Attachment 1 - Statement of Work (SOW).pdf
PDF 1 MB Posted
- Attached to
- 2 CES - Strom Drain Inspection
- Solicitation number
- FA460824QS026
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to inspect stormwater lines near a runway. The contractor shall evaluate the condition of approximately 25,729 feet of underground stormwater drainpipes and junction boxes, document any existing issues or deficiencies, and provide recommendations for necessary repairs and maintenance. The contractor shall coordinate with the base's Civil Engineering Squadron and Airfield Management to establish access and obtain necessary permits. The contractor shall compile a detailed catalog of all identified issues, including photographs, videos, and descriptions, and provide a comprehensive report summarizing the inspection findings and recommendations. The work is to be completed within 45 days of the notice to proceed, during normal business hours Monday through Friday, excluding federal holidays. The related federal contract opportunity, Solicitation Number FA460824QS026, is for the 2 CES - Strom Drain Inspection, with the Department of the Air Force Global Strike Command as the procuring agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Inspect Storm Water Lines near
Runway
DESCRIPTION OF WORK: The contractor shall evaluate the condition of the stormwater drainpipes and junction boxes, document any existing issues or deficiencies, and provide recommendations for necessary repairs and maintenance.
Contractor shall coordinate with 2 CES and Airfield Management to establish access to the stormwater drain lines located on infield of the runway and obtain any necessary permits or permissions for conducting the inspection. Contractor shall conduct a comprehensive visual inspection of approximately 25,729 feet of underground stormwater lines on the east and west side of the south end of the runway as indicated on the Airfield drainage map below. Contractor shall take notes of GPS coordinates of all deficiencies. Contractor shall compile a detailed catalog of all identified issues, including photographs, videos, and description of each issue.
DELIVERABLES:
• Contractor shall provide recommendations for necessary repairs, maintenance, or replacement of stormwater lines based on the findings of the inspection.
• Contractor shall prepare a comprehensive report summarizing the inspection finding catalog of issues and recommendations.
A. The work covered by this contract shall consist of, but is not limited to, the furnishing of all labor, services, tools, materials, equipment, transportation, supervision, and all miscellaneous requirements needed to perform all operations in conjunction with the effort to accomplish the Statement of Work (SOW). The project shall be completed in accordance with industry and conformance standards, applicable safety regulations, Government contract specifications and this SOW. Contract shall coordinate access and project schedule indicating the beginning of all work activities and the anticipated completion dates.
B. FIELD CONDITIONS: The contractor shall be responsible for all field measurements to accomplish work. Quantity and sizes of materials shall be determined from site visits and drawings. The contractor shall carefully examine the entire site and building and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents. Contractor shall notify and work with Airfield Operations Management (318-456-3226) in coordination with construction on airfield. Furthermore, contractor shall provide their own special equipment needed to fulfill the accomplishment of work and obey any safety regulations assign to Barksdale AFB.
FA460824QS026
Attachment 1 - Statement of Work (SOW)
C. ACCOMPLISHMENT OF WORK: The contractor must ensure all access to the existing work area always remain clear for occupants and emergency egress during the construction period. All temporary closures, barriers , and protective procedures shall be coordinated with the Contracting Officer or representative. All work shall be accomplished between the hours of 07:30 a.m. and 4:30 p.m. to exclude federal holidays and weekends. The contractor shall coordinate with Airfield Operations Management for a temporary construction waiver on airfield. Contractor shall coordinate with airfield management for escort out onto the airfield.
WORK CONDITIONS: The contractor shall coordinate base access and work schedule with the Airfield Manager and/or Contracting representative. This schedule shall describe major work items and projected completion dates. The contractor shall notify the Airfield Manger the day he/she moves onto the work site to commence work. The contractor shall again provide notification the day he/she moves back to the work site after an interruption of work schedule and updates if required.
D. PROTECTION OF BUILDING PROPERTY AND PERSONNEL: The contractor shall protect from damage all building property located in or adjacent to the building and shall repair, replace, or otherwise be held liable for all such damage. Building property includes, but is not limited to furniture, vehicles, or items of supplies. Exercise control measures of all dust and toxic fumes associated with certain construction operations to prevent hazards or illness to base and contractor personnel.
E. CLEAN UP: The contractor shall clean up each work site at the end of each workday to the satisfaction of the POC. Upon completion of the work, all demolished equipment and debris shall be removed from the site and the area shall be left in a neat and completely acceptable condition.
F. PERFORMANCE PERIOD: The Contractor shall complete within 45 days of notice to proceed. Workdays are Monday-Friday 7:30 a.m. to 4:30 p.m. except on federal holidays.
FA460824QS026
Attachment 1 - Statement of Work (SOW)
File details come from the government source that posted it. Updated .