About this file

This technical specification and work data sheet is for a federal contract solicitation to construct eight new stock water pits, repair three existing sites, and decommission nine reservoir sites in Valley County, Montana. The solicitation was issued by the Department of the Interior Bureau of Land Management.

The specification provides requirements for clearing, grubbing, excavating new pits, and repairing existing sites using excavated materials. It also outlines requirements for decommissioning nine reservoir sites by filling and contouring embankments. The work data sheet identifies eleven total projects by number, name, quantity of excavation or repair, location, and embankment design. It also provides a table with latitude and longitude coordinates for the construction and decommissioning sites. The specification and work data sheet provide the necessary details for potential offerors to understand the requirements and prepare a proposal for the solicitation.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VALLEY

RESERVOIRS

NORTH CENTRAL

MONTANA DISTRICT

GLASGOW FIELD OFFICE

VALLEY COUNTY, MT

SPECIFICATIONS INDEX

VALLEY RESERVOIRS – 2023

DIVISION 1 - GENERAL REQUIREMENTS TITLE

01009 GENERAL INFORMATION AND REQUIREMENTS

02291 MINOR EARTH DAMS AND PITS

RELATED DOCUMENTS TITLE

WORK DATA SHEET

Valley Reservoirs - 2023 1 General Information and Requirements

DIVISION 1 SECTION 01009

GENERAL REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS

Rev. 5-91.

PART 1: GENERAL

1.01 SUMMARY:

A. Description of work: Furnishing labor, equipment, supplies and materials to construct 8 new stock water pits and repair 3 existing sites with the excavated material being wasted or placed in an embankment or used for repairs. An additional 9 sites will be decommissioned by using the existing embankments to fill and contour the site for drainage and to blend into the natural terrain.

B. Location: Work under this Contract is in Valley County, State of Montana. The work locations are shown on the drawings.

C. Work Data Sheet: Designates the type and quantity of work required at each project location, and dimensions required for typical drawings.

1.02 DEFINITIONS:

A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing.

1.03 SUBMITTALS:

A. Scope: Submittals include the work schedule

1.04 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference with the same force and effect as if they were given full text.

B. Conflict: Where conflict occurs between reference documents and project specifications, the project specifications shall govern.

1.05 PROJECT/SITE CONDITIONS:

A. Access to the Work:

1. Access to the work shall be provided by and at the Contractor's expense. Contactor shall use the designated access routes as illustrated in the drawings and designated by the Contracting Officers Representative unless written permission is granted to do otherwise. Prior to making improvements to access roads across

Valley Reservoirs - 2023 2 General Information and Requirements lands under the jurisdiction of the Bureau of Land Management, the Contractor shall obtain approval of the Contracting Officer.

2. Public or private access roads damaged by the Contractor shall be restored, at the Contractor's expense, to the same condition they were in at the commencement of work.

3. Access construction shall be kept to a minimum and shall be accomplished with regard for environmental considerations.

B. Environmental Considerations: Operations of the Contractor (including storage of materials, project office, camping area, and equipment parking) upon Government premises shall be confined to areas approved by the Contracting Officer. The surrounding landscape shall not be disturbed. If it is disturbed, the Contractor shall restore that area at the Contractors expense. Government premises adjacent to the construction site will be made available for use by the Contractor without cost whenever such use will not interfere with other Government activities. Any oil, chemical, or waste spills shall be brought to the Contracting Officers attention within 24 hours. Contaminated soil and 12 inches of surrounding soil shall be removed and legally disposed of by the contractor in the event of a spill.

C. Underground Utilities: The contractor is responsible for contacting the Utilities Underground Location Center before beginning construction at 1-800- 424-5555 to have all utilities marked out 100’ either side of any work associated with this contract. The contractor shall comply with all OSHA, or Utility Company protocols, whichever is more severe, when working in and around any buried utilities. The contractor is responsible for the cost of the repair or personal damages caused by damage to any underground utilities.

1.06 SEQUENCING AND SCHEDULING:

A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.01 PROJECT MEETINGS:

A. Pre-Work Conference:

1. Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. Attendance: The Contractor, subcontractors, and the person or

Valley Reservoirs - 2023 3 General Information and Requirements persons responsible for coordination of the work shall be present at the meeting.

3. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.

B. Progress Meetings:

1. Location: Meetings shall be held at the project site, or as determined by the Contracting Officer.

2. Notification: Meetings may be called by either the Contracting Officer or the Contractor. Request shall state who should attend.

C. Final Inspection:

1. Location: Meeting shall be held at the project site, or as determined by the Contracting Officer.

2. Notification: The Contractor shall notify the Contracting Officer at least 3 working days before the scheduled completion date so the Government can schedule final inspection.

3. Attendance: Contractor shall require the superintendent be present during this inspection.

3.02 WORK LAYOUT:

A. Requirements: The Government will set construction stakes to give the Contractor measurements, lines, and grades necessary for the work executed under the Contract. Baseline monuments, construction stakes or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: The work described in this section will not be measured for payment.

4.02 BASIS OF PAYMENT:

A. Payment: No direct payment for the work described under this section will be made. Contractors shall include consideration for this item in the bid price for other scheduled items of the Contract.

END OF SECTION

Valley Reservoirs-2023 Minor Earth Dams and Pits

DIVISION 2 SECTION MT 02291

SITE WORK MINOR EARTH DAMS AND PITS

Rev. 12-91

Part 1: GENERAL

1.01 WORK INCLUDED:

A. Description: Clearing, grubbing, excavation, and constructing stock water pits at 9 locations and dam embankment repair at 2 locations, with the excavated material being wasted and/or placed in an embankment and/or used for repairs as shown on the drawings and in the Work Data Sheet. Reclaim 9 existing sites by using the embankments to fill and contour the site for drainage and to blend into the natural terrain.

Note: The breach repair at Forest Reservoir is highest priority and will be completed first.

1.02 PROJECT CONDITIONS:

A. Work Limits: Work limits will be staked, and control points established by the Government. Contractor shall not borrow outside staked areas (usually located below reservoir high water lines) without prior written approval from the Contracting Officer.

B. Climatic Conditions: No work required under this section will be allowed when materials are frozen or excessively wet.

C. Haul Distance: The maximum haul distance shall not exceed 1,500 feet, measured by the straight-line distance from the center of mass of the embankment to the farthest point in the borrow area.

PART 2: PRODUCTS

2.01 MATERIALS:

A. Waste Material: Waste material is defined as brush, trees, stumps, frozen lumps, non-plastic silt, and oversized rocks. Oversized rocks are of such size and shape that will interfere with the uniform placement of earth fill materials in layers of specified thickness.

B. Topsoil: Topsoil material is that material which will sustain plant growth and includes sod, roots, and other small vegetative matter which can be uniformly placed to a thickness of 3 inches without protruding from the finished grade.

C. Permeable Material: Sand, gravel, and rock.

D. Common Excavation: Materials to be removed from excavation, except igneous, metamorphic, and sedimentary rock which cannot be excavated without blasting, will be considered common excavation. Common excavation includes rip-able material. Material shall be considered rip-able if the Contractor is able to rip material with a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a crawler tractor having a power rating of at least 195 net horsepower.

E. Embankment: Embankment materials shall be free of topsoil and waste material. Excavation required for embankment pay quantities shall be subject to the same material requirements as common excavation.

PART 3: EXECUTION.

3.01 PREPARATION:

A. Clearing, Stripping, and Grubbing: The area to be excavated and surface area to be covered by embankments shall be:

1. The Contractor shall clear/grub waste material and conserve available topsoil in stockpiles at designated areas to be replaced on the reclaimed areas and new embankments.

2. Existing water shall be pumped down the drainage areas away from areas to be reclaimed before the filling and grading operations begin.

B. Bank Sloping: Slopes not otherwise designated within the work area, including channel banks, shall be trimmed to a slope not steeper than 3:1.

Suitable material resulting from the bank sloping operation shall be removed and deposited in the embankment, or stockpiled for use in the embankment.

3.02 INSTALLATION:

A. Placement of Topsoil: After construction of the embankment and excavation areas is completed, the stockpiled topsoil shall be uniformly placed to a depth of 3 inches over the downstream slope of embankments which are 3:1 or greater, areas above the high-water line, including the top and upstream slopes of embankments, spillways, borrow pits, and waterfowl islands to form a seedbed for planting.

B. Foundation: After the required preparation has been completed and the core trenches, when required on the Work Data Sheet or drawings, have been excavated, the foundation shall be scarified. Scarifying shall consist of ripping furrows to a depth of 6 to 8 inches. Furrows shall be a maximum of 3 feet apart and parallel to the axis of the embankment.

C. Excavation: Excavated materials shall be removed with a Scraper or Scrapers.

Suitable excavated materials shall be placed directly in required embankments or if authorized, placed in temporary stockpiles, and later placed in the embankment. Excavation material from core trenches for pit reservoirs shall not be stockpiled. Required excavation which is more than the requirements for embankment shall be designated as waste. All waste materials shall be uniformly placed immediately below the downstream toe of the embankment in a manner that will not leave windrows. The Contractor shall use care not to disturb existing vegetation in natural spillways or sod watercourse areas below excavated spillways.

D. Embankment: Embankment and waste/repair materials shall be scraper placed if possible. It is highly recommended that a crawler type dozer also be available for use on these sites to slope any existing breaches to 3:1 slopes or flatter before backfilling. Further requirements are:

1. Materials shall be placed parallel to the axis of the embankment, in even, continuous, approximately horizontal layers not more than 6 inches in thickness(loose). Compaction coverage that ensures that all areas of the fill material have been subjected to at least one pass of the compaction equipment will be considered sufficient. The full cross section of the fill shall be maintained as each successive layer is placed.

2. Successive loads of material shall be placed to produce a distribution of material throughout the embankment that is free from lenses, pockets, streaks, or layers of material differing substantially in texture or gradation from surrounding material.

3. Travel of equipment shall be distributed evenly over the entire width of the embankment to obtain the maximum uniform compaction possible while placing material. Over compaction along the hauling route, which causes lenses to develop, shall be avoided. Should lenses develop, the Contractor shall scarify these areas prior to placing the next lift of materials.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. General: Unless otherwise provided the slope stake basis of measurement for earthwork will be used. Slope stake measurements taken prior to construction will be used provided the work has been acceptably completed in conformity to the staked lines and slopes. When changes in the original slope stakes are approved, final cross-section or comparable measurements will be taken of the completed work. Clearing, stripping, and grubbing of waste material and stockpiling of topsoil and placing of topsoil, and scarifying foundations will not be measured for payment.

B. Common Excavation: Common excavation material will be measured in the original space occupied and includes:

1. Excavated material from designated borrow areas and cut spillways which is placed directly in water retention pit embankments and retention/detention dam embankments.

2. Excavated materials designated and placed as waste.

3. Excavated material which is suitable for placement in minor retention dam embankment but authorized to be placed in temporary stockpiles.

4. Separate payment for material placed directly in retention/detention dam embankments for repairs will not be made and considered incidental to the Contract.

5. When it is impractical to measure material in the original space occupied due to erratic locations of small deposits, three dimensional measurements of hauling vehicles will be used.

Valley Reservoir-2021 4 Minor Earth Dams and Pits

C. Units: Measurements will be recorded in feet and volumes will be computed in cubic yards.

1. Prismoidal volume (pits) will be computed by the prismoidal formula:

Volume = D(AT + 4AM +AB) 27 (6)

Where: D = Average depth in feet.

AT = Top area in square feet.

AB = Bottom area in square feet.

AM = The area halfway between AT and AB in square feet and is not the average of AT and AB (use end and side slopes to calculate AM).

27 = Conversion factor for cubic feet to cubic yards.

6 = Constant for prismoidal volume (1+4+1).

2. Non-prismoidal volumes will be calculated by the average end area method.

Formula: Volume = L (A1 + A2)

27 (2)

Where: L = Horizontal distance between cross sections.

A = Area of the cross section.

27 = Conversion factor for cubic feet to cubic yards.

2 = Divisor (averages of two areas).

D. Other costs: Costs for mobilization, bonding, or any other associated cost incurred by the Contractor should be uniformly spread in the pay quantities for common excavation items.

4.02 BASIS OF PAYMENT:

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item Pay Unit

MT-02291(1) Common Excavation..................................Cubic Yard

END OF SECTION

NUMBER Project # POSSIBLE NAME QUANTITY UNITS TOWNSHIP RANGE SECTION QTR/QTR

1 440797 VR-14 REPAIR 1920 CY 29N 37E 30 SWNW

2 000254 DIVERSITY PIT 3620 CY 29N 36E 23 SENW

3 000255 LGBTQ PIT 3620 CY 29N 36E 27 SENE

4 000253 TRANS PIT 3620 CY 28N 36E 10 NWNE

5 000260 PRIDE PIT 3620 CY 27N 37E 8 NESW

6 000256 INCLUSION PIT 3620 CY 25N 37E 5 SESW

7 000259 INDICTMENT PIT 3620 CY 25N 37E 6 SENW

8 000258 EQUITY PIT 3620 CY 25N 36E 1 NWSE

9 000257 GAFFE PIT 3620 CY 25N 36E 2 SESE

10 447612 YELLOWTAIL REPAIR 3620 CY 25N 33E 22 SENE

11 441183 FOREST REPAIR 7130 CY 25N 37E 27 SWSW

TOTAL= 41630 CY

WORK DATA FOR CONSTRUCTION SITES

Number Project # Name Quantity Units Lattitude Longitude Embankment Shape 1 440797 VR-14 REPAIR 1920 CY 48.24149 -106.97331 as staked,U,L or I 2 000254 DIVERSITY PIT 3620 CY 48.25694 -107.01542 as staked,U,L or I 3 000255 LGBTQ PIT 3620 CY 48.24062 -107.02606 as staked,U,L or I 4 000253 TRANS PIT 3620 CY 48.203268 -107.05703 as staked,U,L or I 5 000260 PRIDE PIT 3620 CY 48.108538 -106.976055 as staked,U,L or I 6 000256 INCLUSION PIT 3620 CY 47.945001 -106.988038 as staked,U,L or I 7 000259 INDICTMENT PIT 3620 CY 47.952517 -107.008037 as staked,U,L or I 8 000258 EQUITY PIT 3620 CY 47.948508 -107.023626 as staked,U,L or I 9 000257 GAFFE PIT 3620 CY 47.943698 -107.039923 as staked,U,L or I 10 447612 YELLOWTAIL REPAIR 3620 CY 47.907623 -107.448796 as staked,U,L or I 11 441183 FOREST REPAIR 7130 CY 47.886615 -106.951658 as staked,U,L or I

TOTAL 41630 CY

Number Project # Name Quantity Units Lattitude Longitude Embankment Shape 1 440797 VR-14 REPAIR 1920 CY 48 14'29" 106 58'24" as staked,U,L or I 2 000254 DIVERSITY PIT 3620 CY 48 15'25" 107 00'55" as staked,U,L or I 3 000255 LGBTQ PIT 3620 CY 48 14'26" 107 01'34" as staked,U,L or I 4 000253 TRANS PIT 3620 CY 48 12'12" 107 03'25" as staked,U,L or I 5 000260 PRIDE PIT 3620 CY 48 06'31" 106 58'34" as staked,U,L or I 6 000256 INCLUSION PIT 3620 CY 47 56'42" 106 59'19" as staked,U,L or I 7 000259 INDICTMENT PIT 3620 CY 47 57'09" 107 00'29" as staked,U,L or I 8 000258 EQUITY PIT 3620 CY 47 56'55" 107 01'25" as staked,U,L or I 9 000257 GAFFE PIT 3620 CY 47 56'37" 107 02'24" as staked,U,L or I 10 447612 YELLOWTAIL REPAIR 3620 CY 47 54'27" 107 26'55" as staked,U,L or I 11 441183 FOREST REPAIR 7130 CY 47 53'12" 106 57' 97" as staked,U,L or I

TOTAL 41630 CY

NUMBER Project # NAME AGE QUANTITY UNITS TOWNSHIP RANGE SECTION QTR/QTR

1 441171 DEER RET RES 1966 5953 CY 25N 35E 5 SESE

2 441236 SNOWBANK RET RES 1962 6500 CY 25N 36E 1 SESW

3 441342 FLUE RET RESERVOIR 1975 2765 CY 25N 37E 5 NENW

4 441343 CHECK RET RESERVOIR 1975 3358 CY 26N 36E 34 NENW

5 441352 FOUR RET RESERVOIR 1975 3062 CY 25N 37E 4 SWNE

6 441378 SIX RET RESERVOIR 1975 2914 CY 25N 37E 6 SENW

7 445908 SCHITZ RESERVOIR 1993 5611 CY 25N 36E 4 SWNE

8 446231 RUNNY NOSE PIT 1998 3560 CY 25N 37E 8 NWSW

9 446866 LAW RES 1951 2000 CY 26N 36E 35 NWNE

TOTAL 35723 CY

WORK DATA FOR DECOMMISSION SITES

Number Project # Name Quantity Units Lattitude Longitude

1 441171 DEER RET RES 5953 CY 47.940649 107.023954

2 441236 SNOWBANK RET RES 6500 CY 47.944954 107.033515

3 441342 FLUE RET RESERVOIR 2765 CY 47.955267 106.994921

4 441343 CHECK RET RESERVOIR 3358 CY 47.970121 107.072099

5 441352 FOUR RET RESERVOIR 3062 CY 47.952173 106.960296

6 441378 SIX RET RESERVOIR 2914 CY 47.952314 107.009198

7 445908 SCHITZ RESERVOIR 5611 CY 47.952003 107.091131

8 446231 RUNNY NOSE PIT 3560 CY 47.934813 106.994279

9 446866 LAW RES 2000 CY 47.969021 107.047101

Number Project # Name Quantity Units Lattitude Longitude

1 441171 DEER RET RES 5953 CY 47 ̊56'35" 107 ̊13'59"

2 441236 SNOWBANK RET RES 6500 CY 47 ̊56'41" 107 ̊01'58"

3 441342 FLUE RET RESERVOIR 2765 CY 47 ̊57'17" 106 ̊59'40"

4 441343 CHECK RET RESERVOIR 3358 CY 47 ̊58'12" 107 ̊04'21"

5 441352 FOUR RET RESERVOIR 3062 CY 47 ̊57'07" 106 ̊57'36"

6 441378 SIX RET RESERVOIR 2914 CY 47 ̊57'08" 107 ̊00'32"

7 445908 SCHITZ RESERVOIR 5611 CY 47 ̊57'06" 107 ̊05'24"

8 446231 RUNNY NOSE PIT 3560 CY 47 ̊56'05" 106 ̊59'05"

9 446866 LAW RES 2000 CY 47 ̊58'09" 107 ̊02'49"

Specification Headsheet.pdf
Specification Index.pdf
Revised Section 01009_6-14-23.pdf
Revised Section 02291_6-14-23.pdf
Revised Work Data for Construction Sites_6-15-23.pdf
SITES
DECIMAL lat-long
DEG MIN SEC LAT&LONG
Decommission Sites.pdf
SITES
DECIMAL lat-long
Deg Min Sec lat-long

File details come from the government source that posted it. Updated .