Attachment 10 (TE-2).pdf

PDF 109 KB Posted

Attached to
Overhaul and Repair of Aids to Navigation (ATON) Buoys and Parts
Solicitation number
70Z08421RBHQ01700
Issued by

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Attachment 14 Rev2.pdf PDF
Amendment 0004.pdf PDF
Attachment 14-Rev.pdf PDF
Amendment 0003.pdf PDF
Attachment 15.pdf PDF
Attachment 3-A0001.xls XLS spreadsheet
Attachment 5-A0002.xls XLS spreadsheet
Attachment 4-A0002.xls XLS spreadsheet
Amendment 0002.pdf PDF
Attachment 1-A0002.xls XLS spreadsheet
Attachment 2-A0002.xls XLS spreadsheet
Attachment (14) SF-1449.pdf PDF
Amendment 0001.pdf PDF
Attachment 4.xls XLS spreadsheet
(13) DWG-107334h.pdf PDF
WD 2015-4572 Rev.12(StPete-FL).pdf PDF
(13) DWG-121175a.pdf PDF
(13) DWG-121102g.pdf PDF
WD 2015-4148 Rev.16(Buffalo-NY).pdf PDF
WD 2015-4840 Rev.12(Detroit).pdf PDF
(13) DWG-121112g.pdf PDF
Attachment 1.xls XLS spreadsheet
(13) DWG-121152f.pdf PDF
(13) DWG-121129g.pdf PDF
WD 2015-4838 Rev.12(Exvile-MI).pdf PDF
WD 2015-4428 Rev.15(SC).pdf PDF
(11) DHS_Form_700-03.pdf PDF
(13) DWG-121132f.pdf PDF
WD 2015-4341 Rev.14(VA).pdf PDF
WD 2015-4265 Rev.13(MD).pdf PDF
Attachment 2.xls XLS spreadsheet
(13) DWG-121109f.pdf PDF
(13) DWG-121176.pdf PDF
(13) DWG-121151f.pdf PDF
Attachment 7 SPEC-507B.pdf PDF
(13) DWG-121159d.pdf PDF
(13) DWG-121145e.pdf PDF
(13) DWG-121113g.pdf PDF
WD 2015-5234 Rev.14(TX).pdf PDF
WD 2015-4234 Rev.16(PA).pdf PDF
(13) DWG-121162a.pdf PDF
WD 2015-5613 Rev.15(LosAng).pdf PDF
(13) DWG-121191.pdf PDF
Attachment 10 (TE-5).pdf PDF
WD 2015-4186 REV.15 (NJ).pdf PDF
WD 2015-5637 Rev.15(SanFran).pdf PDF
Attachment 10 (TE-1).pdf PDF
(13) DWG-121140e.pdf PDF
WD 2015-4606 Rev.11(AL).pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 2

GOVERNMENT FURNISHED PROPERTY (GFP)

1. Materials listed below will be provided by the Government for use in overhaul and outfitting of steel buoys. Items will be provided at the request of the Contractor, based on the need for these materials in the overhaul and outfitting of buoys per work requests. The Contractor may be required to keep stock of some of the below items onsite at the Contractor’s facility; which are considered high turnover. GFP shall be stored in a secure space and accounted for as per PWS. Expected quantities listed below are estimated quantities that the government anticipates being on stock at Contractors facility.

Item Stock Number Drawing Number Expected Qty 85 lbs. Bell 6350-01-034-1349 120994 1 225 lbs. Bell 6350-01-034-1350 120994 1 85 lbs. Bell Stand 2050-00-856-4618 120998 1 225 lbs. Bell Stand 2050-00-856-4614 120998 1 20 in. Gong (60 lbs.) 6350-01-034-1352 120994 1 20 in. Gong (70 lbs.) 6350-01-034-1354 120994 1 20 in. Gong (75 lbs.) 6350-01-034-1353 120994 1 20 in. Gong Stand 2050-00-301-4074 120998 1 22” Pocket Cover 6160-01-290-6897 121104 1 24” Pocket Cover 6160-01-386-9957 121143 1 22” Pocket Conversion Kit 2040-01-391-5046 121162 1 24” Pocket Conversion Kit 2040-01-391-5036 121162 1 Short Tapper Assembly (Small Ball) 2050-01-019-0107 121159 4 Short Tapper Assembly (Large Ball) 2050-01-025-3526 121159 4 Long Tapper Assembly (Large Ball) 2050-01-025-3527 121159 4 Large Tapper Ball 2050-01-392-0939 120382 4 Small Tapper Ball 2050-01-391-6302 120382 4 Whistle 6350-01-034-1347 120777 1 Whistle Valve 4820-01-034-1348 120777 1 Whistle Balls 2050-00-301-4067 120777 4 9x35LWR Tower 2050-01-620-4767 121151 0 9x32LR Tower 2050-01-620-4777 121132 0 8x26LR & 8x26LWR Tower 2050-01-620-4781 121174 1 9x20R & 8x21LR Tower 2050-01-620-4781 121175 1 7x17LR & 6x20LR Tower 2050-01-620-6166 121176 1 5x11LR/5x9LFR Can Radar Reflector 5840-01-043-6233 121024 1 5x11LR/5x9LFR Nun Radar Reflector 5840-01-261-9882 120316 1 5x11LR Pocket Cover 6160-01-387-1643 121160 1 Steel Buoy Counterweight N/A Various 0

2. The Government will furnish the crane service at all Coast Guard facilities required to load and unload buoys and GFP from the Contractor's vehicles.

3. The Contractor shall provide a GFP status report, each quarter to the COR in writing. Report shall include; GFP item and the quantity that the Contractor has on hand. Report shall be signed and dated by the Project Manager. Reports shall be provided to the COR by the end of each quarter.

Quarter Due Date 1st 20 December 2nd 20 March 3rd 20 June 4th 20 September