This document outlines the requirements for an asbestos remediation project at Hawaii Volcanoes National Park. The solicitation is seeking a contractor to remove asbestos-containing caulk from glass panes at two greenhouse structures totaling 150 square feet. Required work includes hazardous material abatement, containment, personal protective equipment, medical surveillance, training, permits, notifications, disposal, and air monitoring. The contractor must follow all applicable EPA, OSHA and state regulations and use methods such as wet removal, HEPA vacuuming and critical barriers to prevent fiber release. The National Park Service is the contracting agency, with a period of performance expected from June 2023 through September 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2123Q0190_Amd_0002.pdf | ||
| Sol_140P2123Q0190_Amd_0001.pdf | ||
| Attachment_3_-_Drawings.pdf | ||
| Attachment_2_-_Terracon_Report.pdf | ||
| Sol_140P2123Q0190.pdf | ||
| Attachment_4_-_Wage_Determinations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hawaii Volcanoes National Park Hawaii
Final Construction Documents (CD) Rehabilitation of Resource Management Buildings
5/24/23
HAVO
PMIS 318732
ASBESTOS REMEDIATION PACKAGE
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
May 24, 2023
Final Construction Documents (CD) for Final Approval 01 11 00 - 1
SUMMARY OF WORK Hawaii Volcanoes National Park, PMIS 318732
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Phases
3. Acronyms
4. Work by Others
5. Government-Furnished Materials
6. Weather Conditions
7. Contractor Use of Site
8. Storage of Materials
9. Public Use of Site
10. Conduct of Operations
11. Firearms
12. Fire Prevention and Protection
13. Park Regulations
14. Vehicle Regulations
15. Work Restrictions
16. Special Construction Requirements
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Locations:
1. Hawaii Volcanoes National Park (HAVO), Hawaii, HI
B. Summary of Work: The Work of the Project is defined by the Contract Documents and consists of the following:
1. Hazardous Material Abatement on both the partial and enclosed greenhouses. Based on the
Hazardous Material Report, this involves the glazing compound on the majority of the greenhouse’s glass.
1.3 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 49:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
3. NPS: National Park Service
01 11 00 - 2
1.4 WEATHER CONDITIONS
A. Project site is located within an environmentally volatile area and weather conditions often change rapidly. Contractor is responsible for monitoring weather conditions and familiarizing themselves with natural hazards that may result from changing weather conditions. Safety precautions shall be included in Accident Prevention Plan (APP) as specified in Section 01 35 23 – Safety Requirements.
1.5 PRESERVATION OF NATURAL FEATURES:
A. Refer to Section 01 11 40 “Preservation of Resources” for additional requirements.
B. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1.6 CONTRACTOR USE OF SITE
A. General: Contractor shall have limited use of site and adjacent property for construction operations. Limit use of premises to areas within the limits indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limit site disturbance, including disruption of earthwork, natural features and clearing of vegetation to the limits designated on the Drawings and as specified in the Contract Documents, or as approved by the CO.
2. Trails and access routes to project sites will be identified by the Government with blue tape along trail or similar method as selected by Government. Alternate access routes are not permitted.
B. Parking: Coordinate acceptable parking locations with CO.
C. Material Storage/Stockpiling: Coordinate acceptable locations with CO.
D. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
E. Housekeeping: Keep project area neat, orderly, and in a safe condition at all times.
01 11 00 - 3
F. Garbage:
1. Immediately remove all hazardous rubbish, including human waste.
2. Do not allow rubbish or garbage to accumulate; all such trash shall be removed upon completion of each work trip. Provide secure and sturdy containers for collection of rubbish.
3. Keep all fruit and vegetable matter in covered containers until properly disposed of outside of the Park.
4. Keep volatile waste in covered containers.
5. Waste that has potential for being windblown or washed away must be always kept secure.
6. Dispose of waste and toxic materials, legally, at public or private dumping areas outside the Park.
7. Do not bury or discard any waste materials (excluding body waste) and garbage on Park land.
1.7 DEMOLISHED MATERIAL
A. Demolished Material: Remove in accordance with Section 02 82 00 - Asbestos Remediation.
1.8 STORAGE OF MATERIALS
A. Restrictions: Storage of supplies, materials, and equipment must be confined to areas as indicated on Drawings or as approved by the CO.
1. Protect all stored materials.
2. Temporary structures are not permitted on NPS land.
1.9 PUBLIC USE OF SITE
A. The park will be open to the public during construction. The visitor use areas surrounding the work will remain open to the public. Contractor shall conduct their operations to ensure the least inconvenience to public.
B. Visitors are present at the Kahuku paddocks Thursday – Sundays. Ensure safe operations and movement of material around the public.
C. Coordinate Kahuku paddocks entry area where overlap of contractor and visitors could occur.
1.10 CONDUCT OF OPERATIONS
A. Conduct operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the CO.
01 11 00 - 4
1.11 WORK RESTRICTIONS
A. On-Site Work Hours:
1. Work shall be generally performed during the following hours, Monday through Friday, except when otherwise indicated or approved by CO.
a. Summer (Summer solstice – winter solstice): 7:30 AM - 6 PM.
b. Winter (Winter solstice – summer solstice): 7:30 AM – 5 PM
2. Weekend Hours: 6:00 AM – 4:30 PM
3. Work at night will not be permitted.
B. Work on Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the CO. Submit requests 3 business days in advance of the work to the CO for approval.
C. Business Days / Working Days: Monday – Friday, except Federal holidays.
D. Deliveries: Material deliveries are permitted Monday - Thursday, 6:00 AM – 4:30 PM.
1.12 FIREARMS AND SMOKING
A. Firearms are not permitted at project site, including: Within the park boundaries, camps, storage areas and fencelines.
B. Smoking/Vaping is permitted if Contractor submits a fire mitigation plan to CO for approval.
Disposal of butts is not permitted on NPS land.
1.13 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website administered by NPS will be used for purposes of managing communication and documents during construction stage.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using
Project Website.
1.14 FIRE PREVENTION AND PROTECTION:
A. Hazard Control: The contractor shall comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). The contractor shall take all necessary precautions to prevent wildland fires, from use of equipment and/or smoking materials always.
B. Spark Arresters: Equip gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by United States Department of Agriculture (USDA) Forest Service.
1. Written determinations of periods and areas of potential fire hazard will be issued by CO.
01 11 00 - 5
1.15 EXPLOSIVES
A. The use of explosives are not permitted.
1.16 PARK REGULATIONS
A. Comply with the following rules and conditions:
1. Ensure all personnel (contractors or subcontractors) working in the park become familiar with and obey all park regulations, wear hard hats in designated areas, and do not enter any restricted areas unless required to do so and until cleared by CO for such entry.
2. Ensure equipment is conspicuously marked for identification.
3. The Contractor shall restrict employees / representatives to the work site and control travel directly to and from the work site.
4. Restore all traffic / parking / security signs and markings, including space numbers, desig-nations, and lines, to their original form if such signs / markings are defaced or deleted during construction/repair.
5. Law Enforcement: Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity. Contractor must immediately comply with any instructions issued by a park law enforcement ranger.
6. Control and security of Contractor-owned equipment and materials at the work site is the responsibility of the Contractor. Report immediately missing / lost / stolen property to the park dispatch / law enforcement rangers at 1-808-985-6170.
1.17 VEHICLE REGULATIONS
A. Inspection for invasive species: As specified in Section 01 11 40 – Natural Resource Protection.
B. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
C. Vehicle Access:
1. Vehicles associated with the Contractor shall be waived the entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicle(s). Please note that the entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
2. Contractor will provide the CO with a listing of its subcontractors and their associated vehicles and employees entering the park on a daily basis.
3. Contractor will provide the CO with a listing of anticipated deliveries for each week.
D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
01 11 00 - 6
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Traffic Control
1. Coordinate need for traffic control, including gate access, with CO a minimum of 3 business days in advance, excluding weekends. Traffic control measures are limited to 7:30 AM - 6:00 PM, Monday – Friday unless approved in advance by CO.
2. Slow Vehicles: Notify the CO a minimum of 3 business days in advance, excluding weekends, of slow vehicles that may cause traffic delays or extended traffic lines.
3. Oversized Vehicles: Oversized vehicles are defined as vehicles where the width of the vehicle or load exceeds one lane (i.e., beyond the center line of the paved road). Oversized vehicles must not exceed the clearances along the Park road corridor. Oversized vehicles will require an escort and drivers must avoid driving on the edges of the Park road.
a. Notify the CO of the need for oversized vehicles, scheduled dates and estimated arrival times at the park entrance, and the identity of who is escorting the vehicle (e.g., police, contractor, etc.). Notify the CO a minimum of 3 working days in advance of the use of any oversized vehicles.
F. Road closures may be permitted, when required, upon specific approval of CO. Coordinate all traffic control or possible interaction with the Public with the CO. Notify CO a minimum of 3 business days in advance of desired closure date(s).
G. Vehicles / Heavy Equipment:
1. Rules of the Road: All vehicles and heavy equipment will comply with posted traffic regulations, including speed limits and double-yellow center lane markings. Vehicles and heavy equipment shall take every safe opportunity to use paved roadside pullouts in order to allow faster moving traffic to pass. Failure to comply with traffic regulations will result in a citation being issued to the driver.
2. Vehicle Parking: Vehicles are not permitted within long-term or overnight parking along park roads or in associated overlooks / pullouts. Vehicles and heavy equipment will be permitted at designated parking areas only.
3. Vehicle Exhaust: All vehicles will be properly maintained to ensure that the exhaust produced is within legal limits. Effects of excessive vehicle exhaust may be subject to enforcement of State and Federal laws regarding emissions as well as those regarding threatened and endangered species.
4. Spills: Contractor shall be responsible for any cleanup efforts required in accordance with 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes. Contractor must immediately notify the CO of any spills.
5. Commercial Vehicle Safety Inspections: The Contractor, employees, contractors, and subcontractors shall fully cooperate regarding safety inspections of commercial vehicles within the Park. Commercial vehicle safety inspections are conducted un announced for employee and visitor safety. Vehicles are checked for safety and mechanical deficiencies and for compliance with current state and federal laws and regulations. Driver licenses and medical certificates are also checked.
6. DOT Compliance: All vehicles are to be compliant with all DOT requirements including but not limited to driver with appropriate license class, medical examiner card as appropriate with license class, carrying 3 triangles or 3 flares, mounted fire extinguisher, and valid DOT safety sticker.
01 11 40 - 1
NATURAL RESOURCE PROTECTION Hawaii Volcanoes National Park, PMIS 318732
SECTION 01 11 40 – NATURAL RESOURCE PROTECTION
1.1 SUMMARY
A. Section includes work restrictions and inspection procedures for protecting resources in the national parks including, but not limited to the following:
1. Preservation of Natural Features and Wildlife.
2. Invasive Species Prevention
3. Threatened & Endangered Species (T&E Species)
4. Soundscape / Noise
B. General: The NPS is the steward of unique resources found within the national parks. The NPS is committed to protecting natural, cultural, historical, archeological, and other resources found within the parks and the adjacent lands.
C. Work to be performed will occur in and around historic buildings and in historic districts.
D. Related Section:
1. 01 35 13.22 Archeological Protection: Protection of archeological resources.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 PRESERVATION OF NATURAL FEATURES AND WILDLIFE
A. General: Comply with the following work restrictions:
1. Prevent damage to natural surroundings.
2. Provide temporary barriers to protect existing trees, tree roots, plants, grass areas and lawns that are directly impacted by construction operations.
3. Do not fasten ropes, cables, or guys to existing trees, rock outcrops, or other natural features.
4. Do not remove, injure, or destroy existing trees, plants, tree roots, or plants without approval by the CO or unless it is explicitly required in the contract documents.
5. If a tree, tree branch, root, or mass of vegetation is preventing the Contractor from completing the work, notify the CO immediately for a determination. Trees must be surveyed by park staff for bird nests prior to removal, or trimming.
6. Carefully supervise the excavation, grading, filling, equipment movement, and other construction operations near trees and tree branches to prevent damage.
01 11 40 - 2
B. During Bat pupping season, clearing, cutting or trimming trees of trees or woody plants greater than a height of 15 feet is not permitted.
1. Hawaiian hoary bat pupping season is: June 1 - September 15.
2. Clearing, cutting, or trimming trees 15 feet tall or taller is only permitted during this time: September 16 – May 31.
3.2 INVASIVE SPECIES PREVENTION
A. General: The introduction of non-native species including invasive weeds and plants;
invasive pests such coqui frogs and frog eggs, little fire ants (LFA), and insects including termites; other vertebrae species such as rats, mice, and reptiles; and diseases such as Rapid ‘Ōhi‘a Death (ROD) spread through contaminated soil can threaten the park’s rare and endangered plants and animals or can create new populations of non-native species not traditionally found in the park.
B. Prior to all entry to the Park, or when moving between project sectors, special precautions must be taken to ensure all vehicles, equipment, machinery, cutting tools, base yards, staging areas, materials, material packaging, material deliveries, material storage, clothing (especially socks and shoes), and personal protective equipment (PPE) are clean and free of invasive weeds and plants, invasive pests, and ROD.
C. Vehicles, Equipment, Helicopters & Machinery: Prior to entry into the Park, or between project sectors comply with the following:
1. Vehicles, equipment, and machinery must be thoroughly pressure washed and visibly free of dirt, mud, plant debris, frogs and frog eggs, insects including termites, other vertebrate species such as rats, mice, and reptiles, other debris. A hot water wash is preferred. Areas of particular concern include bumpers, grills, hood compartments, areas under the battery, wheel wells, undercarriage, cabs and truck beds.
2. The interior and exterior of vehicles, equipment and machinery must be free of rubbish and food. The interiors of vehicles and the cabs of machinery must be vacuumed clean.
Floor mats must be sanitized with a solution of >70% isopropyl alcohol.
3. All vehicles, equipment, and machinery shall park on pavement and not under trees (where possible).
4. All vehicles, equipment, and machinery will be subject to inspection by NPS personnel.
5. All vehicles, equipment, and machinery that do not pass inspection will be turned away and may not return for 48 hours, even after receiving treatment.
6. All vehicles, equipment, and machinery leaving the park for any reason must be cleaned prior to re-entry into the park and may require re-inspection at the park’s discretion. Treatment is the responsibility of the Contractor.
D. Base Yards and Staging Areas: Comply with the following:
1. Inspect base yards and staging areas for invasive pests at the beginning of the project and weekly thereafter. Any invasive pests found are to be removed immediately.
2. Pest control records may be requested anytime at the park’s discretion.
01 11 40 - 3
3. Project vehicles or equipment stored outside of a base yard or staging area, such as a private residence, are to be kept in a pest free area, preferably on pavement and not under trees. Such vehicles or equipment may be subject to additional inspection as described herein and will be turned away if infested.
E. Materials, Packaging, Deliveries, and Storage: Prior to entry into the Park, or between project sectors comply with the following:
1. Materials, packaging, deliveries, and storage containers shall be kept clean and free of invasive pests. This includes soil, aggregate, and rock material from quarries or the source location, as well as temporary facilities and best management practice (BMP) items employed to manage surface water drainage and erosion.
2. Materials, packaging, deliveries, and storage containers will be inspected by NPS personnel for invasive pests. This includes soil, aggregate, and rock material from quarries or the source location, as well as temporary facilities and best management practice (BMP) items employed to manage surface water drainage and erosion.
3. Any item that does not pass inspection will be turned away and not allowed into the park.
4. The pest control records from quarries, source locations, or Contractor base yards may be requested.
5. Fresh crushed aggregate is preferred (if readily available) over aggregate that has been stockpiled at a quarry for a lengthy period.
F. Personal Protective Equipment (PPE): Prior to all entry to the Park, or when moving between project sections, comply with the following:
1. Before going into the field or the jobsite, visually inspect and clean all personal protective equipment (PPE) to include boots, clothes, hard hats, harnesses, belts, and equipment for dirt, mud, seeds, plant debris, and insects. Soles of shoes must be regularly sanitized using a solution of >70% isopropyl alcohol.
G. Invasive Species Disposal / Removal Recommendations: For current disposal / removal recommendations, refer to the following website links:
1. Little Fire Ants: http://www.littlefireants.com
2. Coqui Frogs: http://www.biisc.org
3. Rapid ōhi‘a death (ROD): https://cms.ctahr.hawaii.edu/rod
4. All taxa: http://www.biisc.org
3.3 INVASIVE SPECIES INSPECTIONS
A. General: In order to prevent the spread of invasive species within the park and adjacent lands, NPS personnel from the park will perform inspections of vehicles, equipment, machinery, cutting tools, base yards, staging areas, materials, material packaging, material deliveries, material storage, and personal protective equipment (PPE).
1. Provide safe unfettered access to inspection sites or items being inspected for the NPS inspectors.
2. For all vehicles, machinery, equipment, and materials entering the park, inspections shall occur outside of the park at a location designated by NPS.
http://www.littlefireants.com/ http://www.biisc.org/ http://www.biisc.org/
01 11 40 - 4
B. Inspections for invasive species will include the following:
1. NPS inspectors will perform visual inspections for signs of invasive weeds and plants;
invasive pests such coqui frogs and frog eggs, little fire ants (LFA), and insects including termites; other vertebrae species such as rats, mice, and reptiles; and mud and dirt that may carry Rapid ‘Ōhi‘a Death (ROD).
2. NPS inspectors will test vehicles, equipment, and machinery for little fire ants (LFA) by placing chopsticks baited with a dab of peanut butter for 30 minutes to 1 hour. About six (6) chopsticks (baits) will be used to test personal vehicles and trucks. Larger vehicles, equipment, and machinery may require up to 10-20 baits. Baits will be placed in the shade, inside the cab, engine compartment, and truck bed if applicable. Please note that baits are only good for detection and do not control ants. Baits will not be left in the vehicle for more than 1 hour as this may attract ants from beyond the area of concern.
3. NPS inspectors may employ the same method of testing (as outlined above in G.2) on materials, material packaging, material deliveries, and material storage to include soil, aggregate, and rock material from quarries or source locations, temporary facilities and BMP items employed to manage surface water drainage and erosion.
4. Any LFA found will be collected, bagged, and labeled for identifications by NPS inspectors (or partners) and the vehicle will not be allowed to enter the park until it is cleaned, sanitized, and re-tested following a minimum 48-hour resting period.
5. Infested vehicles shall be sanitized following recommendations by the Hawaii Ant Lab (http://www.littlefireants.com) or other ant control expert and in accordance with all State and Federal laws and baited with a granular or liquid insecticide bait prior to re-entry to the park. Control records will be required to confirm treatment. Treatment is the responsibility of the Contractor.
6. The park reserves the right to conduct additional test for little fire ants (LFA) at any time during the project or require deployment of preventative granular or liquid insecticide baits.
C. Inspection Scheduling / Protocol:
1. The Contractor’s construction schedule shall identify the date of project mobilization as well as the preferred date(s) for invasive species inspections in advance of mobilization.
2. The Material Contractor’s schedule shall identify dates of material deliveries to the Park as well as the preferred date(s) for invasive species inspections.
3. Notify CO a minimum of 3 working days prior to delivery or required inspections not indicated on the construction schedule.
4. The name and contact information for the NPS primary and backup inspectors will be identified at the time of the preconstruction meeting and documented in the meeting notes.
5. Formal requests for inspections shall be made by the Contractor directly to the NPS inspector(s) via the inspector’s contact information.
6. Requests for the initial inspection(s) prior to mobilization shall be made at least3 business days in advance of the inspection date.
7. Once the project is underway, inspections will be performed daily as needed (typically early morning) at the park’s preferred inspection site for the duration of the contract.
8. Inspection requests outside the pre-established days and times will be performed at the discretion and availability of the inspectors.
9. Inspections shall occur at the park’s preferred inspection site shown on the construction drawings, or other locations as determined by inspector.
01 11 40 - 5
10. Inspections of soil, aggregate, or rock materials may occur at the quarry or source location at the park’s discretion.
11. If a re-inspection is required, the Contractor shall clean and sanitize the item thoroughly. A re-inspection for a rejected item cannot be scheduled for at least 48 hours.
3.4 THREATENED & ENDANGERED SPECIES (T&E SPECIES)
A. General: Threatened & Endangered Plant and Animal Species are protected by Federal law.
Workers must obey all park regulations and drivers must obey all traffic laws and watch for animals on or alongside roads or within the project area. Contact NPS Dispatch at: (808) 985- 6170 immediately if an animal is hit or injured or will not move off the road.
B. General Mitigations: Within the project area, the following mitigation measures are required to minimize disturbance to T&E species:
1. The project area shall be cleaned up at the end of each work shift so that tools, materials, debris, and trash are not left out in a manner that could be a hazard to T&E species. All waste must be cleaned up by end of day and waste containers must be covered (especially any that may have food waste) and must be emptied regularly.
2. Noise and vibrations from tools and equipment shall be kept to a minimum when working in the vicinity of a listed T&E species.
3. Hazmat spill prevention protocols shall be employed when using gas-powered equipment.
4. Ensure no standing water on tarps or other construction surfaces in any of the parks in the Hawaiian Islands as it may be a breeding ground for mosquitoes which can carry Dengue fever, avian malaria, avian flu, and other diseases.
5. Ensure loose nails, screws, and fasteners do not fall on the ground when working on exterior surfaces as these can be a hazard to T&E species. If they do land on the ground, pick them up immediately and dispose of them properly.
C. Requirements for Specific T&E Species:
1. Nēnē (Hawaiian goose) - Nēnē are frequently spotted along the roadside at Hawai‘i Volcanoes National Park (HAVO) and do not readily move when approached by cars. If there is a Nēnē on the road, drivers must stop and allow the Nēnē to move away on its own. Drivers should be aware that Nēnē may suddenly appear on the road from low brush and to be especially attentive of this on foggy and/or rainy days. In general, do not approach Nēnē and keep at least 60 feet away. Due to Nēnē breeding, construction activities may be limited at Hawai‘i Volcanoes National Park (HAVO) during the windows outlined below. Refer also to the “Working Around Endangered Birds” factsheet at the end of Section 01 11 40.
• Hawai‘i Volcanoes National Park - Nēnē breeding: From September 1 to May 1.
2. ‘Ua‘u (Hawaiian petrel) –‘Ua‘u are active at night. No night work will be allowed. Refer also to the “Working Around Endangered Birds” factsheet at the end of Section 01 11 40.
01 11 40 - 6
3. ‘Ōpe‘ape‘a (Hawaiian hoary bat) – The Hawaiian hoary bat is an endangered subspecies of the hoary bat family that is endemic to the Hawaiian Islands. Bat birthing and pupping season typically occurs in trees or vegetation greater than 15 feet high from June 1 until September
15. Trees less than 15 feet high can be cut year-round (unless trees are nearcaves where bats may also nest). Cutting of trees and vegetation greater than 15 feet high is limited to the period of September 16 to May 31 to avoid affecting hoary bat pups. Vegetation cutting or clearing that is explicitly required in the contract documents may be cut outside of the bat birthing and pupping season. Should any additional tree or branch need to be cut, Contractor shall get prior approval from the Contracting Officer. If a hoary bat is discovered in the project area, contact NPS Dispatch at: (808) 985-6170.
4. Other T&E Plants & Forest Birds – Prior to construction start, the park shall survey the project area for threatened and endangered plants & forest birds (and their nests) and flag a buffer zone for protection. Avoid flagged nest areas during construction activities.
a. Contractor shall notify Contracting Officer 30 days in advance to schedule surveys.
b. Bird surveys are only good for 7 days. If tree removal work does not happen within 7 days of a bird survey, the survey shall be repeated.
D. Requirements for Other Species of Concern: The following are requirements for other species of concern:
1. ‘Ōhi‘a Trees - Avoid wounding ‘ōhi‘a trees and roots with mowers, chainsaws, weed eaters, and other tools. Cut only a minimum amount of trees and branches as approved by the Contracting Officer and avoid making jagged cuts or stripping bark. Treat the cut, standing sections of ‘ōhi‘a with a wound sealant such as Spectracide Pruning Seal. Wound sealants other than Spectracide Pruning Seal will require review and approval by the Contracting Officer prior to use. ‘Ōhi‘a logs, ‘ōhi‘a parts, and ANY other cut vegetation, organic matter, or green waste that is not part of the project scope may not be brought into the park. All non-‘ōhi‘a logs imported into the park must be sourced from a park approved site free of invasive weeds and plants, invasive pests, and ROD.
3.5 SOUNDSCAPE / NOISE
A. General: The Contractor shall minimize noise levels at the project site to protect the soundscape of the park and minimize noise to staff, visitors, neighbors, and habitat. Perform operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week or as directed by the Contracting Officer. Repetitive and/or intermittent, high-level noise is permitted only during daytime hours. If the Contractor exceeds the thresholds below, the Contractor may be required to stop work, temporarily relocate to a non-sensitive area, or adjust the construction means and methods at no additional expense to the Government.
01 11 40 - 7
1. Maximum permissible construction equipment noise at 50 feet:
EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Front Loaders 75 Concrete Mixers 75 Backhoes 75 Concrete Pumps 75 Dozers 75 Cranes 75 Tractors 75 Derricks Impact 75 Scrapers 80 Pile Drivers 95 Graders 75 Jack Hammers 75 Trucks 75 Rock Drills 80 Pavers, Stationary 80 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75 Compressors 75
2. Do not exceed the following dB(A) limitations at 50 feet:
TIME DURATION OF IMPACT NOISE dB(A) More than 12 minutes in any hour 70 More than 3 minutes in any hour 80
3.6 AIR QUALITY (OUTDOOR)
A. General: The Contractor shall minimize the negative impacts to outdoor air quality as a result of their operations. This may include:
1. Control of emissions from vehicles or heavy equipment.
2. Control of fumes, vapors, or gases from products or packaging.
3. Control of particulates and dust from outdoor operations.
B. Mitigations: The Contractor shall mitigate for negative impacts to indoor and outdoor air quality as a result of their operations. This may include:
1. Ensure vehicles and heavy equipment do not idle when not in use.
2. Ensure proper ventilation and air movement of indoor spaces.
3. Install temporary mechanical ventilation where appropriate.
4. Ensure tools are equipped with the proper guards or particulate catchment devices.
5. Ensure particulates and debris are collected and disposed of on a regular basis.
6. Consider water trucks or temporary irrigation devices for dust control.
7. Ensure products are properly dried or cured prior to advancing the work.
END OF SECTION 01 11 40
01 31 00 - 8
PROJECT MANAGEMENT AND COORDINATION Hawaii Volcanoes National Park, PMIS 318732
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
1.1 PERMITS
A. General:
1. Permits and Responsibilities: Contractor shall, without additional expense to the Government, be responsible for obtaining necessary licenses and permits, and for complying with Federal, State and municipal laws, codes, and regulations applicable to the performance of the work. Contractor shall also be responsible for damages to persons or property that occur as a result of Contractor’s fault or negligence; and for materials delivered and work performed until completion and acceptance of the work.
2. For the purpose of this contract, Contractor will not be considered an agent of the Government. Contractor shall comply with appropriate Federal, State and local laws.
B. Coordination with Agency(ies) with Jurisdiction Issuing Permits
1. Coordination: Contact the Agency(ies) with Jurisdiction as needed and sufficiently in advance to avoid delaying work: Coordinate meetings, reporting requirements, inspections, and other requirements.
02 82 00 - 1
Hawaii Volcanoes National Park, PMIS 318732
Asbestos Remediation
SECTION 02 82 00
ASBESTOS REMEDIATION
1.01 REFERENCES
A. American National Standards Institute (ANSI)
1. ANSI Z87.1 2003) Practice for Occupational and Educational Eye and Face Protection
2. ANSI Z88.2 1992) Respiratory Protection
3. ANSI Z9.2 (2001) Fundamentals Governing the Design and Operation of Local
Exhaust Ventilation Systems
B. ASTM International (ASTM)
1. ASTM D1331 (1989; R 2001) Surface and Interfacial Tension of Solutions of Surface Active Agents
2. ASTM D4397 (2002) Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
3. ASTM E1368 (2003) Visual Inspection of Asbestos Abatement Projects
C. Compressed Gas Association (CGA)
1. CGA G-7 (2003) Compressed Air for Human Respiration
D. National Fire Protection Association (NFPA)
1. NFPA 701 (1999) Fire Tests for Flame Propagation of Textiles and Films
E. National Institute For Occupational Safety And Health (NIOSH)
1. NIOSH 94-113 (1994; 4th Ed) NIOSH Manual of Analytical Methods
02 82 00 - 2
F. Code of Federal Regulations (CFR)
1. 29 CFR 1910 General Industrial Standards
2. 29 CFR 1910.20 Access to Employee Exposure and Medical Records
3. 29 CFR 1910.133 Eye and Face Protection
4. 29 CFR 1910.134 Respiratory Protection
5. 29 CFR 1910.135 Head Protection
6. 29 CFR 1910.136 Foot Protection
7. 29 CFR 1910.141 Sanitation
8. 29 CFR 1910.147 The Control of Hazardous Energy (Lockout/Tagout)
9. 29 CFR 1910.1001 Asbestos
10. 29 CFR 1910.1200 Hazard Communication
11. 29 CFR 1926 Construction Standards
12. 29 CFR 1926.21 Safety Training and Education
13. 29 CFR 1926.33 Access to Employee Exposure and Medical Records
14. 29 CFR 1926.59 Hazard Communication
15. 29 CFR 1926.65 Hazardous Waste Operations and Emergency Response
16. 29 CFR 1926.200 Accident Prevention Signs and Tags
17. 29 CFR 1926.1101 Asbestos, Tremolite, Anthophyllite, Actinolite
18. 40 CFR 61-Subpart A General Provisions
19. 40 CFR 61-Subpart M National Emission Standard for Asbestos
20. 40 CFR 260 Hazardous Waste Management Systems: General
21. 40 CFR 261 Identification and Listing of Hazardous Waste
22. 40 CFR 262 Generators of Hazardous Waste
23. 40 CFR 263 Transporters of Hazardous Waste
24. 40 CFR 264 Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
25. 40 CFR 265 Interim Status Standard for Owners and Operators of Hazardous Waste Treatment, Storage and Disposal Facilities
26. 40 CFR 268 Land Disposal Restrictions
27. 40 CFR 370 Hazardous Substance Spill Reporting
28. 40 CFR 763 The Asbestos Hazard Emergency Response Act (AHERA)-Friable Asbestos-Containing Material in Schools
29. 49 CFR 171 Hazardous Substances
30. 49 CFR 172 Hazardous Materials, Tables, and Hazardous Materials Communications Regulations
31. 49 CFR 173 Shippers-General Regulations for Shipments and Packaging
33. 49 CFR 178 Shipping Container Specifications
G. Environmental Protection Agency (EPA)
1. EPA 560/5-85-024 Guidance for Controlling Asbestos-Containing Materials in
Buildings
02 82 00 - 3
H. International Building Codes (IBC)
1. Chapter 33 Safeguards During Construction
I. Underwriters Laboratories Inc. (UL)
1. UL 586 High Efficiency, Particulate, Air Filter Units
J. National Institute for Occupational Safety and Health
1. NIOSH 2003-154 Manual of Analytical Methods
K. Hawaii Administrative Rules
1. Title 11 Chapter 501 – Asbestos Requirements
2. Title 11 Chapter 502 – Asbestos-Containing Materials in Schools
3. Title 11 Chapter 503 – Fees for Asbestos Removal and Certification
4. Asbestos Abatement Certification Program
Any and all other appropriate Federal, State, and Local regulations, codes and statutes in force at the time and location of the abatement project. All other terminology shall be as defined in the applicable documents. In the case of any conflicting definitions, the definition prescribing the strictest performance and benefiting the owner shall govern.
1.02 DEFINITIONS
A. Amended Water: Water containing a wetting agent or surfactant with a surface tension of at least 29 dynes per square centimeter when tested in accordance with
ASTM D 1331.
B. Asbestos-Containing Material (ACM): Any materials containing more than 1 percent asbestos.
C. Authorized Person: Any person authorized by the Contractor and required by work duties to be present in the regulated areas.
D. Building Inspector: Individual who inspects buildings for asbestos and has EPA
Model Accreditation Plan (MAP) "Building Inspector" training; accreditation required by 40 CFR 763, Subpart E, Appendix C, has EPA/State certification/license as a "Building Inspector".
02 82 00 - 4
E. Class I Asbestos Work: Activities defined by the Occupational Safety and Health Administration (OSHA) involving the removal of thermal system insulation (TSI) and surfacing ACM.
F. Class II Asbestos Work: Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic. Certain "incidental" roofing materials such as mastic, flashing and cements when they are still intact are excluded from Class II asbestos work. Removal of small amounts of these materials which would fit into a glove bag may be classified as a Class III job.
G. Class III Asbestos Work: Activities defined by OSHA that involves repair and maintenance operations, where ACM, including TSI and surfacing ACM, is likely to be disturbed. Operations may include drilling, abrading, cutting a hole, cable pulling, crawling through tunnels or attics and spaces above the ceiling, where asbestos is actively disturbed or asbestos-containing debris is actively disturbed.
H. Class IV Asbestos Work: Maintenance and custodial construction activities during which employees contact but do not disturb ACM and activities to clean-up dust, waste and debris resulting from Class I, II, and III activities. This may include dusting surfaces where ACM waste and debris and accompanying dust exists and cleaning up loose ACM debris from TSI or surfacing ACM following construction.
I. Clean room: An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.
J. Competent Person: In addition to the definition in 29 CFR 1926.32(f), a person who is capable of identifying existing asbestos hazards as defined in 29 CFR 1926.1101, selecting the appropriate control strategy, has the authority to take prompt corrective measures to eliminate them and has EPA MAP "Contractor/Supervisor" training; has EPA/State certification/license as a "Contractor/Supervisor."
K. Contractor/Supervisor: Individual who supervises asbestos abatement work and has
EPA Model Accreditation Plan "Contractor/Supervisor" training; has EPA/State certification as a "Contractor/Supervisor."
L. Critical Barrier: One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.
02 82 00 - 5
M. Decontamination Area: An enclosed area adjacent and connected to the regulated area and consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.
N. Demolition: The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.
O. Disposal Bag: A 0.15 millimeter (mm) 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101, used for transporting asbestos waste from containment to disposal site.
P. Disturbance: Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in one standard sized glove bag or waste bag, not larger than 1.5 m 60 inches in length and width in order to access a building component.
Q. Equipment Room or Area: An area adjacent to the regulated area used for the decontamination of employees and their equipment.
R. Fiber: A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.
S. Friable ACM: A term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763, polarized light microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
T. Glove bag: Not more than a 1.5 by 1.5 m 60 by 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.
U. High-Efficiency Particulate Air (HEPA) Filter: A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
V. Intact: ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix. Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.
02 82 00 - 6
W. Model Accreditation Plan: EPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763.
X. Negative Initial Exposure Assessment: A demonstration by the Contractor to show that employee exposure during an operation is expected to be consistently below the OSHA Permissible Exposure Limits.
Y. NESHAP: National Emission Standards for Hazardous Air Pollutants. The EPA
NESHAP regulation for asbestos is at 40 CFR 61, Subpart M.
Z. Nonfriable ACM: A NESHAP term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
AA. Nonfriable ACM (Category I): A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos.
BB. Nonfriable ACM (Category II): A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos.
CC. Project Environmental Consultant (PEC): A licensed consultant who is specially accredited to oversee projects for the abatement of asbestos and monitor the quality of air and who authorizes the final clearance for projects for the abatement of asbestos on the owner’s behalf.
DD. Permissible Exposure Limits (PELs):
1. PEL-Time weighted average (TWA): Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8 hour time weighted average (TWA).
2. PEL-Excursion Limit: An airborne concentration of asbestos not in excess of
1.0 f/cc of air as averaged over a sampling period of 30 minutes.
EE. Regulated Area: An OSHA term defined in 29 CFR 1926.1101 meaning an area established by the Contractor to demarcate areas where Class I, II, and III asbestos work is conducted; also any adjoining area where debris and waste from such asbestos work accumulate; and an area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.
02 82 00 - 7
FF. Removal: All operations where ACM is taken out or stripped from structures or substrates and include demolition operations.
GG. Repair: Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of ACM attached to structures or substrates.
HH. Surfacing ACM: Asbestos-containing material which contains more than 1 percent asbestos and is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
II. Thermal System Insulation ACM: ACM which contains more than 1 percent asbestos and is applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain or water condensation.
JJ. Transite: A generic name for asbestos cement wallboard and pipe.
KK. Worker: Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101, to include EPA MAP "Worker" training; accreditation if required by the OSHA Class of work to be performed or by the state where the work is to be performed.
1.03 SUBMITTALS
A. Product Data
1. Asbestos Waste Shipment Records
2. Weight Bills and Delivery Tickets
a. Waste shipment records, weight bills and delivery tickets.
3. Encapsulants
4. Respiratory Protection Program
5. Cleanup and Disposal
6. Manufacturer's catalog data for all materials and equipment to be used, including brand name, model, capacity, performance characteristics and any other pertinent information. Test results and certificates from the manufacturer of encapsulants substantiating compliance with performance requirements of this specification. Material Safety Data Sheets for all chemicals to be used onsite in the same format as implemented in the Contractor's HAZARD COMMUNICATION PROGRAM. Data shall include, but shall not be limited to, the following items:
a. HEPA local exhaust equipment
02 82 00 - 8
b. Vacuum cleaning equipment
c. Pressure differential monitor for HEPA local exhaust equipment
d. Air monitoring equipment
e. Respirators
f. Personal protective clothing and equipment
g. Glove bags. Written manufacturer's proof that glove bags will not break down under expected temperatures and conditions.
h. Duct Tape
i. Disposal Containers
j. Sheet Plastic
k. Wetting Agent
l. Strippable Coating
m. Prefabricated Decontamination Unit
n. Material Safety Data Sheets (for all chemicals proposed)
7. Qualifications A written report providing evidence of qualifications for personnel, facilities and equipment assigned to the work.
8. Training Program
a. A copy of the written project site-specific training material as indicated in 29 CFR 1926.1101 that will be used to train onsite employees.
b. Licenses, Permits and Notifications F Licenses, permits, and notifications.
B. Shop Drawings
Detailed drawings, and site layout to include worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facility, access tunnels, location of temporary utilities (electrical, water, sewer) and boundaries of each regulated area.
C. Test Reports
1. Exposure Assessment and Air Monitoring
Initial exposure assessments, negative exposure assessments, air-monitoring results and documentation.
2. Local Exhaust System: Pressure differential recordings.
02 82 00 - 9
D. Certificates
1. Local Exhaust System Manufacturer's certifications showing compliance with ANSI Z9.2 for:
a. Vacuums.
b. Water filtration equipment.
c. Ventilation equipment.
2. Other equipment required to contain airborne asbestos fibers.
E. Encapsulants
1. Certificates stating that encapsulants meet the applicable specified performance requirements.
F. Medical Surveillance Requirements
1. Required medical certification and the Physician's written opinion.
1.04 DESCRIPTION OF WORK
A. This section covers all operations in which ACM are encountered. These procedures and equipment are required to protect workers and building occupants from airborne asbestos fibers and ACM dust and debris. Activities include OSHA Class II work operations. This section also includes containment, storage, transportation and disposal of the generated ACM wastes. The Contractor shall submit Detailed Drawings as specified in the Submittals paragraph.
B. Abatement Work Tasks: The specific ACM to be abated is caulk on glass panes on
Building B-53 (Partially Enclosed Greenhouse and the Enclosed Greenhouse.
Structure Material
Description Material Location
Estimated Quantity
B-53 (Partially Enclosed Greenhouse)
Glass Pane Caulk Roof, Glass Panes Beneath Bar Cap
60 Square Feet
Enclosed Greenhouse Glass Pane Caulk Roof, Glass Panes Beneath Bar Cap
90 Square Feet
If remnant caulk is present on the removed glass panes, the glass shall be containerized and disposed of as Asbestos-containing Waste Material (ACWM).
C. Unexpected Discovery of Asbestos: For any previously untested building components suspected to contain asbestos and located in areas impacted by the work, the Contractor shall notify the General Contractor (GC) who will…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .