Attachment 10 - Schedule of Items.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Renovate Marshall Gulch Picnic Area & Trailhead
- Solicitation number
- 127EAX25R0015
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is a Schedule of Items Excel spreadsheet for the Renovate Marshall Gulch Picnic Area and Trailhead project. The comprehensive bid schedule includes two main sections: Main Bid Items and Additive Bid Items, detailing a complex infrastructure renovation project. Key construction elements include building a 1,100-foot single-lane asphalt road, 32 roadside parking spaces, and two precast prestressed beam bridges (64 and 76 feet long, 30 feet wide). Additional scope involves roadway excavation, stream excavation, riprap placement, retaining wall construction, drainage pipe installation, seeding, signage, and site restoration.
The project's detailed line items cover multiple construction phases, including mobilization, site clearing, staking, excavation, concrete work, bridge installation, and landscaping. Specific quantities are provided for various materials and processes, such as 568 cubic yards of riprap, 3,338 square feet of reinforced split-face concrete masonry unit retaining walls, 584 tons of aggregate base, and 418 tons of asphalt concrete. The project is solicited by the Department of Agriculture Forest Service under solicitation number 127EAX25R0015, currently in pre-solicitation status, with a comprehensive scope of site improvements and infrastructure development.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Renovate Marshall Gulch Picnic Area and Trailhead |
| SCHEDULE OF ITEMS |
| Main Bid Items (Proposed Road and Bridge Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15205 | Bridge Staking, Precision Class A | LSQ | LS | 1 | ||
| 15212 | Slope, Reference, and Clearing and Grubbing Staking, Method 1, Tolerance A | LSQ | LS | 1 | ||
| 15221 | Grade Finishing Stakes, Subgrade, Base Course, and Pavement | LSQ | LS | 1 | ||
| 15713 | Soil Erosion, Pollution Control, Stream Diversion, & Dewatering Plan | LSQ | LS | 1 | ||
| 20101 | Clearing and Grubbing | LSQ | LS | 1 | ||
| 20301 | Removal of Individual Trees and Stumps | LSQ | LS | 1 | ||
| 20302 | Removal of Low Water Crossing and all retaining walls, Disposal Method A | LSQ | LS | 2 | ||
| 20431 | Roadway Excavation and Embankment | LSQ | LS | 1 | ||
| 20804 | Structural Excavation | LSQ | LS | 1 | ||
| 20805 | Foundation Fill | LSQ | LS | 1 | ||
| 20806 | Structural Backfill | LSQ | LS | 1 | ||
| 20807 | Stream Excavation | AQ | CY | 250 | ||
| 25101 | Placed Riprap, Class 6 | AQ | CY | 568 | ||
| 25805 | Reinforced Split Face Concrete Masonry Unit Retaining Walls | AQ | SF | 3338 | ||
| 27250 | Geocell Abutment Stabilization, 6 inch depth | AQ | SY | 96 | ||
| 30103 | Aggregate Base, Compaction Method D | AQ | TON | 584 | ||
| 40304 | Asphalt Concrete, Arizona State DOT, Section 406, 3/4-Inch Mix | AQ | TON | 418 | ||
| 55201 | Cast-in-Place Concrete Curbs, Grade Beams, and Wingwalls | AQ | CY | 155 | ||
| 55301 | Precast, Prestressed Concrete Structural Members, Box Beams | AQ | EA | 16 | ||
| 55401 | Reinforcing Steel | AQ | LS | 1 | ||
| 55601 | Steel Bridge Rail | AQ | LF | 222 | ||
| 60201 | 24" Drainage Corrugated Metal Pipe | AQ | LF | 36 | ||
| 61301 | Simulated Stone Masonry Treatment | AQ | SY | 162 | ||
| 61302 | Simulated Stone Masonry Test Walls | AQ | EA | 1 | ||
| 62528 | Seeding and Mulching, Dry Method | LSQ | LS | 1 | ||
| 63301 | Sign System | AQ | EA | 11 | ||
| 63306 | Posts, Wood | AQ | LF | 80 | ||
| 63307 | Object Markers Type 3 | AQ | EA | 8 | ||
| 63406 | Pavement Markings, Type H | LSQ | LS | 1 | ||
| Main Bid Item Total without Mobilization | ||||||
| Main Bid Items Total |
| Additive Bid Items 1 (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 10010 | Relocate Existing CXT Vault Restroom (Sheets S-02 & D-03) | LSQ | LS | 1 | ||
| 15214 | Survey and Staking, Establish Project Control Points | LSQ | LS | 1 | ||
| 20307 | Removal of 1 Restroom w/ Stairs & 6 Picnic Areas (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 20308 | Removal of Stone Masonry Rubble, <10CY Total (Sheet S-01) | LSQ | LS | 1 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheets S-01 & D-01) | AQ | EA | 2 | ||
| 20310 | Relocate Bulletin Board (Sheet S-01) | AQ | EA | 1 | ||
| 20311 | Relocate Trash and Recycle Bins, 3 total (Sheet S-01) | AQ | EA | 3 | ||
| 25101 | Placed Riprap, Class 4, Restroom fillslope (Sheet S-02) | AQ | CY | 20 | ||
| 60101 | Concrete Staircase w/Handrail, Integral Color (Sheets S-01 & D-02) | LSQ | LS | 1 | ||
| 61501A | Sidewalk, Concrete, 4-inch (Sheets S-02 & D-04) | AQ | SY | 25 | ||
| 61501C | Sidewalk, Aggregate, 4-inch (Sheets S-02 & D-04) | AQ | SY | 25 | ||
| 61801 | Precast Concrete Picnic Tables (Sheets S-01 & D-01) | AQ | EA | 3 | ||
| 63306 | Metal Post Pedestal Grills (Sheets S-01 & D-01) | AQ | EA | 3 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 62510 | Seeding, Dry Method (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 63601 | System Installation, VenTek Model M600XC (Sheets S-01 & D-05) | LSQ | LS | 1 | ||
| Additive Bid Items 1 Total without Mobilization | ||||||
| Additive Bid Items 1 Total |
Main + Additive 1 Bid items Total
| Additive Bid Items 2 - Picnic Areas South (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 20307 | Removal of Picnic Areas (Sheets S-02 & D-01) | AQ | EA | 2 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheets S-02 & D-01) | AQ | EA | 4 | ||
| 20311 | Relocate Trash and Recycle Bins, 3 total (Sheet S-02) | AQ | EA | 3 | ||
| 61501B | Sidewalk, Decomposed Granite (Sheets S-02 & D-01) | AQ | SY | 180 | ||
| 61801 | Precast Concrete Picnic Table (Sheets S-02 & D-01) | AQ | EA | 4 | ||
| 63306 | Metal Post Pedestal Grills (Sheets S-02 & D-01) | AQ | EA | 4 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheets S-02 & D-01) | LSQ | LS | 1 | ||
| 62510 | Seeding, Dry Method (Sheets S-02 & D-01) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheets S-02 & D-01) | LSQ | LS | 1 | ||
| Additive Bid Items 1-2 Total without Mobilization | ||||||
| Additive Bid Items 1-2 Total |
Main + Additive 1-2 Bid items Total
| Additive Bid Items 3 - Additional Vault Restroom (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 61501A | Sidewalk, Concrete, 4-inch (Sheets S-01 & D-04) | AQ | SY | 25 | ||
| 61501C | Sidewalk, Aggregate, 4-inch (Sheets S-01 & D-04) | AQ | SY | 25 | ||
| 64603 | Fixture, Vault Toilet, includes labor and materials (Sheets S-01 & D-03) | LSQ | LS | 1 | ||
| Additive Bid Items 3 Total without Mobilization | ||||||
| Additive Bid Items 3 Total |
Main + Additive 1-3 Bid Items Total
| Additive Bid Items 4 - Ramp To Old Road (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15221 | Grade Finishing Stakes, Subgrade, Base Course, and Pavement | LSQ | LS | 1 | ||
| 20401 | Roadway Excavation (Sheets S-01 & D-06) | LSQ | LS | 1 | ||
| 30103 | Aggregate Base, Compaction Method D (Sheet D-06) | AQ | TON | 70 | ||
| 40304 | Asphalt Concrete, ADOT, Section 406, 3/4-Inch Mix (Sheet D-06) | AQ | TON | 70 | ||
| 62625 | Bollard, Metal, Removable (Sheets S-01, D-06 & D-07) | AQ | EA | 2 | ||
| Additive Bid Item 4 Total without Mobilization | ||||||
| Additive Bid Items 4 Total |
Main + Additive 1-4 Bid items Total
| Additive Bid Items 5 - Marshall Creek Reconstruction (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 15713 | Soil Erosion, Pollution Control, Stream Diversion, & Dewatering Plan | LSQ | LS | 1 | ||
| 20301 | Removal of Pipe Culvert (Sheet S-02) | AQ | EA | 2 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheet D-08) | AQ | EA | 20 | ||
| 20402 | Subexcavation (Sheet S-02) | LSQ | LS | 1 | ||
| 60103 | Concrete Headwall (Sheet D-11) | AQ | EA | 2 | ||
| 60221 | Reinforced Concrete Box Culvert (Sheet D-11) | AQ | EA | 1 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheet D-08) | LSQ | LS | 1 | ||
| 62510 | Seeding, Dry Method (Sheet D-08) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheet D-8) | LSQ | LS | 1 | ||
| 62901 | Rolled Biodegradable Erosion Control Product (Sheet D-08) | LSQ | LS | 1 | ||
| Additive Bid Items 5 without Mobilization | ||||||
| Additive Bid Items 5 Total |
Main + Additive 1-5 Bid items Total
| Additive Bid Items 6 - Sabino Creek Demo Retaining Wall and Recontouring Parking Lot (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 15713 | Soil Erosion, Pollution Control, and Stream Diversion Plan | LSQ | LS | 1 | ||
| 20305 | Removal of Stone Masonry (Sheets S-02 & D-09) | LSQ | LS | 1 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheet D-10) | AQ | EA | 15 | ||
| 20402 | Subexcavation (Sheet S-02) | LSQ | LS | 1 | ||
| 27001 | Grout (Sheet D-09) | LSQ | LS | 1 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheet D-10) | AQ | CY | 25 | ||
| 62510 | Seeding, Dry Method (Sheet D-10) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheet D-10) | LSQ | LS | 1 | ||
| 62631 | Planting, propagate willows, in addition to seeding (Sheets D-08 & D-10) | LSQ | LS | 1 | ||
| 62901 | Rolled Biodegradable Erosion Control Product (Sheet D-10) | LSQ | LS | 1 | ||
| Additive Bid Items 6 Total without Mobilization | ||||||
| Additive Bid Items 6 Total |
Main + Additive 1-6 Bid Items Total