Solar PV Module Quality and Safety Selection Criteria - Questions July 20, 2016

The Solar Module Quality and Safety Selection Criteria is an adjectival evaluation factor. Modules and the associated module sub-components listed below to be reported on do not need to pass all tests in order to be viewed as acceptable.

The following module accelerated testing questions mirror the recommended testing steps detailed in the National Renewable Energy Laboratory (NREL) report “Photovoltaic Module Qualification Plus Testing” 2013 and is available online here: http://www.nrel.gov/docs/fy14osti/60950.pdf

Each proposed module that is constructed of crystalline silicon cells laminated between a glass front sheet and polymeric backsheet and encapsulated in ethylene vinyl acetate (EVA) will be evaluated for quality and safety through the NREL Qualification Plus testing recommendations.

Contractors that propose module technologies other than that covered in the Qualification Plus Test recommendations are required to report the module manufacturer’s quality manufacturing programs in place as well as what accelerated tests have been conducted by

Answers to the following module quality questions must be based on tests done at an accredited laboratory, accredited by either an International Laboratory Accreditation Corporation (ILAC). When a manufacturer submits test data for the component testing, it must be accepted by the independent test lab according their data acceptance procedures. Both the certificate and test report shall indicate that submitted data were accepted by the test lab.

One survey form for each module proposed by contactor.

Tested Module Manufacturer___________________________________________________________

Tested Module Model Number _________________________________________________________

Date of test report ____/____/_______

Table 1 - ISO 9001 Quality Management Qualification Plus Test Survey – Quality Management System at Manufacturer

Document

URL for Document

Management Practices in Use? Yes/No

Guide for Quality Management System for PV Module Manufacturing: Supplemental Requirements to ISO 9001-2008
http://www.nrel.gov/docs/fy13osti/58940.pdf

ISO 9001 Quality System Audit must be from an Certification Body approved by ANSI-ASQ National Accreditation Board (ANAB). A Certification body approved by a similar organization to ANSI such as International Accreditation Forum (IAF). An IAF accredited organization from either inside or outside the United States is acceptable.

Table 2 - Qualification Plus Componenet Tests Qualification Plus Test Survey – Components

Component Test Name
Page & Section of Qualification Plus Document
Pass/Fail Criteria for Test - Page & Section
Results of Test: Pass/Fail?
UV Exposure for Encapsulants
Page 24 Section 1
Page 24 Section 1.d
UV Exposure for Backsheets
Page 24 Section 2.a
Page 24 Section 2.a.iv
Matched Component Coupon Test with Visual Inspection and Physical Property Measurement
Page 25 Section 2.b
Page 24 Section 2.b.vi
UV Exposure for Cables and Connectors
Page 26 Section 3
Page 26 Section 3.d
UV Exposure for Junction Box
Page 26 Section 4
Page 26 Section 4.d
Bypass Diode and Junction Box Thermal Test
Page 27 Section 4
Page 27 Section 5.c

Table 3 - Qualification Plus Module Tests Qualification Plus Test Survey – Modules

Module Test Name
Page & Section of Qualification Plus Document
Pass/Fail Criteria for Test - Page & Section
Results of Test: Pass/Fail?
Thermal Cycling
Page 27 Section 1

Section 10.11 of IEC 61215 with diodes still functioning

Dynamic (Cyclic) Mechanical Load (DML)
Page 28 Section 2
Page 28 Section 2 – same paragraph
System Voltage (Potentially Induced Degradation and Polarization)
Page 28 Section 3
Page 28 Section 3.c
Hot Spot Test
Page 28 Section 3
Page 28 Section 4
Sampling Requirements
Page 28
Page 28 Section 2