Attachment 1 - Statement of Work (SOW).pdf

PDF 77 KB Posted

Attached to
Liquid and Solid Runway Deicer at WPAFB Federal contract opportunity
Solicitation number
FA860121R0056
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Liquid and Solid Runway Deicer at WPAFB, newest first.
File Type Posted
Attachment 7 - Solicitation FA860121R0056 Amendment 2.pdf PDF
Attachment 6 - Solicitation FA860121R0056 Amendment 1.pdf PDF
Attachment 3 - Solicitation FA860121R0056.pdf PDF
Attachment 5 - Question and Answer.docx DOCX document
Attachment 4 - Justification and Approval (Redacted).pdf PDF
Attachment 3 - Solicitation FA860121R0056.pdf PDF
Attachment 2 - Bid Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

13 July 2021

STATEMENT OF WORK

LIQUID AND SOLID RUNWAY DEICERS

REQUIRED DELIVERY/PERFORMANCE SCHEDULE

THE CON TRACTOR SHALL DELIVER SUPPLIES TO THE GOVERNMENT AND OR

PERFORM THE SERVICES CALLED FOR HEREUNDER AS FOLLOWS

1. SPECIFICATIONS FOR LIQUID RUNWAY DEICER:

1.1. Fluid, Deicing/Anti-icing, Runways and Taxiways

1.2. Potassium Acetate based - in addition to requirements set by AMS 1435 A full copy of the latest revision of the AMS 1435 specification can be found at SAE www.sae.org

1.3. Specifications cover a potassium-acetate based deicing/anti-icing fluid in the form of a concentrate liquid meeting FAA-approved specifications SAE AMS 1435 ("The Fluid").

1.4. The Fluid shall be minimum 50% potassium acetate by weight with a freezing point of -76°F (-60°C) or lower (method: ASTM DI 177). The Fluid shall not contain Urea, ethylene or propylene glycol.

1.5. The vendor shall provide comprehensive, on-site training and/or technical briefing to personnel on proper use and application rates.

1.6. The vendor shall provide the name and location of The Fluid production site and a copy of independent laboratory certification of The Fluid to AMS 1435. The certification shall be dated within 24 months of bid submittal. If a license of subcontractor produces The Fluid, all testing shall be required on The Fluid produced at the site as if The Fluid were being initially qualified. The vendor must provide documentation that the licensee or subcontract conforms to AMS 1435

4.4.3. Whenever a fluid is to be produced by a licensee or subcontractor, all testing shall be required on fluid produced at the site, prior to initial shipment. This information is to be provided with bid submittal.

1.7. The Fluid density shall be 10.68 lbs/gal (1.28 kg/L) at 68°F (20°F); the pH shall be in the range of 10.5 to 11.5. This information is to be provided with bid submittal.

1.8. The vendor shall provide written technical information covering at minimum: The

Fluid's environmental impact, SDS, handling storage and application guidelines.

This information is to be provided with bid submittal.

1.9. The vendor shall provide a complete acute aquatic toxicity test report for The

Fluid. The report shall be by an independent party and state compliance with U.S.

EPA Test Methods 40 Code of Federal Regulations Parts 797 .1300 and 797.1400.

The 48-hour daphnia test result shall be reported and shall not be less than 1000 mg/L. The 96-hour test result for rainbow trout, bluegill or fathead minnow shall be reported and shall not be less than 1000 mg/L. This information is to be provided with bid submittal.

1.10. The vendor shall provide a report of The Fluid's biochemical oxygen demand (BOD) and theoretical total oxygen demand (TOD). The report shall be by an independent party and state compliance with EPA test methods. This information is to be provided with bid submittal.

1.11. The vendor shall provide an independent third party test report of The Fluid's compatibility with asphalt concrete pavement materials, including bitumen softening and asphalt concrete adhesion strength before-and after immersion. This information is to be provided with bid submittal.

1.12. The Fluid shall be stable and shall not separate in storage.

2. SPECIFICATIONS FOR SOLID RUNWAY DEICER:

2.1. Compound, Solid Deicing/Anti-icing, Runways and Taxiways.

2.2. 97% Anhydrous Sodium Acetate Base - in addition to requirements set by AMS 1431. A full copy of the latest revision of the AMS 1431 specification can be found at SAE www.sae.org

2.3. Specifications cover an anhydrous sodium acetate based deicing/anti-icing solid meeting FAA-approved specifications SAE AMS 1431 ("The Product").

2.4. The Product shall be anhydrous sodium acetate and contain no more than 1% corrosion inhibitors.

2.5. The vendor shall provide a copy of independent laboratory certification of the Product to AMS 1431 certification and shall be dated within thirty-six (36) months of the bid submittal.

2.6. The Product shall be spherical in shape.

2.7. The vendor shall provide comprehensive technical information covering at minimum: The Product’s environmental impact, SDS, handles, storage and application guidelines with the bid submittal.

2.8. The vendor shall provide chemical toxicity testing for the Product. The report shall be from an independent party and meet the requirements of EPA Method 40 Code of Federal Regulations (CFR) Part 797.1300 and 797.1400. The results shall be reported and show an LC50 of greater than 1000 mg/L for the species tested.

2.9. The vendor shall report the Product’s biological oxygen demand and toxicity with the bid submittal.

2.10. The vendor shall provide comprehensive on-site training to government personnel.

The training will include a general overview to include application rates and usage guidelines.

3. DELIVERY: The contractor shall deliver supplies as follows:

3.1. PLACE OF DELIVERY:

3.1.1. The contractor shall deliver the liquid deicer to the liquid storage tanks located at building 30029, Area A, Wright-Patterson AFB, Ohio, 45433.

3.1.2. The contractor shall deliver the solid runway deicer to building 30247, Area A, Wright-Patterson AFB, Ohio, 45433.

3.2. TIME OF DELIVERY:

3.2.1. Each delivery shall be set up for the time and place agreed upon at the time of the call by authorized personnel. Delivery shall be started within forty-eight (48) hours after placement of call and completed within seven (7) days.

After the call is placed the contractor shall deliver to the assigned location as instructed.

3.2.1.1. Authorized Personnel:

Greg Wheelock Harold Honeycutt Travis Behnken Aime Haas Gary Young Kristian Wade

3.3. HOURS OF DELIVERY:

3.3.1. Deliveries will be between 0730 and 1530 hours, unless otherwise specified by the Government due to emergency requirements, Monday through Friday.

3.4. ADVERSE WEATHER CONDITIONS:

3.4.1. If adverse weather conditions preclude delivery at the agreed upon time, the contractor shall advise an authorized personnel of the earliest possible time of delivery. In no event shall delivery be completed later than seven (7) days after placement of the call.

3.5. EMERGENCY ORDERS:

3.5.1. Emergency requirements shall be completely delivered within twenty-four

(24) hours of notification, including holidays and weekends.

3.6. REFUSAL OF PRODUCT:

3.6.1. Refusal of product will be made by the 88 CES authorized personnel who is designated to receive it. Grounds for refusal include, but are not limited to:

3.6.1.1. Shipments contaminated with anything other than what is listed on the shipping label.

3.6.1.2. Ripped or damaged sacks or containers.

3.6.2. The contractor is responsible for transportation of refused product back to the supplier.

4. RECOGNIZED HOLIDAYS:

4.1. The contractor is not required to provide product on the following days:

• New Year’s Day

• Martin Luther King Day

• Presidents’ Day

• Memorial Day

• Juneteenth National Independence Day

• Independence Day

• Labor Day

• Columbus Day

• Veterans’ day

• Thanksgiving Day

• Christmas Day