Attachment_1_Statement_of_Work.pdf

PDF 872 KB Posted

Attached to
FORTUNA/REDONDO TRASH CONTRACT Federal contract opportunity
Solicitation number
140L6426Q0015
Issued by
Department of the Interior Bureau of Land Management Arizona Region

About this file

This is a Statement of Work (SOW) for trash removal services at two Bureau of Land Management recreation sites in Yuma County, Arizona: Fortuna Pond and Redondo Pond.

The contractor must provide weekly trash collection services on Fridays at both locations using two six-cubic-yard trash containers with hinged lids. The contractor furnishes all labor, materials, supplies, equipment, and vehicles required for service delivery. Specific requirements include: maintaining containers in proper working condition with annual painting; cleaning up any spillage from collection operations; disposing of trash only at approved sanitary landfills; participating in single-stream recycling; and collecting bagged refuse stacked alongside bins when bins are full. The contractor must respond to unscheduled collection requests within 24 hours at the unit price if use exceeds anticipated levels. Only authorized BLM personnel may request on-call services. The contractor assumes all risk for services performed outside the scope of work or in excess of funding and must comply with applicable local, state, and federal regulations. The contract performance period is one year from the award date with four optional one-year renewal periods subject to acceptable contractor performance. Government inspection rights are reserved, with the contractor required to correct any non-compliance issues within two calendar days. If services do not conform to contract requirements, the Government may require reperformance at no additional cost, reduce contract price, perform the services directly and charge costs to the contractor, or terminate the contract for default.

View the file

Other files for this federal contract opportunity

Other files attached to FORTUNA/REDONDO TRASH CONTRACT, newest first.
File Type Posted
Sol_140L6426Q0015_Amd_0001.pdf PDF
Attachment_6_Maps_0001.pdf PDF
Attachment_3_Wage_Determination.pdf PDF
Attachment_4_Clauses_and_Provisions.pdf PDF
Attachment_5_Bid_Schedule.pdf PDF
Attachment_2_Instructions_to_Offerors.pdf PDF
Sol_140L6426Q0015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Bureau of Land Management Yuma Field Office

STATEMENT OF WORK

Fortuna Pond and Redondo Pond

TRASH REMOVAL CONTRACT

1 REQUIREMENT

It is required that trash collection services be performed at both the Fortuna Pond and Redondo Pond Recreation sites, Yuma County, Arizona. The Contractor is required to furnish all labor, material, supplies, and equipment including two six (6) cubic yard trash container and vehicles needed to perform in accordance with these specifications at each site. Bins will have hinged lids that cover the entire opening, will be painted at least once per year, and maintained in proper working condition at all times.

2 LOCATION

U.S. Bureau of Land Management, Fortuna Pond and Redondo Pond Recreation sites, Yuma County, Arizona (see attached map).

3 GENERAL DESCRIPTION OF WORK

One six (6) yard trash container will be placed at each location (total of 2 locations). The collection of trash from the containers will be once per week on Fridays. The Contractor will be responsible for the cleanup of any spillage caused by their operation. Disposal of the trash will be only at approved sanitary landfills. The Contractor must participate in the single stream recycling process.

It is anticipated that bagged refuse will at times be stacked alongside trash bins when bins are full.

The Contractor is required to pick up bagged refuse stacked alongside trash bins.

4 UNSCHEDULED TRASH COLLECTION

If additional trash collection is required due to heavier use than anticipated, the Contractor shall provide the requested service within 24-hours’ notice at the unit price.

5 DELIVERABLES/PERIOD OF PERFORMANCE

The performance period for the contract is one year from the date of the award of the contract, with four 1-year Option Periods subject to acceptable contractor performance.

6 RESTRICTIONS

Only authorized BLM personnel can make on-call services.

Any performance of services outside the scope of work or in excess of funding is at the contractor’s risk. Services must be in accordance with any applicable local, state, or federal regulations.

7 INSPECTION OF SERVICES

7. 1 Inspection of Services-Fixed-Price (Aug 1996)

(a) Definition."Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may-

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may-

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service;

or

(2) Terminate the contract for default.

(End of clause)

7. 2 Government Inspection Procedures

The Government reserves the right to conduct site inspections to ensure compliance with the Statement of Work. The Contractor will be given two calendar days to correct any non-compliance issues.

File details come from the government source that posted it. Updated .