This document is the Technical Certification Attachment for a federal contract opportunity. It outlines the technical capabilities and contractor responsibilities required for the procurement of system repairs and design agent engineering services in support of Carbon Dioxide Scrubber and Carbon Monoxide-Hydrogen Burner Repairs for the USS John Warner.

The key details include: The vendor must certify that their equipment and service meets or exceeds all specifications and contractor responsibilities stated in the solicitation, with no exceptions. The required technical capabilities include travel to the jobsite, performing the recommended repairs based on referenced documents, required testing, and providing a condition report and assessment of any required growth work. All work must be performed in accordance with OEM specifications and the contractor must interface with C246, sign the Letter of Understanding, and follow the work authorization process outlined in the NNSY Work Authorization Form.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (2) – N4215824QS033 Vendor shall certify that equipment being quoted meets the capabilities listed below and that vendor can assume all contractor responsibilities stated below by initialing at the bottom. In order to be considered for award, this must be completed and submitted with the vendor quote.

TECHNICAL CAPABILITES STATEMENT

Award of a single source contract to Cepeda Associates INC. for the procurement for system repairs and design agent engineering services in support of Carbon Dioxide Scrubber and Carbon Monoxide-Hydrogen Burner Repairs.

Shall be provided with the following capabilities, features and specifications:
Yes
No

Travel to jobsite and meet with Point of Contact.

Contractor to perform the recommended repairs of the CO2 Scrubber Plants based on reference 2.2 in accordance with references 2.3 and 2.4 for the USS John Warner.

Required Testing to include visual inspection and measurements, operational and electrical testing and troubleshooting, and temperature/pressure evaluation in accordance with reference 2.8: TP 51560-5-7228 CO2 REMOVAL SYSTEM SIMULATED OPERATION

Provide a condition report and assessment of any required growth work via Recommendation Form and Comment Sheet provided in reference 2.8.

All work to be performed in accordance with OEM specifications.

Before performing any shipboard work, Contractor must interface with C246, sign the Letter of Understanding, and follow the work authorization process outlined in Appendix A --- Local Work Template 042-014, Norfolk Naval Shipyard (NNSY) Work Authorization Form (WAF)

TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION

Vendor hereby certifies that vendor’s service meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. ___________ (initials)

___________________________________________________________________________________
SignaturePrinted Name
___________________________________________________________________________________
TitleDate