Attachment 8 - Technical Question Responses.docx
DOCX document 74 KB Posted
- Attached to
- H145--National Boiler Contract - Training, Testing, Program and Design document Reviews (VA-20-00058849) Federal contract opportunity
- Solicitation number
- 36E77620Q0079
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 9 - Standard ES - 2018 - 001.pdf | ||
| 36E77620Q0079 0001.docx | DOCX document | |
| Attachment 5 - Revised Price Schedule.xlsx | XLSX spreadsheet | |
| 36E77620Q0079_1.docx | DOCX document | |
| Attachment 5 - Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment 4 - SOW Appendix C- Program Review Tracking Sheet.xlsx | XLSX spreadsheet | |
| Attachment 3 - SOW Appendix B - VHA Directive 1810.pdf | ||
| Attachment 1 - STATEMENT OF WORK (SOW).docx | DOCX document | |
| Attachment 6- Past Performance Questionnaire (PPQ).docx | DOCX document | |
| Attachment 7 - Wage Determination Information.pdf | ||
| Attachment 2 - SOW Appendix A - Boiler Program Plant Assesment.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS
AND RESPONSE TRACKING SHEET
Boiler Safety Testing and Training
RFQ 36E77620Q0079
PROJECT TITLE
SOLICITATION #
QUESTION ANSWERED
DATE
| CONTRACTOR QUESTIONS |
| VA RESPONSES TO QUESTIONS |
| 8/13/2020 | |
| 1. | CLIN0006 is for travel (to be priced on a fixed-price basis at the task order level). Do I need to bid dollars for airfare, car rental, hotel and food or does CLIN0006 cover this? If so, how is it accomplished? |
| The contractor that is awarded the contract will provide pricing for travel at the task order level, since it isn’t known at this point where and when the travel will be taking place. Therefore, no travel costs should be bid at this time. |
| 8/13/2020 | ||
| 2. | Attachment 5 “Price Schedule” varies from Attachment 1 “STATEMENT OF WORK (SOW)”. | |
| a. | Attachment 5 has CLIN0002 designated as “Boiler Safety Device Testing” and CLIN0003 as “Boiler Safety Device Training” | |
| b. | Attachment 1 has CLIN0002 designated as “Boiler Safety Device Training” and CLIN0003 as “Boiler Safety Device Testing” | |
| c. | The estimated annual quantity seems to match. It looks like a small typo. Can you please confirm what CLIN0002 and CLIN0003 are for (which one is for training and which one is for testing)? | |
| Please see “Attachment 5 – Revised Price Schedule” of amendment 0001, which corrects typo so CLIN 0002 and CLIN 0003 match the statement of work. |
| 8/13/2020 | |
| 3. | Will the activities for CLIN0001, CLIN0002 and CLIN0003 ever line up at a specific location at the same time? i.e. Will my team be able to come to a facility for the same three days to conduct a comprehensive review/training/testing? |
| The VA program office does not want these at same time. The staff level is minimal and cannot oversee more than one at time, and also have to keep operating. |
| 8/13/2020 | |
| 4. | Is there a specific format you want followed for the reporting contained within the scope? Do you have past examples that we could improve upon? |
| The safety device test manual and Directive 1810 should form the basis of all reviews and subsequent reports required by the contract |
| 8/13/2020 |
| For the 3 consecutive day site visits for program review, training and testing, is it a reasonable assumption that the consecutive days on-site will be Tuesday/Wednesday/Thursday with travel days potentially on Monday and Friday? |
| Yes, but we are open to M-W or W-F, as well. |
| 8/13/2020 |
| Will federal Holidays be excluded from working days? |
| Yes, no work on weekends or federal holiday. |
| 8/13/2020 |
| Will we be provided with a firm annual schedule of site visits (location and dates)? |
| VA will try to schedule each quarter, but there will be some changes due to unforseen conditions. |
| 8/13/2020 |
| Can you please forward a copy of your standards, requirements and guidance for low pressure boilers, low temperature low pressure (below 212 degrees Fahrenheit) hot water generators and other equipment and systems as defined by OCAMES and ACFM. It is our impression that these documents are currently not available to the public and is stored in your intranet https://vaww.vha.vaco.portal.va.gov/sites/DUSHOM/10NA5/HealthcareEngineering/SitesPages/Home.aspx |
Please see “Attachment 9 – Standard ES – 2018 -001” of amendment 0001, which provides a copy of the standards.
| 8/13/2020 |
| Can you please clarify if the requirement for past performance determination references needs to be submitted directly by our references to your office under separate cover addressing this information or merely as an attachment to the bid documents forwarded to your office in support of our effort to be available for follow up by the VA directly with said references if so desired by the VA. |
| Please have references submit past perfformance questionair directly to william.henkel@va.gov |
| 8/13/2020 |
| You specify the following experiential qualifitications as requirement for this contract: |
• At least 10 years of teaching and training on boiler plant equipment (Boilers size of 10,000 Lbs. of steam per hour or larger) and systems to plant personnel.
• At least 10 years of troubleshooting and analyzing problems related to boiler plant systems (Boilers size of 10,000 Lbs. of steam per hour or larger).
• At least 10 years of experience in writing and interpreting boiler and boiler plant safety device testing procedures specific to VA boiler systems.
• At least 10 years of experience in safety device testing specific to the VA’s Boiler systems.
• Auditing and reporting on boiler plant equipment and safety.
• At least one of the on-site personnel shall have Master of Science (MS) in Mechanical Engineering degree with boiler course work from an accredited university and 5 years of experience in the field.
• Perform Statistical Analysis on VA data for annual reports and individual site reports that are being evaluated to determine what areas of improvement are need VA wide.
• Show proof of Professional Engineers License (P.E.) – Preferred for Boiler Construction Design Reviews Task and updating the VHA Safety Device Testing Manual.
• Show how consultant can meet and understand the VA Safety device testing criteria."
Can you please advise if equivalent (or perhaps significantly more rigorous) experience in pressure vessel systems in chemical plants including steam generators (saturated, super-heated and super-critical) as well as high pressure and high temperature chemical reactors, separation and energy conversion equipment is acceptable for your qualifications? Our people have decades of substantial hands on training, operating, testing, auditing, and analytical experience in much higher pressure systems including integrated steam-power co-generation plants compared to the systems currently used to service the facilities of the VA.
The requirements are “At least” or “larger”. Would prefer to see some experience with our size of boilers, etc. If experience is not specifically with VA boiler systems, a clear description of the boiler system’s characteristics should be provided to demonstrate such experience is equivalent to or more complex than VA boiler systems.
8/13/2020
1. In the statement of work section B. Boiler Safety Device Training (CLIN 0002), part r. states
r. During the site visit, the consultant shall review any existing standard operating procedure (SOP) for “On-Going Training” and “Safety Device Testing” for the site. In the absence of an existing SOP, the consultant shall develop such document. The attachment 2- Directive 1810 shall be the basis for both the revised or new SOP. Once a draft is developed the consultant will send the final draft SOP with the Training Site Specific Written Report.
Are the “Ongoing Training” and “Safety Device Testing” SOPs referenced the policy documents governing those two items?
Directive 1810 (Attachment 3) is the reference for these policies.
8/13/2020
In the statement of work section C. Safety Device Testing (CLIN 0003), part a. states a. Consultant shall perform Boiler test sessions at an estimated total of 45 facilities during the duration of the contract. Specific locations will be identified at the task order level. Each session shall be 3 consecutive 8 hour days at locations throughout the continental United States and Puerto Rico. Testing will be onsite for 22 hours. Testing shall include all Boiler Safety Devices and be tested in accordance with the VA Safety Device Testing Manual Version 5/or current version. The Contractor shall provide a report and Tracking Sheet (see Attachment 3).
Please clarify if all safety devices on all boilers are to be tested or all the safety devices on one boiler are to be tested.
All Plant and boiler safety devices are to be tested.
8/13/2020
In the statement of work section C. Safety Device Testing (CLIN 0003), the number of engineers is not specified. Is this task considered “production work” where the objective is purely to produce test results or should it be interpreted more broadly to include some training/troubleshooting/repair?
Primarlily testing (95% or more). Testing requires 2 Engineers.
8/13/2020
In Attachment 5 (Price Schedule), CLIN 0006 is listed as “Travel (to be priced on a fixed-price basis at the task order level)” with columns for Unit, Estimated Annual Quantity, $/Unit, and Total Estimated Annual Value blacked out for CLIN 0006.
Does this mean that travel expenses should be included in the quotes for the other CLINs that require travel (i.e. CLINs 0001, 0002, and 0003)?
The contractor that is awarded the contract will provide pricing for travel at the task order level, since it isn’t known at this point where and when the travel will be taking place. Therefore, no travel costs should be bid at this time.