Attachment 1-Statement of Work.pdf
PDF 682 KB Posted
- Attached to
- VA Class Shaft Seal Technical Oversight Federal contract opportunity
- Solicitation number
- N4215823QS030
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RQF Amendment 00001.pdf | ||
| Combined Synopsis-Solicitation.pdf | ||
| Attachment 2-Addendum to 52.212-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INCLUDES ALL CHANGES THROUGH 17 MAR 2022
NORFOLK NAVAL SHIPYARD
Virginia Class Submarine
REPLACEMENT OF THE PROPULSION SHAFT MAIN SHAFT SEAL ASSEMBLY
SPECIFICATION FOR SERVICE AND WORK TO BE ACCOMPLISHED
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I FY-22 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. TITLE DATE
009-01 General Criteria; accomplish 01OCT2019
009-02 Environmental Compliance Report for Material Usage; accomplish 01OCT2019
009-03 Toxic and Hazardous Substance; control 01OCT2019
009-04 Quality Management System; provide 01OCT2019
009-05 Temporary Access; accomplish 01OCT2018
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 06MAR2020
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 01OCT2020
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 01OCT2020
009-10 Asbestos – Containing Material (ACM); control 01OCT2020
009-18 Mine Warfare Ships Magnetic Material; control 30APR2018
009-19 Provisioning Technical Documentation (PTD); provide 01OCT2018
009-20 Government Property; control 01OCT2017
009-21 Alteration Verification, Logistics and Technical Data; provide 01OCT2018
009-23 Interferences; remove and install 01OCT2018
009-24
Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish
01OCT2019
009 34 Fire Protection of Unmanned Vessels at Contractor’s Facility; accomplish 01OCT2018
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; accomplish
01OCT2018
009 40 Contractor Crane, Multi Purpose Machine and Material Handling Equipment at a Naval Facility; provide
01OCT2019
009-60 Schedule and Associated Reports for Availabilities over 9 Weeks in Duration; provide and manage
14JAN2020
009-61 Shipboard Use of Fluorocarbons; control 18JUL2014
009-67 Integrated Total Ship Testing; manage 30APR2018
009-69 Heavy Weather/Mooring Plan; provide 30APR2018
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
01OCT2019
009-72 Physical Security at Private Contractor’s Facility; accomplish 01OCT2019
009-73 Shipboard Electrical/Electronic Cable Procedure; accomplish 01OCT2018
009-74 Occupational, Safety and Health Plan; accomplish 01OCT2020
009-79 Government Owned Material (GOM); Status for Multi-Ship Multi-Option availabilities; report 01OCT2018
009-80 Ship’s Facilities; maintain 18NOV2016
ITEM NO. TITLE DATE
009-81 Compartment Closeout; accomplish 01OCT2019
009-82 Installation of Equal Component Vice Specified Component; report 26MAR2018
009 83 Wire Rope Assembly; fabricate 26MAR2018
009-84 Threaded Fastener Requirements; accomplish 06MAR2020
009 86 Recovery and Turn In of Ozone Depleting Substance (ODS); accomplish 01OCT2017
009-87 Chemical Disinfection Procedures; accomplish 01OCT2017
009 88 Collection, Holding, and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS Contaminated Tanks, Spaces and Piping; certify
18NOV2016
009-90 Technical Representative; provide 24JUL2019
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
06MAR2018
009 95 Mechanically Attached Fittings (MAF’s); install 01OCT2017
009-99 Ship Departure Report; provide 18JUL2014
009 100 Ship’s Stability; maintain 06MAR2018
009-101 Ship Transit and Berthing; accomplish 26MAR2018
009 103 Weight and Moment Change Data; provide 30APR2018
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01OCT2017
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 01OCT2017
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 18NOV2016
009 111 Scheduled and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
30APR2018
009 112 Prevention of Radiographic Inspection Ionizing Radiation Hazard; accomplish 01OCT2018
009-117 Combat Systems Light-Off Support; provide 01OCT2019
009 118 CG Deck Loading; accomplish 18JUL2014
009-120 Fact Finding and Critique of Unplanned Events; manage 06MAR2018
009-121 Ship Assessment / Inspection; accomplish 18NOV2016
009-122 Temporary Padeye; install and remove 01OCT2018
009 123 Fiber Optic Component; remove, relocate, repair, and install 01OCT2018
1. BACKGROUND:
1.1. The Virginia Class submarine has one (1) forward and one (1) aft main shaft seal assembly. The shaft seal assembly consists of a forward primary seal unit, an after primary seal unit, and an emergency seal unit. The shaft seals provide the hull closure where the propeller shaft penetrates the pressure hull. The primary shaft seal units and the emergency seal unit are contained within individual seal housings connected to form the shaft seal housing assembly. The primary seals are replaced during each scheduled shaft change out.
1.2. NAVSEA has mandated that a Wartsila Defense Technical Representative be present to provide technical oversight in Reference 3.2. Under step 1.x, SMS 2430-081-043 states, “CAUTION: Ensure a Wartsila Lips technical representative is present as the seals are replaced to prevent potential problems and liability.”
Accordingly, an authorized Wartsila Defense, Inc. Technical Representative will provide onsite technical guidance for the overhaul and repair of shaft seals during the upcoming Extended Dry-docking Selected Restricted Availability (EDSRA) at Norfolk Naval Shipyard.
1.3. Wartsila Defense, Inc. has provided similar onsite technical services at Pearl Harbor Naval Shipyard for USS Texas (SSN 775) under contract N00604-12-P-3458 dated 4 May, 2012; and for USS Hawaii (SSN 776) under contract N00604-15-P-3016 dated 8 June, 2015; and for USS North Carolina (SSN 777) under contract N32253- 17-P-0020 dated 30 Jan, 2017.
2. SCOPE:
2.1. Title: Propulsion Shaft Main Shaft Seal Assembly
2.2. Location of Work:
2.2.1. Norfolk Naval Shipyard – – Shaft Alley
2.3. Identification:
2.3.1. Quantity: (One EA), Forward Shaft Seal Assembly
2.3.2. Quantity: (One EA), Aft Shaft Seal Assembly
3. REFERENCES:
3.1. Standard Items, (FY-22)
3.2. SMS 2430-081-043, Restore Propulsion Shafting Main Shaft Seal Assembly. (Drydocking Required)
3.3. NAVSEA S9243-BZ-MA-010, Main Propulsion Shaft Seal Technical Manual
3.4. DWG 243-6985892, Main Shaft Seal Emergency Seal Unit Assembly and Details
4. REQUIREMENTS:
4.1. NNSY requires an authorized Wartsila Defense, Inc. Technical Representative to provide onsite technical guidance for the overhaul and repair of shaft seals during the FY23 EDSRA.
NNSY is solely responsible for the actual disassembly, reassembly and tests for the shaft seal. Wartsila Defense, Inc. shall provide only technical oversight to the Government Personnel working on the seals.
4.2. The Contractor provide the services of an Original Equipment Manufacturer (OEM) capable of providing technical engineering and troubleshooting services to disassemble, load, and reassemble the equipment listed in 2.3.1 and 2.3.2, in accordance with the requirements of 3.2 and 3.3.
4.3. The contractor shall be present and provide technical oversight for the shaft seal disassembly, reassembly, and testing. The work will be completed in three phases. No less than five (5) days’ notice will be given to the contractor prior to the start of any of these evolutions.
4.3.1. Phase one, the Contractor shall be present to provide technical oversight for seal disassembly.
4.3.2. Phase two, the Contractor shall be present providing technical oversight during the stacking of shaft seal parts on the shaft after loading and during the positioning of the shaft seals correctly as the shaft is drawn in for couple up.
4.3.3. Phase three, the Contractor shall be present providing technical oversight during the reassembly and test of seals.
4.4. Travel is required by the Contractor to fulfill the requirements of this PWS. The Contractor is required to make all travel arrangements, in accordance with the DOD Joint Travel Regulations (JTR). The Contractor shall be reimbursed for allowable travel expenses in accordance with Federal Acquisition Regulations (FAR) and (JTR).
5. CONTRACTOR QUALIFICATIONS:
5.1. The contractor shall be an authorized Wartsila Defense, Inc. personnel technical service representative.
5.2. Contractor personnel shall have a valid Driver’s license, and a vehicle pass for NNSY access. The contractor will submit the base access request to NNSY Security.
5.3. U.S. Citizenship is required for facility access. Prior to the start of performance, the contractor shall submit a formal letter to the Contract Officer Representative (COR) requesting facility access to include the following information – full name of all personnel working on this contract, social security number, date and place of birth, and citizenship. The contractor shall state that information has been verified and shall have supporting records on file, if required for examination.
5.4. The contractor shall be able to attain and maintain a Controlled Industrial Area (CIA) Badge.
5.5. Cell phones with a camera feature and cameras of any type are not permitted within the NNSY CIA. No cell phones or PEDs are permitted on board .
5.6. Work on this contract requires that the contractor and its personnel have access to privacy information. Contractor personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code section 552a and applicable NNSY rules and regulations. Services that do not require access to classified data, however, may require access to information which is to be handled as “For Official Use Only”, and may be covered by the Privacy Act. Contractor shall ensure that personnel assigned to this contract understand the meaning of these categories and handle such information accordingly.
5.7. Security Requirements. This contract does require a security clearance level and clearance granted by the Defense Security Service (DSS).
5.8. Contractor employees shall clearly identify themselves as a contractor (i.e. company shirt, badge, company identification) in a visible location on the front of exterior clothing, above the waist, (Except when safety or health reasons prevent such placement). Identification badges shall be worn at all times when performing work.
5.9. The contractor performing services shall be required to comply with all NNSY rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit. Contractor personnel will be escorted when working in sensitive areas, as required. The TPOC will make arrangements to provide escort service if required.
6. GOVERNMENT RESPONSIBILITIES:
6.1. All materials, labor, supplies, utilities, tools, and equipment required by the technical service representative will be provided by NNSY.
6.1.1. If additional special tooling is required, the Government will provide for rental and transportation costs for any special tools or equipment supplied by Wartsila Defense, Inc.
6.2. NNSY as the Lead Maintenance Authority will provide final evaluation and disposition (approval or disapproval) of identified non-conformances.
6.3. NNSY will provide engineering services as the Lead Technical Authority for this availability which includes, but is not limited to; review of Departures From Specification (DFS), Liaison Action Request (LAR) with VIRGINIA Class Planning Yard (VAPY), communications with NAVSEA Technical Authority (NAVSEA 05), communication with Naval Reactors Representative Office (NRRO, NAVSEA 08), and communications with Reactor Plant Planning Yard (RPPY).
7. PERIOD OF PERFORMANCE:
7.1. The Period of Performance (POP) for this contract is:
CLIN 0001: 5/12/23 – 06/30/23
CLIN 0002: 11/01/23 – 3/31/24
CLIN 0003: 02/01/24 – 5/11/24
7.2. Service shall be performed in three (3) phases:
7.2.1. Phase 1: Contractor shall be present to provide technical oversight for forward and aft shaft seal disassembly.
7.2.1.1. Approximate duration for Phase 1 is 30 days. Phase 1 shall begin approximately 80 days after Availability Start.
7.2.2. Phase 2: Contractor shall be present providing technical oversight during the stacking of shaft seal parts on the shaft after loading and during the positioning of the shaft seals correctly as the shaft is drawn in for couple up.
7.2.2.1. Approximate duration for Phase 2 is 30 days. Phase 2 shall begin at the start of Propulsion Shaft Reinstallation.
7.2.3. Phase 3: Contractor shall be present providing technical oversight during the reassembly and test of shaft seals.
7.2.3.1. Approximate duration for Phase 3 is 45 days. Phase 3 shall begin approximately 60 days after the start of the Propulsion Shaft Reinstallation.
7.3. Continuous 7 day 24 hour contractor support during phases 1, 2, and 3 may be required to support project team production schedule.
7.4. Final schedule shall be determined at the time of award.