Attachment 10 - QA from Previous Solicitation.docx

DOCX document 30 KB Posted

Attached to
OSP Fiber Optic Cable Upgrade Federal contract opportunity
Solicitation number
FA251724Q00591
Issued by
Department of the Air Force Space Command

About this file

This document appears to be a set of Questions and Answers (Q&A) from a previous solicitation for the "OSP FOC UPGRADE CMSFS" project, Federal Contract Opportunity FA2517-24-Q-0059.

The key details include:

  • The contractor shall install fiber optic distribution panels and use existing patch panels
  • Preferred connectors are LC, with SC allowed in legacy patch panels
  • Work hours are 7am to 2pm, 5 days/week, with after-hours support limited
  • Contractor shall have proof of confined space training for work in the bellows
  • 4' conduits may require innerducts for future expansion
  • Limited storage and staging space available on site, with some storage in an offsite warehouse
  • Freight elevator is inoperable, so fiber cable reels will need to be transported by hand
  • Prime contractor must have a Facility Secret Clearance, subcontractor clearances are not acceptable
  • Plenum-rated duct and cable are required inside the facility
  • Drawings for the project are available as attachments.

View the file

Other files for this federal contract opportunity

Other files attached to OSP Fiber Optic Cable Upgrade, newest first.
File Type Posted
Attachment 11 - QA.docx DOCX document
Combo CO signed.pdf PDF
Combo .pdf PDF
Attachment 4 - Wage Determination.txt TXT text file
Attachment 6 - Raytheon Lead Results.pdf PDF
Attachment 5 - DD Form 254.pdf PDF
Attachment 7 - Complex 1st Floor Map.pdf PDF
Attachment 8 - Complex 2nd floor Map.pdf PDF
Attachment 9 - Complex 3rd Floor Map.pdf PDF
Attachment 1 - SOW.pdf PDF
Attachment 2 - CLIN Price Sheet.xlsx XLSX spreadsheet
Attachment 3 - Clauses and Provisions (additional).docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A from Previous Solicitation

PROJECT: OSP FOC UPGRADE CMSFS

PROJECT NUMBER: FA2517-24-Q-0059

CONTRACTOR QUESTION
GOVERNMENT RESPONSE
1.
Do the existing panels have splice trays?
No, the contractor shall install fiber optic distribution panels based on the SOW requirement and use existing legacy patch panel were provided (3101).
2.
Can we use anaerobic connectors or pigtails on the patch panel?
We prefer LC connectors. SC can be used in legacy patch panels. Any new patch panels will need to be LC.
3.
What are the working hours?
7am to 2pm (5 days/week). B2000 and B3000 are 24/7. Let us know ahead of time to coordinate after hours.
4.
Are the hours expandable as needed?
The system owners leave at 2pm. We can adjust if needed and move manning where needed, let us know ahead of time and provide us with a work schedule.
5.
Who would be on site?
A safety watch will remove the locks and alarms on the bellows. I recommend doing this work during the 7am to 2pm time for full support. After hours support will be limited.
6.
Do the bellows need to be vented?
They are all properly vented and have A/C.
7.
Are the bellows covered under fire protection?
Yes, they are all covered.
8.
What is the access between the comm rooms?
They are connected by the bellows and the wall. There is a work order in place with CE if access through a wall is necessary.
9.
Are there any other concerns with working inside the bellows?
They are a confined space. CMSFS will require proof of confined space training for each person acting as entrant, attendant, or supervisor. There is also potential lead which we have reports that can be shared with the awarded contractor.
10.
For the 4’ conduits, do you require innerducts for future expansion?
It depends, if you use a multi-cell in flex then no but if you plan to use an easily cut rubber then yes.
11.
Will storage be provided on site?
Yes, we can provide storage. Space is limited in the Mountain. some items may need to be stored outside the facility in B308.
12.
Would the supplies we ship be staged close to the worksite?
Supplies would be staged inside the Mountain; however, space will be limited.
13.
Can we ship to the site?
Yes, we can coordinate to accept and inspect on-site. Ship the equipment to our warehouse where we process all shipments. 1 NORAD Road Bldg. 308, Cheyenne Mountain SFB, CO 80914.
14.
Is there a method of transporting the cable reels to other floors?
The freight elevator is currently inoperable and will not be repaired within the period of performance of this requirement. The reels will need to be transported by hand through the stairwell. Reels of the fiber cable can be stored in the tunnel and carried.
15.
How would we be able to apply for Secret Clearance?
The Prime Contractor must already have a Facility Secret Clearance (FCL).
16.
Can a Prime contractor use its subcontractor security clearance for security requirements?
No.
17.
Can a quote to the Solicitation still be submitted if date is past the noted site visit date?
All quotes are due June 15th at 10:00am MDT.
18.
Is there a plenum duct (fire-proof) required since all of the work is inside? Standard Micro Duct or Plenum Rated?
Yes, Plenum duct and cable is required inside CMSFS.
19.
Is there a requirement for J-boxes at turn locations?
Yes, this will allow us that add to the infrastructure and grow the network of multi cell.
20.
Will all pulls be done through existing conduit or will new pipe be required? Same question for the riser pipe as well.
New pipes, we should like blown fiber for new cable installs.
21.
We would like to know how we will be checking in tools to the facility and getting them into the Mountain for use?
You can hand carry in tools, but we will put it in an equipment authorization list for you to carry them in. All equipment is subject to inspection.
22.
Are some drawings available at this time?
Drawings are available, see Attachments 7, 8, and 9.