Technical Specifications for

EMDD FOG SEAL

BUREAU OF LAND MANAGEMENT

EASTERN MONTANA-DAKOTAS DISTRICT

111 Garryowen Road Miles City, Montana 59301

MAY 2022

TABLE OF CONTENTS

General Information and Requirements...........................................Section MT-01009(1-7)

Mobilization.....................................................................................Section MT-01505(1-2)

Cold Mill Asphalt……………………………………………...….Section MT-02202(1-2)

Aggregate Base Course……………………………………………Section MT-02233(1-3)

Fog Seal...........................................................................................Section MT-02745(1-5)

Pavement Marking...........................................................................Section MT-02765(1-3)

Crack Seal…………………………………………………………Section MT-02878(1-4)

Utility Conduit Pull-Box Enclosure……………………………….Section MT-16110(1-3)

Asphalt Paving…………………………………………………….Section MT-321216(1-4)

GENERAL INFORMATION AND REQUIREMENTS

MT-01009-1

SECTION MT-01009

PART 1: GENERAL

1.01 SUMMARY:

A. Description of Work: Furnishing labor, equipment, supplies, and materials to fog seal the existing pavements and other related work at three Bureau of Land Management (BLM) facilities: the BLM Eastern Montana-Dakotas District Office (EMDDO), the Pompey’s Pillar National Monument (PPNM), and the BLM Billings Retardant Air Tanker Base (BRAT) in accordance with the contract drawings and specifications. The work includes approximately 28,600 square yards of parking lot fog seal, approximately 13,200 linear feet of pavement striping, and approximately 12,200 linear feet of crack sealing.

B. Requirements: Operations necessary to complete the work, including coordination with crafts relative to the Contractor’s requirements, are the Contractor’s responsibility. Work shall be scheduled in a manner as to avoid delays in overall construction and permit installation of work, while maintaining government and public access to the facilities.

Coordinate the work schedule at each BLM site with the Contracting Officer Representative.

C. Stipulations for Performance Time and Site Closure: Onsite work is expected to begin on or near June 6, 2022. Onsite work may begin sooner or later than this date, based upon the weather and the weather forecasted at the time. It is expected that the Notice to Proceed will be issued on or near May 23, 2022, to allow time for submittal review, mobilization, site coordination, etc. Actual Period of Performance dates may vary, and the dates described herein are for informational purposes only.

D. Location: Work under this Contract is located at 111 Garryowen Road, Miles City, MT

59301 (BLM EMDDO), at 3039 US Highway 312, Pompeys Pillar, MT 59064 (PPNM), and at 1299 Rimtop Drive, Billings, MT 59105 (BLM BRAT). Work locations are shown on the drawings.

1.02 REFERENCES:

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor from the following:

ASTM American Society for Testing and Materials 1916 Race Street

MT-01009-2

Philadelphia, PA 19103

FP Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects Superintendent of Documents Government Printing Office Washington, DC 20402

Fed. Spec. Federal Specification/Standard General Services Administration Specifications Branch Room 6039, GSA Building Seventh and D Streets, S.W.

Washington, DC 20407

MDT Standard Specifications for Road and Bridge Construction, 2014 Edition Montana Department of Transportation Contract Plans Section 2701 Prospect Avenue Helena, MT, 59620

MUTCD Manual on Uniform Traffic Control Devices for Streets and Highways Superintendent of Documents Government Printing Office Washington, DC 20402

OSHA Occupational Safety and Health Administration's Standards U.S. Department of Labor Occupational Safety and Health Administration Denver Area Office 333 West Colfax Avenue Denver, CO 80204

*Federal Specifications and catalogs may be obtained at Business Service Centers of Regional Offices of the General Services Administration. (Washington, DC; Boston, MA;

New York, NY; Philadelphia, PA; Atlanta, GA; Chicago, IL; Kansas City, MO; Fort Worth, TX; Denver, CO; San Francisco, CA; and Auburn, WA.)

1.03 DEFINITIONS:

A. Approvals: Approval of the submittal is an indication that the Contractor's submittal has been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.

MT-01009-3

1.04 SUBMITTAL:

A. Scope: Submittals may include, but not necessarily be limited to, the following: design computations, shop drawings, manufacturers' literature, as built drawings, samples, maintenance manuals, and traffic control plans.

B. Requirements: Refer to specifications for submittal required. Allow at least 5 working days for review. Submittal shall be delivered to the Contracting Officer or his/her appointed representative.

C. Identification of Submittal: Completely identify each submittal by showing at least the following information: submit two copies of each submittal for approval.

1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, drawing number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or re-submittal.

5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

1.05 CERTIFICATES OF CONFORMANCE:

A. Requirements: The Contracting Officer may permit use, prior to sampling and testing, of materials when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials conforming to the requirements of the drawings and specifications.

Material not conforming to those requirements will be subject to rejection, whether in place or not.

B. Format: The form of the Certificate of Conformance provided by the supplier shall be as follows: Submit one copy of the Certificate of Conformance for approval.

1. The certificate shall state that the named product conforms to the Contract requirements.

2. The certificate shall either be accompanied with a certified copy of the test results or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.

MT-01009-4

3. The certificate shall provide the name and address of the manufacturer, the testing agency, and the date of tests.

4. The certificate shall set forth the means of identification permitting field determination of the product delivered as being the product covered by the certification.

1.06 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

C. Measurements: Where approved manufacturer's diagrams and shop drawings give specific measurements or rough-in dimensions for equipment. These dimensions shall take precedence over dimensions indicated on the drawings.

1.07 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products, incorporated into the work, from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name and brand designation and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.

B. Storage: The Contractor shall provide temporary storage facilities for products complying with manufacturer's recommendations, which will protect them from damage until installation on the project and final acceptance. The storage area shall permit access for inspection and handling.

C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage until installation on the project.

1.08 PROJECT/SITE CONDITIONS:

A. Access to Work: Contractor shall adhere to any county, state, or federal road regulations for accessing the site. It is the responsibility of the contractor to make any additional accommodations, or to secure applicable variances, in order to meet load limit requirements for all phases of construction.

B. Traffic Control Plan: The Contractor shall implement a traffic control plan for all work at each facility. The traffic control plan shall be submitted for approval to the Contracting Officer a minimum of 3 days prior to beginning any work. The Contractor is also

MT-01009-5

responsible for adhering to any additional county or state regulations for performing work in this area.

1. Contractor is responsible for providing flagging personnel and necessary signage for traffic management beyond the site closure area.

2. Contractor shall consider the safe and efficient movement of traffic during any construction outside of site closure area.

3. Contractor shall open lanes to traffic wherever and whenever practical.

4. Contractor shall minimize and restrict lane closures to the locations and times essential for prosecution of work.

5. Contractor shall address their plan to stage construction at each facility to keep parking available to the public and government personnel during construction.

C. Construction Signing: The Contractor shall furnish all construction signing for, but not limited to: Site closure, speed reduction, road work, barriers, any signs as required by county regulations, as well as, construction signs when necessary on highways according to MUTCD standards.

D. Environmental Considerations: The aesthetic values of the site and surrounding area are of prime importance. The Contractor shall take all care necessary to preserve all plant life and other natural features. Any surface damage outside the project area shall be corrected at the expense of the Contractor. Any damage to existing state, county, or local roads, used to transport materials to the project or that are located within or adjacent to the construction area, shall be corrected at the expense of the Contractor.

E. Construction facilities:

1. Do not park vehicles or equipment, or store materials, on private property without written permission from the property owner.

F. Utility Locates: Contractor is responsible for all public and private utility locates.

Coordinate with Montana Call Before You Dig (811) and any other necessary entities prior to performing any excavation.

G. Repair of Underground and Overhead Utilities: Contractor is responsible for any damage to underground and overhead utilities, such as but not limited to: water, electrical, phone, sewer, and main power lines. All damaged underground or overhead utilities will be the full responsibility of the Contractor and shall be repaired at the Contractor’s expense.

1.09 SEQUENCING AND SCHEDULING:

MT-01009-6

A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days when requested by the Contracting Officer.

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.01 PROJECT MEETINGS:

A. Pre-Work Conference:

1. Notification: A pre-work conference will be held prior to the start of work. The

Contractor will be notified in advance of the meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. Attendance: The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.

3. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittal requested in the specifications.

B. Progress Meetings:

1. Location: Meetings shall be held at the project site or as determined by the Contracting Officer.

2. Notification: Meetings may be called by either the Contracting Officer or the

Contractor. The request shall state who should attend.

C. Final Inspection:

1. Location: Meeting shall be held at the project site, or as determined by the Contracting Officer.

2. Notification: The Contractor shall notify the Contracting Officer, in writing, at least 5 working days before the completion date so the Government can schedule final inspection.

3. Attendance: The Contractor shall require the superintendent to be present during this inspection.

3.02 WORK LAYOUT:

MT-01009-7

A. Government Requirements:

1. General: The Government will locate any referenced baseline monuments, benchmarks, or control points referenced in the contract drawings. Any points disturbed during construction shall be reset by the government at the Contractor’s expense.

B. Contractor Requirements:

1. General: The Contractor shall, immediately upon entering the project site for the purpose of beginning work, locate any applicable reference (survey control) points and take any necessary action to prevent their destruction.

2. Contractor shall set all construction stakes, temporary markers, or string lines needed to perform the required work for horizontal control, location of parking stripes, and installation of pindown parking curbs.

3. Contractor must establish the location of each parking stripe prior to the fog seal process. Contractor may use flexible, temporary raised pavement markers to indicate the location of parking lines or use survey methods to determine location of parking stripes. Markers must be placed at the beginning and tail end of all existing lanes if Contractor chooses to use temporary markers. These markers must match the color of the lane paint (yellow), and must inspect and replace immediately any loose, missing, or damaged markers.

4. Contractor is to use survey grade methods to field verify elevations and grades in the parking lot around the utility pull-box enclosure, and to increase the elevation of the lid of the new Oldcastle Infrastructure Christy B2436 traffic rated enclosure/pull-box, in accordance with the drawings.

3.03 CLEANUP:

A. Waste Removal: The Contractor shall keep the premises free from accumulation of waste materials at all times. This includes any rubbish caused by employees or related work processes. At the completion of the work, the Contractor shall remove all such materials from the work site and dispose of them properly. The Government may remove such materials and charge the cost to the Contractor, if the site is left untidy.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: The work described in this section will not be measured for payment.

4.02 BASIS OF PAYMENT:

MT-01009-8

A. Payment: No direct payment for the work described under this section will be made.

Consideration for this item shall be included in the bid price for other items of the Contract.

END OF SECTION

MOBILIZATION

MT-01505-1

SECTION MT-01505

A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site.

(There are no applicable requirements.)

PART 3: EXECUTION

(There are no applicable requirements.)

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: Progress payments will be made as follows:

1. When 5 percent of the original contract amount is earned from other bid items, 50 percent of the amount bid for mobilization or 5 percent of the original contract amount, whichever is lesser, will be paid.

2. When 10 percent of the original contract amount is earned from other bid items, 100 percent of the amount bid for mobilization or 10 percent of the original contract amount, whichever is lesser, will be paid.

3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10 percent of the original contract amount, will be paid.

4. The total sum of all payments shall not exceed the original contract amount bid for mobilization, regardless of the fact that the contractor may have shut down the work on the project or moved equipment away from the project and then back again.

MT-01505-2

A. Payment: Prices and payment will be full compensation for the work described in this section.

No modification and adjustments shall be allowed for costs and changes to mobilization despite changes in fuel or transportation costs. Payment will be made under:

Pay Item Pay Unit

MT-01505(1) Mobilization…………………………………………………………. Lump Sum

COLD MILL ASPHALT

MT-02202-1

SECTION MT-02202

A. Section Includes: Removal of existing asphalt around the utility conduit pull-box at the BLM

Eastern Montana-Dakotas District Office in accordance with the contract drawings and specifications, and prior to application of the fog seal. This process can be performed by the following methods, or an approved alternative:

1. Cold Milling: Shall consist of the milling of existing bituminous pavement to specified depths at the location shown on the drawings in accordance with these specifications to remove the existing asphalt pavement from around the utility conduit pull-box. The cold milling shall produce a straight and neat edge to pave against after the old utility conduit pull-box has been removed and the new utility conduit pull-box has been installed. The millings produced from the cold mill process shall be removed from the site and disposed of properly in accordance with any State and County regulations at no additional cost to the Government.

2.01 EQUIPMENT:

A. General: Machines, tools, and equipment used in the performance of the work shall be approved by the Contracting Officer Representative and maintained in satisfactory operating condition. Contractor shall submit construction equipment list.

PART 3: EXECUTION

3.01 CONSTRUCTION REQUIREMENTS:

A. General: The existing pavement around the utility conduit pull-box shall be cold milled and removed from the site, allowing the utility conduit pull-box to be removed, and the new utility conduit pull-box to be installed.

B. Mark the outside edge of the asphalt removal area for approval from the Contracting Officer

Representative, prior to beginning the cold mill process. Ensure that the edge of the removed asphalt matches this line during the cold mill process.

C. Contractor shall keep excess dust from entering the air.

D. Contractor is to produce a straight and neat edge in the existing asphalt to pave against.

E. Traffic control shall be addressed in the approved traffic control plan for the facility.

MT-02202-2

F. The millings produced from the cold mill process shall be removed from the site and disposed of properly in accordance with any State and County regulations at no additional cost to the Government.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: The work described in this section will be paid for on a lump sum basis in accordance with the specifications and drawings under MT-16110(1) Utility Conduit Pull-Box Enclosure.

A. Prices and payment will be full compensation for the work described in this section, including the removal and disposal of pavement materials, all labor, equipment, tools, and incidentals necessary to complete the work described herein. Payment will be made under:

MT-16110(1) Utility Conduit Pull-Box Enclosure…………………………Lump Sum

AGGREGATE BASE COURSE

MT-02233-1

SECTION MT-02233

1.01 SUMMARY:

A. Section Includes: Furnishing, placing, and compacting aggregate base course under and around the utility conduit pull-box at the BLM Eastern Montana-Dakotas District Office in accordance with the contract drawings and specifications, prior to the fog seal application.

1.02 SUBMITTALS:

A. General: Submittals shall be according to Section 01009 General Information and

Requirements.

B. Certificates of Conformance: Contractor to submit two copies of written certification from the supplier that the Contractor-furnished material to be used on this project conforms to the requirements of this specification section.

1. Contractor shall include in the submittal, test results from a Certified Geotechnical

Laboratory: Samples shall be obtained from the stockpile of material to be used on this project at the time of Construction for the 3/4-Inch Crushed Aggregate, including:

a. Sieve Analysis according to AASHTO T 99.

b. Standard Proctor according to AASHTO T 99.

c. Atterberg limits according to ASTM D 4318.

2. Contractor to submit documents for materials to be used on this project a minimum of three weeks prior to application of the fog seal for approval by the Government.

2.01 AGGREGATE MATERIAL: Shall be in conformance with the following requirements:

A. General: Aggregate material shall consist of hard, durable particles or fragments of slag, stone, or gravel crushed of the required size and grading. Shall be visually free from organic matter and lumps or balls of clay and shall meet the requirements for the grading given.

MT-02233-2

B. 3/4-Inch Crushed Aggregate Base: Shall meet the following gradation and requirements including added binder or blending material, or an approved equal:

Sieve Size Percent Passing 3/4 inch 100 percent No. 4 40-80 percent No. 10 25-60 percent No. 200 5-20 percent

1. The Maximum liquid limit for the material passing the No. 40 sieve is 35.

2. The Plasticity Index for the material passing the No. 40 sieve may vary between 3 and 10.

3.01 PREPARATION:

A. Any disturbed subgrade shall be prepared and compacted to form a uniform and flat surface.

3.02 INSTALLATION:

A. Water shall be added to aggregate base course material as required to achieve required compaction. A minimum of 6 inches of compacted aggregate is required on the prepared subgrade or prepared subbase in a uniform layer in accordance with the plans.

3.03 COMPACTION

A. Each layer of aggregate base shall be compacted to the full width by means of compaction equipment suitable to the type and depth of material being compacted. Compaction of each layer shall continue until density of not less than 95 percent of the maximum dry density determined in accordance with AASHTO T 99 or ASTM D698, or other approved method, has been achieved.

B. Machines, tools, and equipment used in the performance of the work shall be approved by the Contracting Officer Representative and maintained in satisfactory operating condition.

3.04 TRAFFIC CONTROL

A. Traffic control shall be addressed in the approved traffic control plan for the facility.

4.01 METHOD OF MEASUREMENT

MT-02233-3

A. Units: The work described in this section will be paid for on a lump sum basis in accordance with the specifications and drawings under MT-16110(1) Utility Conduit Pull-Box Enclosure.

4.02 BASIS OF PAYMENT

A. Payment: Prices and payment will be full compensation for the work described in this section, including the furnishing, placing, and compaction of the ¾” aggregate base course, and all labor, equipment, tools, and incidentals necessary to complete the work described herein. Payment will be made under:

MT-16110(1) Utility Conduit Pull-Box Enclosure …………………Lump Sum

FOG SEAL

MT-02745-1

SECTION MT-02745

1.01 SUMMARY:

A. Section Includes: Furnishing and applying bituminous material to a prepared surface at the

BLM Eastern Montana-Dakotas District Office, at the Pompey’s Pillar National Monument, and the BLM Billings Retardant Air Tanker Base in accordance with the contract drawings and specifications.

1.02 SUBMITTALS:

A. General: Submittals shall be according to Section 01009 - General Information and

Requirements.

1. Contractor to submit a mix design formula for the fog seal to be used on this project a minimum of three weeks prior to application of the fog seal for approval by the Government.

B. Certificates of Conformance: Submit one copy of written certification for the materials listed below:

1. Bituminous Material: Manufacturer's certification for each load that it is of the type, grade, and quality specified.

a. Supplier of the specified bituminous material shall provide the Contractor with a temperature viscosity chart to determine the appropriate temperature for application.

Contractor shall then supply the Contracting Officer with two copies of the same.

2. Weight Tickets: Certified weight tickets from supplier for each load of bituminous material delivered to the project site.

1.03 SITE CONDITIONS:

A. Special Stipulations: Maintain government and public access to facilities during construction operations by staging construction.

B. Requirements: Begin fog seal work only with the Contracting Officer’s Representative’s approval. The following conditions govern fog seal work unless directed otherwise by the Government:

MT-02745-2

1. Apply bituminous material only during daylight hours, when both the ambient and pavement temperature are a minimum of 65 degrees Fahrenheit or above, and dry. No application of material is allowed during rainy or foggy weather conditions.

2. Do not perform fog seal work if the weather forecast includes a predicted temperature lower than 45 degrees Fahrenheit within 12 hours after the intended work for the day.

3. Do not perform fog seal work if the weather forecast includes a probability of precipitation greater than 45 percent within the intended schedule of operations for the day. Regardless of the weather forecast, fog seal work may be suspended if impending adverse weather conditions occur in the vicinity of the work.

2.01 BITUMINOUS MATERIAL:

A. Requirements: CSS-1H Emulsified bituminous material meeting the requirements of the table below, or approved equal. Dilute the material 1:1 (one-part emulsion to one part water) at the refinery.

TEST AASHTO METHOD MIN MAX

Viscosity, Saybolt Furol @ 25 Deg C, SFs T59, T72 20 100 Storage Stability test, 24 hr, % (a) T59 1 Particle Charge Test T59 Positive Sieve test, % (a) T59 0.1 Cement Mixing T59 2 Residue (% by mass) T59 57

TEST ON RESIDUE FROM DISTILLATION:

Penetration @ 25C, 5cm/min T49, T59 40 90 Ductility @ 25C, 5cm/min T51, T49 40 ASH Content, % T111 1 Solubility in TCE, % T44 97.5

2.02 EQUIPMENT:

A. Requirements:

1. Bituminous distributor for applying bituminous material shall have a minimum 1000-gallon insulated tank and be equipped with the following: power unit for the pump, full circulation spray bar, vertical and horizontal nozzle adjustments for maintaining a preset height above the road surfaces, a pressure pump, pressure gauge, thermometer well, thermometer, and accurate volume measuring devices. The distributor truck shall apply the oil at the manufacturer’s recommended temperature uniformly on various widths of

MT-02745-3

surfaces up to 15 feet, and at controlled rates of 0.04 to 2.0 gallons per square yard with a variation of not more than 0.02 gallons per square yard.

a. In the event that a non-heated distributor truck cannot apply the oil at the manufacturer’s recommended temperature, Contractor shall supply a distributor truck that is internally heated.

2. Pre-clean sweeper shall be done with a side cast, self-propelled broom prior to fog seal application.

A. Work Prior To Cleaning Pavement:

1. Remove all existing pindown parking curbs prior to cleaning existing pavement as shown on the drawings.

B. Surface Preparation: Immediately before application of bituminous material, clean surface with a side cast, self-propelled broom sweeper. All visible layers of dirt that are caked on the pavement shall be scraped off if not removed by the sweeper.

1. Crack Seal: Crack seal per specification Section MT-02878.

2. Contractor may not start applying bituminous material until the surface is approved.

C. Traffic Control Plan: Contractor shall provide traffic control plan for all work at each facility per Section 1.08 B of the General Information and Requirements. The traffic control plan for each facility is to be submitted for approval to the Contracting Officer a minimum of 3 days prior to beginning any work. It is the responsibility of the Contractor to furnish personnel and materials needed to protect job quality and ensure public safety.

1. The traffic plan shall include the Contractor’s plan to stage construction for all work, including the crack seal, fog seal, striping, and utility conduit pull-box, to keep parking available to the public and government personnel at all facilities during construction.

3.02 APPLICATION:

A. Bituminous Material: Temperature of application shall be determined by the Project

Superintendent using the temperature and viscosity charts submitted by the supplier. At a minimum, both the ambient temperature and surface temperature shall be 60 degrees Fahrenheit or above. Apply uniformly at the approximate rate of 0.04 to 0.18 gallons per square yard diluted. Prevent creating a flushed pavement surface during application. If

MT-02745-4

necessary, use two or three lighter applications rather than one heavy application rate to prevent adversely affecting the skid resistance of the asphalt chip seal.

1. Use a strip of building paper, at least 3 feet in width and with a length equal to that of the spray bar of the distributor plus 1 foot, at the beginning of each spread. If the cut-off is not positive, use paper at the end of each spread. Remove and dispose of paper in a satisfactory manner.

2. The distributor shall be moving forward at proper application speed at the time the spray bar is opened. Any skipped areas or deficiencies shall be corrected by the Contractor.

Make the junctions of spreads carefully to ensure a smooth riding surface.

3. A light application of sand shall be applied to all non-chip-sealed asphalt to improve skid resistance, at the discretion of the Contracting Officer Representative.

3.03 FINISH WORK REQUIREMENTS

A. Finish Work:

1. Re-stripe according to Section MT-02765 Pavement Marking.

2. Reset all pindown parking curbs at their prior locations and in accordance with the drawings.

B. Clean Up: Do not clean the distributor and discharge within the project site boundary. Follow State and County regulations regarding proper cleanup and disposal at no additional cost to the government.

A. Units: The work described in this section will be measured and paid for by the square yard as calculated from the drawings completed to the thickness and widths and as accepted as measured in place, and shall include: pavement cleaning, applying bituminous material, and labor and equipment to complete the overall project in accordance with the specifications and drawings under Section MT-02745(1) Fog Seal.

B. Units: All materials, equipment, and labor to re-stripe the parking areas will be paid for under

Section MT-02765 Pavement Markings.

C. Units: All materials, equipment, and labor for the removal and installation of all pindown parking curbs will be paid for per each under Section MT-02745(2) Remove & Install Pindown Parking Curbs.

MT-02745-5

4.02 BASIS OF PAYMENT

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

MT-02745(1) Fog Seal……………………………………………………Square Yard

MT-02745(2) Remove & Install Pindown Parking Curbs………………..Each

PAVEMENT MARKING

MT-02765-1

SECTION MT-02765

1.01 SUMMARY:

A. Section Includes: Furnishing and applying pavement markings at the BLM Eastern

Montana-Dakotas District Office, at the Pompey’s Pillar National Monument, and the BLM Billings Retardant Air Tanker Base in accordance with the contract drawings and specifications.

1.02 SUBMITTALS:

A. Certificates of Conformance: Submit one copy of written certification from the supplier of the paint to be used on this project showing that it conforms to the requirements of this specification section.

B. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of MDOT for pavement-marking work.

1.03 WARRANTY:

A. Requirements: Markings that become worn off within twelve months shall be replaced under the warranty provisions of this Contract. When pavement applied under this Contract is replaced under warranty, the markings shall be replaced as well.

2.01 MATERIALS:

A. Pavement Marking Paint: Shall conform to the requirements of AASHTO M 248, Type S.

The paint color shall match existing or be yellow, white, or blue if no existing paint markings exist, meeting current industry standards. All paint colors and striping locations shall be approved by the Contracting Officer Representative.

A. General: Machines, tools, and equipment used in the performance of the work shall be approved by the Contracting Officer Representative and maintained in satisfactory operating condition. Contractor shall submit construction equipment list.

MT-02765-2

A. Cleaning: Thoroughly clean surfaces to be marked before application of pavement marking.

Remove dust, dirt, and other granular surface deposits by sweeping, blowing with compressed air, rinsing with water, or a combination of these methods as required. Do not commence marking in any area until pavement surfaces are dry and clean.

B. Proceed with pavement marking only after unsatisfactory conditions have been corrected.

C. Do not apply pavement-marking paint until layout, colors, and placement have been verified and approved by the Contracting Officer Representative.

D. Dimension of Marking:

1. Contractor must establish the location of each parking stripe prior to beginning fog seal.

The Contractor shall note the beginning and tail end of all existing parking lanes.

Contractor may use flexible, temporary raised pavement markers or may use survey methods. Any markers that are disturbed or destroyed during the construction process shall immediately be reestablished by the Contractor.

2. Stripes shall be 4 inches wide.

3. Handicap symbols shall be 5 feet in height and executed with 4-inch lines.

4. Diagonal Stripes shall be 4-inches wide with spacing as called out on the project

E. Traffic Control: Traffic control shall be addressed in the approved traffic control plan for each facility. Construction is to be staged to keep parking available to the public and government personnel at all facilities, and this is to be addressed in the traffic control plan.

3.02 INSTALLATION:

A. Machine Application: The pavement markings shall be applied by machine methods acceptable to the Contracting Officer Representative. Each nozzle shall also be equipped with suitable line guides consisting of metallic shrouds or air blasts.

B. Paint Preparation: The paint shall be thoroughly mixed immediately before application.

Provide guidelines and templates as necessary to control paint application. Take special precautions in marking symbols, and use stencils for markings when necessary. Sharply outline all edges of markings. The paint shall be applied when the air temperature is above 40 degrees Fahrenheit to a clean and dry surface, having a temperature of at least 40 degrees Fahrenheit.

MT-02765-3

C. Application Rate or Coverage Per Gallon of Paint:

Minimum Maximum

Paint 100 square feet 110 square feet

D. Protection of Markings: The painted area shall be protected from traffic until the paint is dry.

3.03 FIELD QUALITY CONTROL:

A. Markings: Shall present a clean cut, and uniform appearance. Markings that fail to have a uniform, and satisfactory appearance, either day or night, will be rejected.

B. Tolerances:

1. Painted lines shall be 4 inches wide plus or minus 1/8 inch.

4.01 METHOD OF MEASUREMENT:

A. Units: The work described in this section will be paid for on a lump sum basis.

4.02 BASIS OF PAYMENT:

A. Prices and payment will be full compensation for the work described in this section.

Payment will be made under:

MT-02765(1) Pavement Marking……………………………………………Lump Sum

CRACK SEAL

MT-02878-1

SECTION MT-02878

1.01 SUMMARY:

A. Description: Furnishing labor, equipment, supplies, and materials to evaluate, route, clean, and seal the transverse and longitudinal cracks in the paved surface with the specified sealant at each work location. Contracting Officer Representative shall approve of all pavement cracks for seal work. Work includes crack sealing any joints between asphalt and concrete pavements (i.e. the asphalt-curb interface).

1. Contractor to submit manufacturer’s printed Product Data Sheet.

B. Certification: The Contractor shall submit the Manufacturer’s Certificate of Compliance for all Contractor supplied materials.

1.03 SITE CONDITIONS:

A. Environmental Requirements:

1. Apply sealant only to clean, dry, and properly prepared cracks and joints.

2. At ambient temperatures below 40 degrees Fahrenheit, use a hot compressed air lance to achieve clean, dry, and warm space for sealant installation.

B. Requirements:

1. Do not perform crack seal work if the weather forecast includes a probability of precipitation greater than 45 percent within the intended schedule of operations for the day. Regardless of the weather forecast, crack seal work may be suspended if impending adverse weather conditions occur in the vicinity of the work.

MT-02878-2

A. Crack Sealant: Use sealant meeting the following ASTM D 5167 specifications.

Cone Penetration, 77°F (25°C), dmm (ASTM D5329) 100-150 Cone Penetration 0°F (-18°C), dmm (ASTM D5329 modified) 25 min Flow, 140°F (60°C) 5h (ASTM D5329) 10 mm max.

Resilience, (ASTM D5329) 30 – 60% Bond, -20°F (-29°C), 200% ext. (ASTM D5329) Pass 3 cycles Recommended Pour Temperature 380°F (193°C) Safe Heating Temperature 410°F (210°C) Asphalt Compatibility (ASTM D5329) Pass

Three known supplier products meeting these specifications are (for reference):

Crafco 522 Maxwell Elastoflex 72 Crackfiller Mfg. CMC-101-ELT-B4135

A. Kettle:

1. Melt down the sealant in a kettle or melter constructed as a double boiler. The space between the inner and outer shells shall be filled with high flash point heat transfer oil or other indirect heating means.

B. The kettle to be used must have constant agitation any time material is over 300 degrees

Fahrenheit. The kettle must have temperature-monitoring capabilities.

C. Roofing kettles or other direct fired melters are not acceptable for these materials.

A. Work Prior To Cleaning Pavement:

1. Remove all existing concrete pindown curbs and all rubber speed bump pindowns, prior to cleaning existing pavement, as shown on drawings, and in accordance with Section MT-02745 Fog Seal.

B. Surface Evaluation: Evaluate each project location for cracks in need of sealing. Obtain

Contracting Officer Representative approval of crack sealing locations and quantities prior to performing any crack seal work. All joints between asphalt and concrete pavements are to be crack sealed.

MT-02878-3

C. Crack Preparation:

1. Routing:

a) Route all cracks between 1/8” and 1” wide.

b) Route the cracks to produce straight 1/2” to 3/4” vertical walls and 1/2” to 3/4” wide flat bottom reservoir, or to remove at least 1/2” from each side to produce vertical, intact surfaces with not loosely bonded aggregate. Width shall not exceed 1 1/2”.

c) Route when the roadway is dry

d) Remove and dispose of the routed material from the roadway before opening the roadway to traffic.

2. Cleaning:

a) Ensure the reservoir and crack are dry and free of dust, dirt, and loose materials immediately before placing backer rod or sand, if applicable, and applying the sealant.

b) Use air equipment producing at least 125 CFM and line pressure of at least 125 PSI.

D. Sealant Preparation

1. Prepare sealant in specified equipment

2. Heat sealant according to manufacturer’s Product Data Sheet and in accordance with

Manufacturer’s recommendations.

E. Surface Preparation: Immediately before application of sealant, clean surface with a side cast, self-propelled broom sweeper. All visible layers of dirt that are caked on the pavement shall be scraped off if not removed by the sweeper.

3.02 APPLICATION:

A. Sealing

1. Contractor shall install sand or backer rod in cracks 1” or more in depth and larger. In cracks that propagate to the base course, sand or backer rod can be utilized to fill the void of the crack underneath the sealant to prevent sealant from settling and causing a depression near the surface of the pavement.

2. Place sealant material within 72 hours of routing.

MT-02878-4

3. Follow the sealant manufacturer’s handling, mixing, and application temperature requirements.

4. Apply sealant, filling the reservoir flush to the top using a pressure type applicator. All “sinkers” will be refilled to achieve flush to 1/8-inch concave surface appearance.

5. Areas subject to traffic may be reopened once the Contractor determines the sealant will not track.

6. Repair or replace all seal work damaged by traffic at the Contractor’s expense.

7. Blotter material must be approved by the Contracting Officer Representative prior to beginning work.

B. Temperature Limitations

1. Do not route when the mat temperature is below 40°F.

2. Apply the sealant when the roadway surface temperature is between 40°F and 120°F.

3.03 PROTECTION

A. Due care must be taken to keep the public from entering area during the application of joint sealant.

B. Failure to follow manufacturer’s printed recommendations could result in a severe burn hazard.

A. Units: The work described in this section will be measured and paid for by the linear foot using previously determined and approved lengths of existing cracks measured at the site.

4.02 BASIS OF PAYMENT

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

MT-02878(1) Crack Seal……………………………………………….Linear Foot

UTILITY CONDUIT PULL-BOX ENCLOSURE

MT-16110-1

SECTION MT-16110

1.01 SUMMARY:

A. Section Includes: Removing and disposing of existing utility conduit pull-box enclosure and installing a new utility conduit pull-box enclosure at a new grade at the BLM Eastern Montana-Dakotas District Office in accordance with the contract drawings and specifications, and prior to application of the fog seal.

Requirements.

B. Certificates of Conformance: Contractor to submit two copies of written certification from the supplier that the Contractor-furnished material to be used on this project conforms to the requirements of this specification section.

A. Pull-Box Enclosure: Shall be Oldcastle Enclosure Solutions CHRISTY B2436 or approved equal by the Contracting Officer.

1. Performance: Traffic Rated, H20 loading.

2. Cover: Steel Checker Plate, Bolt down design.

3. Reinforced concrete Body with Steel frame.

4. Body Dimensions: 31” x 43”

5. Cover Dimensions: 28” x 40”

A. General: Machines, tools, and equipment used in the performance of the work shall be approved by the Contracting Officer Representative and maintained in satisfactory operating condition. Contractor shall submit construction equipment list. Provide necessary equipment

MT-16110-2

and tools to install the new utility conduit pull-box enclosure as shown in the contract drawings or as directed by the Contracting Officer Representative in the field.

3.01 CONSTRUCTION REQUIREMENTS:

A. General: Install the new utility conduit pull-box to the elevation shown in the contract drawings and specifications.

B. Remove asphalt around the existing utility conduit pull-box enclosure as specified in Section

MT-02202 Cold Mill Asphalt.

C. Remove and dispose of existing utility pull-box enclosure.

1. Contractor is responsible for removing and properly disposing of the existing utility pull-box enclosure at a proper disposal location off the project site and at no additional cost to the government. Adhere to any State and County regulations regarding cleanup and disposal.

D. Install the new utility conduit pull-box enclosure to the correct elevation using methods approved by the Contracting Officer Representative.

E. Compact ¾” aggregate base course under and around the utility conduit pull-box as specified in Section MT-02233 Aggregate Base Course and to the approval of the Contracting Officer Representative.

F. Replace the asphalt pavement around the new utility conduit pull-box enclosure to grades and lines as specified in Section MT-321216 Asphalt Paving and shown in the contract

G. Traffic control shall be addressed in the traffic control plan for the facility.

4.01 METHOD OF MEASUREMENT:

A. Units: The work described in this section will be paid for on a lump sum basis in accordance with the specifications and drawings under MT-16110(1) Utility Conduit Pull-Box Enclosure.

A. Prices and payment will be full compensation for the work described in this section, including the raising of the utility conduit pull-box, and all labor, equipment, tools, and incidentals necessary to complete the work described herein. Payment will be made under:

MT-16110-3

MT-16110(1) Utility Conduit Pull-Box Enclosure……………………….…Lump Sum

ASPHALT PAVING

MT-321216-1

SECTION MT-321216

1.01 SUMMARY:

A. Section Includes: Furnishing, placing, and compacting asphalt on the prepared surface around the new utility conduit pull-box enclosure at the BLM Eastern Montana-Dakotas District Office in accordance with the contract drawings and specifications, and prior to application of fog seal.

1.02 SUBMITTALS:

A. General: Submittals shall be according to Section 01009 General Information and

1. Contractor to submit a mix design formula for the asphalt pavement to be used on this project a minimum of three weeks prior to asphalt pavement work for approval by the Government.

B. Certificates of Conformance: Submit one copy of written certification for the materials listed below:

1. Bituminous Material: Manufacturer's certification for each load that it is of the type, grade, and quality specified. Include technical data and tested physical and performance properties including the mix design.

C. Quality assurance: Comply with materials, workmanship, and other applicable requirements of authorities having jurisdiction or the Montana DOT for asphalt paving work.

1.03 SITE CONDITIONS:

A. Requirements: Begin asphalt work only with the Contracting Officer Representative’s approval. The following conditions govern asphalt pavement work unless directed otherwise by the Government:

1. Do not apply asphalt materials if subgrade is wet or excessively damp, or if rain is imminent or expected before time required for adequate cure. Do not perform asphalt pavement work if the weather forecast includes a probability of precipitation greater than 45 percent within the intended schedule of operations for the day. Regardless of the weather forecast, asphalt pavement work may be suspended if impending adverse weather conditions occur in the vicinity of the work.

MT-321216-2

2. Perform asphalt pavement work only during daylight hours, when both the ambient and pavement temperature is a minimum of 40 degrees Fahrenheit or above and rising, and dry.

2.01 REGULATORY REQUIREMENTS:

A. Comply with materials, workmanship, and other applicable requirements of authorities having jurisdiction or the Montana DOT for asphalt paving work.

2.02 MATERIALS:

A. General: Use materials and gradations that have performed satisfactorily in previous installations.

B. Asphalt Binder: Shall conform to AASHTO M320 Performance Grade (PG) 64-28 or 58-28 for Bituminous Surface and Base Courses, or approved equal..

C. Asphalt Cement: ASTM D 3381/D 3381M for viscosity-graded material

D. Tack Coat: ASTM D 2397 or AASHTO M 208 SS1-H cationic emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application.

E. Water: Potable.

F. Hot-Mix Asphalt: Contractor shall submit one copy of the bituminous job mix formula, prepared within one year of submittal, to be used on this project three weeks prior to placement of pavement. The Contractor shall have written approval of the formula by the Contracting Officer before placement of pavement.

2.03 EQUIPMENT:

A. Requirements: Use methods, equipment, and machinery typical of the industry to transport, place, and compact the asphalt pavement mix.

3.01 EXAMINATION:

A. Verify that subgrade and aggregate base course is compacted, dry, and in suitable condition to begin paving.

B. Proceed with paving only after unsatisfactory conditions have been corrected.

MT-321216-3

C. Tack Coat: Apply tack coat uniformly to asphalt surfaces abutting new asphalt at a rate of

0.06 to 0.15 gal./sq. yd.

1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

3.02 PLACING HOT-MIX ASPHALT:

A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand in areas inaccessible to equipment in a manner that prevents segregation of mix. Place the course to required grade, cross section, and thickness when compacted, as shown on the plans.

1. Spread mix at a minimum temperature of 250 deg F.

2. In the presence of the Contracting Officer Representative, properly clean surfaces Tack

Coat will be applied to. Perform all work to meet industry and supplier standards.

3. Apply Tack Coat to adjoining areas requiring patch materials at a rate of 0.05 to 0.15 gal./sq. yd.

3.03 COMPACTION:

A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers, or with vibratory-plate compactors in areas inaccessible to rollers.

1. Complete compaction before mix temperature cools to 185 deg.

B. Average Density: 92…