Attachment 1 Statement of Work for Boiler Management System Service.docx

DOCX document 49 KB Posted

Attached to
J045--Notice of Intent to Sole Source (Butler VAMC) Inspection, Calibration, Tuning, and Testing Services of the Boiler Management System
Solicitation number
36C24426Q0563
Issued by

About this file

Summary: Statement of Work for Boiler Management System Service

This is a Statement of Work for inspection, calibration, testing, and tuning services of the Boiler Management System and associated components at Butler Veterans Affairs Medical Center (BVAMC) located in Butler, Pennsylvania. The contract is structured as a one-year firm-fixed-price IDIQ with four additional option years. The Contractor must provide annual internal and external inspections, combustion tuning and calibration, relief valve service, and safety device testing for four steam boilers, six RBI water heaters, two deaerator systems, one fire tube boiler, 27 domestic gas-fired tankless hot water heaters, and multiple safety relief valves. Additional services include scheduled deaerator pressure vessel inspections using non-destructive testing methods (fluorescent magnetic particle and ultrasonic testing) every six years, with the next scheduled for 2030-2031. Work must be completed on-site during normal business hours (Monday-Friday, 7:00 AM to 5:30 PM) with 24-hour emergency availability and two-hour on-site response time for emergencies.

The Contractor must meet stringent qualifications including a valid National Board commission or equivalent state boiler inspector credential, certified ASNT Level II non-destructive testing technicians, factory authorization and training from equipment manufacturers (Weishhaupt, Fireye/Nexus, and RBI-Futera), minimum four years' experience with parallel position combustion controls, and OSHA 30 certification for site supervisors and OSHA 10 for all personnel. All inspections and test data must be submitted in comprehensive written reports within 30 days, utilizing National Board Forms NB-6 and NB-7, with supporting photographs, sketches, test data, and calculations. Combustion tuning reports must be provided in MS Excel format with specific readings for all fuel sources and firing rates. All personnel require annual Privacy training, and the Contractor must comply with VA security, privacy, and HIPAA requirements. Reports must be bound in 3-ring binders with two copies each, including outlines, task completion lists, certifications, safety plans, and calibration certifications for VA equipment.

View the file

Other files

File Type Posted
36C24426Q0563_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

?.## STATEMENT OF WORK

Statement of Work Boiler Management System Maintenance V04 529 Butler VA Medical Center

1. SCOPE AND OBJECTIVE

The Contractor shall provide inspection, calibration, testing and tuning of Boiler Management System and associated components, inspection of Feedwater-Deaerators, domestic hot water heaters. The Contractor shall be responsible for determining the number of personnel required to perform the duties specified in this Performance Work Statement (PWS). The Contractor will maintain and provide a record of all service activities performed. Services should be provided on-site at the Butler Veterans Affairs Medical Center (BVAMC) located at 325 New Castle Rd. Butler, PA 16001.

2. BACKGROUND

Boilers and boiler plants are essential to the operation of a VA medical facility by providing steam, space heating, hot water (for sanitation, food production and preparation, infection control), heat for process equipment, and a healthful environment for the delivery of healthcare.

The safety, reliability, efficiency, and longevity of equipment in the boiler plant are top priorities for the management at VA Butler. Boilers and feedwater deaerators are pressurized systems that contain steam and hot water. If they fail, they can do so catastrophically, resulting in injuries, fatalities, and significant property damage. Regular inspections conducted by experts are a vital component of a program designed to address these concerns.

The Butler VA is in need of a contract for inspection, calibration testing and tuning of Boiler Management System and all associated components, inspection of Feedwater-Deaerators, domestic hot water heaters. The contractor shall fulfill all requirements that are listed below and provide all incidentals and labor to keep the systems operational to meet the needs of the Butler VA. This Butler VA is requesting a one-year firm-fixed price IDIQ with 4 (four) additional option years.

3. REQUIREMENT OVERVIEW

3.1. Work Required

3.1.1. At VA Butler Healthcare, located at 325 New Castle Road, Butler, PA, annual internal and external inspections, combustion tuning and calibration, as well as relief valve service and safety device testing, shall be performed according to VA and manufacturer's recommendations for the following:

Line #
Item
Make
Model
Serial #
Location
001
Boiler #1
E. Keller Co
NB4601
14860-3
Building 7
002
Boiler #2
Superior Boiler
7-X-1250
20773
Building 7
003
Boiler #3
E. Keller Co
NB4599
14860-1
Building 7
004
Boiler #4
Unilux Advanced Manufacturing LLC
ZF 1200 HS
A2263
Building 7
005
RBI #1
RBI Water Heater
MB2000
100954357
CLC
006
RBI #2
RBI Water Heater
MB2000
100954390
CLC
007
RBI #3
RBI Water Heater
MB2000
100954358
CLC
008
RBI #4
RBI Water Heater
MB2000
021055381
CLC
009
RBI #5
RBI Water Heater
MB2000
021055363
CLC
010
RBI #6
RBI Water Heater
MB2000
080953778
CLC
011
Boiler #1
Harsco Industrial – Patterson-Kelley
92211
FY47-10-35055
DOM
012
Boiler #2
Harsco Industrial – Patterson-Kelley
92213
FY47-10-35057
DOM
Line #
Item
Quantity
Description/Location
DE Aerators
2
Large DA

Summer DA

002
Fire Tube Boiler
1
Boiler #2
003
Domestic Gas Fired Tankless Hot Water Heater
27
NAVIEN - Building 2, 4 DOM 22, 23,24,25
004
Safety Relief Valves
2
005
Stream PRV Station Valves
2
006
Oil Pump Relief Valves
2
007
Large DA Tank Safety Relief Valves
2
008
Building 46 Safety Relief Valve
1
009
Building 8 Safety Relief Valve
1
010
Small DA Tank Safety Relief Valve
2
011
Boiler #1 Economizer Relief Valves
1
012
Boiler #1 Relief Valves
2
013
Boiler #2 Economizer Relief Valve
1
014
Boiler #2 Relief Valves
2
015
Boiler #3 Relief Valves
1
016
Boiler #4 Relief Valves
2
017
Remove and Replace
2
018
Re-inspection
3
Re-inspection after corrected deficiencies or repairs.
019
8-hour Onsite Service Days
4 days
020
Emergency Repairs
4 days

3.2. Vessel Deaerator NDT Weld Test/Inspection – Summary Requirements

3.2.1. Feedwater deaerator pressure vessel inspections must be scheduled during periods of low steam demand.

3.2.2. This inspection is due every 5 years and will only be required in 2030.

3.2.3. Coordinate the inspection schedule with the TPOC (Technical Point of Contact) so that VAMC can prepare the boilers and feedwater deaerators for the inspections in advance and have personnel available to monitor inspections.

3.2.4. The boiler and feedwater deaerators inspections shall comply with the guidelines in the current issue of the National Board Inspection Code, Part RB, in service inspection of Pressure-Retaining items and ASME Boiler and Pressure Vessel Code, Section VI and VII as applicable. In addition to those guidelines, the inspections shall comply with all VAMC requirements as listed in this document.

3.2.5. The contractor shall inspect and enter all the internal spaces of the boiler or feedwater deaerator and visually inspect all internal surfaces that can be accessed. Confined space entry person, attendant, and equipment is the responsibility of the contractor.

3.2.6. Health Safety Plan and confined space entry training certificates must be submitted for approval.

3.3. Hydronic Boilers – Summary Requirements

3.3.1. Using the control panel, enter the information mode and scroll down to view the flame signal. When the boiler is firing, the signal will be "yes" and when the boiler is not firing, the signal will be "no".

3.3.2. Test high-limit control by reducing setting below the operating temperature. Burner should shut off. After readjusting the thermostat, press the button to reset the switch.

3.3.3. Test operating temperature control by reducing temperature setting as necessary to check burner operation.

3.3.4. Check flue gas temperature at outlet. If there is a temperature increase over previous readings, the probable cause is soot or water-scale build- up on the tubes.

3.3.5. Test the water flow switch by trying to restart boiler with the system pump off. The boiler should not operate, and the control should display LOW FLOW/ILK

3.3.6. Test low gas pressure switch and high gas pressure switch. The boiler should fail to start, and the control should display LOW GAS or HIGH GAS

3.3.7. Inspect and clean the inlet screen of any accumulated dust or lint.

3.3.8. The relief valve should be tested as per manufacturer's instructions or every two months by lifting the lever for 5 seconds and allowing the valve to snap shut. Please see the manufacturer's recommendations on the relief valve tag.

3.3.9. Inspect burner and ignition system. Wash the burner (do not scrub or use wire brush) to remove any soot or foreign material that may have accumulated. Check the burner and its parts. If there is evidence of deterioration or corrosion, replace immediately.

3.3.10. Inspect combustion chamber. To access the heat exchanger, remove the front door and the front inner wrapper. Note any signs of deterioration. Examine the gasket and replace it if necessary.

3.3.11. Inspect and clean heat exchanger. Wash the copper tubes with water and non-corrosive soap. Be sure to rinse thoroughly. Green scale on the tubes indicates that the boiler is condensing which is detrimental to boiler life. Perform corrective action as necessary.

3.3.12. Examine the venting system

3.3.12.1. Check all joints and pipe connections for tightness.

3.3.12.2. Check vent for corrosion or deterioration. If any venting needs replacing, do so immediately.

3.3.13. Inspecting heating system for other problems

3.3.14. Perform combustion analysis and adjust if necessary

3.3.15. Leak test gas valves.

3.4. Steam Boilers – Summary Requirements

3.4.1. Review of the boiler history including operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks

3.4.2. Assess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes.

3.4.3. Inspect foundations for signs of stress such as cracking or movement.

3.4.4. Inspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation.

3.4.5. Inspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits.

3.4.6. Examine all stays and stayed plates.

3.4.7. Inspect gas side baffles.

3.4.8. Inspect internal drum surfaces and steam separating internals.

3.4.9. Inspect soot blowers and verify proper alignment.

3.4.10. Inspect tubes, tube ends and tube alignment. Check for sagging tubes.

3.4.11. Verify that all nozzles of internal piping such as feedwater admission and bottom blowoff collection are clear with no obstructions.

3.4.12. Inspect seating surfaces of manways and handholes.

3.4.13. Check that boiler structure is plumb and level with no excessive deformations.

3.4.14. Check for missing items such as bolts and nuts.

3.4.15. Examine all valve and pipe connections to the pressure vessel.

3.4.16. Inspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor. Separate reports to be provided on each boiler.

3.4.17. Verify proper alignment of burner assembly.

3.4.18. Inspect furnace for evidence of flame impingement.

3.4.19. Test operation of water level gage glass.

3.4.20. Perform mechanical and electrical inspection of disassembled low water cutouts (disassembly by VA). After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually.

3.4.21. Verify that steam pressure gauge has been calibrated by VA within the inspection year.

3.4.22. Test operation of high steam pressure cutouts on hot boilers by raising steam pressure.

3.4.23. Inspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken.

3.4.24. Inspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, evidence of detrimental conditions.

3.4.25. Inspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions.

3.4.26. Inspect valves on boiler feedwater, blowdown, drain and steam systems.

3.4.27. Provide recommendations for non-destructive testing when the inspections indicate that this is necessary to ensure continued safety and reliability under current operating conditions.

3.4.28. Perform BEI safety device testing per latest edition once annually.

3.5. Feedwater Deaerators - Summary Requirements

3.5.1. Review the feedwater deaerator history including operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post-weld heat treatment, history of repairs and modifications.

3.5.2. Assess the external parts of the feedwater deaerator and accessories and piping for safety, accessibility, cleanliness. Proper operation, and compliance with codes.

3.5.3. Inspect for evidence of leakage.

3.5.4. Note feedwater deaerator pressure gage and thermometer readings and verify gage and thermometer accuracy.

3.5.5. Inspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the deaerator can safely withstand the test pressure prior to testing the valve(s) in-situ

3.5.6. Verify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases.

3.5.7. Inspect support structures for proper integrity and allowance for thermal expansion.

3.5.8. Internal inspections for both large and summer feed water deaerators should be completed in 6-year intervals unless otherwise recommended because of welding repairs): To be completed in 2031.

3.5.8.1. Visually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking.

3.5.8.2. Inspect spray nozzles and trays.

3.5.8.3. Certified American Society for Non-Destructive Testing (ASNT) Level II technicians shall perform non-destructive tests using the wet fluorescent magnetic particle (WFMT), ultrasonic testing (UT), and any other necessary non-destructive tests.

3.5.8.4. Completely examine all accessible welds utilizing the WFMT test method. Properly prepare the surfaces before testing.

3.5.8.5. Determine pressure vessel material thickness by ultrasonic testing (UT). Thickness measurement locations shall be selected by dividing the storage tank heads into quadrants and taking measurements at each quadrant on two imaginary rings in each head (eight measurements total). Measurement locations on the shell shall be on each of the quadrants, on four to six locations along the length of the shell (16 to 24 measurements total). The technician may recommend fewer or more tests to the owner, providing justification.

3.5.8.6. Typically, the pressure vessel section containing the deaerator trays and sprays is not accessible for non-destructive testing. The experience is that this section, which is mainly exposed to steam, is less vulnerable to weld failures and material thinning than the storage section which contains condensate and make-up water.

3.5.8.7. Calculate maximum allowable working pressure rating of vessel based on thickness measurements. Calculate depletion rate of material thickness.

3.6. Combustion Tuning of Boilers – Summary Requirements

3.6.1. The Contractor will provide a tuning report for each boiler in MS Excel, format for both “as found” and “post tuning” results for each fuel source, at all fuel curve points for three (3) dual fuel steam boilers operating nexus burner management system on fuel oil and gas. Readings to include:

Line #
Value
001
AIR
002
OIL
003
SLE
004
FGR
005
O2 NEX
006
O2 ANL
007
CO
008
NOX
009
HEAD
010
EFFICIENCY
011
STACK TEMP
012
OIL SUPPLY
013
OIL PUMP
014
OIL RETURN

3.6.2. Complete combustion tuning and data logging at high and low firing rate for six (6) CLC Phase 1 and 2 and two (2) Dom building 21 hydronic boilers. Readings to include:

Line #
Value
001
O2
002
CO2
003
CO raw
004
CO Free Air
005
NOX raw
006
NOX 3%
007
Efficiency
008
Stack Temp
009
Draft
010
Excess Air
011
Ambient Temp
012
Supply Gas Pressure
013
Manifold Pressure
014
Furnace Pressure
015
Gas Flow
016
Life Safety Pressure devices- leaks and reseat

3.6.3. Complete run time logging and notes for recommended maintenance improvements based on overall inspection and tuning.

4. REPORT REQUIREMENTS

4.1. Reports will be available within 30 days of any inspections and/or work completed on any of the items listed in C. (1) a.

4.2. A comprehensive written report that details all inspections and tests conducted, along with the corresponding findings and recommendations will be submitted.

4.3. Each report will clearly indicate the condition of each inspected item, categorizing them as either acceptable or deficient. For any identified deficiencies, provide a thorough description and outline recommended methods for correction. Utilize the National Board Forms NB-6 and NB-7, or other forms that are acceptable to the owner.

4.4. Sketches and photographs will be provided as requested by the owner to illustrate areas deemed unacceptable for continued service or requiring repair.

4.5. All relevant test data and calculations are to be included in all reports and will provide detailed sketches that illustrate the location and extent of all non-destructive testing conducted.

4.6. All safety-related deficiencies shall be immediately reported to the TPOC and/or designee during the inspection visit.

4.7. Provide recommendations on need for re-inspections after correction of deficiencies.

4.8. All inspection, calibration, and performance data must be submitted in 3-ring binders. Include 2 copies of each document, clearly labeled with the year and facility on the spine and will include:

4.8.1. Outline

4.8.2. Excel based task item list with completion dates and following year due dates

4.8.3. Copy of the contract

4.8.4. Manufacturer’s representative certification

4.8.5. Employee certifications (If applicable)

4.8.6. Template Test forms

4.8.7. Health safety plans include confined space policy and confined space certificates.

4.8.8. Contractor shall furnish equipment and confined space entry attendant for all entries.

4.9. Annual Calibration Certification of VA Equipment shall be submitted for the following:

4.9.1. Testo combustion analyzer Serial #01437249/710

4.9.2. Amatek JOFRA HPC500/502 pressure calibrator

5. TECHNICAL ACCEPTANCE/CONTRACTOR QUALIFICATIONS

5.1. A qualified contractor must have documented knowledge and experience in the design and construction of boiler plants and VA’s standards for construction and testing of safety devices, http://vaww.hefp.va.gov/resources/boiler-plant-tool-list-safety-device-testing

5.2. Non-destructive testing qualifications: Non-destructive testing of feedwater deaerator pressure vessels shall be performed by certified non-destructive testing technicians under the guidance of the Qualified Professional Inspector:

5.2.1. Boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).

5.2.2. A boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a state jurisdiction.

5.2.3. Boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement and has a representative serving as a member of the ASME Conference Committee.

5.2.4. A boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance.

5.3. The technicians shall be certified as being qualified Level II technicians in the non-destructive testing methods to be utilized. The certification shall be in accordance with the requirements of the American Society for Non-Destructive Testing (ASNT).

5.4. Combustion tuning qualifications: Combustion tuning shall be performed by a technician factory authorized & trained by the equipment manufacturer.

5.5. Manufacturers’ certificates of training shall be submitted to the VA for the following items:

5.5.1. Weishhaupt Burners and Tuning

5.5.2. Fireye Nexus Control Systems

5.5.3. RBI-Futera Hydronic Burners

5.5.4. ASME Certification Health and Safety

5.6. Must have access to licensed Fireye/Nexus software, technical support and employ authorized trained technicians in the Nexus operation of parallel position Combustion Control systems with VSD blowers.

5.7. Must have minimum of 4 years' experience with parallel position combustion controls.

5.8. OSHA 30 for site supervisor and OSHA 10 training certificates for all other personnel and submission of a Health safety plan that includes confined space entry plan shall be pre-approved by VA.

6. HOURS OF OPERATION/SCHEDULE

6.1. Normal hours of coverage are Monday through Friday from 7:00 am to 5:30 pm, excluding holidays.

6.1.1. Federal Holidays observed by Veterans Health Administration are: New Years' Day, Labor Day, Martin Luther King Day, Columbus Day, Presidents' Day, Veterans' Day, Memorial Day, Thanksgiving, Independence Day, Christmas Day, and Juneteenth.

6.1.2. All services will be performed during normal hours of coverage unless requested or approved by Government POC.

6.1.3. Testing Coordination, the testing dates will be coordinated with the TPOC and/or designee.

6.1.4. The annual testing will be completed within 1 month following the award of the contract and annually thereafter unless otherwise noted.

6.1.5. All cancellations/reschedules require 24-hour notice to the TPOC and/or designee.

7. EMERGENCIES

7.1. The contract must have 24-hour availability for all emergencies.

7.2. Emergency response time of 1 hour by phone and on-site within 2 hours.

7.3. Emergency services are defined as any corrective maintenance performed to restore equipment to full functional operation. Emergency services include any work performed outside of normally scheduled maintenance and repair activities and the normal work schedule outlined

7.4. The contractor shall be required to provide the Contracting Officer (CO) and TPOC with a detailed cost proposal and/or quote as well as a schedule with critical milestones for completing the Services Call Order. The Government reserves the right to obtain these services from a different vendor.

7.5. The contractor will not commence work until they are provided with written approval from TPOC.

7.6. A separate line item in this contract will be defined for these services.

7.7. These coverages shall include emergency services between inspections and work that shall occur outside regular working hours.

7.8. For emergencies: Prior to engaging in service or repair the contractor shall obtain written approval from the TPOC. The Government reserves the right to obtain these services from a different vendor.

7.9. Any work performed without CO or TPOC/Government POC approval shall not be approved for payment and considered and Unauthorized Commitment.

8. INVOICING

8.1. The VA will only be charged for the service line items that are performed at the time of testing.

8.2. Invoices will be submitted within 7 days of services being performed.

8.3. If additional testing is required, the contractor shall be available and begin additional testing within 48 hours of notification.

8.4. Additional testing is at the discretion of the TPOC and will be billed at the line-item cost for an on-site visit.

9. CODE REFERENCES

9.1. VHA requires that certain boiler plant safety devices be provided and requires periodic inspections and tests of boilers/burners and safety devices (VHA Directive 2003-050, “Boiler Plant Operations”). VHA requirements are based on the major codes, but codes are minimum requirements. VHA has some requirements that exceed the codes. These requirements are significant safety enhancements

9.1.1. Devices

9.1.1.1. NFPA 85-2007, “Boiler and Combustion Systems Hazards Code”, Chapter 5

9.1.1.2. ASME Boiler and Pressure Vessel Code, Section 1 – 2007, Part PG.

9.1.2. Inspection/Testing Required

9.1.2.1. NFPA 85-2007, Chapter 4, “Fundamentals of Combustion Systems”, requires: “Operation, set points, and adjustments shall be verified by testing at specified intervals, and the results shall be documented.” Therefore, all devices related to the combustion systems must be periodically tested.

9.1.2.2. Testing of Safety Valves Required – National Board of Boiler and Pressure Vessel Inspectors Inspection Code (NB) – 2004, Part RB.

9.1.2.3. Inspection of Boilers and Feedwater Deaerators Required – National Board of Boiler and Pressure Vessel Inspectors Inspection Code (NB) – 2004, Part RB.

10. ARRIVAL AND DEPARTURE

10.1. Contractor personnel shall check-in and check-out with the TPOC and/or designee representative immediately upon arrival at the VAMC and prior to the end of each site visit respectively.

10.2. At arrival the contractor shall inform the TPOC of its work plan for each visit, and at check-out the contractor shall inform the TPOC of the actual work performed and any other information concerning the safe operations of the equipment.

11. SECURITY REQUIREMENTS

11.1. All VA sensitive information shall be always protected, in accordance with VA local site guidelines. The Contractor shall report any known or expected security/privacy incidents, or any unauthorized disclosure of sensitive information, to the TPOC.

11.2. All Contractors must receive Privacy training annually.

11.3. The contractor will not have access to VA Desktop computers. They will not have access to online resources belonging to the VA or the U.S. government.

11.4. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Service. The Butler VA will not validate or make reimbursements for parking violations to the Contractor under any conditions. Smoking is prohibited on all VA campuses.

11.5. The Contractor’s field service employee will wear visible identification issued by the VA Police Service.

11.6. Possession of weapons, illegal drugs & alcohol is prohibited on Government Property.

11.7. Enclosed containers, including tool kits, shall be subject to search.

11.8. The Contractor takes all responsibility of their staff while on Butler VA property.

11.9. The Contractor is responsible for any damage to property whether personal, private or government owned.

11.10. The Contractor shall follow all Government rules and regulations regarding information security to prevent disclosure of sensitive information to unauthorized individuals or organizations, and shall adhere to all VA Privacy & Security, the Privacy Act, and Health Insurance Portability and Accountability Act (HIPPA) requirements when obtaining and reviewing information.

=====================END OF STATEMENT OF WORK===================