Base
| SCHEDULE B.3 (REGION 3 - MID ATLANTIC (D5)) | |||||
| Base Period: 03 Mar 2021 - 02 Mar 2022 | |||||
| CLIN | DESCRIPTION | Estimated Quantity | Unit | Unit Price | TOTAL |
| 0001 | OVERHAUL SERVICES | ||||
| 0001AA | 9X35LWR | 0 | EA | $0.00 | $0.00 |
| 0001AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | $0.00 |
| 0001AC | 9X20BR/GR Buoy | 1 | EA | $0.00 | $0.00 |
| 0001AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 8 | EA | $0.00 | $0.00 |
| 0001AE | 8X21LBR and 8X21LR Buoy | 0 | EA | $0.00 | $0.00 |
| 0001AF | 7X20LI Buoy | 0 | EA | $0.00 | $0.00 |
| 0001AG | 7X17LR Buoy | 6 | EA | $0.00 | $0.00 |
| 0001AH | 6X20LBR and 6X20LR Buoy | 0 | EA | $0.00 | $0.00 |
| 0001AJ | 5X11LNR and 5X11LCR | 4 | EA | $0.00 | $0.00 |
| 0001AK | 1NR and 1CR Buoys | 0 | EA | $0.00 | $0.00 |
| 0001AL | 2NR and 2CR Buoys | 2 | EA | $0.00 | $0.00 |
| 0001AR | 5X9LFR | 1 | EA | $0.00 | $0.00 |
| 0001AS | 2NFR and 2CFR Buoy | 1 | EA | $0.00 | $0.00 |
| 0002 | COLOR CHANGE | ||||
| 0002AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 1 | EA | $0.00 | $0.00 |
| 0002AF | 7X20LI Buoy | 1 | EA | $0.00 | $0.00 |
| 0003 | ADDITIONAL WORK ITEMS | ||||
| 0003AA | REPLACE 1 SQFT BUOY BODY PLATING | 15 | SF | $0.00 | $0.00 |
| 0003AB | REPAIR BATTERY POCKET(S) | 2 | EA | $0.00 | $0.00 |
| 0003AC | POCKET FLANGE AND CLOSURE DEVICE CONVERSION | 0 | EA | $0.00 | $0.00 |
| 0003AD | PERMANENTLY CLOSE BATTERY POCKET(S) | 4 | EA | $0.00 | $0.00 |
| 0003AE | INSTALL NEW TOWER | 0 | EA | $0.00 | $0.00 |
| 0003AF | 7X20LI CONVERSION TO 7X20LIR | 2 | EA | $0.00 | $0.00 |
| 0003AG | MANUFACTURE AND INSTALL LIFTING EYE/MOORING EYE ON LIGHTED BUOY (1 ea) | 2 | EA | $0.00 | $0.00 |
| 0003AH | MANUFACTURE AND INSTALL MOORING ARM (1 each) | 2 | EA | $0.00 | $0.00 |
| 0003AJ | INSTALL COUNTERWEIGHT TUBES | 0 | EA | $0.00 | $0.00 |
| 0003AK | SERIAL NUMBER MODIFICATION | 6 | EA | $0.00 | $0.00 |
| 0003AL | OUTFIT SOUND SIGNAL | 4 | EA | $0.00 | $0.00 |
| 0003AM | BELL OR GONG STAND INSTALL | 0 | EA | $0.00 | $0.00 |
| 0003AL | PRE-PRICED ADDITIONAL WORK ITEM | 928 | EA | $0.00 | $0.00 |
| 0004 | DISPOSAL | ||||
| 0004AA | 9X35LWR | 0 | EA | $0.00 | $0.00 |
| 0004AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | $0.00 |
| 0004AC | 9X20BR/GR Buoy | 0 | EA | $0.00 | $0.00 |
| 0004AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 1 | EA | $0.00 | $0.00 |
| 0004AE | 8X21LBR and 8X21LR Buoy | 0 | EA | $0.00 | $0.00 |
| 0004AF | 7X20LI Buoy | 1 | EA | $0.00 | $0.00 |
| 0005 | TRANSPORTATOIN OF BUOYS | ||||
| 0005AA | Contractor’s Facility to/from USCG Base Portsmouth | 8 | TRIP | $0.00 | $0.00 |
| 0005AB | Contractor’s Facility to/from USCG Yard | 10 | TRIP | $0.00 | $0.00 |
| 0005AC | Contractor’s Facility to/from SECTOR Fort Macon | 1 | TRIP | $0.00 | $0.00 |
| 0005AD | Contractor’s Facility to/from SECTOR Delaware Bay | 1 | TRIP | $0.00 | $0.00 |
| 0005AE | PRE-PRICED TRANSPORTATION OF BUOYS | 1985 | TRIP | $0.00 | $0.00 |
| NOTE: Greyed out Line Items, with "0" estimated quantities are not applicable to this Schedule for the Base Period |
&C&14SOLICITATION 70Z08421RBHQ01700
Amendment 0002&R&14Attachment 3
Option Period 1
| SCHEDULE B.3 (REGION 3 - MID ATLANTIC (D5)) | ||||||
| Option Period One: 03 Mar 2022 - 02 Mar 2023 | ||||||
| CLIN | DESCRIPTION | Estimated Quantity | Unit | Unit Price | TOTAL | Portion of the Unit Price Subject to EPA |
| 1001 | OVERHAUL SERVICES | |||||
| 1001AA | 9X35LWR | 1 | EA | $0.00 | $0.00 | N/A |
| 1001AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | N/A | |
| 1001AC | 9X20BR/GR Buoy | 0 | EA | $0.00 | N/A | |
| 1001AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 6 | EA | $0.00 | $0.00 | N/A |
| 1001AE | 8X21LBR and 8X21LR Buoy | 2 | EA | $0.00 | $0.00 | N/A |
| 1001AF | 7X20LI Buoy | 3 | EA | $0.00 | $0.00 | N/A |
| 1001AG | 7X17LR Buoy | 3 | EA | $0.00 | $0.00 | N/A |
| 1001AH | 6X20LBR and 6X20LR Buoy | 2 | EA | $0.00 | $0.00 | N/A |
| 1001AJ | 5X11LNR and 5X11LCR | 2 | EA | $0.00 | $0.00 | N/A |
| 1001AK | 1NR and 1CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 1001AL | 2NR and 2CR Buoys | 2 | EA | $0.00 | $0.00 | N/A |
| 1001AM | 3NR and 3CR Buoys | 0 | EA | $0.00 | N/A | |
| 1001AN | 5NR and 5CR Buoys | 0 | EA | $0.00 | N/A | |
| 1001AP | 3NI and 3CI Buoys | 0 | EA | $0.00 | N/A | |
| 1001AQ | 5NI and 5CI Buoys | 0 | EA | $0.00 | N/A | |
| 1001AR | 5X9LFR | 1 | EA | $0.00 | $0.00 | N/A |
| 1001AS | 2NFR and 2CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 1002 | COLOR CHANGE | N/A | ||||
| 1002AA | 9X35LWR | 0 | EA | $0.00 | N/A | |
| 1002AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | N/A | |
| 1002AC | 9X20BR/GR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 1002AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 0 | EA | $0.00 | N/A | |
| 1002AE | 8X21LBR and 8X21LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 1003 | ADDITIONAL WORK ITEMS | N/A | ||||
| 1003AA | REPLACE 1 SQFT BUOY BODY PLATING | 15 | SF | $0.00 | $0.00 | N/A |
| 1003AB | REPAIR BATTERY POCKET(S) | 1 | EA | $0.00 | $0.00 | N/A |
| 1003AC | POCKET FLANGE AND CLOSURE DEVICE CONVERSION | 1 | EA | $0.00 | $0.00 | N/A |
| 1003AD | PERMANENTLY CLOSE BATTERY POCKET(S) | 4 | EA | $0.00 | $0.00 | N/A |
| 1003AE | INSTALL NEW TOWER | 1 | EA | $0.00 | $0.00 | N/A |
| 1003AF | 7X20LI CONVERSION TO 7X20LIR | 1 | EA | $0.00 | $0.00 | N/A |
| 1003AG | MANUFACTURE AND INSTALL LIFTING EYE/MOORING EYE ON LIGHTED BUOY (1 ea) | 2 | EA | $0.00 | $0.00 | N/A |
| 1003AH | MANUFACTURE AND INSTALL MOORING ARM (1 each) | 2 | EA | $0.00 | $0.00 | N/A |
| 1003AJ | INSTALL COUNTERWEIGHT TUBES | 0 | EA | $0.00 | N/A | |
| 1003AK | SERIAL NUMBER MODIFICATION | 6 | EA | $0.00 | $0.00 | N/A |
| 1003AL | OUTFIT SOUND SIGNAL | 4 | EA | $0.00 | $0.00 | N/A |
| 1003AM | BELL OR GONG STAND INSTALL | 0 | EA | $0.00 | N/A | |
| 1003AN | PRE-PRICED ADDITIONAL WORK ITEM | 928 | EA | $1.00 | $928.00 | N/A |
| 1004 | DISPOSAL | N/A | ||||
| 1004AA | 9X35LWR | 0 | EA | $0.00 | N/A | |
| 1004AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | N/A | |
| 1004AC | 9X20BR/GR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 1004AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 0 | EA | $0.00 | N/A | |
| 1004AE | 8X21LBR and 8X21LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 1005 | TRANSPORTATOIN OF BUOYS | N/A | ||||
| 1005AA | Contractor’s Facility to/from USCG Base Portsmouth | 10 | TRIP | $0.00 | $0.00 | $0.00 |
| 1005AB | Contractor’s Facility to/from USCG Yard | 10 | TRIP | $0.00 | $0.00 | $0.00 |
| 1005AC | Contractor’s Facility to/from SECTOR Fort Macon | 0 | TRIP | $0.00 | N/A | |
| 1005AD | Contractor’s Facility to/from SECTOR Delaware Bay | 0 | TRIP | $0.00 | N/A | |
| 1005AE | PRE-PRICED TRANSPORTATION OF BUOYS | 2085 | TRIP | $1.00 | $2,085.00 | N/A |
| NOTE: Greyed out Line Items, with "0" estimated quantities are not applicable to this Schedule for Option Period One (1) |
&C&"-,Bold"&14SOLICITATION 70Z08421RBHQ01700 Amendment 0002&R&"-,Bold"&14Attachment 3
Option Period 2
| SCHEDULE B.3 (REGION 3 - MID ATLANTIC (D5)) | ||||||
| Option Period Two: 03 Mar 2023 - 02 Mar 2024 | ||||||
| CLIN | DESCRIPTION | Estimated Quantity | Unit | Unit Price | TOTAL | Portion of the Unit Price Subject to EPA |
| 2001 | OVERHAUL SERVICES | |||||
| 2001AA | 9X35LWR | 1 | EA | $0.00 | $0.00 | N/A |
| 2001AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | N/A | |
| 2001AC | 9X20BR/GR Buoy | 0 | EA | $0.00 | N/A | |
| 2001AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 6 | EA | $0.00 | $0.00 | N/A |
| 2001AE | 8X21LBR and 8X21LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2001AF | 7X20LI Buoy | 3 | EA | $0.00 | $0.00 | N/A |
| 2001AG | 7X17LR Buoy | 3 | EA | $0.00 | $0.00 | N/A |
| 2001AH | 6X20LBR and 6X20LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2001AJ | 5X11LNR and 5X11LCR | 2 | EA | $0.00 | $0.00 | N/A |
| 2001AK | 1NR and 1CR Buoys | 2 | EA | $0.00 | $0.00 | N/A |
| 2001AL | 2NR and 2CR Buoys | 3 | EA | $0.00 | $0.00 | N/A |
| 2001AM | 3NR and 3CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 2001AN | 5NR and 5CR Buoys | 0 | EA | $0.00 | N/A | |
| 2001AP | 3NI and 3CI Buoys | 0 | EA | $0.00 | N/A | |
| 2001AQ | 5NI and 5CI Buoys | 0 | EA | $0.00 | N/A | |
| 2001AR | 5X9LFR | 1 | EA | $0.00 | $0.00 | N/A |
| 2001AS | 2NFR and 2CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2002 | COLOR CHANGE | |||||
| 2002AG | 7X17LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2002AH | 6X20LBR and 6X20LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2003 | ADDITIONAL WORK ITEMS | |||||
| 2003AA | REPLACE 1 SQFT BUOY BODY PLATING | 15 | SF | $0.00 | $0.00 | N/A |
| 2003AB | REPAIR BATTERY POCKET(S) | 1 | EA | $0.00 | $0.00 | N/A |
| 2003AC | POCKET FLANGE AND CLOSURE DEVICE CONVERSION | 1 | EA | $0.00 | $0.00 | N/A |
| 2003AD | PERMANENTLY CLOSE BATTERY POCKET(S) | 4 | EA | $0.00 | $0.00 | N/A |
| 2003AE | INSTALL NEW TOWER | 0 | EA | $0.00 | N/A | |
| 2003AF | 7X20LI CONVERSION TO 7X20LIR | 1 | EA | $0.00 | $0.00 | N/A |
| 2003AG | MANUFACTURE AND INSTALL LIFTING EYE/MOORING EYE ON LIGHTED BUOY (1 ea) | 2 | EA | $0.00 | $0.00 | N/A |
| 2003AH | MANUFACTURE AND INSTALL MOORING ARM (1 each) | 2 | EA | $0.00 | $0.00 | N/A |
| 2003AJ | INSTALL COUNTERWEIGHT TUBES | 1 | EA | $0.00 | $0.00 | N/A |
| 2003AK | SERIAL NUMBER MODIFICATION | 6 | EA | $0.00 | $0.00 | N/A |
| 2003AL | OUTFIT SOUND SIGNAL | 4 | EA | $0.00 | $0.00 | N/A |
| 2003AM | BELL OR GONG STAND INSTALL | 0 | EA | $0.00 | N/A | |
| 2003AN | NON-PRICED ADDITIONAL WORK ITEM | 928 | EA | $1.00 | $928.00 | N/A |
| 2004 | DISPOSAL | |||||
| 2004AG | 7X17LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2004AH | 6X20LBR and 6X20LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 2005 | TRANSPORTATION OF BUOYS | |||||
| 2005AA | Contractor’s Facility to/from USCG Base Portsmouth | 9 | TRIP | $0.00 | $0.00 | $0.00 |
| 2005AB | Contractor’s Facility to/from USCG Yard | 9 | TRIP | $0.00 | $0.00 | $0.00 |
| 2005AC | Contractor’s Facility to/from SECTOR Fort Macon | 1 | TRIP | $0.00 | $0.00 | $0.00 |
| 2005AD | Contractor’s Facility to/from SECTOR Delaware Bay | 1 | TRIP | $0.00 | $0.00 | $0.00 |
| 2005AE | NON-PRICED TRANSPORTATION OF BUOYS | 2200 | TRIP | $1.00 | $2,200.00 | N/A |
| NOTE: Greyed out Line Items, with "0" estimated quantities are not applicable to this Schedule for Option Period Two (2) |
&C&"-,Bold"&14SOLICITATION 70Z08421RBHQ01700 Amendment 0002&R&"-,Bold"&14Attachment 3
Option Period 3
| SCHEDULE B.3 (REGION 3 - MID ATLANTIC (D5)) | ||||||
| Option Period Three: 03 Mar 2024 - 02 Mar 2025 | ||||||
| CLIN | DESCRIPTION | Estimated Quantity | Unit | Unit Price | TOTAL | Portion of the Unit Price Subject to EPA |
| 3001 | OVERHAUL SERVICES | |||||
| 3001AA | 9X35LWR | 0 | EA | $0.00 | N/A | |
| 3001AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | N/A | |
| 3001AC | 9X20BR/GR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AE | 8X21LBR and 8X21LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AF | 7X20LI Buoy | 2 | EA | $0.00 | $0.00 | N/A |
| 3001AG | 7X17LR Buoy | 4 | EA | $0.00 | $0.00 | N/A |
| 3001AH | 6X20LBR and 6X20LR Buoy | 0 | EA | $0.00 | N/A | |
| 3001AJ | 5X11LNR and 5X11LCR | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AK | 1NR and 1CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AL | 2NR and 2CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AM | 3NR and 3CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AN | 5NR and 5CR Buoys | 2 | EA | $0.00 | $0.00 | N/A |
| 3001AP | 3NI and 3CI Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AQ | 5NI and 5CI Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AR | 5X9LFR | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AS | 2NFR and 2CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AT | 3NFR and 3CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 3001AU | 4NFR and 4CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 3002 | COLOR CHANGE | |||||
| 3002AA | 9X35LWR | 1 | EA | $0.00 | $0.00 | N/A |
| 3002AJ | 5X11LNR and 5X11LCR | 1 | EA | $0.00 | $0.00 | N/A |
| 3003 | ADDITIONAL WORK ITEMS | |||||
| 3003AA | REPLACE 1 SQFT BUOY BODY PLATING | 15 | SF | $0.00 | $0.00 | N/A |
| 3003AB | REPAIR BATTERY POCKET(S) | 2 | EA | $0.00 | $0.00 | N/A |
| 3003AC | POCKET FLANGE AND CLOSURE DEVICE CONVERSION | 0 | EA | $0.00 | N/A | |
| 3003AD | PERMANENTLY CLOSE BATTERY POCKET(S) | 4 | EA | $0.00 | $0.00 | N/A |
| 3003AE | INSTALL NEW TOWER | 1 | EA | $0.00 | $0.00 | N/A |
| 3003AF | 7X20LI CONVERSION TO 7X20LIR | 2 | EA | $0.00 | $0.00 | N/A |
| 3003AG | MANUFACTURE AND INSTALL LIFTING EYE/MOORING EYE ON LIGHTED BUOY (1 ea) | 2 | EA | $0.00 | $0.00 | N/A |
| 3003AH | MANUFACTURE AND INSTALL MOORING ARM (1 each) | 2 | EA | $0.00 | $0.00 | N/A |
| 3003AJ | INSTALL COUNTERWEIGHT TUBES | 1 | EA | $0.00 | $0.00 | N/A |
| 3003AK | SERIAL NUMBER MODIFICATION | 6 | EA | $0.00 | $0.00 | N/A |
| 3003AL | OUTFIT SOUND SIGNAL | 4 | EA | $0.00 | $0.00 | N/A |
| 3003AM | BELL OR GONG STAND INSTALL | 1 | EA | $0.00 | $0.00 | N/A |
| 3003AN | PRE-PRICED ADDITIONAL WORK ITEM | 928 | EA | $1.00 | $928.00 | N/A |
| 3004 | DISPOSAL | |||||
| 3004AJ | 5X11LNR and 5X11LCR | 1 | EA | $0.00 | $0.00 | N/A |
| 3004AK | 1NR and 1CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3004AL | 2NR and 2CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 3005 | TRANSPORTATOIN OF BUOYS | |||||
| 3005AA | Contractor’s Facility to/from USCG Base Portsmouth | 7 | TRIP | $0.00 | $0.00 | $0.00 |
| 3005AB | Contractor’s Facility to/from USCG Yard | 7 | TRIP | $0.00 | $0.00 | $0.00 |
| 3005AC | Contractor’s Facility to/from SECTOR Fort Macon | 1 | TRIP | $0.00 | $0.00 | $0.00 |
| 3005AD | Contractor’s Facility to/from SECTOR Delaware Bay | 1 | TRIP | $0.00 | $0.00 | $0.00 |
| 3005AE | PRE-PRICED TRANSPORTATION OF BUOYS | 2300 | TRIP | $1.00 | $2,300.00 | N/A |
| NOTE: Greyed out Line Items, with "0" estimated quantities are not applicable to this Schedule for Option Period Three (3) |
&C&"-,Bold"&14SOLICITATION 70Z08421RBHQ01700 Amendment 0002&R&"-,Bold"&14Attachment 3
Option Period 4
| SCHEDULE B.3 (REGION 3 - MID ATLANTIC (D5)) | ||||||
| Option Period Four: 03 Mar 2025 - 02 Mar 2026 | ||||||
| CLIN | DESCRIPTION | Estimated Quantity | Unit | Unit Price | TOTAL | Portion of the Unit Price Subject to EPA |
| 4001 | OVERHAUL SERVICES | |||||
| 4001AA | 9X35LWR | 0 | EA | $0.00 | N/A | |
| 4001AB | 9X32LR and 9X32LBR Buoys | 0 | EA | $0.00 | N/A | |
| 4001AC | 9X20BR/GR Buoy | 0 | EA | $0.00 | N/A | |
| 4001AD | 8X26LBR, 8X26LGR, 8X26LR, 8X26LWR Buoy | 6 | EA | $0.00 | $0.00 | N/A |
| 4001AE | 8X21LBR and 8X21LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AF | 7X20LI Buoy | 3 | EA | $0.00 | $0.00 | N/A |
| 4001AG | 7X17LR Buoy | 3 | EA | $0.00 | $0.00 | N/A |
| 4001AH | 6X20LBR and 6X20LR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AJ | 5X11LNR and 5X11LCR | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AK | 1NR and 1CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AL | 2NR and 2CR Buoys | 2 | EA | $0.00 | $0.00 | N/A |
| 4001AM | 3NR and 3CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AN | 5NR and 5CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AP | 3NI and 3CI Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AQ | 5NI and 5CI Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AR | 5X9LFR | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AS | 2NFR and 2CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AT | 3NFR and 3CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 4001AU | 4NFR and 4CFR Buoy | 1 | EA | $0.00 | $0.00 | N/A |
| 4002 | COLOR CHANGE | |||||
| 4002AA | 9X35LWR | 0 | EA | $0.00 | N/A | |
| 4002AB | 9X32LR and 9X32LBR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4002AK | 1NR and 1CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4002AL | 2NR and 2CR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4003 | ADDITIONAL WORK ITEMS | |||||
| 4003AA | REPLACE 1 SQFT BUOY BODY PLATING | 15 | SF | $0.00 | $0.00 | N/A |
| 4003AB | REPAIR BATTERY POCKET(S) | 0 | EA | $0.00 | N/A | |
| 4003AC | POCKET FLANGE AND CLOSURE DEVICE CONVERSION | 1 | EA | $0.00 | $0.00 | N/A |
| 4003AD | PERMANENTLY CLOSE BATTERY POCKET(S) | 4 | EA | $0.00 | $0.00 | N/A |
| 4003AE | INSTALL NEW TOWER | 1 | EA | $0.00 | $0.00 | N/A |
| 4003AF | 7X20LI CONVERSION TO 7X20LIR | 2 | EA | $0.00 | $0.00 | N/A |
| 4003AG | MANUFACTURE AND INSTALL LIFTING EYE/MOORING EYE ON LIGHTED BUOY (1 ea) | 2 | EA | $0.00 | $0.00 | N/A |
| 4003AH | MANUFACTURE AND INSTALL MOORING ARM (1 each) | 2 | EA | $0.00 | $0.00 | N/A |
| 4003AJ | INSTALL COUNTERWEIGHT TUBES | 0 | EA | $0.00 | $0.00 | N/A |
| 4003AK | SERIAL NUMBER MODIFICATION | 6 | EA | $0.00 | $0.00 | N/A |
| 4003AL | OUTFIT SOUND SIGNAL | 4 | EA | $0.00 | $0.00 | N/A |
| 4003AM | BELL OR GONG STAND INSTALL | 0 | EA | $0.00 | N/A | |
| 4003AN | PRE-PRICED ADDITIONAL WORK ITEM | 928 | EA | $1.00 | $928.00 | N/A |
| 4004 | DISPOSAL | |||||
| 4004AA | 9X35LWR | 1 | EA | $0.00 | $0.00 | N/A |
| 4004AB | 9X32LR and 9X32LBR Buoys | 1 | EA | $0.00 | $0.00 | N/A |
| 4005 | TRANSPORTATION OF BUOYS | |||||
| 4005AA | Contractor’s Facility to/from USCG Base Portsmouth | 7 | TRIP | $0.00 | $0.00 | $0.00 |
| 4005AB | Contractor’s Facility to/from USCG Yard | 9 | TRIP | $0.00 | $0.00 | $0.00 |
| 4005AC | Contractor’s Facility to/from SECTOR Fort Macon | 1 | TRIP | $0.00 | $0.00 | $0.00 |
| 4005AD | Contractor’s Facility to/from SECTOR Delaware Bay | 1 | TRIP | $0.00 | $0.00 | $0.00 |
| 4005AE | PRE-PRICED TRANSPORTATION OF BUOYS | 2400 | TRIP | $1.00 | $2,400.00 | N/A |
| NOTE: Greyed out Line Items, with "0" estimated quantities are not applicable to this Schedule for Option Period Four (4) |