Attachment 2 - PS Squared Data Requirements List.pdf

PDF 124 KB Posted

Attached to
Psyche Storage and Processing Service (PS Squared) Federal contract opportunity
Solicitation number
80KSC023CA001_RFP
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This document includes a Data Requirements List and Statement of Work for the Psyche Storage and Processing Services solicitation issued by the National Aeronautics and Space Administration Kennedy Space Center. The solicitation seeks offers for payload processing services to store and process components for the Psyche spacecraft. Key requirements include providing 92,000 square feet of working floor space, mobile cranes with 92-ton capacity, 120V 30A power, and contamination control. Offerors must submit certificates of facility readiness, safety manuals, transportation plans, and mishap reporting procedures. The solicitation was amended to clarify power requirements and add mobile crane specifications. Offers are due by September 5, 2022 and the contract will be a fixed-price commercial item contract. The North American Industry Classification System code is 336419 and the size standard is 1000 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Psyche Storage and Processing Service (PS Squared), newest first.
File Type Posted
SF 30 80KSC023CA001 RFP Amd 001.pdf PDF
Attachment 1 - Statement of Work for PSx2 Amd 1.pdf PDF
Attachment 3 - PS Squared Acronyms and Abbreviations.pdf PDF
Attachment 4 - PS Squared Definitions.pdf PDF
Attachment 6 - Spacecraft Processing Termination.pdf PDF
80KSC023CA001 RFP.pdf PDF
Attachment 5 - PS Squared List of Applicable Documents.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

DATA REQUIREMENTS LIST

Launch Services Program

Psyche Storage and Processing Services (PSx2) for the

National Aeronautics and Space Administration

PSx2 ATTACHMENT 02 DRL 80KSC023CA001_RFP

1.0 Data Requirements List

The Data Requirements List (DRL) identifies critical elements of the contracted effort where aspects of payload processing insight are required by NASA and where NASA approval is required. The following DRL defines the scope of documentation required;

however, NASA will utilize the Contractor’s existing documentation to the extent practicable if it meets compliance requirements. The submittal dates specified represent due dates to the Contracting Officer (CO). DRL approval may be assumed unless the Contractor is notified by NASA of disapproval within thirty (30) days, or as otherwise identified.

All DRLs shall be submitted electronically to the respective points of contact. All data requirements shall be delivered to the CO, with an informational copy to the Contracting Officer’s Representative (COR) and Launch Site Integration Manager (LSIM). The Contractor shall notify the CO in writing of DRL delivery.

DRL

Item Document Submittal Date

Insight (I) Approval

(A)

Subsequent Submittal/ Changes

1 Mishap Reporting and Investigation

No Later Than 5 Days after Type A, B, or C Occurrence.

No Later Than 7 Days after all other

Occurrence.

I As Required

2 Certificate Of Facility Readiness (COFR)

See “Attachment 1

- Statement of

Work for PSx2” A As Required

Off-loading and Transport Operation Procedures and Transportation route survey

3 Business Days After Contract

Award A As Required

4 Facility Safety Manual 10 Business Days

After Contract Award

A As Required

5 Impound Plan 10 Business Days

After Contract Award

I As Required

DRL 1 Mishap Reporting and Investigation For Type A, B, C, and D mishaps and close calls, as defined in NPR 8621.1, reports shall be generated per requirements in SOW paragraph 3.2. A copy of the report shall be forwarded to the COR within five days for Type A, B, and C mishaps and seven days for all others.

DRL 2 Certificate of Facility Readiness (COFR) The Contractor shall generate a detailed report on the facility, facility systems and facility support equipment documenting that the square footage required is provided for, and that contamination and environmental control, electrical, communication and video systems comply with the requirements as stated in the SOW and associated Appendices. As a minimum, the COFR shall:

• Identify all systems by name

• Identify each system as critical/non-critical

• Provide a brief description of status and readiness of the facility and each facility system

• Provide a copy of the certification for each systems proofload, calibration, compliance or inspection

• List supporting documentation for each system

• Provide a summary of facility modifications implemented since last NASA usage

• Have an Open items, Issues, and Concerns Section with associated correction plan and date

• Have an Exception, waivers, and deviation Section

• Provide a Safety statement of readiness

DRL 3 Offloading and Transport Operation Procedures and Transportation

Route Survey The Contractor shall be notified of approval or disapproval within one business days of submittal. For offloading Flight hardware and GSE, any operation procedures used shall be submitted by the Contractor. The survey will include but not be limited to: road conditions, overhead obstruction, bridge conditions and a map identifying the transportation route. Not earlier than one (1) business day prior to transportation, a final route survey shall be performed by driving the transport route.

DRL 4 Facility Safety Manual The Facility Safety Manual should provide detailed description of the hazardous and critical systems in a facility in accordance with AFSPCMAN 91-710. As standard operating safety requirements for organizations occupying the facility change, the Contractor shall revise the safety manual to reflect current safety policy and criteria applicable to GSE and to ground operations processing at the facility. The Contractor shall also make the appropriate revisions if there are any mission-unique safety systems for a mission that drives the control or mitigation for a potential safety hazard other than those already addressed in the current Manual.

DRL 5 Impound Plan

The Contractor’s Impound Plan shall identify the procedures/actions, roles and responsibilities that will be implemented by the Contractor after a mishap occurs.

The Impound Plan shall include:

a. Identification of the location or space where impounded data, records, and equipment shall be stored and secured during an investigation

b. Procedures for release of impounded data, records, equipment, and facilities at the mishap site

Data and records, regardless of format, to be impounded may include, but are not limited to:

a. Check-out logs, test and check-out record charts, launch records, weather information, telemetry tapes, video tapes, audio tapes, time cards, training records, work authorization documents, inspection records, analyses, and problem reports.

b. Historical data associated with the specific equipment, operations, and operating personnel including, environmental, operational, psychological, and other factors bearing on the situation.

File details come from the government source that posted it. Updated .