This document contains a cost proposal template for a federal contract opportunity to provide analytical services in support of target descriptions, vulnerability and survivability studies, weapon effectiveness studies, current operations, and a joint live fire program. The template outlines the required cost categories including direct labor, fringe benefits, overhead, subcontracts, consultants, other direct costs, general and administrative costs, and fee. Offerors must complete the template with their proposed costs for the base period and any option periods, along with supporting documentation and rate escalation tables. The solicitation number is W911QX23R0002P1 and is issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground for analytical services to support their programs. Offerors must submit a fully completed cost proposal using this template to be considered for award.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

Cost Proposal
GENERAL INFORMATION
The purpose of the requested information in the attached worksheets is to assit Government personnel in the review and evaluation of cost proposals submitted by Offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed costs; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data.
Options: If proposing options, they must be separately priced and separate spreadsheets, worksheets or tables should be provided for each option. Any proposed options that are not fully priced out, will not be included in any resulting award.

Total Effort

Cost Proposal (NOTE 4)
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY/FY 10 or 11CY/FY 11 or 12CY/FY 12 or 13CY/FY 13 or 14CY/FY 12 or 13CY/FY 13 or 14Total
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR(NOTE 3)X-Months
Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #02Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #03Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00
EquipmentProvide details on next Worksheet$0.00
TravelProvide details on next Worksheet$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 5)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "hours/base" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: A separate spreadsheet must be provided for any proposed option period/effort.
Note 5: Profit or fee is not allowed on direct costs for equipment, Government entities or cost share contracts. In addition, ONR utilizes DD Fom 1547 (DFARS 215.404-70) in calculating the Government objective for fee.

&C&"Arial,Bold"&12&A &LOfferor: &CPage &P of &N Pages&R&F Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

The months during the base period of performance that these rates apply Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Indicate total months of base period Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

The months during the base period of performance that these rates apply Note:

The months during the base period of performance that these rates apply Note:

The months during the base period of performance that these rates apply Note:

The months during the base period of performance that these rates apply Note:

The months during the base period of performance that these rates apply

Escalation & Indirect Rates

LABOR ESCALATION
Year 1Year 2Year 3Year 4
Labor Category (Note 1)NameBase Rate (Wage Determination)Escalation RateEscalation RateEscalation RateEscalation Rate
Program ManagerJohn Doe2.30%2.10%2.20%2.30%
EngineerJohn Flaskxxxxxxxx
EngineerCheryl Drum
TechnicianRobert Glass
Indirect Rates (Note 2)
Year 1Year 2Year 3Year 4
Rate CategoryRateRateRateRateBasis of RateApplied Against
Fringe BenefitsProvisional Billing Rate
Labor OverheadForward Pricing Rate Agreement
Material Handling
General and Administrative
Facilities Cost of Money
Note 1:Add additional labor categories if needed.
Note 2:Add additional indirect rates as needed.

Subcontractor

SUBCONTRACTOR COST DATA
Subcontracts/Interorganizational Transfers – A cost proposal as detailed as the Offeror’s cost proposal including support documentation will be required to be submitted by all proposed subcontractors and for all interorganizational transfers over $100,000. If opitons are proposed, the option periods should be separately priced. The subcontract or interorganizational transfer proposal, along with supporting documentation, must be provided either in a sealed envelope with the prime’s proposal or via email directly to the Program Officer or Contract Specialist upon request. The email should identify the prime Offeror, proposal title, and that the attached proposal is a subcontract. The subcontractor and interorganizational transfer proposals with supporting documentation must be received and reviewed before the Government can complete its cost analysis of the proposal and enter negotiations.
The prime contractor should perform and provide a cost/price analysis of each subcontractor’s cost proposal. Offerors are required to obtain competition to the maximum extent practicable when selecting subcontractors; if the offeror has obtained competitive quotes, copies should be provided. If the Offeror has selected other than the low bid for inclusion in their proposal or intends to award the subcontract on a sole-source basis, the offeror should provide rationale for their decision.
Certified cost or pricing data may be required for subcontractor proposals over $650,000.
*Note: Federal Acquisition Regulation provision 52.215-22 is incorporated into this solicitation by reference. The offeror is to exclude excessive pass-through charges from subcontractors. The offeror must identify in its proposal the percentage of effort it intends to perform and the percentage to be performed by each of its proposed subcontractors. If more than 70 percent of the total effort will be performed through subcontractors, the offeror must include the additional information required by the above-cited clause.
SubcontractorCompetitive/Sole SourceCost/price analysis included (Y/N)Competitive Quotes or Sole Source Documentation Included (Y/N)Total amount exceeds $650K (Y/N)
ABC CompanyCompetitiveYYN
XYZ CompanySole SourceYYY

&C&"Arial,Bold"&12&A &LOfferor: &CPage &P of &N Pages&R&F

Consultants

CONSULTANTS (Note 2)
NameDescription of effort to be performed by the Cosultant or attach Consultant Statement of WorkNumber of HoursHourly RateTravel costsOther CostsTotalBasis of Estimate (Note 1)Included copy of Consulting Agreement or other documentation supporting the proposed rate (Y/N)Reference Document Number
Base
John DoeProvide technical assistance to the prime during sea tests.300$75$3,000$0$25,500Y1
$0
$0
Option I$0
John DoeProvide technical assistance to the prime during sea tests.300$75$3,000$0$25,500Y1
$0
$0
$0
TOTAL$51,000.00
Note 1:Describe how and why the consultant was selected.
Note 2:Include a separate section in the above table for the base and each option

DCAA and Accounting System

PART 1 (To Be Completed by Contractor)Page 1/2
1. Contractor Name:3. Contractor CAGE Code:
1A. Contractor POC Name/Phone:4. RFP No. and/or Contractor's Prop. No.:
2. Contractor's Address:
5. Total Dollar Amount:
6. Type of Proposal (FFP/CPFF/CPAF/CPIF/Other:
*Note: Primes shall NOT propose T&M; subcontractors without approved accounting system may propose T&M
7. Subcontractor To: (if applicable)
8. Period of Performance:
9. PROVIDE NAME, ADDRESS, TELEPHONE NUMBER AND E-MAIL ADDRESS FOR THE FOLLOWING (if available)
A. CONTRACT ADMINISTRATION OFFICE (DCMA)B. AUDIT OFFICE (DCAA)
10. DO YOU HAVE AN ADEQUATE ACCOUNTING SYSTEM AS DETERMINED BY DCAA OR ANOTHER AGENCY?11A. DO YOU REQUIRE GOVERNMENT CONTRACT FINANCING TO PERFORM THIS PROPOSED CONTRACT?(FFP ONLY) (If "Yes," complete Item 11B)11B. TYPE OF FINANCING (Mark "x" for one type)
SPECIFY STATUS OF ACCOUNTING SYSTEM
12. HAS THE CONTRACTOR BEEN AWARDED ANY CONTRACTS OR SUBCONTRACTS FOR THE SAME OR SIMILAR ITEMS WITHIN THE PAST 3 YEARS? (If "Yes," identify item(s), customer(s), and contract number(s))13. IS THIS PROPOSAL CONSISTENT WITH ESTABLISHED ESTIMATING & ACCOUNTING PRACTICES & PROCEDURES & FAR PART 31 COST PRINCIPLES? (If "No," explain)
PART 2 Contractors complete 14A and 14B "Proposed" categories and rates. DCAA please complete recommendations/basis for recommendation columns and address additional request for information
14. INFORMATION REQUESTED:Page 2/2
14A. Direct Labor Categories and/orBase YearDCAA Recommended*Basis of DCAA16. Requesting Office Information (to be completed by Contract Specialist)
Employee Name if Actuals ProposedProposed RatesRatesRecommendationContracting Officer:
Phone Number:
E-Mail Address:
Contract Specialist:
Phone Number:
E-Mail Address:
*Based on Floor Check/Audit Performed, etc and Date
14B. Indirect RatesBase YearOption 1Option 2Option 3Option 4
Proposed:DCAA Rates*Proposed:DCAA RatesProposed:DCAA RatesProposed:DCAA RatesProposed:DCAA Rates
Contractor Site OH:
Government Site OH:
Fringe:
G&A:
Cost of Money:
Escalation:
*Include basis of recommendation/date
15. ADDITIONAL INFORMATION (TO BE COMPLETED BY CONTRACT SPECIALIST)
1). If no audit has been performed within the last 12 months, please provide a copy of the contractor's most recent payroll run and a copy of the last audit report, if available.
2). Please indicate if contractor has an approved accounting system in order to award a cost type contract. Include Audit Report Number and Date of when the accounting system was approved
3). Additional info requested (uncompensated overtime, weighted averages, etc)

Yes No Yes No

ADVANCE PAYMENTS

GUARANTEED LOANS

Yes No Yes No Yes No Yes No

PROGRESS PAYMENTS

Yes No Yes No