Attachment 1-Techinacal Specifications-Drawnings-Bill of Quantities.pdf
PDF 470 KB Posted
- Attached to
- Pinciana Fire Alarm System, Rome Italy
- Solicitation number
- 191T7023Q0022
- Issued by
-
Department of State
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment no. 0001.pdf | ||
| RFQ-191T7023Q0022- PINCIANA FIRE ALARM SYSTEM.docx | DOCX document | |
| SF-1442.doc | DOC document | |
| Cover Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBU – SENSITIVE BUT UNCLASSIFIED
- 1 –
Embassy of the United States of America
Rome, Italy
Fire Alarm Systems for Government Properties in Rome Pinciana Building
Facility Engineering Office
- 2 –
CHAPTER 1
FOREWORDS
The Embassy of the United States of America in Rome solicits the construction of new fire alarm systems for the common areas of the following government properties in Rome:
Pinciana building, Via di Villa Pinciana 21, Roma
CHAPTER 2
GENERAL
The subject premises are residence for the American Officers, and shall remain in use during the execution of the project.
The object of the solicitation is the execution of work for the supply and installation of new fire alarm systems.
The contractor shall supply all the materials and equipment, skilled and unskilled labor, technical supervision, as well as logistic and administrative support. The contractor shall also supply all accessory services such as: preparation of shop drawings, transportation, leasing, equipment and tools, disposal of debris, cleaning the work area and anything else necessary to complete the project in compliance with the present specifications.
Maximum attention is required for the safety of personnel and family members living in the work site. The workers shall operate in compliance with standard codes. In view of the fact that the building consists of residential apartments, temporary safety protection measures towards third parties shall be installed with care and attention, especially for the hours when the work site is closed.
The Contractor shall be responsible for submitting, for approval by the COR, a detailed and finalized safety plan, shop drawings, samples of materials and supplies to be used.
It shall be the contractor’s responsibility to verify all the quantities.
- 3 –
Art. 2.1
DEFINITIONS
A glossary of terms and relative equivalents used in the drawing up of the tender documents are indicated hereunder:
Client, Administration, Project Supervisor, COR, CO: all these denominations identify the technical administrative staff, predisposed to handle the contract on behalf of the Embassy of the United States of America.
Contracting Company, Contractor: all these denominations identify the subject that undertakes to carry out the work described in the contract.
Contract, Purchase Order (P.O.), Work Order: these terms identify the contract document with which the project is awarded. The Client at his indisputable judgment shall make the formal selection of the different types of documents.
For safety plan purposes, the figures of the Embassy that are key elements in the definition of roles and responsibility in the safety plan are:
"RUP RESPONSABILE UNICO DEL PROCEDIMENTO" The Contracting Officer of Tri-Missions Rome, whose name appears in the contract or Purchase Order.
"COMMITTENTE" The Senior Facility Manager of Tri-Missions Rome, whose name shall be communicated after the award.
"RESPONSABILE DEL SERVIZIO PREVENZIONE E PROTEZIONE" and "RESPONSABILE DEI LAVORI" The POSHO (Post Safety and Health Officer) of the Tri-Mission Rome, whose name shall be communicated after award. The POSHO shall perform his/her duties also using an A/POSHO part of his/her staff.
"DIRETTORE DEI LAVORI" The COR nominated by the Contracting Officer after award.
Art. 2.2
SAFETY STANDARS
The contractor must fulfill all the safety legal requirements according to the D.Lgs. 81/2008 Testo Unico sulla Salute e Sicurezza nei Luoghi di Lavoro. The objective is to avoid or in any case to reduce to the minimum the workers’ exposure to risks associated with work activities. Therefore the contractor is expected to deliver the Risk Assessment Document (Documento Valutazione Rischi, DVR) or the Operational Safety Plan (Piano Operativo di Sicurezza, POS) when required, to provide trainings to the laborers, to supply individual and collective protective equipment and to comply with all the other requirements disciplined by the D.Lgs. 81/08.
In the solicitation process set up by the Contracting Officer Representative (RUP), to verify the professional technical suitability, the Embassy asks the offerors a statement
- 4 – on the average annual workforce and on collective bargaining agreement (Contratto di lavoro) applied to employees, the details of the workers' complaints made to INPS, INAIL and Casse Edili.
In the case of private works, no permission from construction and the amount of the work less than € 100,000, the verification of the suitability of the company is simplified and is considered satisfied through the presentation by the company of the certificate of registration in the Chamber of Commerce, Industry e Handicraft and the Single Document of Regularity Contribution (DURC), accompanied by self-certification in order to meet the other requirements set out in Annex XVII of the Local Consolidated Law on Finance.
The contractor shall submit with the offer a preliminary safety plan that must take into account all kind of work to be performed within the project being solicited.
The plan must be detailed sufficiently to let the team evaluating the offers that the contractor had understood correctly the nature of the work and its own typical risks, and therefore, had evaluated the relevant costs in their proposal.
The Preliminary Safety Plan must contain:
- For each sequence of work a brief description of the related risks.
- For each sequence of work brief description of the practices, the measures, the individual and collective protection devices that will be adopted by the company in order to respond, minimizing the highlighted risks.
- For each sequence of work a cost-analysis of the selected measures.
The estimate must be congruous, analytical for single items, per unit or per measure.
After the tender closure, the company entitled to the work must submit a detailed Operational Safety Plan (Piano Operativo di Sicurezza) at least 15 days before starting the operations.
The safety plan submitted must clearly identify the professional figures as follows:
"DIRETTORE TECNICO DI CANTIERE" The construction site technical director is the person who manages for the contractor the construction site. This role can be played by both an employee of the company and by an external professional, with a specific and formal assignment. The figure of the technical director of the construction site must not be confused with that of the construction manager, who is instead appointed by the client and checks that the works are carried out in accordance with the provisions of project and related specifications.
"PREPOSTO" an individual who is identified for the functions he/she performs and is therefore comparable to what with other terms is indicated as site manager, workshop manager, department head, office manager, etc. He/she must also be trained to be able to perform the functions attributed to him, as indicated in art. 19 letter g) of paragraph 1 and according to the objectives set by art. 37 of D.Lgs. 81/08. The PREPOSTO, insures continuously and effectively that the workers:
- 5 –
1) follow the safety regulations imparted and outlined in the safety plan.
2) use the required personal protective equipment (PPE).
3) promptly report to the employer or manager any deficiencies in the procedures, tools, personal protective equipment,and persistent protocols disregards.
Art. 2.3
DESCRIPTION OF WORK
The work to be carried out consists of the following:
Supply and install the fire alarm system for the Pinciana building. The areas of the building that shall be covered by the fire alarm system are all the common areas, namely all areas on basement floor and the stairs.
The fire alarm system shall include the "Phase I Emergency Recall Operations" for the 2 elevators in the building. The emergency recall shall be installed outside the door of the machinery room. However these devices shall not be actually connected to the elevators because they require modifications that shall be made by the authorized elevator maintenance contractors before final acceptance of the system.
A supervision terminal shall be installed in the Local Guard Force Post (LGFP) at the building entrance. This device must be able to monitor the status of the system and, in case of trouble or fire, must be able to show the location of the trouble or fire.
Inside the building, in a location that shall be agreed upon with the COR, shall be installed the fire panel that controls all fire devices of the building.
NOTE: FIRE PANEL LANGUAGE SHALL BE ENGLISH AS WELL AS ALL SIGNS OR
INDICATORS
The initiating devices, as well as the optical and acoustic notification appliances are shown on the enclosed drawings, and further specified in the following specifications chapter. The number and type of initiating devices and notification appliances shown on the enclosed drawing are for reference only. It shall be the contractor responsibility to hire a registered fire engineer to prepare final shop drawings on which basis the system shall be built.
The contractor shall ensure the systems are covered with 2 years of standard warranty on parts and installation and to grant a full year of assistance and operation, including maintenance, for the first year after the systems have been accepted. Further details on the performance required during this first year of operation shall be given in the technical specification chapter.
Contractual obligations for carrying out the following tasks not described in the specifications or bill of quantities shall be added:
Closing the work area to prevent safety hazards.
- 6 –
Civil work to create passages for the fire alarm system cables. Conduits must not be installed exposed over the walls and ceilings, but they must be buried in the walls.
Preparing and submitting all design details necessary for correct execution of project (Shop Drawings) following the methodology and times determined in the chapter entitled "Times and Penalties".
Labor, protecting, moving, packing and transporting furnishings, equipment and other stuff that may be present in the work area, if needed to grant enough room for performing the work in a safe fashion.
Accurate and professional cleaning of all the areas subject of work.
Supplying "As Built" drawings of all the work carried out, both on paper (1 copy) and on software in ".dwg" format.
Furnishing instruction and maintenance manuals for all the machinery supplied and installed placed in box files according to type of system.
Provide training to the Embassy service personnel (max 3 people) by the manufacturer of the systems installed as to certify them as "Qualified service Personnel" according to the NFPA 72-2016 code.
Provide training to the Embassy Programming personnel (max 2 people) by the manufacturer of the systems installed.
Provide training to the Embassy Supervising Station Operator personnel (max 2 people) by the manufacturer of the systems installed.
Art. 2.4
LIMITATIONS
The accomplishment of the project shall be circumscribed to the specific requests described in the Tender Documents.
Art. 2.5
MATERIAL EQUIVALENTS
The contractor shall verify and ensure that all the materials supplied are new and without defects and that their use and/or installation is carried out using the best techniques and fully respecting the instructions supplied by the manufacturers.
Special parts shall be manufactured solely by workshops that are highly qualified in that specific sector.
The makes indicated in this SOW (Scope of Work) are intended as a point of reference and therefore, the words or approved equivalent are implicit. This however, shall not apply to the brand of the fire system that shall be "NOTIFIER" as it is the standard system adopted by OBO.
- 7 –
Therefore, the makes and products listed are to be deemed equivalent to each other.
Different selections implemented by the Contractor shall be approved in advance by the COR, after submission of samples and technical cards.
Art. 2.6
TENDER DOCUMENTS
The following documents shall form an integral part of the contract:
The present Special Tender Document General Conditions in use by the Client Bill of Quantities Drawings:
F101 Fire alarm in basement and ground floors F102 Fire alarm in first and second floors F103 Fire alarm in third and attic floors.
Art. 3
SOLICITATION CHARACTERISTICS
3.1 CONTRACT PHASE
Within the time specified in the solicitation package, and in according to it, the Contractor shall submit the following documentation to the Embassy’s Technical Office:
A final and detailed work schedule of the various interventions and relative length of time required to carry out all the work requested in the contract.
A final SAFETY PLAN as set forth in the General chapter, finalized with the names of all actors and with the results of the discussions with the POSHO.
A list of the names, complete with bio-data, of all the employees, as well as possible suppliers and sub-contractors for specific work, who will require access to the work-site. Furthermore, the contractor shall submit a complete list of vehicles to be used during the project, indicating the make, model, license number and color.
Designation of someone who will be in charge of the project on behalf of the contractor and who will be fully authorized to discuss and decide together with the COR any variations during the course of the project, both concerning methodology of the work and the supplies.
3.2 IMPLEMENTATION PHASE
- 8 –
During the course of the work, the contractor shall draw up and submit a weekly or monthly report (as stated in the solicitation package) describing the progress of the work and illustrating the work schedule for the following week or month.
Normal working hours are from 08:00-08:30 to 16:30-17:00 during weekdays. Any work to be carried out after normal working hours or during the week-end shall be agreed upon in advance with the COR in order to obtain all the necessary authorizations and approvals.
Demolitions, perforations and other high noise operations shall be carried out no earlier than 09.30. The quiet rule shall apply even during the time 12.30 to 15.30, during work days. Since the premises are residence of Embassy staff and families, it is requested that noise work shall not be carried out for period of time longer than 2 hours continuative.
The work-site shall be kept clean.
Areas for storing material shall be agreed upon, together with the COR, based on logistical-operative criteria.
Any temporary interruptions of utilities shall be scheduled at least 5 days in advance and shall be subject to approval from the COR.
Tests on the correct operation of the systems and consignment of parts of completed work shall be carried out by a contractor's provided specialized technician who shall submit a test procedure before the actual testing, and someone authorized by the Embassy. The contractor shall be responsible for drawing up the necessary delivery reports for the work and systems carried out and shall be subject to verification and acceptance by the COR.
3.3 CONCLUSION PHASE
Once the project is completed a final inspection shall be carried out with representatives of the contractor and the Embassy, in order to verify that the project has been carried out correctly, that it is in compliance with the technical specifications and that the systems operate correctly.
When the work has been completed and accepted by the Embassy, the contractor shall submit the following documents to the Embassy’s Technical Office, before the COR can release payment of final 10% of project:
- Detailed “as-built” drawings showing the new constructions, both the architectural/structural aspects as well as all the systems. The drawings shall be submitted on paper and software in ".dwg” format.
- Technical cards of the most important materials used in the project, with a list indicating the location of the vendors and local suppliers.
- 9 –
- certification of conformity and tests carried out by the manufacturers for materials, as well as guarantee of the correct installation of all the materials by the contractor with regard to the project realization and law requirements.
- 6 hours of instruction to the embassy staff who will be in charge of the management and maintenance of the systems.
- Screen shots and brief operative manual for the LGF on duty.
- 10 –
4 FIRST YEAR POST COMPLETION MAINTENANCE
For the first year after the full acceptance of each system the contractor shall grant a full operation and maintenance service of the systems.
In detail the contractor shall perform trimestral inspection of each system during which he will test the operation, read the trouble statistics, perform software and hardware changes and upgrade if necessary for the correct operation of the systems.
This maintenance service shall include both manpower and spare parts eventually necessary.
Art. 6
WORK PROGRESS
In general, the Contractor shall have the faculty of developing the work in the way he believes more convenient and shall hand it over completed within the terms of the contract, as long as, in the opinion of the Project Manager, this is not detrimental to the outcome of the project and the interests of the Administration.
The Administration reserves the right to request that a specific task be carried out within a pre-determined period of time, or to dispose the order of the performance of the work in the way it deems more convenient, especially in relation to requirements depending on the performance of work and delivery of supplies excluded from the contract, without the Contractor having the possibility to refuse or ask for special compensation.
Before starting the work, the Contractor shall submit for the COR's approval a detailed operative schedule and costs, which he will follow during the performance of the contract.
Art. 7
PARKING
No parking is allowed inside Pinciana’s grounds. The Contractor's vehicles shall be allowed to enter only for loading and unloading materials.
Loading and unloading operations shall be carried out using only one vehicle at a time.
Consequently, during the accomplishment of the project the Contractor shall ensure that its vehicles are parked at its own expense outside the Government property.
- 11 –
CHAPTER 8
TECHNICAL SPECIFICATIONS
Art. 8.1
DOCUMENTATION
Art. 8.1.1
MINIMUM REQUIRED DOCUMENTATION
The contractor shall submit for approval shop drawings of the fire alarm system made by a local register professional certified as "Fire protection Engineer" also cited in the following as the engineer.
The engineer shall adopt the more stringent code between the NFPA 72 National Fire alarm and Signaling Code and the local UNI 9795.
The minimum requirements for the documentation that shall be part of the submission are:
Written narrative providing intent and system description
Riser diagram
Floor plan layout showing location of all devices, control equipment, supervision station and shared communications equipment with each sheet showing the following:
a) Point of compass (North arrow)
b) A graphic representation of the scale used
c) Room use identification
d) Building features that will affect the placement of initiating devices and notification appliances
Sequence of operation in either an input/output matrix or narrative form
Equipment technical data sheets
Manufacturers' published instructions, including operation and maintenance instructions.
Battery capacity and de-rating calculations
Voltage drop calculations for notification appliances circuits
Mounting height elevation for wall-mounted devices and appliances
Minimum sound pressure levels that must be produced by the audible notification
- 12 – appliances in covered areas.
Pathway diagrams between the control unit and the supervising station and shared communications equipment.
For software based systems, a copy of site specific software, including specific instructions on how to obtain the means of system and software access (password).
As built drawings
Complete record of inspection and testing
Art. 8.1.2
SHOP DRAWINGS
Shop drawings shall provide basic information and shall provide the basis for the as built drawings.
All shop drawings shall include the following information:
Name of protected premises and owner.
Name of installer or contractor.
Location of protected premises.
Device legend and symbols in accordance with NFPA 170 (preferred) or other symbols acceptable to the authority having jurisdiction.
Date of issue and any revision dates.
Floor plan drawings shall be drawn to an indicated scale and shall include the following information:
Floor level or level identification.
Point of compass (North arrow).
Graphic scale.
All walls and doors.
Room and area description.
System devices/component locations.
Locations of fire alarm primary power disconnecting means.
Location of monitor/control interfaces to other systems.
System riser locations.
Type and number of system components/devices on each circuit, on each floor or level.
Type and quantity of conductors and conduit (if used) for each circuit.
Identification of any ceiling over 3.0 meter in height where automatic fire protection is proposed.
Details of ceiling geometries, including beam and solid joists, where automatic fire detections proposed.
System riser diagrams shall be coordinated with the floor plans and shall include the following information:
General arrangement of the system in building cross-section.
- 13 –
Number of risers.
Type and number of circuits in each riser.
Type and number of system components/devices on each circuit, on each floor or level.
Number of conductors for each circuit.
Control unit diagram shall be provided for all control equipment (i.e. equipment listed as either a control unit or control unit accessory), power supplies, battery chargers and annunciators, and shall include the following information:
Identification of control unit depicted.
Location(s) of control equipment.
All field wiring terminals and terminal identifications.
All indicators and manual controls.
Field connections to supervising station signaling equipment, releasing equipment, r emergency safety control interfaces, where provided.
Typical wiring diagrams shall be provided for all initiating devices, notification appliances, remote indicators, annunciators, remote test stations, and end of line power supervisory devices.
Art. 8.1.3
RECORD DRAWINGS (AS-BUILT)
Record drawings shall consist of currently updated shop drawings reflecting the actual installation of all system equipment, components and wiring.
A sequence of operations in input/output matrix or narrative form shall be provided with the record drawings to reflect actual programming at the time of completion.
Where necessary, revised calculations shall be provided depicting any changes due to installation conditions.
Record drawings shall be turned over to the owner with a copy placed inside the documentation cabinet.
Art. 8.1.4
SITE-SPECIFIC SOFTWARE
For software-based systems, a copy of the site-specific software shall be provided to the system owner.
The site-specific software documentation shall include both the user password and either the system programming password or specific instructions on how to obtain the
- 14 – programming password from the manufacturer.
The passwords provided shall enable currently certified qualified programming personnel to access, edit, modify and add to the existing system site-specific software.
A copy of site-specific software shall be stored onsite in nonvolatile, non erasable, non rewritable memory.
Art. 8.2
PERSONNEL QUALIFICATIONS
Art. 8.2.1
PERSONNEL QUALIFICATIONS - SYSTEM DESIGNER
Fire alarm systems plans and specifications shall be developed by persons who are experienced in the design, application, installation, and testing of the systems.
US or local licensure regulation shall be followed to determine qualified personnel.
The system engineer shall be identified on the system design documents.
Art. 8.2.2
PERSONNEL QUALIFICATIONS - SYSTEM INSTALLER
Fire alarm systems and emergency communications systems installation personnel shall be qualified or shall be supervised by persons who are qualified in the installation, inspection, and testing of the systems.
Personnel shall provide documentation of their qualification by one or more of the following:
Registration, licensing or certification by a state or local authority having jurisdiction.
Certification by an organization acceptable to the authority having jurisdiction.
Manufacturer's certification for the specific type and brand of the system provided.
Art. 8.2.3
PERSONNEL QUALIFICATIONS - INSPECTION, TESTING AND SERVICE
PERSONNEL
Inspections shall be performed by personnel who have developed competence through training and experience that are acceptable to the authority having jurisdiction.
- 15 –
Service personnel shall have knowledge and experience of the maintenance and servicing requirements of the equipment being serviced or maintained and of the servicing or maintenance methods.
Both inspection and service personnel qualification shall include, but shall not be limited to, one or more of the following:
Personnel who are factory trained and certified for the specific type and brand of system being serviced.
Personnel who are certified by a nationally recognized certification organization.
Personnel who are employed and qualified by an organization listed by a nationally recognized testing laboratory for the servicing of systems.
Art. 8.2.4
PERSONNEL QUALIFICATIONS - PROGRAMMING PERSONNEL
Personnel programming a system shall be certified by the system manufacturer.
Art. 8.2.5
PERSONNEL QUALIFICATIONS - SUPERVISING STATION OPERATORS
All operators in the supervising station shall be certified by the manufacturer of the alarm monitoring automation system.
Art. 8.3
INITIATING DEVICES
Art. 8.3.1
REQUIREMENTS FOR SMOKE AND HEAT DETECTORS
All detectors shall be Dual Technology Detectors (smoke and heat)
Detectors shall not be recessed into mounting surface.
Where partitions extend to within 15% of the ceiling height, the spaces separated by the partitions shall be considered as separate spaces.
Detector coverage. The embassy requires the total coverage of all common areas regardless of the floor or level in the building of these areas.
- 16 –
Where inaccessible areas are constructed of, or contain combustible material, they shall be made accessible and shall be protected by a detector.
The elevator shafts require fire detection only if sprinklers are located therein.
Total coverage requires that a fire above the suspended ceiling be detected. Detector spacing and location for above ceiling spaces shall comply with 17.7.3.5.2 of NFPA 72-2016.
Art. 8.3.2
REQUIREMENTS FOR MANUAL PULL STATIONS
Manual pull stations SHALL NOT be of the common type with breaking glass. Pull stations shall be provided with a flexible membrane for activation. Membrane shall be reset-able without replacing any components. Membrane shall be contained in a red box enclosure that can be for either inside use or waterproof (IP67).
Device shall also have red LED for local signaling and lighting of the membrane, and isolator for protection of the communication line. Addressing of unit shall be via rotating selectors. Comply with EN54 parts 11 and 17
Manually actuated alarm-initiating devices shall be securely mounted on a background of contrasting color.
The operable part of a manually actuated alarm-initiating device shall be not less than
1.07 meter, and no more than 1.22 meter from the finished floor.
Listed protective covers shall be permitted to be installed over manually actuated alarm-initiating devices.
Manual fire alarm boxes shall be used only for fire alarm initiating purposes. They shall be installed so that they are conspicuous, unobstructed and accessible.
Manual fire alarm boxes shall be located within 1.5 meter of each exit doorway on each floor.
Additional manual fire boxes shall be provided so that the travel distance to the nearest manual fire alarm box will not exceed 61 meter measured horizontally on the same floor.
Art. 8.3.3
PROJECTED BEAM SMOKE DETECTOR
Covered distance 5 ÷ 70m. Automatic gain control built in. LED indications for alarm, fault and normal conditions. Wide range of alarms detected. Fault and alarm relay output. Compiles to EN54-12
- 17 –
Art. 8.4
NOTIFICATION APPLIANCES
Art. 8.4.1
GENERAL
Notification appliances shall provide stimuli for initiating emergency action and provide information to users, emergency response personnel and occupants.
All notification appliances shall include on their nameplates reference to electrical requirements and rated audible or visible performance.
Protective enclosures, if required, should not interfere with the performance characteristics of the appliance.
Art. 8.4.2
AUDIBLE CHARACTERISTICS
An average ambient sound level greater than 105 dBA shall require the use of a visible notification appliance(s).
The total sound pressure level produced by combining the ambient sound pressure level with all audible notification appliances operating shall not exceed 110 dBA at the minimum hearing distance.
Sound from normal or permanent sources, having duration greater than 60 seconds shall be included when measuring maximum ambient sound level.
The design sound pressure levels to be produced by the notification appliances for the various coverage areas shall be documented for use during acceptance testing of the system.
The alarm audible signal pattern used to notify building occupants of the need to evacuate shall be the standard alarm evacuation signal consisting of a three-pulse temporal pattern, as follows:
"ON" phase lasting for 0.5 second plus and minus 10% "OFF" phase lasting 0.5 second plus and minus 10% for three successive "ON"periods "OFF" phase lasting 1.5 second plus and minus 10%
- 18 –
The signal shall be repeated for a period appropriate for the purposes of evacuation of the building, but not for less than 180 seconds.
Art. 8.4.3
LOCATION OF AUDIBLE NOTIFICATION APPLIANCES FOR BUILDING OR
STRUCTURE
If ceiling heights allow, wall mounted appliances shall have their tops above finished floors at heights of not less than 2.29 meter and below the finished ceilings at a distance not less than 150 mm.
Art. 8.4.4
VISIBLE CHARACTERISTICS
The mounting height of the appliances affects they distribution pattern and level of illumination produced by an appliance on adjacent surfaces.
Mounting height of appliance is between 2.03 meter and 2.44 meter.
Light used for fire alarm signaling only to signal the intent for complete evacuation shall be clear or nominal white and shall not exceed 1000 cd of effective intensity.
The flash rate shall not exceed two flashes per second (2 Hz) nor be less than one flash per second (1Hz) throughout the listed voltage range of the appliance.
The maximum light pulse duration shall be 20 milliseconds with a maximum duty cycle of 40 percent.
Art. 8.5
EMERGENCY CONTROL FUNCTION INTERFACES
Art. 8.5.1
ELEVATOR PHASE I EMERGENCY RECALL OPERATION
Elevator Phase I Emergency Recall Operation involves removing elevators from normal service by having them automatically travel to a pre-determinated level upon
- 19 – activation of specific smoke detectors.
This feature is a requirement to provide a means of leaving the elevator cars in a safe location for passengers to exit and for subsequent use by fire fighters.
To the scope of this contract, it is not required the contractor to actually have the elevators to react to the emergency recall.
The contractor shall supply and install all devices in proximity of the elevators, but the actual connections to the elevators are not in scope.
However, the fire alarm system shall be configured and programmed and equipped for the emergency recall.
All fire alarm initiating devices used to initiate elevator phase I emergency recall operation shall be connected to the building fire alarm system.
ANSI/ASME A17.1/CSA B44 requires a fire alarm initiating device at each floor served by the elevator; in the associated machine room, machinery space containing a motor controller or driving machine, control space or control room
Only elevator lobby, elevator hoist way, elevator machine room, elevator control room and elevator control space smoke detectors shall be used to initiate elevator Phase I Emergency recall Operation.
Each initiating device used to initiate Phase I Emergency recall Operation shall be capable of initiating elevator recall when all other devices on the same initiating device circuit have been manually or automatically placed in the alarm condition.
A lobby smoke detector shall be located on the ceiling within 6.4 meter of the centerline of each elevator door within the elevator bank under control of the detector.
Smoke detectors shall not be installed in un-sprinklered elevator hoist way unless they are installed to activate the elevator hoist way smoke relief equipment or to initiate Phase I Emergency recall Operations.
Art. 8.6
SUPERVISING STATION ALARM SYSTEMS
NFPA 72 chapter 26 covers the requirements of a protected premises fire alarm system to, and the monitoring by, a continuously attended supervising station.
Supervising station physical location for this contract is the Local Guard Force (LGF) Post shown on the drawings associated with this contract.
Alarm signals shall include detailed information about the alarm, at the initiating device level for addressable systems.
- 20 –
The supervising station shall recognize the fire alarm and shall pop up the alarm to the operator including the appearance on a screen of the floor plan of the building with the initiating device(s)
Even though, trouble or other supervisory signal are not mandatory to be transmitted to the supervising station, the supervising station under this contract shall be able to recognize and alert the operator even for trouble signal, always using a graphic form or reporting to allow for a quick and easy communication of the location of trouble or fire.
Art. 8.7
WIRING INSTALLATION
Art. 8.7.1
WIRING METHODS
All wiring to be provided under this contract shall be routed inside Electric Metal Tubing (EMT) for indoor installations, on wall.
Any existing conduits can be retained into service provided the contractor certifies they are suitable in size and location for the new wiring.
Size of EMT's shall be 32 millimeter
The use of Flexible Metal Tubing shall be limited. In any case the flexible tubing shall be permitted in lieu of a proper bend of tubing.
Art. 8.7.2
CABLE TYPES
A Power Cables
The power cables to be used under this contract shall comply with local CEI EN 50200 code, and the recent CPR.
Minimum cable cross section shall be 2.5 square millimeters.
Grounding conductor with yellow and green color shall always part of the multi core cable.
- 21 –
B Loop Cables
Loop cables shall be marked Notifier, and consists of a shielded twisted pair with a red color jacketing, of following characteristics:
Twisting spacing 100 millimeter circa Electric isolation grade 4 Halogen free - LSZH Comply with EN50200 PH30
Loop cable cross section shall be in no case less than 1 square millimeter. Loop cable section shall be sized to maintain the loop electrical resistance less than 40 Ohms.
- 22 –
PINCIANA FIRE ALARM
SBU ‐ SENSITIVE BUT UNCLASSIFIED
No. DESCRIPTION QUANTITY
TOTAL COST
Site preparation including fences, provisional staging area, move of furniture, protection of materials and furniture, protection of floors and walls lump sum
2 Remove and reinstall false ceiling at basement to allow the installation of conduits lump sum
Civil work to allow the installation of all the new fire alarm conduits encased in the walls.
To include demolitions, trenching walls and ceiling, painting and restoring them to their original conditions lump sum
4 Supply and install two additional empty Ø32 conduits from basement floor to fourth floor lump sum
Supply and installation of input module for addressable systems, on controlled line. Equipped with a green LED flashing under normal conditions and permanet ON when in alarm.
lump sum
Supply and installation of rechargable batteries of prime maker: 24V, 17Ah
Batteries for AM8200N fire panel
Batteries for AUX feeder cabinet lump sum
Supply and installation of auxiliary feeder: 24 Vcc, 150W, 5A, with microprocessing control unit inside a metallic enclosure. Housing for 2 batteries
12V,17Ah, separately sold. Complies with EN 54‐4 ‐ CPR‐0483 lump sum
Supply and installation of addressable fire panel with a minumum of 2 loops, each loop connecting up to 99 detectors and 99 modules. Controlled output for sirens, relay outputs for alarm and trouble. Up to 4 serial port for communication, standard output for
16 terminals and for computer acces for programming the panel. Includes a graphic display for local output. Certified CPR per EN 54‐2 and EN 54‐4, battery included
It also includes a remote terminal board with 7" LCD display to be installed in the LGF guardbooth.
‐ Notifier AM8200N lump sum
Supply and installation of addressable dual technology detector. Activation for rapid temperature increase up to 10 °C per minute or at fixed air temp of 58 °C. or opaque smoke. Dual, tri‐color LED light visible at 360° programmable (fixed light or flashing). Short circuit isolator built in. Certified CPR per EN 54 part 7 and 17. Voltage 15 to 32 VCC. Temperature ‐30°C to +70 °C
‐ Notifier NFXI‐SMT2 lump sum
Supply and installation of addressable temperature rise detector. Activation for rapid temperature increase up to 10 °C per minute or at fixed air temp of 58 °C. Dual, tri‐color LED light visible at 360° programmable (fixed light or flashing). Short circuit isolator built in. Certified CPR per EN 54 part 7 and 17.
Voltage 15 to 32 VCC. Temperature ‐30°C to +70 °C
‐ Notifier NFXI‐TDIFF lump sum
11 Supply and installation of base for addressable detectors
Supply and installation of manual pull station with elastic membrane. Red color casing. With red LED light for local signaling of alarm.
‐ Notifier MCPSC‐NT WITH RESETABLE MEMBRANE IN RED BOX lump sum
Supply and installation of siren with strobe. Fed from the loop. Certified CPR per EN54 part 3, 17 and 23
Complete with: Output module for controlling the unit and "FIRE ALARM" film in English language.
‐ Notifier WSS‐PC‐102 lump sum
14 Supply and installation of red color wall support for Siren/stobe
No. DESCRIPTION QUANTITY
TOTAL COST
Supply and installation of output module for the phase I emergency recall of the elevator, including wiring and conduits up to the elevator machinery room, or the elevator main control panel for the elevators without the machinery room, programming of the fire panel. Actual modification of elevator for respond to the emergency Phase I recall is not in scope. Output module to control loads at 220V in addressable systems, provided with NC and NO contacts, with tri‐color LED for signalling device status.
lump sum
Supply and installation of conduits and wiring for the fire alarm in the building according to the drawings and technical specifications lump sum
Supply of equipment for testing of smoke detectors, as follows: testing pole 4.5 meter, retractable testing kit to test smoke and heat detectors with display for visualizing operation ongoing, bi‐color LED for smoke/heat, 1 canister for smoke generation, batteries and battery charger lump sum
Supply of spare parts for pull stations
Spare parts consist of:
#10 Elastic membrane
#10 spare test keys
19 Supply of programming kit for AM8200N fire panel lump sum
20 Execution of full design of fire alarm as per Technical Specification lump sum
21 As built drawings and O&M manuals lump sum
One year service maintenance after the full acceptance of the system.
The contractor shall grant trimestral inspection of a Notifier authorized technician. Maintenance activity will include but should not be limited to: test the operation, read the trouble statistics, perform software and hardware replacement and upgrade to grant the correct operation of the systems. This maintenance service shall include both manpower and spare parts.
lump sum
23 Costs for safety lump sum
TOTAL