This document is a Statement of Work (SOW) for the United States Space Force to monitor rocket launch acoustics in Santa Barbara, Ventura, and northern Los Angeles counties. The primary requirements include procuring, developing, and deploying eight long-term and four to fifteen short-term acoustic monitoring stations to measure lift-off noise, ascent sonic booms, and re-entry sonic booms for at least 50 launches. The contractor will be responsible for calibrating stations quarterly, conducting spatial and statistical analysis of acoustic data, performing PCBoom modeling and simulations with meteorological data, and providing quarterly reports and presentations to Space Launch Delta 30 (SLD 30) and interagency partners.
The SOW specifies detailed technical requirements, including measuring acoustics at 51.2 or 50 kHz sampling, analyzing launch acoustic data, uploading results to an AFNET central repository within one week of each launch, and transferring ownership of the monitoring equipment to SLD 30 at the contract's conclusion. The contract is associated with a pre-solicitation Request for Information (RFI) seeking vendors in the North American Industry Classification System (NAICS) code 541690 for scientific and technical consulting services, with a size standard of $19 million. The Department of the Air Force Space Command is the sponsoring agency, seeking to continue acoustic launch and re-entry noise analysis.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARMENT OF DEFENSE
UNITED STATES SPACE FORCE
LAUNCH ACOUSTICS MONITORING STATEMENT OF WORK
Approval Date: Day Month Year Contract Number:
Prepared by: Adekunbi Adewunmi, SLD 30/S5I Prepared on: Day Month Year
1. SCOPE. The scope of this Statement of Work (SOW) is to monitor rocket launch acoustic through acoustic measurements of launch noise and sonic booms produced by rocket ascents and re-entries in Santa Barbara, Ventura, and northern Los Angeles counties. These measurements will include all trajectories and various meteorological conditions. The work consists of
a. Procurement, development, and deployment of eight (8) acoustic monitoring stations and identifying sites for those stations
b. Measurement of launch noise acoustic data at acoustic monitoring stations throughout the listed counties
c. Conducting spatial and statistical analysis of measured acoustic data
d. Conducting simulations using modeling software with rocket trajectories, and historic and forecast meteorological and weather ballon data to understand which factors impact launch noise and sonic booms seasonally
e. Compare modeled results with measured results and coordinate with SLD 30 partners to improve the model
f. Briefing results to SLD 30 and interagency partners
2. APPLICABLE REFERENCES
2.1. SLD 30 has the authority to conduct measurements of launch vehicle ascent and re-entry data and modeling. SLD 30 is authorized to enter into agreements with outside agencies to accomplish such as per:
2.1.1. AF Instruction 25-201, Support Agreement Procedures, 1 December 1996
2.1.2. Department of Defense Instruction (DODI) 3100.12, Space Support
2.1.3. DODD 3200.11, Major Range Test and Facility Bases
2.1.4. Title 33, Code of Federal Regulation, 334.1130
3. ACRONYMS and DEFINITIONS
3.1. AF – Air Force
3.2. AFNET
3.3. CONS – Contracting Squadron
3.4. DODI – Department of Defense Instruction
3.5. PKB
3.6. SLD – Space Launch Delta
3.7. SOW – Statement of Work
4. REQUIREMENTS
4.1. The contractor shall procure, develop, and deploy eight (8) launch acoustic monitoring stations, referred to as long-term stations.
4.2. The contractor shall travel to calibrate and perform maintenance at all long-term launch acoustics monitoring stations at least each quarter.
4.3. The contractor shall measure lift off noise, ascent sonic booms, and re-entry sonic booms for at least 50 launches at all long-term stations.
4.4. The contractor shall measure launch acoustics with 51.2 kHz or 50 kHz sampling.
4.5. The contractor shall measure lift off noise, ascent sonic booms, and re-entry sonic booms for at least four (4) launches at 10-15 short-term stations.
4.6. The contractor shall add additional measurements for structural vibrations for at least four (4) launches.
4.7. The contractor shall deploy long-term and short-term acoustic monitoring stations at locations in Santa Barbara, Ventura, and northern Los Angeles Counties at locations coordinated with SLD 30.
4.8. The contractor shall analyze all measured launch acoustic data and upload results to SLD 30 to a central repository in the AFNET.
4.8.1. The contractor shall deliver launch results to SLD 30 within one week of launch.
4.8.2. The results will include at least peak value at each station and a comprehensive map for each launch.
4.9. The contractor shall perform modeling and simulation with PCBoom for various launch trajectories and meteorological conditions.
4.9.1. The contractor shall include historic and forecasted meteorological and weather ballon data to modeling and simulation.
4.9.2. The contractor shall provide hindcasted modeling and simulation results for previously measured launches.
4.10. The contractor shall provide updates on analysis of meteorological impacts to sonic boom propagation at least quarterly.
4.11. The contractor shall provide quarterly reports or presentations launch noise acoustic analysis to SLD 30 and interagency partners.
4.11.1. The contractor shall provide presentations documents at least three (3) days prior to the meeting.
4.12. The contractor shall provided feedback to SLD 30 and the National Aeronautics and Space Administration (NASA) team for bug fixes and improvements to PCBoom.
4.13. The contractor shall attend monthly working groups with SLD 30.
4.14. The contractor shall transfer ownership of the launch acoustic monitoring equipment developed to SLD 30 at the end of the contract period of performance.
5. DATA DELIVERABLES
5.1. Contract Data Requirements List (CDRL)
| CDRL No. |
| Data Item Description |
| PWS Para. |
| Version/Rev |
| A001 |
| Raw Acoustic Data Recordings |
| Para 4.1, 4.3, 4.4 |
| 1.0 |
| A002 |
| Launch Analysis Reports |
| Para 4.9, 4.10 |
| 1.0 |
| A003 |
| PCBoom Model Input/Output Files |
| Para 4.11, 4.12 |
| 1.0 |
| A004 |
| Quarterly Technical Reports |
| Para 4.14, 4.15 |
| 1.0 |
| A005 |
| Quarterly Presentation Materials |
| Para 4.15, 4.16 |
| 1.0 |
| A006 |
| Equipment Documentation Package |
| Para 4.1, 4.19 |
| 1.0 |
| A007 |
| Meteorological Integration Data |
| Para 4.12, 4.13 |
| 1.0 |
| A008 |
| Station Calibration and Maintenance Records |
| Para 4.2 |
| 1.0 |
6. GOVERNMENT FURNISHED EQUIPMENT
| GFP Item |
| Equipment Description |
| Quantity |
| Location |
| PUMA LT Stations |
| Permanently installed acoustic monitoring stations with GRAS 146AE, 46AO-S5 Type-1 microphones, 51.2/50 kHz sampling capability |
| 8 Each |
| Santa Barbara, Ventura, and northern Los Angeles Counties |
The Government will provide the location of each geographic monitoring station, and make each station available for contractor usage within 10 business days of contract award.
7. OTHER AGREEMENTS
7.1. The contractor shall only perform work required under this statement of work. If they identify any additional requirements, they shall notify the Government and shall not proceed on work outside the scope of this SOW without written directions from the Contracting Officer.
8. AMENDMENTS
8.1. This SOW may be amended by a modification issued by the 30 CONS and by acceptance of modification by the agency/contractor.
9. OTHER PROVISIONS
9.1. Nothing stated herein is intended to conflict with the current federal or state directives or applicable law. If the terms of this SOW are inconsistent with existing federal or state directives or applicable laws, then those portions of the SOW which are determined to be inconsistent shall be invalid. The remaining terms of the SOW shall remain in full force and effect.