Text version
United States Department of Agriculture Research, Education, and Economics
Agricultural Research Service
Location Support Staff
2150 Centre Ave, Bldg. D, Ste. 3225 • Fort Collins, CO 80526
Voice: (970) 492-7762 • Fax: (970) 492-7719 • E-mail: mike.bernal@usda.gov
An Equal Opportunity Employer
STATEMENT OF WORK
TITLE: Walk-in Cooler Condenser and Evaporator Replacement for Sugar Beet Research
1. BACKGROUND:
The Agriculture Research Service (ARS) is the chief in-house agency of the United State Department of
Agriculture (USDA) located on Colorado State University (CSU) campus. The USDA ARS Facility department is responsible for providing an adequate and safe work environment supporting crops research and genetic resource preservation. This facility supports on-going sugar beet research. The project is located at 5021 East
County Road 58, Fort Collins, CO 80524.
2. OBJECTIVE:
The intent of this solicitation is to obtain updated modernization of walk-in cooling units storing sugar beet material for long term storage. This project consists of relocating condenser unit to the north side of building one from the current attic location. The evaporator will be replaced with a new component to assist with keeping temperatures at precise temperature thresholds as requested by research staff performing work with sugar beets. This project will consist of the installation of an advanced KE2 thermostat controller providing better control and energy savings related to upgrade of environmental unit and controls.
3. SCOPE:
3.1. List of milestones during replacement of equipment are listed below:
Date:
DESCRIPTION
Demolition
1. Properly lock-out/tag-out electrical service related to equipment replacement
2. Evacuate and capture existing refrigerant relating to current unit
3. Disconnect and remove the existing (2) condenser skids
4. Demo existing (2) evaporator coils
5. Extend or replace existing refrigerant line-sets for new locations for condenser and evaporator locations
6. Recycle the existing unit components and refrigerant per applicable environmental codes and regulations
New Work
1. Install two (2) new outdoor condenser skids with the following components listed with low profile/low velocity center mount coils. Unit is to be located on the West side of building. Unit is to be installed either on concrete pad or stand.
- Install Air-Cooled Scroll Compressors; three (3) hp cooler system- Semi Hermetic compressors.
- Install Adjustable Pressure Controls, Johnson Dual with Flex
Hose
- Replace Capacity Control – Hot Gas Bypass to suction line
- Liquid Line Filter + Sight Glass, Sealed
- Suction Accumulator, without heat exchanger
-Install T-quick vac valves and hail guard
- 208/230/3 phase/ 60 amp
2. Replace down switch, hot gas bypass to evaporators
3. Install replaceable core liquid and suction filters
4. Provide labor and materials to install (2) new evaporator coils
- Low Velocity Evaporator -Aux Side-port Connector
- Expansion Valve, Sporlan TXV
- Liquid Line Solenoid Valve
- Install KE2 Controllers
5. Pre-assemble remote
6. The new components will leave enough room for misting system
7. Install new insulated copper refrigerant liquid and vapor lines between each evaporator and compressor
8. Leak-check and charge with new R-407C refrigerant (recommend 507)
9. Install new electrical service disconnects and wiring from new condensing units to disconnects
10. Re-connect electrical service to the evaporators
11. Re-connect evaporator coils to condensate pipe and drain line
12. Integrate room temperature sensor status into existing system
13. Integrate room temperature sensor status into existing system.
14. Install KE2 Evaporator Efficiency and Demand Defrost Electronic Controller for enhanced temperature control and energy efficiency
CONDENSING UNIT FOR HOT GAS BYPASS
3.2. Contractor will install valves, shutoffs, additional piping, and peripheral equipment associated with the installation of new components.
3.3. Contractor is required to field verify all water supply and drainage requirements.
3.4. The contractor will install new electrical disconnects associated to safe shutoff of equipment. The contractor will install new electrical conduit and wire per National Electrical code and Life Safety codes.
3.5. The contractor shall submit all material and equipment proposals for review.
3.6. The Contractor shall furnish all labor, supervision, equipment, tools, transportation, and service necessary (unless otherwise specified herein) to perform the services required in accordance with commercial standards, local, state, and federal laws, and the requirements of this SOW.
3.7. The equipment will be turn-key operational prior to acceptance by the USDA.
3.8. A pre-construction meeting will be held prior to the start of project. The contractor will require a time project chart or schedule.
4. PERIOD OF PERFORMANCE: Performance period will begin 30 days after acceptance of contract. The period of performance will be for 90 days. The USDA recognizes material and/or parts may have a long lead time. The contractor will notify COR if this occurs.
4.1. Federal Holidays. When scheduled services fall on an observed federal holiday contractor shall perform services on next business day.
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Juneteenth Day Christmas Day
Independence Day
4.2. HOURS OF OPERATION: The contractor is responsible for conducting business between the hours of 0730 to 1630 hours Monday through Friday, except Federal holidays or when the closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW.
4.3 Campus closures. When an unforeseen closure occurs on a regularly scheduled day of work, the
Government shall have the following options:
4.3.1 Reschedule the work performed the following workday.
4.3.2 Reschedule the work on any day mutually satisfactory to both the contractor and Contracting
Officer or his designated representative.
5. PREMISES TO BE SERVICED: The work to performed under this contract will be located at 5021 East
County Road 58, Fort Collins, CO 80524.
6. SUPPLIES AND MATERIALS FURNISHED BY THE CONTRACTOR: The Contractor shall supply any additional PPE such as nitrite gloves, goggles, and face masks. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
6.1. All equipment shall have bumpers or guards to prevent marking or scratching fixtures, furnishings, or building surfaces. Equipment deemed by the COR to be of improper type or design, or inadequate for the purposes intended, shall be removed from the premises, and replaced with satisfactory equipment.
6.2. Contractor shall store and preserve all cleaning solvents in accordance with manufacture specifications. All commercial markings shall remain on items for identification and medical instruction. If items should require transfer to another container, that container shall clearly marked its content and SDS instructions.
6.4. Furnished Property, Material, Equipment, or Information (GFM, GFM, GFE, or GFI) will not be
7. RESPONSIBILITIES:
7.1 SUPERVISION OF EMPLOYEES. Contractor shall provide for supervision of employees. Prior to commencement of services under this contract, the Contractor shall furnish to the COR a list of employees who will work on-site performing the services, and the name of the individual who will be responsible for supervision of such employees and who will function as the Project Manager. The
Project Manager shall:
7.1.1 Have the Contractor’s full authority to act on matters pertaining to the performance of services.
7.1.2 Designated work lead will be on-site or on-call during work performed at the site.
7.1.3 Report damage to Government property, loss of keys or badges, personal injuries and/or hazardous conditions to the COR within twelve work hours after occurrence.
8. PROPERTY: Except for reasonable wear and tear, the Contractor assumes full responsibility for and shall indemnify the Government for any and all loss or damage of whatsoever kind and nature to any and all Government property including any equipment, supplies, accessories, or parts furnished while in the Contractor’s custody and care for storage, repairs or services to be performed under the terms of this Contract, resulting in whole or in part from the negligent acts or omissions of Contractor, and subcontractor, or any employee, agent or representative of Contractor or subcontractor.
9. PERSONS: The Contractor will be responsible for any negligent or wrongful acts or omissions of the
Contractor, his employees or agent’s incident to the performance of this contract. The Contractor will hold and save the Government harmless from all liability for any death or damage to all persons
(other than the liability of the contract as provided under the Federal Employees Compensation Act) or to real or individual property, which results from the operation of, or incident to, equipment furnished by the Contractor. The Contractor will not be responsible for any negligent or wrongful acts or omissions of the U.S. Department of Agriculture; its employees, the U.S. Department of Agriculture’s
Cooperators, or their employees.
10. LIABILITY INSURANCE: The Contractor shall maintain such insurance as will protect him/her from claims under Workmen’s Compensation, General Liability, Property Damage and from any other claims for damages for personal injury including death which may arise from operations under this
Contract, whether such operation by himself or by any subcontractor or anyone directly or indirectly employed by either of them.
11. LOST AND FOUND PROPERTY: The Contractor shall ensure that all articles of possible personal or monetary value found by the Contractor’s employees on the premises of this location turned over to the
COR. At the time of their discovery, such items will be reported to government representative.
12. SECURITY: Only authorized Agricultural Research Service, Agricultural Research Service employees, the Contractor and Contractor’s employees are allowed access in the building during performance of this contract. The Contractor will close any open doors, turn off lights (except those left on for security), and lock designated interior and all exterior doors. The facility is considered closed for business from 4:30pm to 7:30am daily, all weekend hours, and Federal Holidays.
12.1. The contractor will coordinate with the COR or designated personal assigned to get permission from the Contracting Officer prior to any deviations in work schedule such as after hours, weekends and holidays in accordance with service proposal.
12.2. SECURITY CLEARANCES: Upon contract award, all contractor personnel who will be working in the building are required to complete a background investigation. Upon clearance, contractor personnel will work with the designated USDA, Agricultural Research
Services employees to obtain a Linc Pass, which will serve as a permanent ID and authorize building access during business hours.
13. CONDUCTION OF CONTRACTOR AND EMPLOYEES: Contractor personnel shall not smoke or use vaporizing tobacco products in the building, as this is a non-smoking/non-vaporizing building.
Contractor personnel shall comply with the installation traffic laws and other regulations and instructions pertaining to conduct of persons on Government facilities.
13.1. Contractor personnel shall in no event, enter any area to which access is restricted, unless such area have been identified as an area in which services are to be rendered.
13.2. Contractor shall place his/her employees on notice if infraction of any of the above rules, regulations or prohibitions may be grounds for removal from Federal Property.
14. INSPECTIONS:
14.1 Definition: “Services” includes services performed, workmanship and materials furnished or utilized in the performance of services.
14.2 The COR may require the Contractor to remove any employee the COR deems incompetent, careless, or otherwise objectionable.
14.3 The COR, or other designated representative, will make random inspections of parts of the building where services are to be performed. Inspections will not interfere with or delay the Contractor’s work.
15. DEFICIENCIES:
15.1 Any deficiencies identified will be brought to the Contractor’s attention. Any changes to scope of work will be required to notify the Contracting Office and Contract Officer Representative on site.
15.2 If any service performed does not conform to the contract, the Government may require the
Contractor to requirements, at no increase to the contract amount.
16. ADMINSTRATIVE:
16.1. Contractor Documentation and Pre-Coordination Meetings: The contractor will bring all documentation required at the start of maintenance project. The contractor will attend site location and pre-conference with designated facility personnel.
16.2. The contractor will meet with designated COR or facility staff at a minimum weekly to discuss issues or challenges related to this service contract. Feedback through surveillance will be shared between parties to ensure all expectations are being met in a timely manner.
16.3. All documentation related to this project will be turned over to the government prior to closing of project. This may include warranties, drawings, and schematics, and as-builts.
17. SAFETY (Special Considerations)
17.1. Contractor will be responsible for COVID- 19 protocols while working in Federal Facilities. The contractor will provide appropriate PPE such as facemasks, rubber gloves, etc. for Covid-19 exposure.
17.2. Contractor will ensure that all employees are following current USDA guidelines while working on USDA premises. Contract personnel will be briefed prior to start of project to ensure all personnel are following USDA guidelines at the work site.
17. PAYMENTS: For payment, all invoices must be submitted to the Department of Treasury's Invoice
Processing Platform (IPP) via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Payments shall be made monthly, in arrears, upon electronic submission of invoices to the IPP.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm