Attachment 1 - Statement of Work for PSx2 Amd 1.pdf

PDF 796 KB Posted

Attached to
Psyche Storage and Processing Service (PS Squared) Federal contract opportunity
Solicitation number
80KSC023CA001_RFP
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This is a combined synopsis and solicitation for commercial items from the National Aeronautics and Space Administration (NASA) Kennedy Space Center. NASA is seeking Psyche Storage and Processing Services (PS Squared) to support the Psyche mission. Key requirements include transportation, short-term storage, long-term storage, and assembly, testing and launch operations of the Psyche spacecraft. Services are needed from October 2022 through October 2023 at the contractor's payload processing facility. The solicitation number is 80KSC023CA001_RFP and offers are due by September 5, 2022. The NAICS code is 336419 with a size standard of 1,000 employees. The solicitation incorporates FAR clauses 52.212-4 and 52.212-5. Questions regarding this combined synopsis and solicitation must be submitted to Justin Ko at Justin.j.ko@nasa.gov by September 5, 2022. Responses shall be submitted electronically in accordance with Section 6.4 of the solicitation attachment.

View the file

Other files for this federal contract opportunity

Other files attached to Psyche Storage and Processing Service (PS Squared), newest first.
File Type Posted
SF 30 80KSC023CA001 RFP Amd 001.pdf PDF
80KSC023CA001 RFP.pdf PDF
Attachment 5 - PS Squared List of Applicable Documents.pdf PDF
Attachment 3 - PS Squared Acronyms and Abbreviations.pdf PDF
Attachment 4 - PS Squared Definitions.pdf PDF
Attachment 6 - Spacecraft Processing Termination.pdf PDF
Attachment 2 - PS Squared Data Requirements List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSx2 ATTACHMENT 01 SOW 80KSC023CA001_RFP Amd 001

Attachment 1

STATEMENT OF WORK (SOW)

Launch Services Program

Psyche Storage and Processing Services (PSx2) for the

National Aeronautics and Space Administration

Summary NASA Launch Service Program (LSP) is seeking to procure a payload processing facility (PPF) that is capable to support Psyche storage and processing services. Due to the Psyche’s unique requirements, LSP requires four discrete phases to support the mission that will coincide with mission milestones/gates impacting the initial launch capabilities (ILC). The four discrete phases are described within this Statement of Work (SOW). Furthermore, upon award, the hazardous procedures, safety data packages, and other pertinent mission processing information will be provided to the Contractor.

Key Requirements

• Spacecraft that will be packed by the Government into a Government-provided shipping container shall be transported once. If spacecraft is to be relocated within the facility, it shall be accomplished with minimal outside exposure. The relocation shall be coordinated with LSP to ensure minimal impact and relocation shall be within the Contractor’s PPF that will not require use of the shipping container (a move of no more than 1 mile distance).

• PPF must be able to support solar array integration with a minimum cleanroom working area of 70ft x 30ft.

• During Phase 4, Assembly, Testing, Launch Operations (ATLO 2.0), the spacecraft will have high pressure xenon/GN2 (2700psi) loading that require a minimum of 14 days with 24/7 support.

• Spacecraft shall be in a separate secured cleanroom working area from any other spacecrafts as stated in Section 2.12 (Joint Facility

Occupancy).

Processing Phasing Processing will be broken into 4 discrete phases that span from October 2022 to October 2023: (1) Transportation, (2) Short Term Storage, (3) Long Term Storage, and (4) ATLO 2.0. Reasons for the delineation of phases is to coincide with project milestones/gates that may impact the future launch date of Psyche.

Phase 1- Transportation Phase one encompasses the move of Psyche flight hardware, mechanical, and electrical GSE from the PHSF to the Contractor’s PPF. The spacecraft will be transported in the Government-constructed shipping container on a Government-provided flatbed truck. The loading of all spacecraft flight hardware, mechanical, and electrical GSE will be accomplished by the Government.

The Contractor shall be responsible for the below:

Phase Key Requirements

• Certificate of Facility Readiness

The Contractor is responsible for submittal of the COFR of Spacecraft arrival for Phase 1 and Phase 2 no later than 2 days prior to initial facility occupancy. The Government will provide approval/ disapproval not later than 1 day prior to initial facility occupancy. The approval will involve random inspection of system back-up documentation used in the preparation of the COFR and may include an inspection or walkthrough of the facility, by the COR or a designee. As a minimum, the COFR shall:

Identify all systems by name Identify each system as critical/non-critical Provide a brief description of status and readiness of the facility and each facility system Provide a copy of the certification for each system’s proofload, calibration, compliance, or inspection Provide supporting documentation for each system Include an Open Items, Issues and Concerns Section with associated correction plan and date Include an Exception, Waivers, and Deviation Section Provide a Safety Statement of Readiness

• 30 ton crane capacity

• Working cleanroom space for container removal (99’ x 17’ or 66’ x 27’)

• Temporary access for NTE 20 Government personnel

Detailed LSSP Requirements

Req.

No. Location Category Item Requirement Description Recipient Commit

Source Equipment Forklift One (1) diesel forklift, 40K capacity

For off-loading for spacecraft dolly

Psyche PPF

Equipment Crane Provide one (1) 30-ton crane with hook height of 35 ft min

Equipment Tractor Provide tractor to remove JPL provided trailer with empty container and move to storage area (TBD).

Equipment Pallet Jacks Two (2) pallet jacks needed for offload of Psyche GSE Psyche PPF

No. Location Category Item Requirement Description Recipient Commit

Source Equipment Electric Forklift Provide electric forklift, 10K capacity for GSE movement in cleanroom.

Psyche PPF

Services Escort Provide escort for spacecraft/wide load transport from KSC property line to PPF facility

Psyche PPF

Commodity GN2 For Purge Provide MIL-PRF-27401, Grade B gaseous nitrogen for spacecraft purge. To be immediately accessible once the spacecraft container is located in the airlock/highbay

Psyche PPF

Services GN2 Analysis Provide analysis/verification of GN2 as per MIL-PRF- 27401G, Grade B

Psyche PPF

Stock Garmenting Provide cleanroom garmenting for working in high bay/airlock

Psyche PPF

Space Working Floor Space- container removal

Provide a working cleanroom space with at least the following dimensions:

Linear: 99ft L x 27ft W x 37ft H

Or

Parallel: 66 ft L x 27ft W x 37 ft H

Psyche PPF

Space Working floor space- spacecraft storage

Provide a working cleanroom space with at least the following dimensions: 27 ft L x 29ft W x ft H

Psyche PPF

Environment al

Cleanliness Provide a clean room certified to no less than the standards of ISO-14644 Class 8.

Psyche PPF

Equipment Scissor Lift (2) Scissor lifts for sling attachment

Power Electrical Outlet PGPU power requires 120V, 30A, (L5-30) UPS power

PPF Comm

PPF

Data PGPU PPF Remote Monitoring

Provide a KOPEN Ethernet connection from the PPF Highbay PGPU rack to reach JPL personnel. This is required from S/C arrival till S/C move to pad.

Implementation Details:

This will require a manual switchover from the primary to the backup by the S/C

PSYCHE

Network PPF Highbay KOPEN

Provide wireless access to KSC Open in the PPF highbay during Spacecraft Processing.

JPL shall notify Hangar AE 24-48 hours before RF sensitive operations so they can coordinate shutoff with NICS

PSYCHE

PPF COMM Fibers Provide 2 full duplex fibers between AE and PPF

Commodities GN2 Provide primary/backup k-bottle 6 pack’s for purge during transportation

Psyche JPL

Equipment Trailer Provide drop down trailer for transport/storage of Psyche shipping container.

Equipment Mobile Crane Provide mobile crane with minimum 92-ton capacity for spacecraft container lift to JPL provided trailer.

Phase 2- Short Term Storage This phase encompasses the time the spacecraft is in the shipping container, and immediately after the spacecraft has been lifted to the storage dolly. During this phase, there is no anticipated testing or work being performed on the spacecraft. The spacecraft will require the use of the facility’s GN2 for purge operations (backup GN2 k-bottles will be provided by the Government).

The Contractor shall be responsible for the below:

Phase Key Requirements

• GN2 purge/backup

• Badging for JPL employees

• Access for two (2) JPL technicians to check the Purge Gas Purification Unit (PGPU) system daily

• 24/7 emergency access if there is an issue with the purge

• Internet connectivity for PGPU

No. Location Category Item Requirement Description Recipient Commit

Source Equipment Crane Provide one (1) 30-ton crane with hook height of 35ft Psyche PPF

Equipment Pallet Jacks Two (2) pallet jacks needed for offload of Psyche GSE Psyche PPF

Equipment Electric Forklift Provide electric forklift, 10K capacity for GSE movement in cleanroom.

Psyche PPF

Commodity GN2 For Purge Provide MIL-PRF-27401, Grade B gaseous nitrogen for spacecraft purge.

Psyche PPF

Services GN2 Analysis Provide analysis/verification of GN2 as per MIL-PRF- 27401G, Grade B

Psyche PPF

Stock Garmenting Provide cleanroom garmenting for working in high bay/airlock

Source Space Working floor space- spacecraft storage

Provide a spacecraft storage bay with at least the following dimensions: 27 ft L x 29ft W x 35 ft H

Psyche PPF

Environment al

Cleanliness Provide a clean room certified to no less than the standards of ISO-14644 Class 8.

Psyche PPF

Badging Badging/Access Provide access for 2 JPL employees daily to check on purge operations.

Psyche PPF

Security Security Spacecraft storage bay must be secure and not a shared space. Access only allowed to JPL, PPF contractor, and LSP. Monitoring is required 24/7.

Psyche PPF

Internet Internet access for PGPU remote monitoring Psyche PPF

Power Electrical Outlet PGPU power requires 120V, 30A, (L5-30) UPS power

PPF Comm

PPF

Data PGPU PPF Remote Monitoring

Provide a KOPEN Ethernet connection from the PPF primary to the backup by the SC sensitive operations so they can coordinate shutoff with NICS

PPF COMM Fibers Provide 2 full duplex fibers between AE and PPF

Phase 3- Long Term Storage This phase encompasses the longest portion of storage mode. During this phase, the spacecraft requires powered operations and data communications to a local spacecraft control room and KSC. There may be system testing performed in this phase, but specific details/schedules are not currently finalized. The timeframe of this phase will vary and relies on the start of Phase 4, ATLO 2.0. The timeframe will be determined once an official launch date has been established with the expectation that ATLO will be L-4 months.

The Contractor shall be responsible for the below:

Phase Key Requirements

• GN2 purge/backup

• Access to the spacecraft of daily approximately (10) JPL personnel

• Systems testing support

• Spacecraft Control Room

No. Location Category Item Requirement Description Recipient Commit

Source Space Working floor space- spacecraft storage

Provide a spacecraft storage bay with at least the following dimensions: 27 ft L x 29ft W x 35 ft H

Power Electrical Outlets 208V,3,60A (Wye confg [X, Y, Z,N,G]) Mating connector: HBL560P9W (208V, 3, 60A) Facility outlet: HBL560MI9W (208V, 3, 60A) Max. Est. Power Draw: 17.3 kW

Maxar

Power Electrical Outlets One (1) / 208V, 30A, 3-phase NEMA L21-30R twist-lock receptacle. (HBL2810 or equivalent)

Maxar - M&C

Maxar - ACS PPF

Power Electrical Outlets Four(4) / 208V, 60A, 3-phase HBL560MI9W receptacles or equivalent

Maxar -

SAS1

Power Electrical Outlets One (1) / 480V, 60A, 3-phase HBL560MI7W receptacle or equivalent.

One(1) / 208V, 60A, 3-phase HBL560MI9W receptacles or equivalent

Maxar -

EPSC

Maxar - SC Rotation Dolly

Power Electrical Outlets One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

Maxar

MBUS

Monitor

Power Electrical Outlets One (1) / 120V, 30A, single phase NEMA L5-30R

One (1) / 208V, 30A, 3-phase NEMA L21-30R twist-

JPL - Rack 1 PPF

Power Electrical Outlets One (1) / 120V, 15A, single phase NEMA 5-15R receptacle.

JPL -

Telecom

Power Electrical Outlets One (1) / 120V, 15A, single phase NEMA L5-15R receptacle.

JPL –

Telecom Load Rack

Source Power Electrical Outlets One (1) / 120V, 20A, single phase NEMA 5-20R receptacles.

One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

JPL - GDS

CAR1

Power Electrical Outlets One (1) / 120V, 20A, single phase NEMA 5-20R receptacles.

One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

JPL - GDS

CAR2

Power Electrical Outlets Three (3) / 120V, 30A, single phase NEMA L5-30R

Electrical Workstation Power 2x Spacecraft Area Misc. Power

Psyche Quad-Boxes

Power Electrical Connectors

Five (5) HBL560C9W (or equivalent) 208V, 3 phase, 60A connectors.

One (1) HBL560C7W (or equivalent) 480V, 3 phase, 60A connector.

Power Electrical Outlet PGPU power requires 120V, 30A, (L5-30) UPS power

Power Electrical outlet One (1) / 120V, 20A, single phase NEMA 5-20R receptacles.

Psyche ESD Table Air Ionizer

MISC Table/ESD Certified 3x6 ESD table for hardware Psyche

Table Cleanroom table for mechanical/QA use Psyche

Admin Phones # of Lines / # of Phones:

One (1) / One (1)

JPL/Maxar PPF

Environ Humidity 30%-60% RH Continuous monitoring Provide daily reports to LSIM, JPL LSE

Environ Particulate Class 8 (ISO 14644-1);

Source Environ Temperature 69 +/- 3 deg. F

Continuous monitoring

Environ Particle Fallout Provide a minimum of two (2) particulate fallout plates exposed at all times. Each sample will be exposed for up to a 30-day period with changeout of one sample every two weeks (allowing two-week overlap between samples). Placement of first fallout plate starting at six (6) weeks prior to solar array arrival. Analyze particle fallout per ASTM F312.

Preserve particulate sample for SEM-EDX, if required.

Environ Non-Volatile Residue

To (2) NVR plates handled and installed in accordance with ASTM E-1234. Plates shall be collected and analyzed every two (2) weeks in a staggered configuration, starting six (6) weeks prior to solar array arrival. Plates limits shall be 1.0 mg per 0.1m^3 per month.

All NVR residues shall be saved for further FTIR analysis, if required by the SC project.

Environ Volatile Hydrocarbons

15 ppm maximum.

Analyzed every month.

Security Security High bay must be secure and not a shared space.

Access only allowed to JPL, PPF contractor, and LSP.

Monitoring is required 24/7. Badge reader required on entrances.

Commodity Gaseous Nitrogen Provide source of GN2 Grade B as per MIL-PRF-2701G capable of 55 SCFH.

Service GN2 Certification Provide passing sample for MIL-PRF-27401G Grade B GN2 at facility output

Source Consumable Tacky Mats Tacky mats placed just inside garment changeout room door.

Replace as needed.

Stock Garments (body) Polyester bunny suits (coveralls) for 10 JPL persons/week.

Stock Garments (face) Ear Loop Face Masks for 10 JPL persons/day, Psyche PPF

Stock Garments (beard covers)

Provide beard covers for 10 JPL persons/day, Psyche PPF

Stock Garments (hand) Nitrilite 93-311 clean room gloves for 10 JPL persons/day

Bring from PHSF?

Stock Garments (shoe covers)

Provide shoe covers for 10 JPL persons/day. Psyche PPF

Stock Garment Storage Provide garment storage for 10 JPL persons/day Psyche PPF

Consumable Hair Net Provide hairnets for 10 JPL persons/day Psyche PPF

Admin Chairs # / Type: 10 PPF

Admin Phones # of Lines / # of Phones / # of Modems: 5 phones / 1 per table

Admin Tables # / Size: 6 standard tables / 30” by 60” PPF

Environ Humidity Range: 30 percent min and 60 percent max / continuous

JPL PPF

Environ Temperature Range: 71 +/- 6 deg F / continuous

Source Power Electrical Outlets # / Spec / Connector:

Four (4) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle

OR

One (1) / 208V, 60A, 3-phase HBL560MI9W receptacles or equivalent

JPL - GDS

BAR

Power Electrical Outlets # / Spec / Connector:

Three (3) / 120V, 15A, single phase NEMA 5-15R receptacle.

JPL – Misc Use Outlets

Power Electrical Outlets # / Spec / Connector:

receptacle for Workstations with UPS Misc Equipment

JPL –TC,

CMD, and

GDS

PPF

Power Electrical Outlets # / Spec / Connector: Six (6) / 120V, 15A, single phase/NEMA 5-15R for Workstations Not On UPS

JPL –

Systems, Telecom X-band, and Guest

Security Security Control room must be secure and not a shared space.

Monitoring is required 24/7. Badge reader required on entrances.

Control Room Comm

Data ATLO Data

Provide two (primary and backup) 22 Mbps, full-duplex, Ethernet circuits for PSYCHE ATLO data terminated with a standard RJ-45 male connectors between the Spacecraft Control Room and JPL Pasadena during Spacecraft processing. The maximum tolerable latency for these circuits is 120 milliseconds.

• JPL project is responsible for submitting the CRQ through Roger Cortez for the WAN between Hangar AE and JPL.

• Hangar AE will extend circuits to the control room.

• Ensure to implement LLDP command or forward all traffic protocols

• This circuit could also be utilized to update the

Spacecraft

Provide a KOPEN Ethernet connection from the PPF

PPF

Data PPF EGSE Connection

Provide four (primary and backup) full duplex 1 Gbps (22 Mbps expected) fiber for PSYCHE EGSE terminated with LC connectors between PPF Highbay and the Spacecraft Control Room during Spacecraft processing.

• Hangar AE to provide circuits.

• All connections will be on separate VLANs

• Customer required BPDU and Native VLAN traffic to be passed. This required the MPLS config to be modified to allow for passage of the traffic.

Network Admin KOPEN Wireless

Provide wireless access to the KSC Open Net (for JPL) in the JPL office area and Control Rooms during Spacecraft processing and Pad operations. Wireless access in the control rooms could reach 60 devices.

sensitive operations so they can coordinate shutoff with NICS

Network SC Control Room KOPEN Drops

Provide eleven 1000baseT KOPEN LAN drops for PC, Mac, or network printers in the Spacecraft Control Rooms during Spacecraft processing and Pad operations.

PPF

Timing Control Room Clock Display

Provide GMT and the Hangar AE Countdown Clock Display to the Spacecraft Control Room during rehearsals, ORTs.

Timing EGSE Timing

Provide IRIG B-120 1344 (IEEE 1344 adds the year to the timecode) timing at 1 kilohertz reference signal to Control Room and the PPF Highbay during Spacecraft processing terminated with BNC connectors.

Video S/C Processing Video Routing

Provide color CCTV coverage of Spacecraft in PPF routed to the Spacecraft Control Rooms.

Video Spacecraft Control Room Video Monitors

Provide two existing color TV monitors in the Spacecraft Control Room.

Video RC1 Rack View

Provide a view of the RC1 Prime and Backup Racks in the PPF Highbay

• This will require two portable pivot cams To be displayed in the control room

PSYCHE LSP

provided

Comm

Video Haz Op Video Recording

Provide video recording with time tagging of hazardous operations.

• Person will notify PPF when to record This includes TBD hazardous ops in the PPF

PPF

Video PPF Highbay Cameras

Provide highbay cameras

Source

Voice AE to SC Control Room Voice Nets

Provide 4 voice nets during Spacecraft processing operations to the Spacecraft Control Room.

Talk/Listen voice nets include:

PSYCHE ATLO SC 1 T/L

PSYCHE ATLO SC 2 T/L

PSYCHE TEST T/L

PSYCHE ORT T/L

PPF

Voice SC Control Room to PPF Voice Nets

Provide 4 voice nets in the PPF during Spacecraft processing in Talk/Listen:

PSYCHE ATLO SC 1 T/L

PSYCHE ATLO SC 2 T/L

PSYCHE COORD 1 T/L

Voice SC Control Room Voice End Instruments

Provide 6 [six] units with 2 headsets for Spacecraft team at the Spacecraft Control Room during Spacecraft processing operations.

Voice PPF External Speakers

Provide external speakers for one portable unit in PPF Highbay (pre-propellant load)

PSYCHE

PPF Comm

PPF

Voice PPF Voice End Instruments

Provide two portable end instruments with 1 headset each, for use in PPF.

Control Room COMM Space Accommodate NASA comm rack PSYCHE

Phase 4- ATLO 2.0 This phase shall encompass the ATLO 2.0 operations including: solar array integration/testing, xenon/GN2 fueling operations, ordnance installation, encapsulation. Timeframe for the start of Phase 4 is to be approximately four months prior to new launch date. Additionally, this phase will have requirements levied by the launch service contractor for encapsulation operations.

The preliminary requirements for communications/telemetry requirements are listed below. If any changes are required, this will be accomplished via a Launch Site Support Plan amendment form (LAF) after award.

The Contractor shall be responsible for the below:

Phase Key Requirements

• Certificate of Facility Readiness (COFR) related to the Storage of the Spacecraft.

The Contractor is responsible for submittal of the COFR not later than 45 days prior to initial facility occupancy. The Government will provide approval/ disapproval not later than 30 days prior to initial facility occupancy. The approval will involve random inspection of system back-up documentation used in the preparation of the COFR and may include an inspection or walkthrough of the facility, by the COR or a designee.

As a minimum, the COFR shall:

Identify all systems by name Identify each system as critical/non-critical Provide a brief description of status and readiness of the facility and each facility system Provide a copy of the certification for each system’s proofload, calibration, compliance, or inspection Provide supporting documentation for each system Provide a summary of facility modifications implemented since last NASA usage Include an Open Items, Issues and Concerns Section with associated correction plan and date Include an Exception, Waivers, and Deviation Section Provide a Safety Statement of Readiness

• Solar array integration space

• Hazardous processing (xenon/GN2 loading) o No less than 14 days of 24/7 support.

• Encapsulation

Source AL Space Min. Floor Space 2,400 sq. ft. for LVC fairing processing. Minimum floor space dimensions: 65’ L x 45’ W x 60’ H.

LVC PPF

AL Space Minimum Door Size

20’ W x 53’ H. LVC PPF

AL Environment Cleanliness ISO 8 – Class 100,000 or spacecraft requirements, whichever is stricter.

Yellow and red alarm limits according to ISO 8.

Facility Provider will provide cleaning services for the processing facility areas during LVC standalone ops and LVC/SVC joint ops at an appropriate frequency as determined by the integration teams.

AL Environment Temperature 69 +/- 3 deg. F Continuous monitoring

LVC PPF

AL Environment Humidity 30-[60] % RH continuous

AL Services LVC Notification Facility Provider will notify LVC within 30 minutes facility cleanliness, temperature, humidity threshold values are hit, and immediately when hypergolic propellant is detected.

Source EB Electrical Power Electrical accommodation to support the LVC payload trailer, conforming to the specifications below:

Vendor: Motion Laboratories

- Description: Generator Connection Cabinet, any size.

- Powersafe UL T5 Threaded Post Termination, bottom mount.

Specifications:

- 480V colors (Brown/Orange/Yellow/Green)

- Disconnect handle.

- 400A breaker.

Panel Source Connectors, UL Listed:

- 1000-01-03-07-007 (BROWN)

- 1000-01-03-07-014 (ORANGE)

- 1000-01-03-07-015 (YELLOW)

- 1000-01-03-07-001 (GREEN)

EB Electrical Backup Power Automatic transfer

Facility Provider will notify LVC when backup power is initiated.

EB Electrical Facility Ground Common ground for connecting ground straps tied to facility ground.

LVC PPF

EB Admin Devices Use of facility hard line phones (capable of calling local and long distance).

Ability to use LVC laptops.

Source EB Equipment Crane (1) 15T crane, 55’ hook height (spacecraft weight not included).

AL Equipment Cleanroom Entry (1) shoe cleaner

(1) tack mat

AL Space Cleanroom Storage

20’ L x 20’ L x 10’H (miscellaneous storage). LVC PPF

EB Equipment Electric tug Provide electric tug for LVC use during encapsulation. LVC PPF

EB Space Min. Floor Space 2,400 sq. ft. for LVC fairing processing. Minimum floor space dimensions: 65’ L x 45’ W x 60’ H.

LVC PPF

EB Space Minimum Door Size

20’ W x 53’ H. LVC PPF

EB Environment Cleanliness ISO 8 – Class 100,000 or spacecraft requirements, whichever is stricter.

Yellow and red alarm limits according to ISO 8.

Facility Provider will provide cleaning services for the processing facility areas during LVC standalone ops and LVC/SVC joint ops at an appropriate frequency as determined by the integration teams.

EB Environment Temperature 69F +/- 3F

EB Environment Humidity 30-[60] % RH continuous.

EB Services LVC Notification Facility Provider will notify LVC within 30 minutes facility cleanliness, temperature, humidity threshold values are hit

Source EB Electrical Backup Power Automatic transfer.

Facility Provider will notify LVC when backup power is initiated.

EB Electrical Facility Ground Common ground for connecting ground straps tied to facility ground.

LVC PPF

EB Electrical Power Receptacles

Receptacles in the fairing processing area:

Nine (9) 120V 15A 1Φ, NEMA 5-15R.

LVC PPF

EB Admin Devices Use of facility hard line phones (capable of calling local and long distance).

Ability to use LVC laptops.

LVC PPF

EB Networks Wi-Fi Ability to use LVC networks through WiFi or hard-line Ethernet Internet access.

EB Commodity GN2 (1) GN2 tube trailer or equivalent supply, capable of >500 psi, MIL-PRF-27401, Grade B.

This GN2 supports the Psyche purges and is required for closing the latches during encapsulation (~60-80 psig, <300 psig to close all the latches).

LVC

EB Equipment Crane (1) 15T crane, 55’ hook height (spacecraft weight not included).

EB Equipment Boom Lifts (2) cleanroom-capable electric man lifts, 500 lb (two people) capacity, 45’ high platform height.

EB Equipment Forklifts (1) cleanroom-capable electric forklift, 3,000 lb capacity (or cleanroom pallet jacks).

Source EB Equipment Forklifts (1) “outside” forklift, 5,000lb capacity (general ESGE equipment handling).

EB Equipment Exhaust Snorkel (1) exhaust snorkel for trailer and payload transporter.

EB Admin Tables (4) cleanroom capable tables, minimum 2 stainless steel.

EB Equipment ESD Workbench 2 certified ESD mat/tables. LVC PPF

EB Admin Chairs (8) cleanroom-capable chairs.

EB Admin Carts (2) cleanroom-capable equipment carts.

EB Admin Trash Receptacles (4) for standard garbage.

(4) for solvent-soaked wipes.

EB Commodity IPA (6) gal, technical grade TTI-735A isopropyl alcohol.

EB Equipment Chemical Dispensers

(4) 16 oz liquid chemical dispensers.

EB Equipment Paint/Oil Locker (1) paint and oil locker (flame cabinet).

EB Equipment Cleanroom Entry (1) shoe cleaner

(1) tack mat

Source EB Service Training Crane, Forklift, scissor-lift and boom lift familiarization for twenty (20) LVC personnel. One morning and one afternoon (1600 hours) class requested due to two shifts of personnel.

EB Admin LVC Devices Ability to use LVC hard line phones, cell phones, iPads, and laptops.

LVC PPF

EB Space Unconditioned Storage

20’ L x 20’ L x 10’H (miscellaneous storage). LVC PPF

EB Services PPF Badging Unescorted area access for approximately twenty

(20) LVC personnel.

LVC PPF

HB Space - Solar Array integration Floorspace

Provide 70ft L x 30ft W floor space for solar array integration

Psyche PPF

HB Power Electrical Outlets 208V,3,60A (Wye confg [X, Y, Z,N,G]) Mating connector: HBL560P9W (208V, 3, 60A) Facility outlet: HBL560MI9W (208V, 3, 60A) Max. Est. Power Draw: 17.3 kW

Maxar

HB Power Electrical Outlets One (1) / 208V, 30A, 3-phase NEMA L21-30R twist-lock receptacle. (HBL2810 or equivalent)

Maxar - M&C

PPF

HB Power Electrical Outlets One (1) / 208V, 30A, 3-phase NEMA L21-30R twist-lock receptacle. (HBL2810 or equivalent)

Maxar - ACS PPF

HB Power Electrical Outlets Four(4) / 208V, 60A, 3-phase HBL560MI9W receptacles or equivalent

Maxar -

SAS1

PPF

HB Power Electrical Outlets One (1) / 480V, 60A, 3-phase HBL560MI7W receptacle or equivalent.

One (1) / 208V, 60A, 3-phase HBL560MI9W receptacles or equivalent

Maxar -

EPSC

PPF

HB Power Electrical Outlets One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

Maxar

MBUS

Monitor

HB Power Electrical Outlets One (1) / 208V, 30A, 3-phase NEMA L21-30R twist-

Maxar - SC Rotation Dolly

Source HB Power Electrical Outlets One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

One (1) / 208V, 30A, 3-phase NEMA L21-30R twist-lock receptacle. (HBL2810 or equivalent)

JPL - Rack 1 PPF

HB Power Electrical Outlets One (1) / 120V, 15A, single phase NEMA 5-15R receptacle.

JPL -

Telecom

PPF

HB Power Electrical Outlets One (1) / 120V, 15A, single phase NEMA L5-15R receptacle.

JPL –

Telecom Load Rack

HB Power Electrical Outlets One (1) / 120V, 20A, single phase NEMA 5-20R

One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

JPL – GDS

CAR1

PPF

HB Power Electrical Outlets One (1) / 120V, 20A, single phase NEMA 5-20R receptacles.

One (1) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

JPL - GDS

CAR2

HB Power Electrical Connectors

Five (5) HBL560C9W (or equivalent) 208V, 3 phase, 60A connectors.

One (1) HBL560C7W (or equivalent) 480V, 3 phase, 60A connector.

Psyche PPF

HB Power Electrical Outlets Three (3) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle.

Electrical Workstation Power 2x Spacecraft Area Misc. Power

Psyche Quad-Boxes

Power Electrical Outlet PGPU Power (220V 30A) Psyche PGPU Power

Power Electrical Outlet One (1) / 120V, 20A, single phase NEMA 5-20R

Psyche ESD Table Air Ionizer

HB Admin Chairs 10 Cleanroom and ESD-compatible. JPL/Maxar PPF

HB Admin Phones # of Lines / # of Phones:

One (1) / One (1)

Source HB Admin Tables Six (6) ESD compatible 30”x60” tables. Note: ESD mats requested for tables provided by PHSF.

JPL/Maxar PPF

HB Equipment ESD Mats Six (6) certified ESD mats for use in HB with stainless steel tables.

JPL/Maxar PPF

HB Environ Cleanliness ISO 14644-1 Class 8 , ISO 7 when optics exposed. JPL/Maxar PPF

HB Environ Humidity 30%-60% RH Continuous monitoring Provide daily reports to LSIM, JPL LSE

JPL/Maxar PPF

HB Environ Particulate Class 8 (ISO 14644-1);

Provide daily reports to LSIM, JPL LSE

JPL/Maxar PPF

HB Environ Temperature 69 +/- 3 deg. F Continuous monitoring Provide daily reports to LSIM, JPL LSE

JPL/Maxar PPF

HB Environ Particle Fallout Provide a minimum of two (2) particulate fallout plates exposed at all times. Each sample will be exposed for up to a 30-day period with changeout of one sample every two weeks (allowing two week overlap between samples). Placement of first fallout plate starting at six (6) weeks prior to solar array arrival. Analyze particle fallout per ASTM F312.

Preserve particulate sample for SEM-EDX, if required.

HB Environ Non-Volatile Residue

To (2) NVR plates handled and installed in accordance with ASTM E-1234. Plates shall be collected and analyzed every two (2) weeks in a staggered configuration, starting six (6) weeks prior to solar array arrival. Plates limits shall be 1.0 mg per 0.1m^3 per month.

All NVR residue shall be saved for further FTIR analysis, if required by the SC project.

Source HB Environ Volatile

Hydrocarbons 15 ppm maximum.

Analyzed every month.

HB Equipment Blast Shield Provide a blast shield for GN2 and Xenon loading/pressurization operations.

Psyche PPF

HB Security Security High bay must be secure and not a shared space.

Access only allowed to JPL, PPF contractor, and LSP.

Monitoring is required 24/7. Badge reader required on entrances.

Psyche PPF

HB Consumable Wipes 500/week Texwipe, Vectra processed Alpha 10 (TX 1010) 9”x9” double knit, sealed border.

Psyche PPF

HB Commodity IPA for SC Cleaning

Provide technical grade TTI-735A isopropyl alcohol Psyche PPF

HB Equip (Transport)

Pallet Jacks Two (2) needed for offload/load of Psyche’s GSE. Psyche PPF

HB Equipment Forklifts (1) cleanroom-capable electric forklift, 3,000 lb capacity (or cleanroom pallet jacks).

HB Equipment Forklifts (1) “outside” forklift, 5,000lb capacity (general ESGE equipment handling).

HB Commodity Gaseous Nitrogen Provide source of GN2 Grade B as per MIL-PRF-2701G capable of 55 SCFH.

Psyche PPF

HB Service GN2 Certification Provide passing sample for MIL-PRF-27401G Grade B GN2 at facility output

Psyche PPF

HB Consumable Tacky Mats Tacky mats placed just inside garment changeout room door.

Replace daily.

Psyche PPF

HB Equipment HEPA Vacuum, portable

Portable, ESD-safe, HEPA vacuum with attachments. Psyche PPF

HPF Service Ventilation Path

Provide a path for ventilation of helium and nitrogen gas to go outside during Maxar fueling operations.

Psyche /Maxar

Source HPF Service Sample Analysis GN2 Analysis for Maxar-provided Cold Gas Thruster

(CGT) GN2.

Provide analysis of GN2 for all constituents in accordance with MIL-PRF-27401 Grade C

Turnaround time for results is required to be less than 4 hours.

Psyche/Max ar

HPF Service Sample Analysis Xenon Sample Analysis

Sample analysis of xenon gas for:

· H20

· C0

· C02

· 02

· Total Hydrocarbon content

In accordance with the maximum allowable impurities table listed below.

Xenon gas sample container will be provided in a 0.5L bottle, at 1500-2000psi, with a ¼” VCR fitting.

Turnaround time for sample results is required to be less than 4 hours.

Psyche/Max ar

Source GCR Stock Garments (body) (100) polyester bunny suits (coveralls), assorted sizes, per week.

LVC PPF

GCR Stock Garments (feet) (1000) ESD-approved shoe covers, assorted sizes, per week.

LVC PPF

GCR Stock Garments (hand) (5000) nitrile, powder-free gloves, assorted sizes, TechNiGlove TN2000W-E Series Class 100 ESD.

LVC PPF

GCR Stock Garments (head) (150) disposable facial beard covers, per week. LVC PPF

GCR Stock Garments (head) (1000) disposable bouffant caps, per week. LVC PPF

GCR Stock Garment Bags (75) large Ziploc bags large enough to fit XXXL cleanroom coveralls.

LVC PPF

GCR Equipment Garment Lockers A minimum of 8 storage lockers with the ability to be locked for personal items and/or storage for garments that can be reused.

LVC PPF

GCR Stock Garments (body) 150 polyester bunny suits (coveralls) per week for Psyche, LSP and TOSC use. Small- 10; Medium- 30;

Large- 45; XL- 45; XXL- 20. Psyche also requests clean room boots.

Psyche PPF

GCR Stock Garments (face) 1000 Ultraguard Ear Loop Face Masks (Part No.

APP0340) per week for use with cleanroom garments.

Psyche PPF

GCR Stock Garments (beard covers)

Provide 200 beard covers per week during PHSF operations. Beard covers will be worn over surgical masks by personnel who have facial hair.

Psyche PPF

GCR Stock Garments (hand) Nitrilite 93-311 clean room gloves. Quantity per week is: small- 100 /medium- 300 / large- 300 / extra large- 500. Leftover Mars2020 gloves are acceptable.

Kimberly-Clark Kimtech nitrile gloves, extra small, 100/week.

Psyche PPF

GCR Stock Garments (shoe covers)

Provide 1000 shoe covers per week for use in garment change room.

Psyche PPF

GCR Stock Garment Bags (75) large Ziploc bags large enough to fit XXXL cleanroom coveralls.

Source GCR Consumable Hair Net 350/week

Spun polyester Bouffant style

OFFICE

Admin Offices Provide 40 standard office cubicles each equipped with:

Desk Chair Telephone Internet connection Filing cabinet Shelf

Psyche PPF

OFFICE Admin Offices Provide 7 private offices (4 for JPL, 3 for LSP) each equipped with:

Chair Desk Phone Internet connection TV monitor Filing cabinet Shelf

Psyche PPF

OFFICE Admin Conference Rooms

Provide access to a conference room with seating capability of at least 30 people.

OFFICE Admin Copiers 2 Network Scanner/Copiers. Access to enable scanning/emailing to be provided prior to arrival.

Psyche PPF

OFFICE Space Offices Seating up to 8 people in the facility. LVC PPF

OFFICE Electrical Office Electrical (6) 120V 15A 1Φ, NEMA 5-15R. LVC PPF

OFFICE Networks Office Wi-Fi Ability to use LVC networks through Wi-Fi or hard lines.

LVC PPF

OFFICE Admin Office Room Phones

(4) phones that can call local and long distance. LVC PPF

OFFICE Admin Chairs # / Type: 18 Psyche PPF

Source OFFICE Admin Phones # of Lines / # of Phones / # of Modems: Twelve (12) phones / 1 per table Psyche PPF

OFFICE Admin Tables # / Size: Twelve (12) standard tables / 30” by 60” Psyche PPF

OFFICE Environ Humidity Range: 30 percent min and 60 percent max / continuous

OFFICE Environ Temperature Range: 71 +/- 6 deg F / continuous

OFFICE Power Electrical Outlets # / Spec / Connector:

Four (4) / 120V, 30A, single phase NEMA L5-30R twist-lock receptacle

OR

One (1) / 208V, 60A, 3-phase HBL560MI9W receptacles or equivalent

JPL - GDS

BAR

OFFICE Power Electrical Outlets # / Spec / Connector:

receptacle for Workstations with UPS Misc Equipment

JPL –TC,

CMD, and

GDS

PPF

Power Electrical Outlets # / Spec / Connector: Six (6) / 120V, 15A, single phase/NEMA 5-15R for Workstations Not On UPS

JPL –

Systems, Telecom X-band, and Guest

OFFICE Security Security Control room must be secure and not a shared space.

Monitoring is required 24/7. Badge reader required on entrances.

MISC

Equip (Facility)

Freezer Freezer capable of -70 degrees. Psyche PPF

MISC

Equipment Lift Cleanroom lift for spacecraft access Psyche PPF

MISC Storage Ordnance Storage Provide storage Psyche ordnance being shipping to the launch site.

Source MISC Commodity Acetone Provide one (1) gallon of reagent or HPLC grade

(>99.5% purity) acetone for SC use.

Psyche PPF

MISC Service Lab Analysis Provide lab analysis of spacecraft samples performed, including the following:

Particulate analysis per ASTM F 312-08.

Request that particulate samples are preserved for SEM-EDX, if required by SC.

NVR analysis per ASTM E 1235-12.

Request that NVR residue is preserved for FTIR, if required by SC.

MISC Equipment Box Truck Provide box truck to transport GSE/EGSE from PPF to Hangar/Pad as needed

Psyche PPF

MISC Equipment Electric Vehicles Provide one electric vehicle with small cargo carrying capability for transport of small ground support equipment (GSE).

Provide two (primary and backup) 22 Mbps, full-duplex, Ethernet circuits for PSYCHE ATLO data terminated with a standard RJ-45 male connectors between the Spacecraft Control Room and JPL Pasadena during Spacecraft processing. The through Roger Cortez for the WAN between Hangar AE and JPL.

• Hangar AE will extend circuits to the control room.

• Ensure to implement LLDP command or forward all traffic protocols

Provide a KOPEN Ethernet connection from the PPF

Data PPF EGSE Connection

Provide four (primary and backup) full duplex 1 Gbps (22 Mbps expected) fiber for PSYCHE EGSE terminated with LC connectors between PPF Highbay and the Spacecraft Control Room during Spacecraft

• Hangar AE to provide circuits.

• All connections will be on separate VLANs

• Customer required BPDU and Native VLAN traffic to be passed. This required the MPLS config to be modified to allow for passage of the traffic.

Network Admin KOPEN Wireless

Provide wireless access to the KSC Open Net (for JPL) in the JPL office area and Control Rooms during sensitive operations so they can coordinate shutoff with NICS

Network SC Control Room KOPEN Drops

Provide eleven 1000baseT KOPEN LAN drops for PC, Mac, or network printers in the Spacecraft Control Rooms during Spacecraft processing and Pad

Network LVC Network

Ability to use LVC networks through Wi-Fi or hard lines

• LVC shall use the existing PPF wifi and access their WOs via VPN

• This could be up to 20 LVC users

• LSP shall provide two KOPEN copper wired backups

Data KVM and RF GSE Fibers

Provide two single mode fibers pairs terminated with LC connectors for ethernet over fiber between high bay and control room, one for KVM control and another for the RF rack data.

MIL-71

Comm

PPF

Data Telecom Team - Highbay to MIL-71

Provide two single mode fiber pairs terminated with Type FC connectors between PPF High Bay and MIL-

71. (RF)

Timing Control Room Clock Display

Provide GMT and the Hangar AE Countdown Clock Display to the Spacecraft Control Room during rehearsals, ORTs, and launch operations.

Timing EGSE Timing

Provide IRIG B-120 1344 (IEEE 1344 adds the year to the timecode) timing at 1 kilohertz reference signal to Control Room and the PPF Highbay during Spacecraft processing terminated with BNC connectors.

Video S/C Processing Video Routing

Provide color CCTV coverage of Spacecraft in PPF routed to the Spacecraft Control Rooms, JPL Cape Operations Office (Si’s Office) and the SC conference rooms during Spacecraft processing.

Provide three existing color TV monitors in the Spacecraft Control Room, one existing color TV monitor in the JPL Project Manager's office, ATLO Manager’s office, and one existing color TV monitor in the PPF conference rooms during Spacecraft

Video RC1 Rack View

Provide a view of the RC1 Prime and Backup Racks in the PPF Highbay

• This will require two portable pivot cams To be displayed in the control room

Video LSP Countdown Video

Provide video as requested routed to the LSP Countdown Page during Spacecraft processing and Pad operations.

Psyche Video Plan

• JPL would like a PPF highbay quad during processing

This is password protected video views accessible from the internet

Video Haz Op Video Recording

Provide video recording with time tagging of hazardous operations.

• Person will notify PPF when to record This includes TBD hazardous ops in the PPF

Video PPF Highbay Cameras

A total of one tripod color video camera and 2 wall mounted video cameras and an airlock camera will be provided in the PPF highbay during Spacecraft

AE Comm

Voice AE to JPL Voice Nets

Provide 4 voice nets between AE and JPL, Pasadena during Spacecraft processing operations.

PSYCHE ATLO SC 2 T/L

Monitor voice nets include:

Source

Voice AE to SC Control Room Voice Nets

Provide 4 voice nets during Spacecraft processing operations to the Spacecraft Control Room.

PSYCHE ATLO SC 2 T/L

Voice AE to PPF Voice Nets

Provide 4 voice nets in the PPF during Spacecraft processing in Talk/Listen:

PSYCHE ATLO SC 1 T/L

PSYCHE ATLO SC 2 T/L

PSYCHE COORD 1 T/L

Voice SC Control Room Headsets

Provide [twelve] OIS-M units for Spacecraft team at the Spacecraft Control Room during Spacecraft processing operations.

• JPL brings their own wireless headsets

• AE provides the PJ-7 Cables

KIAC will provide the 12 OIS-M units

Voice PPF External Speakers

Provide external speakers for one portable OIS unit in PPF Highbay (pre-propellant load)

Voice PPF Voice End Instruments

Provide two portable end instruments with 1 headset each, for use in PPF air lock during Spacecraft

• 2 End Instruments with 1 headset each in PPF Airlock

• 6 headsets in the PPF Highbay

• 1 headset in PPF Equipment Airlock

• Wired headsets to be used

Voice LVC End Instruments

Provide (8) RF headsets that communicate to one another inside the facility

• LVC to provide 3M PELTOR LiteCom Plus 2-Way Radio Headset

(model number MT7H7A4610-NA)

COMM 24 Hour Comm Support

Provide 24 hour communication engineering and technician support during mission critical activities.

Contingent upon Pysche needs

Source

PAD EGSE

ROOM

Comm

PAD

Data PAD EGSE ROOM EGSE Connection

Provide four (primary and backup) full duplex 1 Gbps (22 Mbps expected) fiber for PSYCHE EGSE terminated with LC connectors between Control Room and PAD EGSE Room.

Notes:

• All connections will be on separate VLANs

• Customer required BPDU and Native VLAN traffic to be passed. This required the MPLS config to be modified to allow for passage of the traffic.

• The ETXS circuit between the SC CR and AE on the backup path was found to be blocking BPDUs. This was solved by utilizing a direct fiber path between AE and SC Control Room.

PAD

Provide two (primary and backup) 22 Mbps, full-duplex, Ethernet circuits for PSYCHE ATLO data terminated with a standard RJ-45 male connectors between the Spacecraft Control Room and JPL Pasadena during Spacecraft Pad operations. The through Roger Cortez for the WAN between Hangar AE and JPL.

• Ensure to implement LLDP command or forward all traffic protocols

Source

PAD

AO

AE

Data PAD Fibers

LVC shall provide 2 single-mode fiber pairs each between buildings:

• 39A PAD EGSE room to AO Comm Room

• 39A Hangar EGSE room to AO Comm Room

LSP will arrange 2 single-mode fiber pairs from the range along with LVC between:

• AO Comm Room to AE

• 39A PAD EGSE room to AE

• The connectivity between 39A PAD to AE will also extend from AE to the Control Room as a Mandatory Launch Constraint

• LVC shall test their provided fibers from end-to-end prior to LSP’s coordinated install date and provide loss measurements to LSP

• LVC shall provide the demarcation points including jack numbers in their drawing to LSP at least a week prior to the coordinated install date for these locations.

• The AO to AE fibers are permanently in place

Source

PAD

ANNEX

Comm

PAD

Data CAR to CAR connection

Provide connectivity between the CAR rack at the Hangar Annex EGSE room and the CAR rack at the PAD EGSE room.

This will require a separate VPLS.

Source

PAD EGSE

ROOM

Comm

PAD

Data PGPU PAD Remote Monitoring

Provide a KOPEN Ethernet connection from the PAD Upper AGE ROOM PGPU Prime Rack and one from the PGPU backup Rack to reach JPL personnel via the PAD EGSE ROOM NASA Rack with a 400 kilobit data rate.

Need to be able to access remotely via a JPL laptop off-base. During a switch from the main PGPU rack to the spare, the connection will drop.

• PGPU will have a static IP address and port

• NSPAR Firewall exception submitted to Brian

Boatright

• Ensure that all the VPN servers work and have this exception added

• The connection point on the SC customer rack is at the back of the rack at the bottom

• LVC shall provide an ethernet connection between the PAD EGSE room and the PAD Upper AGE room. LVC shall provide the demarcation point for the PAD EGSE Room.

LSP shall provide a switch in the PAD AGE room which will provide connectivity for the LSP PGPU camera and KOPEN connectivity.

Network Office Area KOPEN Wireless

Provide wireless access to the KSC Open Net (for JPL) in the JPL office area and Control Rooms during

PAD

Network SC Control Room KOPEN Drops

Provide eleven 1000baseT KSC Open Net LAN drops for PC, Mac, or network printers in Control Room during Spacecraft processing and Pad operations.

PAD EGSE

ROOM

Comm

PAD

Network S/C KOPEN PAD EGSE ROOM Drops

Provide three 1000baseT KSC Open Net LAN drops terminated with male RJ-45 connectors for PC/MAC laptop in the PAD EGSE ROOM during the Pad

AE to extend KOPEN to PAD EGSE ROOM

Timing Control Room Clock Display

Provide GMT and the Hangar AE Countdown Clock Display to Control Rooms during rehearsals, ORTs, and launch operations.

Provide GMT and the Hanger AE Countdown Clock Display to the PAD EGSE ROOM during launch

PAD Comm

PAD

Video S/C Video Routing

Provide color CCTV coverage of Spacecraft at the PAD routed to the Spacecraft Control Room, JPL Cape Operations Office and the conference rooms during Spacecraft processing and Pad operations.

The LVC should be notified of any LVC videos being transported to other facilities

Provide color CCTV coverage of Spacecraft at the PAD routed to the Spacecraft Control Rooms, JPL Cape Operations Office (Si’s Office), and the SC conference rooms during Spacecraft Pad operations.

Video LSP Countdown Video

Provide video as requested routed to the LSP Countdown Page during Spacecraft processing and Pad operations.

This is password protected video views accessible from the internet

Source

PAD EGSE

ROOM

COMM PAD Video PAD EGSE ROOM Purge Cart View

Camera view of the PAD EGSE ROOM Purge Cart with Pan/Tilt/Zoom sent back to AE.

• JPL will reach out to Hangar AE for PTZ

• AE will need to bring a Tripod since there are no wall connection points

• This is in the PAD Upper AGE room

• This is an LSP provided camera

FR4

Video FR4 Video

LVC shall display all video being sent by Hangar AE during MDR, Static Fire, and Launch as required for LSP and SC representatives in FR4.

Video On-Board Camera View

Provide routing of launch vehicle on-board cameras video from LVC to Hangar AE. Hangar AE will route to Control Rooms

Video Hazardous Operation Recording

LVC shall provide 24 hour recording of SC at the PAD including for hazardous operations.

• LSP will provide backup recording of operations specified by the SC customer

• This shall include SC mate operations, where LVC shall provide included videos to Hangar AE

• LVC shall provide the recording to LSP or SC in the event of a contingency scenario or emergency data review

The security feed shall not otherwise be sent unless a valid reason is specified

Video LVC VIDEO ROUTING

LVC shall provide the 18 video views to Hangar AE full-period during PAD phase.

• This shall start when SC moves their EGSE equipment to the PAD or before Static Fire, whichever is sooner

Video PAD EGSE ROOM EGSE View

Provide color CCTV coverage of Spacecraft EGSE located in the PAD EGSE ROOM routed to the Spacecraft Control Room during Pad operations.

• LVC shall provide the two permanent wall mounted EGSE room camera views to LSP/AE, but these shall not otherwise be routed without LVC permission

• LSP shall provide their LSP camera routed through the LSP network back to AE for distribution to the Psyche

The LSP camera view shall be approved by LVC

Voice AE to JPL Voice Nets

Provide 15 voice nets between AE and JPL, Pasadena during Spacecraft processing and Pad operations.

PSYCHE ATLO SC 2 T/L

PSYCHE SC ANOM 1 T/L

PSYCHE COORD 1 T/L

PSYCHE TEST T/L

PSYCHE MGMT COORD T/L

PSYCHE OPS T/L

DSN COORD T/L

DSN TRACK T/L

ART T/L

NLM M

COUNTDOWN NET M

WX CONF M

PAD

Voice AE to SC Control Room Voice Nets

Provide 15 voice nets during Spacecraft processing and Pad operations to the Spacecraft Control Room.

PSYCHE ATLO SC 2 T/L

PSYCHE SC ANOM 1 T/L

PSYCHE COORD 1 T/L

PSYCHE TEST T/L

PSYCHE MGMT COORD T/L

PSYCHE OPS T/L

DSN COORD T/L

DSN TRACK T/L

PSYCHE ORT T/L

ART T/L

LVC ANOMALY T/L

NLM M

COUNTDOWN M

WX NET M

Voice SC Launch Countdown Rehearsal Nets

Provide the following nets between the Spacecraft Control Room, JPL, and AE during the Spacecraft Launch Countdown Rehearsal

• CD1 (simulated)

• NLM Net

• PSYCHE MGMT Coord

• PSYCHE ART

Voice Voice Checks

SC and LVC shall be required to participate in scheduled voice checks with a participant that is capable of changing voice lines in real-time.

• A meeting time shall be coordinated and sent via meeting invite to participating parties

A list of nets will be coordinated among the participants

PAD COMM PAD Voice PAD EGSE Headsets

Provide 2 headsets in the PAD EGSE ROOM during PAD operations (Including IST and CST)

Voice Test Conductor Nets

Provide talk capability for the PSYCHE Test Conductor in the Spacecraft Control Room on the following voice nets:

Countdown Net

• Test Conductor has hold authority

• The Test Conductor is expected to be in the PPF control room This may also apply to the TC backup(s)

PAD EGSE

ROOM

Comm

PAD

Voice PAD EGSE ROOM Net Extension

Provide 3 voice nets in the PAD EGSE ROOM during PAD Operations.

Talk/Monitor local voice nets include:

PSYCHE ATLO SC 2 T/L

FR4 Comm

Voice FR4 Voice

LVC shall have the FR4 voice nets configured at least a day prior to the scheduled LSP checks. LVC shall provide a separate escort for LSP personnel to check the SC and LSP voice for the room.

COMM 24 Hour Comm Support

Provide 24 hour communication engineering and technician support during mission critical activities.

LVC facilities Comm

COMM LVC Support

LVC shall provide a network POC to be local and on-call at the time of LSP and SC rack deployments and troubleshooting activities. LVC shall provide a pad escort for pre-coordinated LSP PAD deployments.

LVC shall provide an on-console comm POC and a voice net between AE and the LVC POC during on-console PAD phase operations. The comm POC shall be reachable by any SC or LSP personnel on console within LVC facilities.

LVC shall also provide escort as needed into the AO Comm Room.

LVC shall also provide a comm POC familiar with changing the voice switch and able to change voice circuits during coordinated Voice Checks.

Implementation Details:

The Net utilized between the LVC and AE Comm POCs shall be coordinated, but is expected to be SIM Net

Attachment 1
STATEMENT OF WORK (SOW)
Summary
Key Requirements
Processing Phasing
Phase 1- Transportation
Phase Key Requirements
Detailed LSSP Requirements
Phase 2- Short Term Storage
Phase Key Requirements