This document is a Statement of Work (SOW) for the procurement of materials to construct a new tie-switch between the Main Switch Station (MSS) 1 and MSS2 switchgears at Peterson Space Force Base (PSFB) in Colorado. The SOW outlines the general requirements, purpose, required civil and electrical materials, work area access, safety, protection of government property, and closeout procedures. The related federal contract opportunity is a Solicitation for the delivery of the specified S&C Electric brand name and generic electrical items to PSFB. The solicitation is open to full and open competition under NAICS code 335313 for Switchgear and Switchboard Apparatus, with a size standard of 1,250 employees. The government will evaluate quotes in accordance with FAR 52.212-2, and reserves the right to not make an award. The purpose is to procure the required materials per the attached Single Source Justification document and PSFB Design Guide.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

CUI

PSFB MSS1 & MSS2 Tie-Switch

Peterson Space Force Base (PSFB) Colorado

12 Sept 2024

CUI 2

PSFB MSS1 & MSS2 TIE-SWITCH

Table of Contents

1.1. GENERAL REQUIREMENTS

1.2. PURPOSE

1.3. CIVIL MATERIALS

1.4. ELECTRICAL MATERIALS

2. WORK AREA ACCESS

3. SAFETY

4. PROTECTION OF GOVERNMENT PROPERTY

5. CLOSEOUT

CUI 3

1.1. GENERAL REQUIREMENTS

1.1.1. The Contractor shall follow all Green Procurement mandates and submittal requirements.

The government requires the use of recycled and recovered materials, bio-based products, energy, and water saving products, and environmentally preferable products.

1.1.2. All equipment, and materials required for this contract shall be staged in an area coordinated with the Base Civil Engineer (BCE) personnel or Government designated representative (i.e., Contracting Officer, Project Manager, Construction Manager).

1.1.3. All equipment and materials delivered shall be subject to stoppages and delays due to critical PSFB mission requirements.

1.1.4. All equipment and materials deliveries shall be coordinated with Base Civil Engineering (BCE) personnel, namely the assigned Construction Manager and/or Project Manager, via the Contracting Officer.

1.2. PURPOSE

1.2.1. The electrical shop is requesting the purchase of materials to construct a new tie-switch between the Main Switch Station (MSS) 1 and MSS2 switchgears.

1.2.2. The delivery location of the materials is: Electrical Shop, 580 Goodfellow Street, Peterson SFB, Colorado 80914.

1.2.3. The Purchasing and Delivery for this project shall be executed in the best and most workman like manner. The Contractor shall coordinate and perform all operations in a manner that will result in a professional and expeditiously completed project.

1.2.4. The Electrical Shop will be responsible for the demolition and disposal of any waste and debris.

1.3. CIVIL MATERIALS

Line Item Description Quantity 1 #3 Rebar 3/8” Diameter Grade 40 – 10’ 149 2 Concrete Type 1 (General Purpose) 28 Cubic Yards

Table 1 List of Materials for Encased Duct Bank

CUI 4

1.4. ELECTRICAL MATERIALS

1.4.1. All S&C power fuse units are unique to the S&C PMU switchgear equipment authorized in the PSFB Design Guide. Therefore, only S&C power fuses can be procured for this purchase request. Refer to PSFB Design Guide.

Item Number

Description Quantity

3 S&C 822300 822300 -Meg--Kilovolts: 14.4 Amperes:

300 Speed: 153-2 (E) SMU-40 Power Fuse Unit REV 005

4 Fuse & Live Parts - 612010 612010--kilovolts: 14.4 amperes:

10 Speed: 153-2 (e) SMU-20 Power Fuse Unit

5 612015 612015--kilovolts: 14.4 amperes: 15 Speed: 153-2

(E) SMU-20 Power Fuse Unit

6 612020 612020--Kilovolts: 14.4 Amperes: 20 Speed: 153-2

(E) SMU-20 Power Fuse Unit

7 612025 612025--Kilovolts: 14.4 Amperes: 25 Speed: 153-2

(E) SMU-20 Power Fuse Unit

8 612050 612050--Kilovolts: 14.4 Amperes: 50 Speed: 153-2

(E) SMU-20 Power Fuse Unit

7 PVC 6” SCH 40 Conduit 10’ 10 8 UA9ARB 6” Sched 40 STD 90 deg 12 9 Prime EB600 6 UL End Bell 10

10 HER SPB600X300 6” x 3” Base Spacer 200 11 Cold Shrink Termination with Skirts for Shielded Cable. 700-1500

5kV, 600-1250 8kV, 500-100 15 kV, 250-800 25kV, 1.05-1.8 (3 Terminations per kit) 250 MCM AL/CU Str. 2-Hole NEMA Long Barrel AL/CU Lug – ½ Stud – Heavy Duty

13 Cold Shrinkable Single JCN Termination with Skirts Outdoor, 500mcm-750mcm 5kV, 350mcm-700mcm 8KV, 4/0 – 500mcm 15KV, 2/0-250mcm 25kV fir Concentric Neutral (1 Termination per kit) 250 MCM AL/CU Str. 2-Hole NEMA Long Barrel AL/CU Lug – ½ Stud – Heavy Duty

14 Ground Flags (Red) 15 15 LOTO Tag Holder 20 16 Hold Card Tag Tool 12 17 Ground Mat (Yellow) 58” x 58” 1 18 Underground Warning Tape 1 19 Basic OX Kit 1 20 Dig Volt Phasing Meter Kit 1 21 Bushing Adapter 2 22 Hot Stick Canister 6” PVC 5 23 Dual Display Dig Voltmeter 1 24 ¾” x 10’ Ground Rod 4

CUI 5

25 Ground rod clamp (package of 5) 4 26 Split Bolt #8 to #3 AWG 20 27 Split Bolt #1 to 250 KCMIL 20 28 HV Ammeter 2 29 2-hole lug, 250 KCMIL 60

Table 2 List of Electrical Materials

2. WORK AREA ACCESS

2.1. This worksite is located on PSFB but not within the restricted area and all contractors must have proper authorization. Upon acceptance of this contract, the contractor shall complete and submit a PSFB Visitor Request to 21st CES. All PSFB Visitor Request requests shall be submitted no later than 15 business days prior to the first day of work.

The Contractor shall coordinate EAL processing with the Contracting Officer. Any contractor who fails to pass a background check will not be permitted to work on the installation.

3. SAFETY

3.1. All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147) and 29 CFR 1926, and Air Force Occupational Safety & Health (AFOSH) AFOSH standards including 91-205.

4. PROTECTION OF GOVERNMENT PROPERTY

4.1. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the government installation. If the Contractor fails to use reasonable care and causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.

5. CLOSEOUT

5.1. Submit all equipment specifications including wiring sizes and electrical information prior to ordering any parts or equipment.

5.2. Contractor shall provide a Warranty Letter identifying start and duration of warranty.

Equipment shall have a standard warranty for a minimum of 12 months.

END OF STATEMENT OF WORK

1.1. GENERAL REQUIREMENTS
1.2. PURPOSE
1.3. CIVIL MATERIALS
1.4. ELECTRICAL MATERIALS
2. WORK AREA ACCESS
3. SAFETY
4. PROTECTION OF GOVERNMENT PROPERTY
5. CLOSEOUT