This is a Statement of Work (SOW) for the purchase of one new 83-inch wide by 16-foot long telescoping dump trailer to support field operations, equipment transport, and habitat management activities at the USWFS Air Force Wildland Fire Branch located at JBER in Anchorage, Alaska. The trailer must meet or exceed detailed specifications including a minimum GVWR of 15,400 lbs, four 235/80R16 Load Range E 10-ply radial tires with one matching spare, heavy-duty welded D-rings at each corner, DOT-compliant LED lighting, an 8-inch I-Beam frame and tongue, 10-gauge steel floor, 24-inch solid steel sides, a 12,000 lb spring-loaded jack, two 8,000 lb electric brake axles, hydraulic telescopic hoist with 4.375-inch diameter by 120-inch cylinder rated at 12 tons or higher, three-way spreader gate, two 6-foot slide-in loading ramps, pull-back tarp system, breakaway brake system, and all required safety decals and documentation. The trailer must be FMVSS and DOT compliant and delivered with complete owner's manuals and warranty documentation.
The contractor shall provide a minimum two-year structural warranty covering frame and structural components, one-year warranty on factory-applied paint, and manufacturer's warranties on all purchased components including hydraulic system, axles, suspension, brakes, tires, and electrical systems. The period of performance is four months from contract award, with delivery to JBER at 7212 12th Street, Anchorage, Alaska 99506. The trailer must be fully assembled, serviced, inspected, and ready for immediate operation upon delivery. The contractor must coordinate delivery 48 hours in advance with the Government Points of Contact: Kevin McCasland (907-707-8301) and Rawlin Myers (907-791-0414). All listed specifications must be met and the trailer must pass inspection by refuge staff, with any deficiencies corrected by the contractor at no additional cost.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3-_Past_Performance_Data_Document.docx | DOCX document | |
| Sol_140FS326Q0174.pdf | ||
| Attachment_2-Quote_Schedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supply Requirement
83" x 16' Telescoping Dump Trailer JBER – AFB - AF Wildland Fire Branch
7212 12th ST JBER, AK 99506
1. Purpose The purpose of this Statement of Work is to outline the requirements for the purchase of a dump trailer to support field operations, equipment transport, and habitat management activities at USWFS Air Force Wildland Fire Branch in JBER Alaska.
2. Scope of Work The contractor shall provide one (1) new dump trailer that meets or exceeds the specifications outlined below. The trailer will be used for transporting tools, equipment, and materials across varied terrain within refuge boundaries.
3. Specifications All products must meet standards greater than or equal to the specifications listed below.
Dimensions and Standard Options
• 83-inch wide × 16-foot long dump bed
• Minimum GVWR: 15,400 lbs
• Four (4) 235/80R16 Load Range E (10-ply) radial tires
• One (1) matching 235/80R16 Load Range E (10-ply) radial spare tire mounted on a matching steel wheel
• Four (4) heavy-duty welded D-rings, one located near each corner of the dump bed
• DOT-compliant LED lighting system
• Heavy-duty 8-inch I-Beam frame and tongue
• 10-gauge engineered steel floor
• 24-inch solid steel sides
• Adjustable 2-5/16-inch bumper-pull ball coupler
• One (1) 12,000 lb spring-loaded jack
• Two (2) 8,000 lb electric brake axles
• Heavy-duty leaf spring suspension
• Hydraulic telescopic hoist with one (1) 4.375-inch diameter × 120-inch telescopic hydraulic cylinder rated at
12 tons or higher
• Rear stabilizer: (2 each) drop leg
• Three-way spreader gate
• Two (2) 6-foot slide-in rear loading ramps
• Pull-back tarp system
• Electric brakes on both axles
• Breakaway brake system
• DOT-compliant safety chains
• Manufacturer-issued VIN plate
• FMVSS and DOT compliant
• Complete owner's manuals
• Warranty documentation
• All required safety decals
• Sealed wiring harness with standard 7-way RV plug
4. Warranty The trailer shall include, at a minimum:
• Two (2) year structural warranty covering the frame, tongue, crossmembers, subframe, side posts, fenders, and other structural components against defects in materials and workmanship.
• One (1) year warranty on the factory-applied paint finishes against defects in materials and workmanship.
• Manufacturer's warranty on all purchased components, including but not limited to the hydraulic system, axles, suspension, electric brakes, tires, wheels, coupler, jack, tarp system, LED lighting, and electrical wiring.
• All warranty documents shall be furnished to the Owner at the time of delivery.
5. Period of Performance The period of performance (POP) begins upon contract award and ends upon successful delivery and acceptance of the trailer. The POP for this project is four (4) months from the award date.
6. Acceptance Criteria The trailer must meet all listed specifications and pass inspection by refuge staff. Any deficiencies must be corrected by the contractor at no additional cost.
7. Delivery Location and Point of Contact Dealer shall deliver the trailer to the delivery location identified in the contract award. The contractor shall coordinate delivery with the Government Point of Contact 48 hours before delivery. The trailer shall be delivered fully assembled, serviced, inspected, and ready for immediate operation upon acceptance by the Government.
Delivery location and Point of Contacts
Dealer provides Delivery to
JBER – AFB - AF Wildland Fire Branch 7212 12th ST JBER, AK 99506
POC: Kevin McCasland 907-707-8301 SPOC: Rawlin Myers 907 791-0414
| Supply Requirement |
| 83" x 16' Telescoping Dump Trailer |
| 1. Purpose |
| 2. Scope of Work |
| 3. Specifications |
| Dimensions and Standard Options |
| 4. Warranty |
| 5. Period of Performance |
| 6. Acceptance Criteria |
| 7. Delivery Location and Point of Contact |
File details come from the government source that posted it. Updated .