Attachment 1 Statement of WorkWind Turbine.pdf
PDF 1 MB Posted
- Solicitation number
- 1282A726Q0072
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for annual preventative maintenance services on a wind turbine located at Pine Ridge Job Corps Civilian Conservation Center in Chadron, Nebraska (15710 Highway 385).
The contractor must provide monitoring and maintenance services for a Northwind 100 wind turbine mounted on a Northwind Monopole 120-foot tower located at building 53 of the facility. Services include inspecting, cleaning, lubricating all rotating parts, and performing daily monitoring and routine maintenance on an annual basis. The contractor must furnish all labor, transportation, and supervision necessary to complete the work and must be qualified to service Northwind turbine systems, operating independently without direct government supervision. All services must comply with manufacturer specifications and applicable safety standards. The contract commenced in 2022 with option years available for 2023, 2024, and 2025, though the 2025 option year was not exercised. Travel costs are included in the estimate, with the contractor expected to schedule preventative maintenance regionally to coincide with other projects in the area. No government-furnished equipment, key personnel requirements, security clearances, data rights provisions, or Section 508 compliance standards apply to this contract. Evaluation factors and subfactors for source selection are to be included in an attachment if applicable.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Attachment 1 Services Statement of WorkWind Turbine
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards Attachment
Project Pine Ridge Job Corps Wind Turbine PM
General Information
1.0 Scope of Work
Annual preventative maintenance conducted on the wind turbine at Pine Ridge Job Corps CCC.
2.0 Background
Annual PM conducted starting in 2022, with option years in 2023, 2024 and 2025. Option Year 2025 was not conducted.
Contractor Requirements
3.0 Technical Requirements / Tasks
Pine Ridge Job Corps has a need for a Monitoring and Maintenance Service of a Wind turbine; model Northwind 100.
MFR: Northwind. Tower MFR: Northwind; Model Monopole 120’ at the Pine Ridge Job Corps Civilian Conservation Center at 15710 Highway 385, Chadron, NE 69337. The wind turbine is located at building 53 at PRJC. This solicitation/contract shall include, but not be limited to the following: inspecting, cleaning, lubricating all rotating parts on an annual basis. The contractor shall furnish all labor, transportation, and supervision necessary to perform the work required for the daily monitoring and routine maintenance of the Wind Turbine at Pine Ridge Job Corps.
All services shall be performed in accordance with manufacturer specifications and applicable safety standards. The contractor must be qualified to service Northwind turbine systems and operate independently without direct government supervision.
4.0 Government Furnished
N/A
5.0 Deliverables / Schedule
The contractor shall furnish all labor, transportation, supervision necessary to perform work required for the daily monitoring and routine maintenance of the Wind Turbine located at Pine Ridge Job Corps Center.
6.0 Travel
Average single trip per calendar year; costs are included in estimate. Contractor schedules PM in region to couple with other projects in the area.
7.0 Contractor’s Key Personnel
NA
8.0 Security Requirements
NA
9.0 Data Rights
NA
10.0 Section 508 – Electronic and Information Technology Standards
NA
Attachment If applicable, include an Attachment stating Evaluation Factors and significant Subfactors representing the key areas of importance and emphasis to be considered in the source selection decision.
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |
| 9.0 Data Rights |
| 10.0 Section 508 – Electronic and Information Technology Standards |
| Attachment |
File details come from the government source that posted it. Updated .