This is a Statement of Work (SOW) for the procurement and installation of mural protectors at the Naval Nuclear Power Training Command (NNPTC) facility in Goose Creek, South Carolina.

The contractor shall provide six heavy-duty protective coverings designed to shield custom painted murals located in BEQ (Bachelor Enlisted Quarters) lounges from accidental impacts, scratches, and vandalism while maintaining optical clarity and aesthetic appeal. Each protector must cover murals measuring approximately 7 feet high by 14 feet wide and be constructed from high-impact resistant, clear transparent material such as architectural-grade polycarbonate, Lexan, or heavy-duty acrylic. The material must feature anti-glare or non-reflective finish, be UV-resistant to prevent yellowing, and include tamper-resistant heavy-duty mounting hardware that secures the protector without damaging the underlying artwork. All materials must comply with DoD and NFPA fire safety standards, with routed, beveled, or framed edges to eliminate sharp hazards. The outer surface must be scratch-resistant and easily cleanable using standard DoD janitorial supplies without clouding. The contractor is responsible for coordinating delivery and installation schedules with the Government Technical Point of Contact (MMNC Hodges, Jonathan L, at 843-765-6937) and must perform all work Monday through Friday, 0600-1530 local time, excluding federal holidays. The contractor must remove all installation debris daily and perform final cleaning upon completion. All contractor personnel require compliance with standard DoD and local installation security regulations, including base access procedures and photography restrictions limited to pre-approved mural installation sites. Payment will be made via DFAS Electronics Funds Transfer through the Wide Area Work Flow (WAWF) System in arrears, requiring contractor registration in WAWF prior to payment processing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work: NNPTC BEQ Mural Protectors

Naval Nuclear Power Training Command (NNPTC)

1.0 BACKGROUND

1.1 The mission of Naval Nuclear Power Training Command (NNPTC) is to prepare safe and trusted naval nuclear operators ready for follow-on prototype training and, ultimately, service in the Fleet.

1.2 As part of ongoing facilities modernization, NNPTC requires durable, transparent physical protection for custom painted murals located in the high-traffic BEQ lounges to preserve the artwork.

2.0 OBJECTIVE

The objective of this contract is to procure and install heavy-duty protective coverings that will shield the artwork from accidental impacts, scratches, and vandalism, while preserving the optical clarity and aesthetic value of the murals.

3.0 DESCRIPTION OF REQUIREMENT

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to provide, deliver, and install the mural protectors as defined in this

Statement of Work (SOW).

4.0 DETAILED REQUIREMENTS

4.1 Product and Installation Specifications: The mural protectors and installation shall meet the following minimum characteristics:

• Material Composition: High-impact resistant, clear transparent material (e.g., architectural-grade polycarbonate, Lexan, or heavy-duty acrylic).

• Dimensions: Sized to completely cover murals measuring approximately 7' (H) x 14' (W).

• Optical Quality: Material must feature an anti-glare or non-reflective finish and be UV-resistant to prevent yellowing or degradation.

• Hardware & Mounting: Tamper-resistant, heavy-duty mounting hardware (anchors, stand-offs, or edge-framing) that secures the protector to the bulkhead without puncturing or damaging the underlying mural.

• Safety & Compliance: Materials must comply with DoD and NFPA fire safety standards. Edges must be routed, beveled, or framed to eliminate sharp hazards.

• Maintenance: The outer surface must be scratch-resistant and easily cleanable using standard DoD janitorial supplies without clouding.

• Quantity: Six, One for each Mural in the Designated BEQ lounges

5.0 CONTRACTOR RESPONSIBILITIES

5.1 The Contractor is responsible for coordinating the delivery and installation schedule with the Government

Technical Point of Contact (GTPOC) prior to commencement of work.

5.2 The Contractor shall remove all installation debris, hardware shavings, and packaging materials from the premises daily and perform a final cleaning of the installed protectors.

6.0 DELIVERY ADDRESS/LOCATION

Naval Nuclear Power Training Command (NNPTC)

Attn: MMNC Hodges, Jonathan L

101 NNPTC Circle

Goose Creek, SC 29445

(843)765-6937

7.0 BUSINESS HOURS

Deliveries and installation shall be made Monday to Friday, 0600 - 1530 (Goose Creek, SC Local Time), excluding

Federal Holidays or other times the facility is closed by Government direction.

8.0 METHOD OF PAYMENT

Payment for this contract shall be made via DFAS Electronics Funds Transfer (EFT) utilizing the Wide Area Work

Flow (WAWF) System. The contractor must be registered in the WAWF System to receive payment. Payment shall be made in arrears.

9.0 SECURITY

9.1 All contractor personnel requiring access to NNPTC must comply with standard DoW and local installation security regulations. All contractor equipment, personnel, and vehicles are subject to inspection and search by US government security officials upon entry.

9.2 Contractor personnel shall comply with all local base/installation security procedures required to gain access to

US Government facilities and must remain within the designated work areas.

9.3 Personnel are prohibited from taking unauthorized photographs. Photography must be strictly limited to the mural installation site and must be pre-approved by the Command POC.

File details come from the government source that posted it. Updated .