Attachment 1 - STATEMENT OF WORK (SOW).docx
DOCX document 36 KB Posted
- Attached to
- H145--National Boiler Contract - Training, Testing, Program and Design document Reviews (VA-20-00058849) Federal contract opportunity
- Solicitation number
- 36E77620Q0079
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 9 - Standard ES - 2018 - 001.pdf | ||
| Attachment 8 - Technical Question Responses.docx | DOCX document | |
| 36E77620Q0079 0001.docx | DOCX document | |
| Attachment 5 - Revised Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 6- Past Performance Questionnaire (PPQ).docx | DOCX document | |
| Attachment 7 - Wage Determination Information.pdf | ||
| 36E77620Q0079_1.docx | DOCX document | |
| Attachment 5 - Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 4 - SOW Appendix C- Program Review Tracking Sheet.xlsx | XLSX spreadsheet | |
| Attachment 3 - SOW Appendix B - VHA Directive 1810.pdf | ||
| Attachment 2 - SOW Appendix A - Boiler Program Plant Assesment.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Boiler Safety Testing and Training
Contract Terms:
This is a firm, fixed-price requirements contract with a Period of Performance of September 30, 2020 through September 29, 2025. The contractor shall provide all equipment, supplies, management, supervision, personnel, and transportation necessary to assure that all services are in accordance with the contract and all applicable laws and regulations. The contractor shall ensure all work meets performance standards specified in this SOW and referenced documents.
Consultant Tasks
A. Detailed Boiler Plant Program review (CLIN 0001)
a. Consultant shall review the boiler plant operations program at an estimated total of 60 Medical Center sites during the duration of this contract. Each session shall be 3 consecutive 8 hour days at locations throughout the continental United States and Puerto Rico. Specific locations will be identified at the task order level.
b. The following areas shall be addressed:
i. The purpose of these evaluations is to try to assess why certain sites have excellent Boiler Plant Operations Programs and how this information can be used to develop a national strategy to strengthen the Boiler Operations program nationally. The consultant shall speak with the Chief Engineer and Boiler Plant Supervisor or Lead to verify the below information. To the extent possible, hard copy data should be supplied as supporting documentation.
ii. The consultant shall visit each site for 3 consecutive days. Sites will be picked by VHA Office of Healthcare Engineering (10NA5E).
iii. At each site, the Consultant will interview the Boiler Plant Supervisor, Chief Engineer and possibly others outside of the boiler plant to be able to collect the following information at a minimum.
iv. The consultant shall use the attachment number 1 - Sample questions for Boiler Plant Assessment:
v. Management Reports: Detail Boiler Program Review:
· The consultant shall provide the VA with a site-specific report which shall include items reviewed, analysis of status, any conclusion/recommendations for improvement, action items, successes, challenges, etc. for each site:
· Upon the conclusion of each task order, the consultant shall also provide a summary report of all sites that shall address the same issue as the individual reports, only at a National level with global perspective. The management summary report shall address a national strategy to reduce risk and minimize exposure related to Boiler Plant Operations based on this review and a broader overview perspective to address what should take place nationally to improve the Boiler safety program.
B. Boiler Plant Safety Device Training (CLIN 0002)
a. Consultant shall perform Boiler training sessions at an estimated total of 145 facilities during the duration of the contract. Each session shall be 3 consecutive 8 hour days at locations throughout the continental United States and Puerto Rico. Specific locations will be identified at the task order level. The training will be for the site VA Boiler operators and supervisor from within that VISN. In the training session, the consultant will demonstrate how to test the safety devices using the VHA Boiler Plant Safety Device Testing Manual - Current Edition. The Consultant will review the process to develop a site-specific testing procedure document and explain how to set up the plant equipment for convenient and safe testing of the safety devices and how to properly use test equipment. Training on proper methods to test safety devices will be conducted. The objective is for plant personnel to actively participate in the testing while being "taught/coached" by the consultant/s and test identified in item c. below. The next priority will be given to training on those safety devices requested by the supervision/plant personnel and then as many other safety devices as time permits.
b. Consultant will send 1 trainer to each site identified in the task order and the VA will have up to 6 attendees.
c. The following Safety Devices must be tested during this training:
i. Low fire proving switch(s)
ii. Low water levels (all)
iii. High steam pressure switches (all)
iv. Lift the safety valves
v. Purge air proving switch
vi. Combustion air proving switch
vii. Proof of closure switches
viii. High and low gas pressure switches
ix. Low O2
x. Test the flame scanner for all failures - times, seeing spark, early spark termination, etc.
xi. High and low oil pressure switches
xii. Low atomizing media pressure switch
d. Provide Summary of Safety Device Tests and if they passed, failed or failed repaired.
e. Did the facility have written Policy and SOPs that address (Publish date must be less than 3 years old):
· Boiler Plant Safety Devices and testing frequencies – Yes/No/Inadequate
· Boiler Plant has a policy or SOP that addresses ongoing boiler Operator Training – Yes/No/Inadequate
· Boiler Plant has a policy or SOP that addresses emergency operating conditions - Yes/No/Inadequate
· Facility is firing boiler and pilot light per Directive on alternate fuel (fuel oil, propane, etc.) - Yes/No/Inadequate
g. Each site will be assessed by the consultant in the following areas (the consultant may suggest other assessments to be used in addition to the below):
i. Status report of Safety Devices (pass/fail) tested above as compared to the documentation of the testing provided by the facility.
ii. BP Supervisor engagement in safety device testing, willingness to learn and participation at training session.
iii. Facility knowledge of the proper safety device testing methods and understanding of the site-specific requirements.
iv. Ability to test the safety devices correctly
v. Plant equipment being set up for proper device testing
vi. Proper test equipment is available and documented calibration data on record.
vii. Ability/knowledge to use the testing equipment
viii. Boiler Plant overall score as related to Boiler Plant Safety Device testing.
ix. Whether the Safety Device Testing can be performed safety in-house.
x. The above questions should be graded as follows:
1. 5- Excellent/Good, progressing in the correct manner and has or will meet the VA goals if they continue in this manner.
2. 3- Fair, progressing in the correct manner, but more is needed in this area to meet VA goals in a timely manner
3. 1- Poor, progress is not going well and at this pace will not accomplish VA goals in a timely manner
4. The contractor shall track each site included in the respective task order and the above 9 questions via an excel spreadsheet and send CEOSH an updated spreadsheet every month by the 15 day of each month and provide a summary report annually.
h. Consultant shall evaluate the site-specific testing procedures. If they have not been developed the consultant shall coach the site on their development.
i. Consultant will provide training material and test equipment sufficient to accomplish the work. Examples of test equipment includes: combustion analyzer for oxygen, carbon monoxide test gas, and electrical multi-meter for continuity and voltage. Typical and usual audiovisual equipment may be requested in advance from the VAMC, if needed.
j. Combustion tests will be performed on one boiler on at least three load points from low fire to high fire.
k. Review water chemistry tests performed on water in one boiler, condensate return and on soft water.
l. An overview of the plant arrangement will be conducted regarding access to valves and equipment, the existence of valved piping bypasses of equipment such as the feed water deaerator, for emergencies, normal repairs, and inspections.
m. Each site visit will begin with a 30-minute meeting with the VAMC management and invited staff to discuss the objectives and methods of the staff training.
n. Consultant will briefly interview plant supervision, operators, and involved maintenance personnel to evaluate their knowledge, skills, education, and experience.
o. A final meeting on-site with plant personnel will be conducted to discuss findings and recommendations, and to respond to questions. Allow up to one (1) hour for this activity.
p. An exit meeting will be conducted providing an oral report to VAMC management to discuss findings and recommendations. Allow 1 hour for this activity.
q. After the first training session the consultant will provide up to 1 hours of telephone and/or email time to answer questions from each of the sites trained. Questions will be in form of email from Supervisor with COR CC: to the contractor. All questions shall be asked within 2 months of the site visit.
r. During the site visit, the consultant shall review any existing standard operating procedure (SOP) for “On-Going Training” and “Safety Device Testing” for the site. In the absence of an existing SOP, the consultant shall develop such document. The attachment 2- Directive 1810 shall be the basis for both the revised or new SOP. Once a draft is developed the consultant will send the final draft SOP with the Training Site Specific Written Report.
s. Site Specific Written Report - will be prepared for each site addressing the above items that were assessed and delivered by email to CEOSH officials and/or designees within 3 weeks of completion of the site visit. The consultant’s report shall provide the VA with a site-specific review of the items investigated, the deficiencies found, any conclusion/ recommendations, action items, successes, challenges, complete with pictures and backup documentation etc. for each site based upon the above evaluation items and onsite training sessions. The consultant shall also ensure the updated SOP for “On-Going Training” and “Safety Device Testing” is included as part of the final deliverable for this task.
C. Safety Device Testing (CLIN 0003)
a. Consultant shall perform Boiler test sessions at an estimated total of 45 facilities during the duration of the contract. Specific locations will be identified at the task order level. Each session shall be 3 consecutive 8 hour days at locations throughout the continental United States and Puerto Rico. Testing will be onsite for 22 hours. Testing shall include all Boiler Safety Devices and be tested in accordance with the VA Safety Device Testing Manual Version 5/or current version. The Contractor shall provide a report and Tracking Sheet (see Attachment 3).
b. After the testing session the consultant will provide up to 1 hours of telephone and/or email time to answer questions from each of the sites tested. Questions will be in form of email from Supervisor with COR CC: to the contractor. All questions shall be asked within 2 months of the site visit.
D. Update VHA Safety Device Testing Manual (CLIN 0004)
a. Contractor shall update the current edition to reflect the following:
Specific details regarding updates to the VHA Safety Device Testing Manual will be included at the task order level.
E. Boiler Construction Design Reviews (CLIN 0005)
a. Consultant shall conduct review of boiler plant construction documents to ensure compliance with all VA, federal and local code and standards. The basis for reviews will be: VA boiler plant directive, VA Steam Design Manual and other VA design manuals, VA Safety Device Test Manual, VA Specifications, codes, regulations and laws. In addition to the references provided the review must consider potential boiler operational disruptions, employee impacts and help ensure boiler plant compliance. Consultant shall provide a full report for each review complete with findings, recommendations for mitigation strategies when needed, to correct problems identified; and promote strategies to minimize risks to operations, and employees. Consultant must provide technical assistance resources with reliable support to effectively address problems with design deficiencies, so they don’t proceed to construction/operational issue. VHA will require immediate access to services and readily available experts. Consultant personnel will work independently under the general guidance of VHA Office of Healthcare Engineering (10NA5E) staff or could participate in teams that are led by VHA staff. No travel is required for this task.
b. Tasks for Boiler Construction Design Review Support
Project Review
· Upon the award of a task order, the consultant will be sent a set of project documents. Design review documents may include Basis of design, narratives, specifications, drawings, calculations, product information, requests for information (RFIs), cost estimates or other documents. Facility Manager or designee will provide documents in electronic format. Subsequent design reviews of the same project (if any) require confirmation of previous comment resolution.
· The consultant shall develop a complete report of the review and findings and provide a copy of all reports and comments to COR, as well as Facility Manager or designee. At a minimum the report shall include the following and be submitted within a week of the completion of review.
· Summary of understanding of project scope
· Executive summary
· Findings of review
· Recommendations of corrective actions
· Action grid of findings and recommended corrective actions.
Reports shall be provided according to the following timelines:
A. Task Level 1: review Replacement of one boiler7-day review time B. Task Level 2: review New or Replacement of Boiler Plant 14-day review time C. Task Level 3: review Replacement of Central Utility Plant 21-day review time
Note: VA will identify the level of review needed at the task order level.
General Information:
· Requests for contract changes or modifications will be made to the VA Contracting Officer through the CEOSH designated Contracting Officer Representative (COR)
· The consultant will immediately contact VACO 10NA5, OCFM and CEOSH designated officials concerning any high-risk safety issues for the Medical Center Boiler Plant Operations. Also contact the designated CEOSH COR with any problems related to performing the requirements of this contract.
· Invoices for on-site sessions will be authorized for payment by the CEOSH once audit/training reports are received/approved by the CEOSH designated official/COR. All reports shall be received within 3 weeks. Any critical issues shall be emailed with confirmation of read to CEOSH and OCAMES.
· The contract shall follow latest versions of NFPA 70, 70E and 85.
· When performing work on “Live” electrical equipment or systems, the following minimum Personal Protective Equipment (PPE) shall be worn:
a. Long Sleeve Shirt - Natural fiber or arch rated (When Live Electrical Work)
b. Pants - Natural fiber or arch rated
c. Eye Protection - Goggles or Safety Glasses
d. Hearing Protection - When required by 70E or noise level (db)