This statement of work specifies materials required for the Cibola Unit 1 Pipe and Fittings project. The Bureau of Reclamation requires 8,900 feet of 30-inch DR 32.5 IPS HDPE pipe, along with associated fittings including 16 each of 24-inch x 2-inch IPS HDPE electrofusion saddles with stainless steel outlets, 16 each of 2-inch air/vacuum relief valves, and 32 each of 2-inch x 6-inch brass nipples. Additional required items include tees, flanges, blind flanges, and couplings to connect the HDPE pipe segments. The pipe must be high-density polyethylene meeting ASTM F714 and ASTM D3350 standards, supplied in 50-foot segments, and joined with butt fusion. Delivery of all pipe and fittings is requested between January 3rd and February 25th, 2023 to the Cibola National Wildlife Refuge in California. This statement of work corresponds to solicitation 140R4022Q0083 issued by the Department of the Interior Bureau of Reclamation for the Cibola Unit 1 Pipe and Fittings Materials project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Purpose_of_Amendment_0001_0001.pdf | ||
| Statement_of_Work_Amendment_0001_0001.pdf | ||
| Combined_Synopsis_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cibola Unit 1 Pipe
HDPE Pipe and Fittings Specifications
Cibola Unit 1
HDPE Pipe and Fittings
Materials Specifications
INTRODUCTION
The Bureau of Reclamation, Upper Colorado Region, requires HDPE piping and associated components as described in this specification.
LOCATION
Delivery location is near the Cibola National Wildlife Refuge (approximately 33.361403, -
114.696753). This site is located 18 miles south of Blythe, CA.
Cibola Unit 1 Pipe
HDPE Pipe and Fittings Specifications
Quantity Item
8900 FT 30” DR 32.5 IPS HDPE Pipe
16 EA 24” X 2” IPS HDPE Electrofusion Saddle with 316SS FPT Outlet
16 EA 2” 3500 Air/Vacuum Relief Valve
16 EA 2” T11001-NL Brass Valve
32 EA 2”X6” Brass Nipple
16 EA “Tee” 30” x 24” x 30”
2 EA 30” flange with backer ring and bolts
16 EA 24” flange with backer ring and bolts
16 EA 24” Blind Flange
Contractor shall supply and deliver HDPE Pipe and Fittings and shall supply documentation ensuring compliance with these specifications.
1.01 HIGH DENSITY POLYETHYLENE (HDPE) PIPE
A. HDPE solid wall pipe having the following salient characteristics:
1. ASTM F 714, solid wall, Dimension Ratio as specified in the quantities table.
2. Material: PE 4710 polyethylene material conforming to ASTM D 3350, Cell Classification 345464C or 345464E.
3. Pipe delivered in 50-foot segments.
B. Joining System: Butt fusion joints
C. Fittings, Reducers, and Couplings
1. Adapters, couplings, bends, and connections at structures and encasements:
Fabricated from HDPE unless otherwise specified.
2. HDPE fittings: In accordance with ASTM F 2206.
3. Material: Same as specified for pipe.
4. Manufacturer’s standard couplings.
2.01 DELIVERY
A. Supplier shall deliver pipe in 50-foot lengths. Supply couplers and fittings boxed and palleted where possible. Tentative delivery date shall be Jan 3 – Feb 25, 2023. Please coordinate delivery with Ryan Proctor 801-669-1105.
All pipe and fittings are to be delivered F.O.B Destination to "Location" above.