Attachment 03 AGATCS SDP Sample Orders 0001_RevB_2Sep2020.docx

DOCX document 25 KB Posted

Attached to
Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production (SDP)
Solicitation number
W900KK-20-R-0020
Issued by

About this file

This federal solicitation seeks proposals for an Army Ground Aerial Target Control System (AGATCS) Support, Development, and Production indefinite delivery/indefinite quantity contract with a five-year base period and two optional one-year ordering periods. The U.S. Army Contracting Command Orlando, on behalf of the U.S. Army Program Executive Officer for Simulation, Training, and Instrumentation Program Manager Cyber Test Training, will award a single contract to provide AGATCS capabilities for aerial, maritime, and ground-based targets. Proposals are due by the date stated in the solicitation, with questions accepted no later than seven calendar days before. Interested parties must have a completed distribution agreement on file to receive restricted documents related to the solicitation.

View the file

Other files

File Type Posted
Attachment 04A Contract Data Requirement List_Delivery Order 0001_2Sep2020.pdf PDF
Attachment 09 SF1408 Preaward_Survey_of_Prospective_Contractor_Accounting_System.pdf PDF
Attachment 10 DCAA Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Attachment 19 DATA Rights CDRLs Workbook_23Jun2020.xlsx XLSX spreadsheet
Distribution_Agreement.pdf PDF
Attachment 18 -Contract Labor Rates (FFP and CPFF Rates)_02Jun2020.docx DOCX document
Attachment 02A AGATCS SDP Delivery Order 0001_2Sep2020.docx DOCX document
Attachment 12 DD254.pdf PDF
Attachment 04 Contract Data Requirement List (CDRL)_Base Contract_1Sep2020.pdf PDF
W900KK20R0020.pdf PDF
Attachment 15 Government Furnished Property (GFP-GFE) 659.xlsx XLSX spreadsheet
Exhibit A Consolidated CDRL List Base and DO .docx DOCX document
Attachment 11A Quality Assurance Surveillance (QASP) Delivery Order 0001_10Aug2020.pdf PDF
Attachment 11 Quality Assurance Surveillance Plan (QASP)_Final_v.1.0_20Apr2020.pdf PDF
Attachment 13 Cost-Price Workbook Example_08142020.xlsx XLSX spreadsheet
Attachment 08_Clarification_Form (Industry Questions).doc DOC document
Attachment 14_Cross_Reference_Matrix_03Jun2020.xlsx XLSX spreadsheet
Attachment 07 Technical_Experience_Project_Worksheet (Factor-1).docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 03

SAMPLE ORDER

Army Ground Aerial Target Control System (AGATCS) Support Development Production (SDP)

W900KK-20-R-0020

Sample Order - The offeror shall submit a response to the following hypothetical requirements. The response shall specifically identify and detail what contractor activities will be performed and define the personnel resource allocations for Sample Order A to demonstrate the offeror’s capability and approach. Do not provide cost with the Technical Volume III/Factor 3. Pricing will be provided with Volume IV/Factor 4.

(a) Sample Order A: Remotely Operated Aerial Target

(a)(1) Requirement: The Government has a new requirement to have a remotely operated high speed fixed-wing aerial target. The remotely operated aerial target must be ready to support a first mission in 12 months with three (3) aerial targets. Targets must operate under the control of the Army Ground Aerial Target Control System (AGATCS). Present a response that outlines the approach and indicates a thorough understanding of the requirement. Some hardware and software integration should be expected.

(a)(2) Operating Conditions: Targets must be able to operate using waypoint following at 375 knots indicated air speed and 20,000 feet (MSL).

(a)(3) Delivery Location: Redstone Arsenal, AL

(a)(4) Applicable Documents: For an actual aerial target control development, the contractor would be provided an interface control document (ICD) and would have access to an actual target. For the example task, no ICD will be provided, so the contractor must list all assumptions made.

(a)(5) Proposal/Solution: The Offeror shall present a response that identifies and details what contractor activities will be performed and what personnel resources allocated for Sample Order 0001. The offer shall demonstrate their capability and approach in their response. Address the following:

(i) Hardware/Software Design

(ii) Design Reviews

(iii) Test and Evaluation

(iv) Production

(v) Documentation

(vi) Delivery of target instrumentation /control system hardware and software

(vii) Provide Integrated Master Plan and the Integrated Master Schedule

(viii) Provide Material and Equipment list

File details come from the government source that posted it. Updated .