Attachment 1 - Statement of Work.pdf
PDF 210 KB Posted
- Attached to
- 321 STS - DC2 Comm WAPTAC Equipment
- Solicitation number
- FA558726Q0035
About this file
This is a Statement of Work (SOW) for the 321st Special Tactics Squadron's Distributed Command and Control (DC2) Communications Equipment procurement at Royal Air Force Lakenheath, dated 21 May 2026.
The 321st Special Tactics Squadron requires ROMEO SIX portable tactical C2 communications systems to address a critical capability gap in their existing command and control infrastructure. The procurement includes three R6-TAC-C2-BOX units (hardened portable pelican cases) at $108,891.01 each, along with multiple SLED adapters enabling integration with existing equipment: three SLED-DACAS Black Diamond 4-port hubs, six SLED-HH-01 adapters, six SLED-HH-02 adapters, six SLED-MP-01 adapters, and three SLED-MP-02 adapters. The total contract value is $326,891.01 including delivery and shipping. The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, hardware, software, accessories, and training materials necessary for implementation. The contractor is responsible for all shipping costs on an FOB Destination basis, with specific instructions provided for vendors located inside and outside the United Kingdom, including United States Postal Service, commercial small parcel carrier, or consolidated shipping point options. Work hours are Monday through Friday, 0800-1700 local UK time, excluding US federal holidays and UK bank holidays. Key requirements include contract management with a single point of contact, operational security compliance with installation OPSEC policies, safety incident reporting within 24 hours, contractor personnel access pass documentation, and maintenance of airfield sealing operations capability.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Statement of Work
(SOW)
“321st STS Distributed Command and Control (DC2) Communications Equipment at Royal Air Force (RAF) Lakenheath
21 May 2026
1.0 Introduction
1.1 Mission: In an era of renewed great power competition, the 321st Special Tactics Squadron (321 STS) provides a highly responsive and rapidly deployable force designed to deter aggression and project power across the European theater. As a key enabler for joint and combined forces, the 321 STS is prepared to establish and control the critical air-to-ground interface in contested environments against near-peer adversaries. The squadron's elite Combat Controllers, Pararescuemen, and Special Reconnaissance operators are experts in a range of core tasks. These include conducting clandestine reconnaissance and surveillance of potential targets, the assessment and establishment of austere airfields and assault zones, and providing precision air traffic control and secure, long-range command and control communications.
Furthermore, the unit remains on constant alert to provide expeditionary combat trauma care, personnel recovery, and terminal attack control for munitions delivered by a variety of air assets.
In line with the strategic imperative for increased burden-sharing, the 321 STS is dedicated to enhancing the lethality and interoperability of NATO allies and partners, ensuring a cohesive and resilient force capable of responding to any contingency within the EUCOM/SOCEUR Area of Responsibility.
1.2 Background: The 321st Special Tactics Squadron’s existing C2 infrastructure is insufficient to meet the demands of a modern, contested environment, creating a critical capability gap. To ensure seamless interoperability and mission success, new Tactical C2 portable communications systems from ROMEO SIX are required. These rugged, man-portable C2 boxes will complement a larger command hub and extend command and control to the tactical edge, enabling dismounted teams to maintain robust connectivity with the main TOC. The integration of this system will greatly enhance the 321 STS's ability to conduct agile and distributed operations
1.3 Scope: This communications solution will equip the 321st Special Tactics Squadron (321 STS) with a modernized, resilient, and agile infrastructure required for multi-domain operations. The ROMEO SIX portable communications systems extend C2 capability to the tactical edge, ensuring operators maintain reliable connectivity even when dismounted or in austere locations. This ensures that our Special Tactics operators can effectively execute their mission across the full spectrum of conflict.
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract. There will be no need or requirement from the Contractor for installation of requested product(s).
2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.
Work hours are from 0800 to 1700 local UK time.
3.0 Product Specifications & Installation Requirements
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items and services necessary to successfully implement the new system. To include all hardware, software, and accessory equipment and training material or technical manuals.
Line
Part Number Part Description Detailed Description Qty UoM Unit Price
01 R6-TAC-C2-BOX Romeo Six Tactical C2 Box Complete with Sleds This is the hardened highly portable pelican case that will house/hold all the sleds and equipment.
3 Box/Case $108,891.01
1.1 SLED-DACAS Black Diamond 4-port hub and EUD This SLED/adapter will allow existing equipment to communicate between each other
3 EA
1.2 SLED-HH-01 AN/PRC-
161/163//TRE/TNRE/SIR/MPU5//TW950/SC4200
This SLED/adapter will allow the use of existing equipment already in inventory
6 EA
1.3 SLED-HH-02 AN/PRC-163 with Mission Module This SLED/adapter will allow the use of existing equipment already in inventory
6 EA
1.4 SLED-MP-01 AN/PRC-117G/158/167 This SLED/adapter will
allow the use of existing equipment already in inventory
6 EA
1.5 SLED-MP-02 AN/PRC-160 This SLED/adapter will
allow the use of existing equipment already in inventory
3 EA
2 Delivery Shipping 1 $326,891.01
3.2 It is a requirement for this installation to maintain the capability conducting sealing operations on the airfield.
4.0 Special Requirements
4.1 Security & Safety
4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.
4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.
4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.
4.3 Shipping Instructions
4.3.1 For vendors located inside the United Kingdom.
4.3.1.1 Shipment shall be FOB Destination.
4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).
4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2 For vendors located outside of the United Kingdom.
4.3.2.1 Option One: United States Postal Service.
4.3.2.1.1 Shipping shall be FOB Destination.
4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.
4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.1.5 Hazardous material is not submitted.
4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.
4.3.2.2 Option Two: Commercial small parcel carrier.
4.3.2.2.1 Shipping shall be FOB Destination.
4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.
4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.
4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2.3 Option Three: Consolidated Shipping Point.
4.3.2.3.1 Shipping shall be FOB Destination.
4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.3.3 Weight of individual shipments must exceed 300lbs.
4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).
4.3.2.3.5 Hazardous material may be shipped via this method.
4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.
4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED
STATES AIR FORCE” in order to ensure shipments clear customs.
4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.
4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)
4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.
4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.
4.3.3.3 Commercial phone number; +44 01638 52620.
4.4 Government Furnished Material: N/A
4.5 Applicable Directives: N/A
5.0 Appendix: Related Documents
mailto:48lrs.lgrddc.inboundcustoms@us.af.mil mailto:48lrs.inboundcargo@us.af.mil
File details come from the government source that posted it. Updated .