Attachment 1 - Statement of Work (SOW).docx

DOCX document 47 KB Posted

Attached to
USCG SMTC Barracks Motorized Valve and Dedicated Outdoor Air System (DOAS) Functional Assessment
Solicitation number
70Z02726QPORT0019
Issued by

About this file

This is a Statement of Work (SOW) for the USCG SMTC Barracks Motorized Valve and Dedicated Outdoor Air System (DOAS) Functional Assessment at Naval Support Activity Northwest Annex, 1320 Northwest Blvd, Chesapeake, VA 23322. The contractor must inspect, test, and diagnose the functionality of 3-way motorized valves and actuators on both heating (hot water) and cooling (chilled water) coils for 20 separate air handlers, identifying root causes of malfunctions and providing clear repair or replacement recommendations. Work includes verifying water flow to both hot and cold sides of each air handler and conducting a thorough operational, mechanical, and controls assessment of the existing DOAS to identify deficiencies, operational improvements, and required repairs.

Task One requires visual inspection of valves and actuators for leaks, corrosion, physical damage, and loose wiring; voltage verification using a multimeter; commanding valves to different positions and measuring control signals; checking wiring and terminal connections; and verifying water flow. Task Two requires a comprehensive DOAS assessment with all findings and recommendations documented in a formal report. All work must be performed between 0700-1530 EST, Monday through Friday, with the period of performance not exceeding 30 working days after contract award. The contractor must furnish all facilities, materials, equipment, and services; coordinate base access through DBIDS credentials; comply with federal safety (OSHA) and environmental (EPA) regulations; obtain all necessary permits; and employ only qualified personnel available for telephone consultation with the Quality Assurance Evaluator (QAE) Nathan Chappell (757-483-8792, Nathan.C.Chappell@uscg.mil) between specified hours. Deliverables must be provided in electronic format compatible with Microsoft Office applications, and travel costs must be included in overall pricing.

View the file

Other files

File Type Posted
SF1449 RFQ 70Z02726QPORT0019.pdf PDF
Attachment 2 - DOL Wage Determination.pdf PDF
Attachment 3 - DOL SCA Poster.pdf PDF
RFQ 70Z02726QPORT0019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

Motorized Valve and Dedicated Outdoor Air System (DOAS) Functional Assessment. USCG SMTC Barracks

1.1 SCOPE

The work will consist of inspecting, test, and diagnose the functionality of the 3-way motorized valves and their associated actuators on both the heating (hot water) and cooling (chilled water) coils for 20 separate air handlers.The goal is to identify the root cause of any malfunction and provide clear recommendations for repair or replacement. Verify the water flow to both the hot and cold sides of each air handler.

To conduct a thorough operational, mechanical, and controls assessment of the existing Dedicated Outdoor Air System. The primary goal is to identify any deficiencies, areas for operational improvement, or required repairs. All findings and actionable recommendations will be documented in a formal report to be submitted to the USCG .

Location of work: The primary place of performance will be at 1320 Northwest Blvd Chesapeake,VA 23322. Naval Support Activity Northwest Annex

2.1 TASK One . Air Handler 3-Way Motorized Valve Troubleshooting

2.1.1 Before any work begins, properly lock out and tag out all related electrical and mechanical energy sources to the Air Handler Unit.

2.1.2 Conduct a thorough visual inspection of both the hot water and chilled water 3-way valves and their actuators. Check for any visible signs of leaks, corrosion, physical damage to the valve body, or loose wiring.

2.1.3 Using a multimeter, confirm that the actuator for each valve is receiving the correct voltage (e.g., 24VAC or 24VDC) as specified by the manufacturer.

2.1.4 Command the valve to different positions (e.g., 0%, 50%, 100%) and measure the corresponding control signal at the actuator terminals (e.g., 2-10 VDC, 4-20 mA). Verify that the signal is present and matches the commanded output.

2.1.5 Check all wiring and terminal connections between the controller and the actuators for both valves. Ensure all connections are tight and free of corrosion.

2.1.6 Verify the water flow to both the hot and cold sides of each air handler.

2.4.7 Provide clear report of all findings along with recommendations for repair or replacement.

2.4.7 Once troubleshooting is complete, remove all Lockout/Tagout devices and restore the system to its normal operating condition.

2.5 Task Two Dedicated Outdoor Air System (DOAS) Assessment and Recommendation Report

2.5.1 Before any physical inspection of internal components, ensure all electrical disconnects for the DOAS unit are properly locked out and tagged out

2.5.2 Conduct a thorough operational, mechanical, and controls assessment of the existing Dedicated Outdoor Air System.

2.5.3 Once inspection is complete, remove all Lockout/Tagout devices and restore the system to its normal operating condition.

2.5.4 provide a report to the USCG of all findings and any recomdentations for repairs.

3.0 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this SOW.

4.0 KEY PERSONNEL

Project Manager

4.1 PROJECT MANAGER

4.1.1 The Project Manager must be available to the QAE via telephone between the hours of 0700 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 24 hours of notification.

5.0 EMPLOYEE IDENTIFICATION

5.0.1 All Contractor personnel, including any subcontractors, performing work under this contract are required to obtain Defense Biometric Identification System (DBIDS) credentials for unescorted access to the installation. The Contractor is solely responsible for coordinating with the base Visitor Control Center (VCC) to complete the registration process for all its employees. Failure to obtain and present a valid DBIDS credential will result in denial of unescorted access. Any resulting project delays, schedule impacts, or additional costs will be the sole responsibility of the Contractor.

5.1 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

5.2 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

5.3 SITE VISIT

A site visit is recommended to conduct field verification of any/all quantities and measurements before submitting bids. Interested parties shall make arrangements for a site visit with the QAE.

5.3.1 DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE

Nathan Chappell. 757-483-8792 Nathan.C.Chappell@uscg.mil.

5.3.2 All site visits are to be pre-arranged a minimum of three (03) days in advance.

5.3.3 CONDITIONS AFFECTING THE WORK

The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents. All contractors that require Base access will have to be pre-vetted for entry prior to commencement of work. All work that exceeds a completion time greater than 10 days, may be subject presenting RapidGate as a method of Base entry.

6.0 AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

7.0 PERIOD OF PERFORMANCE

The period of performance for this contract must not exceed 30 working days after contract award or as negotiated with Contracting Officer and Facilities Engineering.

7.1 PLACE OF PERFORMANCE

The primary place of performance will be at 1320 Northwest Blvd Chesapeake,VA 23322.

7.2 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0700 and 1530 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government to inspect the work in progress.

7.3 TRAVEL

Travel shall not be included as an additional/separate line item. Travel is required for delivery and installation purposes and shall be included as part of the overall cost.

7.4 GENERAL REPORT REQUIREMENTS

The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).

7.5 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.

7.6 GOVERNMENT ACCEPTANCE PERIOD

Upon completion of work, contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

7.6.1 The QAE will conduct an inspection of the work conducted by the Contractor and will have the right to reject or require correction of any deficiencies found that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the QAE of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

8.0 OTHER APPLICABLE CONDITIONS

8.1 SECURITY/SAFETY

All contractors working on Naval Support Activity Northwest Annex shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

Written notification must be provided to the Base Safety Officer; in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Naval Support Activity Northwest Annex . A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.

Every employee working on Naval Support Activity Northwest Annex has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

8.2 ENVIRONMENTAL PROTECTION REQUIREMENTS:

All contractors working on Naval Support Activity Northwest Annex shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractors written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.

Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Naval Support Activity Northwest Annex . Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

8.3 PERMITS: The contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

8.4 WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory for the Contracting Officer.

8.5 ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

PAGE 8/17