploaded as an attachment.
10. Customer Satisfaction
Customer satisfaction is the most significant indicator of success and effectiveness of all products provided by the contractor. Quality products that are delivered on time and within cost are evidence of proper contractor project management and quality control.
Customer feedback (level of satisfaction) will be primarily communicated in the form of email, verbally, and surveys.
Customer satisfaction evaluation results will use the same definitions used for CPARS found in FAR 42.15, Table 42-1 “Evaluation Rating Definitions” and will be reflected under the “Management or Business Relations” factor in the annual assessment.
11. Formal Project Reviews
Project reviews assist the Government customer in making ongoing business decisions regarding the project by evaluating its overall health at any given moment in time by:
a. Evaluating the effectiveness of project management
b. Comparing actual deliverables against the original requirements
c. Identifying lessons learned
d. Assessing performance (e.g. comparing the planned schedule, cost, and compliance requirements against the actuals)
e. Capturing stakeholders’ opinion of how the project was delivered
f. Disseminating project status results and findings for the record
12. QASP Criteria Performance Metrics for Delivery Order 0001
The contractor is responsible for achieving the AQLs for all of the major processes identified below, as included and identified under DO 0001. The Government will perform surveillance of the contractor’s compliance with the standards through the various surveillance methods identified in Section 5 of this QASP. Table 1 below provides the performance requirement, acceptable quality levels and methods of surveillance that will https://wawf.eb.mil/ be used.
Table 1: Delivery Order 001 Acceptable Quality Levels (AQL)
Element # /Title
Base SOW Para.
Acceptable Quality Level (AQL) Surveillance
Method
Unsatisfactory
Marginal
Satisfactory
Very Good
Exceptional
1) Overall Rating
SOW 3.1; 6.0;
14.0
Products or services are unacceptable.
They do not meet SOW requirements.
Product or service requires correction with significant Government involvement.
Meets SOW requirements after Government intervention and guidance.
Product or service meets all SOW requirements.
There are only minor corrective actions required and minimal Government intervention.
Product or service exceeds all
SOW
requirements.
There are only minor corrective actions required and are resolved with no Government intervention.
Product or service exceeds all
SOW
requirements.
Highly effective corrective actions.
Improved performance and quality.
Monitor issues thru meetings, Management Information Systems, Testing, Customer feedback and via CDRLs.
2) Contractor’s
Monthly Progress Report
SOW 3.1.5
Contractor successfully reported less than 90% of the management, technical, logistics and administrative program status in accordance with (IAW) the Integrated Master Plan (IMP) and Integrated master Schedule (IMS). The contractor has not identified faults and initiated corrective actions.
Content missing from
N/A Contractor successfully reported 90% of the management, technical, logistics and administrative program status IAW the IMP and IMS on time. Monthly Progress Report content is acceptable.
The contractor has identified faults and initiated corrective actions.
Contractor successfully reported 100% of the management, technical, logistics and administrative program status IAW the IMP and IMS on time.
Monthly Progress Report content is complete and accurate per the Data Item Description
(DID).
Contractor successfully reported 100% of the management, technical, logistics and administrative program status IAW the IMP and IMS on time.
Monthly Progress Report content is complete and accurate per the DID with recommenda-tions for solutions beyond the scope of the contract.
Monthly Progress Report review, IPT meeting information, Team meeting discussions.
13. Rating Definitions
Table 2: FAR 42-1 Evaluation Ratings Definitions
Overall Performance Rating
Standard
Exceptional
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Contract Data Requirements List (CDRL) or not addressed.
4) Configuration Management (CM) / Technical Data
SOW 8.0
Meets less than 80% of Section 8.0 requirements and does not flow down and ensure responsibility for CM performance to sub-contractors and/or does not communicate configuration changes to stakeholders.
N/A
Meets 80-90% of Section 8.0 requirements and flows down and ensure responsibility for CM performance to sub- Contractors and/or does communicate configuration changes to stakeholders.
Meets more than 90% of Section 8.0 requirements and flows down and ensure responsibility for CM performance to sub- Contractors and/or does communicate configuration changes to stakeholders.
Meets or exceeds all of Section 8.0 requirements
Program & Technical Reviews.
Integrated Product Team (IPT) meeting information.
5) GFP/CAP
SOW 9.0, 10.0,
11.0
Meets less than 80% of
GFP/CAP
requirements
N/A
Meets 80-90% of
GFP/CAP
requirements
Meets more than 90% of
GFP/CAP
requirements
Meets or exceeds all of GFP/CAP requirements
Physical audits, Inventory Adjustment Reports, GFP Inventory Reports
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
14. Documenting Performance
a. Acceptable Performance
The Government shall document positive (i.e. acceptable) performance. Any report may become a part of the supporting documentation for payments or other actions.
Additionally, surveillance results will be used to prepare or support Performance
Assessment Reports in CPARS.
b. Unacceptable Performance
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document verbal communications via the COR monthly report in the COR tracking tool.
When the COR determines formal written communication is required, the COR shall prepare a Non-Conformance Report (NCR) and present it to the contractor’s task manager or on-site representative. A NCR template is attached to this QASP (See
Appendix B – Non-Conformance Report (NCR).
The contractor shall acknowledge receipt of the NCR in writing. The NCR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The NCR will also state how long after receipt the contractor has to present his corrective action plan to the COR. The Government shall review the contractor’s corrective action plan to determine acceptability.
Any NCRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.
Non-Conforming Performance. A Non-conformance occurs when the Contractor fails to meet the terms, conditions and/or specifications of the Contract/Task Order. All instances of non-conformance must be documented by the COR. The COR will provide the details of the non-conformance, using the NCR, to the KO who will notify the
Contractor of each nonconformance occurrence, unless the KO has authorized the COR to submit directly to the contractor, and copy the KO. Resolution of any non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor. Non-conformances are classified as either: Level I (Minor); Level II (Major); or Level III
(Critical).
Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written NCR. However, the Government is required to document verbal Level I
NCRs. The COR may issue verbal Level I NCRs directly to the appropriate level of
Contractor management. The COR will notify the KO as soon as practical when a verbal
Level I NCR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The KO will issue and sign written Level I NCRs.
Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I NCRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II NCRs. The KO issues all Level II NCRs in writing.
The COR will notify the KO as soon as practical when a major non-conformance is identified.
Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II NCRs.
The Contracting Office Director or Deputy Director issues written Level III NCRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.
Documenting NCRs. The COR will provide the details of the non-conformance using the NCR. If the Requiring activity prefers to issue a locally developed NCR, documentation must include as a minimum: the Contract or Task Order number;
reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.
Tracking and Resolving NCRs. All NCRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and KO shall track NCRs to ensure the Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non- conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.
15. Reviews and Resolution
The COR must initially coordinate and communicate with the contractor to resolve immediate performance issues or concerns while informing the Government’s PM and
KO. The Government’s PM, COR, and contractor should jointly formulate and document long-term courses of action with the concurrence of the KO. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented and must be approved by the KO and incorporated into the contract via a modification.
If the contractor disputes a surveillance determination or has concerns over the
Government’s performance management of the contract in general, they must first attempt to resolve through the Government’s PM. If, in the contractor’s opinion, resolution is not possible or there is clearly an impasse that is adversely affecting the contractual relationship and/or performance, the contractor must report their concerns to the KO within three business days from the date they determine resolution through the
Government’s PM is not possible. The KO will be responsible to determining or negotiating the resolution approach and timeframe.
16. Deduct Plan
This acquisition does not include a Deduct Plan.
17. Data Analysis
Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Report and may be used to make adjustments to surveillance schedules and/or checklist items to increase or decrease surveillance, based on performance trends. Negative trends noted using
Government data/observations could result in issuing the Contractor Nonconformance
Report. Trends noted using Contractor data will not result in a NCR unless the Contractor has not addressed the negative trend. QASP changes based on Data Analysis will be coordinated with the Contracting Officer for approval.
18. Acceptance of Services
When all services have been deemed acceptable and there is documented, objective, quality evidence to support acceptable performance, the COR will accept the services provided and authorize payment to the Contractor. Acceptance and payment will be made by approving the Contractor’s Receiving Reports in Wide Area Workflow at https://piee.eb.mil as an iRAPT Inspector, and/or Acceptor.
19. COR Status Report
CSR will be submitted on a monthly basis to the Contracting Officer via the Surveillance and Performance Monitoring (SPM) module. CSRs must be uploaded into the SPM module using the “Smart Form”. CSRs will be due no later than the 10th day of the month following the month of surveillance. CSRs will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis must contain a summary of surveillances performed, Customer Feedback if any, NCRs if any, an analysis of the
Contractors performance, recommended adjustments to surveillance schedules, and any other pertinent contract information IAW FAR 46.104, and the COR Appointment Letter.
Completed Surveillance Checklists and NCRs, if any, will be included as attachments to
COR Status Reports.
20. Enterprise-Wide Contractor Manpower Reporting Application (eCMRA)
Reporting Labor Hours. The Office of the Assistant Secretary of the Army (Manpower &
Reserve Affairs) operates and maintains a secure Army data collection site where the
Contractor shall report all Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address: https://www.ecmra.mil.
The required information includes the following:
a. KO name, COR name;
b. Contract number, including task and delivery order number;
c. Beginning and ending dates covered by reporting period;
d. Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data;
e. Estimated direct labor hours (including sub-Contractors);
f. Estimated direct labor dollars paid this reporting period (including sub-Contractors);
g. Total payments (including sub-Contractors);
h. Predominant Federal Service Code (FSC) reflecting services provided by Contractor
(and separate predominant FSC for each sub-Contractor if different);
i. Estimated data collection cost;
j. Organizational title associated with the Unit Identification Code (UIC) for the Army
Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
k. Locations where Contractor and sub-Contractors perform the work (specified by zip https://www.ecmra.mil/ code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
l. Presence of deployment or contingency contract language; and Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country).
While inputs may be reported any time during the fiscal year, The COR shall ensure the contractor submits all data shall no later than October 31 of each calendar year. The
COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in the COR SPM module, CMRA section.
Contracting officers shall ensure that the requirement to report contractor manpower is included in all contracts, task/delivery orders and modifications.
21. Contractor Performance Assessment Reporting System Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and Critical Design Reviews (CDRs), if any) will be used to support
CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15
– Contractor Performance Information.
22. Combating Trafficking in Persons (CTIP) In accordance with Procedures, Guidance, and Information (PGI) 222.17 and FAR 52.222-
50, the KO will be notified immediately of any information from any source that alleges a
Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.
23. COR/Quality Assurance Surveillance Files The official COR/Quality Assurance Surveillance Files will be maintained in the on-line
Joint Appointment Module (JAM) and SPM module IAW DoDI 5000.72, and DFARS PGI
201.602-2.
24. QASP Changes This QASP is a living document and, as such, may be changed as needed based on Data
Analysis (trends), contract modifications by the KO, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes. Changes will be tracked in the Document Revision History table in Section 25.
25. Document Revision History
Version
Effective Date
Originator Summary of Changes
1.0
Approved by:
Mr. Barry M. Hatchett, Sr. Date
TSMO Target Support Branch Chief
Reviewed by:
Mr. Jason Jerome Date:
Contracting Officer
Appendix A – Acronym List
Acronym Acronym Defined ACC-ORL Army Contracting Command-Orlando
AFARS Army Federal Acquisition Regulation Supplement
AGATCS Army Ground Aerial Target Control System
AQL Acceptable Quality Level
CAP Contractor Acquired Property
CDR Critical Design Review
CDRL Contract Data Requirements List
CM Configuration Management
COR Contracting Officer’s Representative
CPARS Contractor’s Performance Assessment Reporting System
CPFF Cost Plus Fixed Fee
CS Contract Specialist
CSR COR Status Report
CT2 Cyber, Test & Training
CTIP Combatting Trafficking in Persons
DFARS Defense Federal Acquisition Regulation Supplement
DID Data Item Description
DO Delivery Order
DODI Department of Defense Instruction eCMRA Enterprise-Wide Contractor Manpower Reporting Application
FAR Federal Acquisition Regulations
FFP Firm Fixed Price
FSC Federal Service Code
GFP Government Furnished Property
IAW In Accordance With
ID/IQ Indefinite Delivery/Indefinite Quantity
IMP Integrated Master Plan
IMS Integrated Master Schedule
IPT Integrated Product Team
JAM Joint Appointment Module
KO Contracting Officer
NCR Non-Conformance Report
PEO Program Executive Officer
PGI Procedures, Guidance, and Information
PM Program Manager
PoP Period of Performance
QASP Quality Assurance Surveillance Plan
QSP Quality System Plan
SDP Support, Development & Production
SOW Statement of Work
SPM Surveillance and Performance Monitoring
STRI Simulation, Training, and Instrumentation
TBD To Be Determined
TSMO Threat Systems Management Office
UIC Unit Identification Code
Appendix B – Non Conformance Report (NCR)
Nonconformance Report (NCR): The COR may initiate a NCR at any time contractor performance is determined to be impacting cost, schedule, or performance standards. When the Contractor's performance is unsatisfactory, a NCR will be issued. The Contractor shall reply in writing within five (5) working days from the date of receipt of the NCR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.
File details come from the government source that posted it. Updated .