Statement of Work Tomahawk Manufactured Materials
1. SCOPE.
1.1. Background. The Naval Surface Warfare Center Port Hueneme Division (NSWC PHD) is tasked with producing Tactical Tomahawk Weapon Control System (TTWCS) suites of equipment for installation on new ships and to retrofit into existing ships. NSWC PHD needs to procure large amounts of various materials to produce the TTWCS equipment. On time delivery and quality assurance of these materials is critical to meet program schedules and requirements.
1.2. Purpose. This Statement of Work (SOW) encompasses the requirements for procurement, manufacturing, assembly, quality assurance, testing, reporting, and delivery of material to ensure all parts delivered to the Government are in accordance with the technical drawings and specifications.
2. APPLICABLE DOCUMENTS.
2.1. IPC/WHMA-A-620D – 2020, Requirements and Acceptance for Cable and Wire Harness Assemblies - Association Connecting Electronics Industries/Wiring Harness Manufacturer’s Association
2.2. MIL-DTL-5541 – 2006, Chemical Conversion Coatings on Aluminum and Aluminum Alloys
2.3. ASME Y14.5 – 2018, Dimensioning and Tolerancing
2.4. ASME Y14.100 – 2017, Engineering Drawing Practices
2.5. ASQ/ANSI/ISO 9001:2015 – 2015, Quality Management Systems — Requirements
3. REQUIREMENTS.
3.1. General Requirements
3.1.1. The drawing part numbers, quantities, delivery requirements, and delivery dates will be provided with each delivery order under this contract.
3.1.2. The Contractor shall ensure the materials delivered to the Government are correct and meet the specifications of the Technical Data Package (TDP) (Attachment 01) provided as Government Furnished Information (GFI).
3.1.3. Design engineering requirements are not associated with this SOW; however, technical expertise will be required to understand and comply with the drawings and to identify discontinued or obsolete parts.
3.1.4. The Contractor shall have a counterfeit material prevention plan. This plan shall include strategies to avoid, detect, and mitigate counterfeit material. The Contractor shall provide written notification via electronic mail (email) to the Procuring Contracting Officer (PCO) and Contracting Officer’s Representative (COR) of any or suspected counterfeit material within 24 hours of discovery.
3.2. Technical Data Package
3.2.1. The TDP includes the drawings with specifications and tolerances associated with each line item to be procured, manufactured, and assembled. The Contractor shall adhere to all applicable Military Standards, specifications, and requirements on each drawing included in the TDP.
3.2.2. The Government estimates the drawings will be revised four (4) times per year due to engineering changes, obsolescence, Diminishing Manufacturing Sources and Material Shortages (DMSMS), etc. The COR will provide the Contractor with a copy of the revised drawings. The Contractor shall destroy all superseded revisions of the drawings. The Contractor shall ensure all parts are being manufactured to the latest revision of the drawings.
3.2.3. The Government will provide a Drawing Revision List (Attachment 02) to the Contractor to ensure the latest revision of each drawing is being used.
3.2.3.1. This list will be provided to the Contractor when new orders are submitted
3.2.4. The Government reserves the right to revise any drawing at any time due to design or requirement changes inherent to the development of TTWCS.
3.2.5. The Contractor shall not deviate from the specifications and technical data provided in the TDP without receipt of prior written approval from the PCO. The Contractor shall not substitute, change, or modify any specification or technical data in the TDP without written authorization from the PCO.
3.2.5.1. If the Contractor determines the materials cannot be procured or materials listed are incompatible due to shortage, obsolescence, DMSMS, and/or manufacturability, the Contractor shall contact the PCO and COR via email within two (2) business days of discovery to resolve any issues, errors, or ambiguous information contained within the TDP.
3.2.5.2. The COR will relay the issue to the proper Government technical advisors who will provide resolution to any issues, errors, or ambiguous information contained within the TDP to the PCO and COR. The COR will then communicate the technical advisors’ resolution to the Contractor.
3.2.5.3. The Contractor may request a deviation to a drawing in order to resolve technical, manufacturing, and/or procurement issues. To request a deviation, the Contractor shall complete and submit a TTWCS HW Deviation Record TTWCS- PHD-23-314 (Attachment 03) to the COR. The Contractor shall include necessary supporting information and documentation.
3.2.5.4. The Government technical team will review the TTWCS HW Deviation Record and provide a recommendation to the PCO who will make the final approval/disapproval determination. If approved, the COR will provide written notification via email to the Contractor to proceed with the approved deviation. If the deviation request is disapproved, the COR will provide a written notification that includes both a reason(s) for disapproval and a proposed solution to proceed.
3.3. Procurement
3.3.1. The Contractor shall procure all materiel in accordance with the TDP. No substitutions nor modifications of similar items is allowed unless previously approved under section 3.2.5.3
3.3.2. The Contractor shall ensure that all materials provided under this contract are not counterfeit. The Contractor shall examine potential suppliers to assess the risk of receiving counterfeit materiel.
3.3.3. The Contractor shall use Government or industry services such as Government-Industry Data Exchange Program (GIDEP) and other commercially available services to identify part or supplier quality or authenticity problems.
3.3.4. The Contractor shall use purchasing procedures which require the selection of parts and materiels from the Original Equipment Manufacturer (OEM) or an OEM authorized supplier.
The Contractor shall not use independent distributors.
3.3.5. The Contractor shall require a certificate of compliance and supply chain traceability for all materiel.
3.3.6. The Contractor shall warrant the materiels delivered under this contract (1) are new; (2) contain materials procured directly from the OEM or an OEM authorized supplier; (3) are not nor contain counterfeit items; (4) contain only authentic, unaltered OEM labels and other markings; (5) have documentation made available upon request that authenticates traceability to the applicable OEM or OEM authorized supplier; (6) are free from defects in workmanship and materials; and (7) conform to the drawings, specifications, and requirements of the TDP and this contract. These warranties of workmanship and materials shall survive inspection, test, receipt and acceptance of the materiels and shall cover a 12-month period following receipt and acceptance.
3.4. Manufacturing & Assembly
3.4.1. The Contractor shall furnish all materiel, labor, and incidentals to accomplish the efforts required by this SOW.
3.4.2. The Contractor shall manufacture all parts, assemblies, and cables to the specifications and tolerances contained within the TDP Drawings.
3.4.3. The Contractor shall assemble or build materiel per the specifications of the drawings.
3.4.4. The Contractor shall build all cables in accordance with the Requirements and Acceptance for Cable and Wire Harness Assemblies (IPC/WHMA-A-620D) referenced in section 2.2. The cables built shall meet Class 3 – High Performance Electronic Products test requirements identified within the IPC/WHMA-A-620D standard. If the IPC/WHMA-A-620D standard conflicts with a drawing, the Contractor shall notify the COR via email within two
(2) business days of discovery for guidance or to submit a deviation request as referenced in section 3.2.4.3.
3.4.5. Chemical Conversion Coatings on Aluminum
3.4.5.1. The Contractor shall ensure all aluminum parts that require chemical conversion coatings conform to MIL-DTL-5541
3.4.5.2. The Contractor shall ensure all aluminum parts that are specified on the drawing as Class 3, Yellow are continuous in appearance and of an industry standard yellow/gold color. Variable or clear chemical conversion coating and finish will not be accepted for parts that specify Class 3, Yellow finish.
3.4.5.3. The Government shall provide a baseline sheet metal sample that exhibits acceptable finish for Class 3, Yellow chemically converted parts.
3.4.5.4. Material touch-up is permitted in accordance with section 3.4 of MIL-DTL- 5541; the area to be touched up shall be not greater than 5 percent of the total item surface area. If the area to be touched up exceeds 5 percent, specific approval must be obtained from the Government technical team. The Contractor shall notify the COR via email with a request for approval before the material can be touched up. If approved, the COR will provide written notification via email to the Contractor to proceed
3.4.6. The contractor shall be responsible to manufacture, using design details provided by the government, the COTS parts listed below in the event they are not commercially available:
3.4.6.1. SLSATACDADAP (BACKPLANE, 2-1/2", SLIMELINE SATA, OPTICAL
DRIVE)
3.4.6.2. SLIM-7P-ADPT (BACKPLANE, 2-1/2", SLIMELINE SATA, OPTICAL
DRIVE)
3.5. Testing & Inspection
3.5.1. First Article Testing
3.5.1.1. Table 1 identifies the selected parts, assemblies, and cables that require First Article destructive testing and inspection by the Government.
3.5.1.2. Upon contract award, the first delivery order will include quantity one (1) First
3.5.1.3. Article of each of the parts identified in Table 2.
3.5.1.4. The parts shall be delivered to the Government for test and evaluation for compliance with the drawings.
3.5.1.5. If the parts are not compliant with the drawings, the Government will provide written notification via email indicating how the parts were not compliant and the Government may require repeat first article testing. If a repeat first article test is required, the Contractor shall manufacture and deliver the necessary replacement part(s) to the Government at the Contractor’s cost.
3.5.1.6. The Contractor shall ensure manufacturing corrections are performed such that first article testing is not repeated more than two times for the same part.
3.5.1.7. All first article parts delivered to the Government will not be returned to the Contractor.
3.5.1.8. All first article parts must pass Government testing and inspection before the contractor can start manufacturing and delivering materiel.
3.5.1.8.1. Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor.
3.5.1.8.2. The government reserves the right to waive this requirement.
If the Government chooses to waive this requirement and allow the Contractor to begin manufacturing and delivering specific parts before the first article parts pass Government testing and inspection, the COR will provide an explicit waiver to the contractor in writing via email. The waiver will specify the parts the contractor may begin manufacturing and delivering before first article testing and inspection.
Table 1 - First Article Testing Required
PART
NUMBER
DESCRIPTION QTY
(EA)
Required Delivery
ARO
(Months)
8749402-01 Cable Assembly, Input Power 1 5
8749404-07 Cable Assembly, AC Power 1 5
8749414-01 Cable Assembly, NTDS E 1 5
8749420-01 Power Control Panel Assembly 1 5
8749440-05 Router Assembly 1 5
8749460-01 Auxiliary Assembly 1 5
8749500-07 Rack Mounted Processor Assembly RT (USN)
1 5
8749500-08 Rack Mounted Processor Assembly TTWCS (USN)
1 5
8749500-09 Rack Mounted Processor Assembly TMPC (USN)
1 5
8749650-01 ATDC Frame Assembly 1 5
8749690-01 Electronic Enclosure Assembly 1 5
3.5.2. Functional Testing
3.5.2.1. The Contractor shall conduct Functional Tests for all assemblies identified in Table 3.
3.5.2.2. The Contractor shall verify each assembly passes all respective “REQUIRED TESTS” identified in Table 2.
3.5.2.3. The Contractor shall deliver a final report for each assembly indicating the unit has passed all tests required by Table 2. The details of the final report are specified in section 3.72.
3.5.2.4. The Contractor shall perform a minimum 6-hour Burn-In Test on the Rack Mounted Processor (RMP) assemblies after the assembly passes all Functional Tests.
The Central Processing Unit (CPU) shall be running at 80% or greater capacity during the 6-hour Burn-In Test.
3.5.2.5. All RMP assemblies must pass all Functional Tests and Burn-In Test prior to delivery.
3.5.2.6. The Functional Tests may require installation of a diagnostics tool set to verify hardware components identified in Table 3 are operational. Diagnostics tools (Hardware or Software) will not be provided by the Government.
3.5.2.7. The Contractor shall record any component that fails during Functional or Burn- In Test and record the repair(s) made to the assembly; this information shall be included in the final report for each assembly. The Contractor shall repeat all Functional and Burn-In tests until all testing passes without any component failures.
Table 2 - Functional Testing Required
NUMBER DESCRIPTION DRAWING
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
8749500-07 Rack Mounted Processor Assembly RT
(USN)
8749500 1. Power Supply 1. Verify all power indicators are enabled and the assembly boots up
2. Motherboard 1.Verify BIOS accessible and installed components register
3. RAM 1. Verify Memory size
2. Verify read and write function
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
4. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
2. Verify LED indicator function
5. Serial Port Interfaces
1. Verify interface operational by loopback test
6. Video Interfaces 1.Verify interface operational with external source (monitor)
7. USB 3.0 Interfaces 1. Verify interface operational with external source (keyboard)
2. Verify transmission speed of 5Gb/s
8. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and functions (Read/Write)
2. Verify HD position per interconnect diagram
9. Asynchronous Serial Card Interface (PCIe)
1. Verify interface operational by loopback test
10. NTDS-A Card Interface (PCIe)
1. Verify interface operational by loopback test
11. NTDS-E Card Interface (PCIe)
1.Verify interface operational by loopback test
12. CPU 1. 6-hour Burn-In Test 8749500-08 Rack Mounted
Processor Assembly TTWCS
(USN)
8749500 1. Power Supply
1. Verify all power indicators are enabled and the assembly boots up
2. Motherboard
1. Verify BIOS accessible and installed components register
3. RAM
1. Verify Memory size
4. Hard Drives function 3.Verify position per interconnect diagram
5. Optical Drive 1. Verify, power
2. Interface and read function with disk
6. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
2. Verify LED indicator function
7. Serial Port Interfaces
1. Verify interface operational by loopback test
8. Video Interfaces
1. Verify interface operational with external source (monitor)
9. USB 3.0 Interfaces with external source (keyboard)
2. Verify transmission speed of 5Gb/s
10. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in BIOS correctly
11. CPU 1. 6-hour Burn-In Test
8749500-09 Rack Mounted Processor Assembly TMPC
(USN)
boots up
2. Motherboard 1. Verify BIOS accessible and function 3.Verify position per interconnect diagram
5. Optical Drive 1. Verify, power, interface and read function with disk
6. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
2. Verify LED indicator function
7. Serial Port Interfaces
1. Verify interface operational
(keyboard)
2. Verify transmission speed of 5Gb/s
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
10. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in BIOS correctly
11. Serial Card Interface (PCIe)
1. Verify interface operational by loopback test
12. Synchronous Serial Card Interface (PCIe)
1. Verify interface operational by loopback test
13. CPU 1. 6-hour Burn-In Test 8749500-10 Rack Mounted
Processor Assembly RT (GL) function
4. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
2. Verify LED indicator function
5. Serial Port Interfaces
1. Verify interface operational
6. Video Interfaces
7. USB 3.0 Interfaces 1. Verify interface operational with external source (keyboard)
2. Verify transmission speed of 5Gb/s
8. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and functions (Read/Write)
2. Verify HD position per interconnect diagram
9. Fiber Optic Ethernet, Circuit Card Assembly (PCIe)
1. Verify interface operational by loopback/ping using fiber optic media converter
10. CPU 1. 6-hour Burn-In Test
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
8749500-11 Rack Mounted Processor Assembly TTWCS
(GL)
function 3.Verify position per interconnect diagram
5. Optical Drive 1. Verify, power, interface and read function with disk
6. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
2. Verify LED indicator function
7. Serial Port Interfaces
1. Verify interface operational
(keyboard)
2. Verify transmission speed of 5Gb/s
10. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in BIOS correctly
11. CPU 1. 6-hour Burn-In Test
8749500-12 Rack Mounted Processor Assembly TMPC
(GL)
1. Verify Memory size; Verify read and write function;
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
Verify position per interconnect diagram
5. Optical Drive 1. Verify, power, interface and read function with disk
6. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
2. Verify LED indicator function
7. Serial Port Interfaces
1. Verify interface operational
(keyboard)
2. Verify transmission speed of 5Gb/s
10. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in BIOS correctly
11. Serial Card Interface (PCIe)
1. Verify interface operational by loopback test
12. NIC, Circuit Card Assembly (PCIe)
1. Verify interface operational by ping
13. CPU 1. 6-hour Burn-In Test
8749500-13 Rack Mounted Processor Assembly TTWCS
(FMS)
Verify position per interconnect diagram
5. Optical Drive 1. Verify, power, interface and read function with disk
6. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
2. Verify LED indicator function
7. Serial Port Interfaces
1. Verify interface operational
8. Video interfaces
(keyboard)
2. Verify transmission speed of 5Gb/s
10. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in BIOS correctly
11. CPU 1. 6-hour Burn-In Test
8749500-14 Rack Mounted Processor Assembly TMPC
(FMS)
read and write function
Verify position per interconnect diagram
5. Optical Drive 1. Verify, power, interface and read function with disk
6. Ethernet Ports 1. Verify interface operational (ping test to external device acceptable)
2. Verify LED indicator function
7. Serial Port Interfaces
1. Verify interface operational
8. Video interfaces
(keyboard)
2. Verify transmission speed of 5Gb/s
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
10. Unused Hard Drive Bays
1. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in BIOS correctly
11. Serial Card Interface (PCIe)
1. Verify interface operational by loopback test
12. Synchronous Serial Card Interface (PCIe)
1. Verify interface operational by loopback test
14. CPU 1. 6-hour Burn-In Test
8749420-01 Power Control Panel Assembly
8749420 1. Circuit Breakers 1. Verify all circuit breakers function
2. Indicators (LED) 1. Verify all power indicator LEDs function
3. Power Receptacles
1. Verify all power receptacle output
4. Connector (3 Pin) 1. UPS power output
5. DB9 Coupler 1. Power sensor output
8749460-01 Auxiliary Drawer Assembly
8749460 1. KVM Switch
1. Verify KVM Switch function; Verify video input and output
2. Power Supply
1. Verify power supply function and output
3. Base Sensor
1. Verify sensor function and data communication with Power Failure Sensor
1. Verify "Ok” status when power applied to Power Failure Sensor
1. Verify “Failure” status when power not applied to Power Failure Sensor.
4. Power Failure Sensor
1. Verify sensor function and data communication with Base Sensor
8769690-01 Electronics Enclosure Assembly
8749690 1. Power Supply
1. Power supply function and output
2. Carrier Board
1. Verify installed components register and communicate
3. Thin Client
(system boot from external device acceptable)
4. RAM
NUMBER
COMPONENT TO
BE TESTED REQUIRED TEST
5. Ethernet Port Interface
1. Verify Thin Client Ethernet interface operational (system boot from external device acceptable)
6. Sensor and Control Cable
1. Verify interfaces and functions operational with external source
7. DP++ Video Interfaces
1. Verify video interfaces operational with external source (monitor)
8. Monitor Power Cables
1. Verify power output
8. USB Interface
1. Verify USB interface operational with external source (keyboard)
9. Fan
1. Verify fan function and direction of flow
10. Temperature Sensor
1. Verify temperature sensor function
8749549-01 Fan Panel Assembly
8749549 1. Fans 1. Verify fans function and direction of air flow
3.6. Quality Control
3.6.1. The Contractor shall develop and maintain a quality assurance (QA) program which meets the requirements of ‘ASQ/ANSI/ISO 9001:2015 – 2015, Quality Management Systems
— Requirements’.
3.6.2. The Contractor shall maintain a supplier QA program that ensures subcontractor(s), suppliers, and/or vendors’ supplies/parts conform to the requirements of this contract.
3.6.3. All of the QA requirements of this contract shall flow down as part of the QA and reliability requirements to all tiers of subcontracts.
3.6.4. The Contractor’s QA program shall focus on the prevention and detection of discrepancies to assure delivered products satisfy the performance requirements.
3.6.5. The Contractor shall ensure all software installed on assemblies to be delivered to the Government are free of any malicious coding or similar; typically referred to as viruses or malware.
3.7. Tracking & Reporting
3.7.1. The Contractor shall maintain a listing of suppliers by CLIN. The Contractor shall record all suppliers used for every delivery order executed under this contract (CDRL A001). The following requirements shall be followed.
3.7.1.1. The listing shall include the country of origin for all materials
3.7.1.2. The listing shall include all suppliers of electronic Commercially Available Off-
The-Shelf (COTS) parts and sub-assemblies within the Contractor’s supply chain.
Electronic COTS parts and sub-assemblies should be tracked by serial number to allow tracking to specific suppliers.
3.7.1.3. The Contractor shall provide the supplier list via email to the COR once per delivery order.
3.7.1.4. The Contractor shall deliver the initial list 3 months after contract award
3.7.1.5. If changes to the supplier list occur, the Contractor shall notify and provide an updated list to the COR within one (1) business day.
3.7.2. The Contractor shall deliver a final report for each individual assembly providing objective quality evidence (OQE) that the drawing requirements and required tests are met.
The final report shall include: (1) Test results required by Table 2, (2) Final configuration of the delivered assembly including part numbers, serial numbers, model numbers, Basic Input Output System (BIOS) and firmware versions installed on all applicable components (ex.
Hard Drives, KVM Switch, Power Supply, NTDS-A Card, NTDS-E Card, Motherboard, Serial Card, Synchronous Card, and PCIe), and (3) Certification that the assembly conforms to all requirements of the drawing. The report shall be provided in electronic form via email upon shipment. A hardcopy of the report shall also be provided within each shipment.
(CDRL A002).
3.7.3. The contractor shall deliver a quality inspection report for all cable assemblies providing OQE that the drawing, testing and inspection requirements are met for all cable assemblies
(CDRL A003).
3.7.3.1. A batch quality inspection report may be submitted for multiple quantities of a single cable assembly part number.
3.8. Delivery & Packaging
3.8.1. The Contractor shall use industry best practices to package and deliver material.
Materials and methods of packaging must ensure all materiel is delivered in new condition and undamaged.
3.8.2. Parts shall be individually packaged and marked with part number and applicable CLIN clearly visible on the package exterior prior to being placed within the final shipment packaging.
3.8.3. All individual cable assemblies shall be packaged in re-closable polyethylene bags.
3.8.4. Expanded polystyrene, polystyrene, or “styrofoam” shall not be used as a packaging material for any shipment.
3.8.5. Packing peanuts shall not be used as a packaging material for any shipment.
3.8.6. Label Requirements. The Contractor shall label on the outside of each individual box delivered to the Government with the contract number, shipping number, invoice number, CLIN, SLIN, ACRN, Part Number, top-level assembly serial number (if applicable) and the WBS number.
3.8.7. Delivery Transport. The Contractor shall utilize authorized transportation companies and drivers able to access and make deliveries onto Naval Base Ventura County Port Hueneme without a Government escort.
3.8.8. Deliveries must pass inspection prior to acceptance by the Government. The Government reserves the right to inspect and accept all materiels up to 20 business days after receipt.
3.9. Deliverables
3.9.1. The Contractor shall ensure all deliverables provided against this contract contain the appropriate classification marking and distribution statement. All Controlled Unclassified Information (CUI) must be marked and protected according to applicable laws, regulations, and government-wide policies.
3.9.2. The Government reserves the right to reject deliverables without the appropriate marking and distribution statement and for errors. The Contractor shall correct the deliverable and resubmit to the Government within three (3) workings days after receipt of notice of rejection.
3.9.3. Mark CUI according to the DoDI 5200.48, March 6, 2020, and apply Distribution Statements according to DoDI 5230.24, August 23, 2012.
3.9.4. Destruction Notice for classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 - 19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
3.9.5. Government documentation shall be destroyed upon completion of the contract. Use of Government documentation for commercial purposes is forbidden.
ACRONYMS
1Acronyms
ATDC Advanced Tactical Display Center
BIOS Basic Input Output System
COR Contracting Officer Representative
COTS Commercially Available Off-The-Shelf
CLIN Contract Line Item Number
ECP Engineering Change Proposal
FOB Freight On Board
GFI Government Furnished Information
IDIQ Indefinite Delivery Indefinite Quantity
NSWC PHD Naval Surface Warfare Center Port Hueneme Division
NTDS Naval Tactical Data System
OEM Original Equipment Manufacturer
PCIe Peripheral Component Interconnect Express
RAM Random Access Memory
RMP Rack Mounted Processor
RT Real Time
SOW Statement of Work
TMPC Theater Mission Planning Center
TTWCS Tactical Tomahawk Weapon Control System
WHMA Wiring Harness Manufacturer’s Association
UEFI Unified Extensible Firmware Interface
| 1. SCOPE. |
| 1.1. Background. The Naval Surface Warfare Center Port Hueneme Division (NSWC PHD) is tasked with producing Tactical Tomahawk Weapon Control System (TTWCS) suites of equipment for installation on new ships and to retrofit into existing ships. NSWC PHD... |
| 1.2. Purpose. This Statement of Work (SOW) encompasses the requirements for procurement, manufacturing, assembly, quality assurance, testing, reporting, and delivery of material to ensure all parts delivered to the Government are in accordance with th... |
| 2. APPLICABLE DOCUMENTS. |
| 2.1. IPC/WHMA-A-620D – 2020, Requirements and Acceptance for Cable and Wire Harness Assemblies -Association Connecting Electronics Industries/Wiring Harness Manufacturer’s Association |
| 2.2. MIL-DTL-5541 – 2006, Chemical Conversion Coatings on Aluminum and Aluminum Alloys |
| 2.3. ASME Y14.5 – 2018, Dimensioning and Tolerancing |
| 2.4. ASME Y14.100 – 2017, Engineering Drawing Practices |
| 2.5. ASQ/ANSI/ISO 9001:2015 – 2015, Quality Management Systems — Requirements |
| 3. REQUIREMENTS. |
| 3.1. General Requirements |
| 3.1.1. The drawing part numbers, quantities, delivery requirements, and delivery dates will be provided with each delivery order under this contract. |
| 3.1.2. The Contractor shall ensure the materials delivered to the Government are correct and meet the specifications of the Technical Data Package (TDP) (Attachment 01) provided as Government Furnished Information (GFI). |
| 3.1.3. Design engineering requirements are not associated with this SOW; however, technical expertise will be required to understand and comply with the drawings and to identify discontinued or obsolete parts. |
| 3.1.4. The Contractor shall have a counterfeit material prevention plan. This plan shall include strategies to avoid, detect, and mitigate counterfeit material. The Contractor shall provide written notification via electronic mail (email) to the Procu... |
| 3.2. Technical Data Package |
| 3.2.1. The TDP includes the drawings with specifications and tolerances associated with each line item to be procured, manufactured, and assembled. The Contractor shall adhere to all applicable Military Standards, specifications, and requirements on e... |
| 3.2.2. The Government estimates the drawings will be revised four (4) times per year due to engineering changes, obsolescence, Diminishing Manufacturing Sources and Material Shortages (DMSMS), etc. The COR will provide the Contractor with a copy of th... |
| 3.2.3. The Government will provide a Drawing Revision List (Attachment 02) to the Contractor to ensure the latest revision of each drawing is being used. |
| 3.2.3.1. This list will be provided to the Contractor when new orders are submitted |
| 3.2.5. The Contractor shall not deviate from the specifications and technical data provided in the TDP without receipt of prior written approval from the PCO. The Contractor shall not substitute, change, or modify any specification or technical data i... |
| 3.3. Procurement |
| 3.4. Manufacturing & Assembly |
| 3.5. Testing & Inspection |
| 3.5.1. First Article Testing |
| 3.5.1.1. Table 1 identifies the selected parts, assemblies, and cables that require First Article destructive testing and inspection by the Government. |
| 3.5.1.2. Upon contract award, the first delivery order will include quantity one (1) First |
| 3.5.1.3. Article of each of the parts identified in Table 2. |
| 3.5.1.4. The parts shall be delivered to the Government for test and evaluation for compliance with the drawings. |
| 3.5.1.5. If the parts are not compliant with the drawings, the Government will provide written notification via email indicating how the parts were not compliant and the Government may require repeat first article testing. If a repeat first article te... |
| 3.5.1.6. The Contractor shall ensure manufacturing corrections are performed such that first article testing is not repeated more than two times for the same part. |
| 3.5.1.7. All first article parts delivered to the Government will not be returned to the Contractor. |
| 3.5.1.8. All first article parts must pass Government testing and inspection before the contractor can start manufacturing and delivering materiel. |
| 3.5.1.8.1. Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. |
| 3.5.1.8.2. The government reserves the right to waive this requirement. If the Government chooses to waive this requirement and allow the Contractor to begin manufacturing and delivering specific parts before the first article parts pass Government te... |
| 3.5.2. Functional Testing |
| 3.6. Quality Control |
| 3.6.1. The Contractor shall develop and maintain a quality assurance (QA) program which meets the requirements of ‘ASQ/ANSI/ISO 9001:2015 – 2015, Quality Management Systems — Requirements’. |
| 3.6.2. The Contractor shall maintain a supplier QA program that ensures subcontractor(s), suppliers, and/or vendors’ supplies/parts conform to the requirements of this contract. |
| 3.6.3. All of the QA requirements of this contract shall flow down as part of the QA and reliability requirements to all tiers of subcontracts. |
| 3.6.4. The Contractor’s QA program shall focus on the prevention and detection of discrepancies to assure delivered products satisfy the performance requirements. |
| 3.6.5. The Contractor shall ensure all software installed on assemblies to be delivered to the Government are free of any malicious coding or similar; typically referred to as viruses or malware. |
| 3.7. Tracking & Reporting |
| 3.7.2. The Contractor shall deliver a final report for each individual assembly providing objective quality evidence (OQE) that the drawing requirements and required tests are met. The final report shall include: (1) Test results required by Table 2,... |
| 3.8. Delivery & Packaging |
| 3.8.1. The Contractor shall use industry best practices to package and deliver material. Materials and methods of packaging must ensure all materiel is delivered in new condition and undamaged. |
| 3.8.2. Parts shall be individually packaged and marked with part number and applicable CLIN clearly visible on the package exterior prior to being placed within the final shipment packaging. |
| 3.8.3. All individual cable assemblies shall be packaged in re-closable polyethylene bags. |
| 3.8.8. Deliveries must pass inspection prior to acceptance by the Government. The Government reserves the right to inspect and accept all materiels up to 20 business days after receipt. |
| 3.9. Deliverables |
| 3.9.1. The Contractor shall ensure all deliverables provided against this contract contain the appropriate classification marking and distribution statement. All Controlled Unclassified Information (CUI) must be marked and protected according to appli... |
| 3.9.2. The Government reserves the right to reject deliverables without the appropriate marking and distribution statement and for errors. The Contractor shall correct the deliverable and resubmit to the Government within three (3) workings days after... |
| 3.9.3. Mark CUI according to the DoDI 5200.48, March 6, 2020, and apply Distribution Statements according to DoDI 5230.24, August 23, 2012. |
| 3.9.4. Destruction Notice for classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 - 19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy ... |
| 3.9.5. Government documentation shall be destroyed upon completion of the contract. Use of Government documentation for commercial purposes is forbidden. |