This is a Statement of Work (SOW) for the FY25 BRL B3 Barn Steam Bundle Conversion project, revised May 9, 2025, located at the Biosciences Research Laboratory in Fargo, North Dakota.

The project scope involves converting domestic hot water heating from natural gas to steam. Technical requirements include two primary tasks: (1) BRL B3 (Barn) Room A103 steam bundle and line replacement, which entails removing the old steam bundle, installing a new Taco G8404S 24" 4-Pass Heat Exchanger with associated valves and controls, installing two 150-foot ¾-inch copper return lines from laboratory sinks in rooms A105 and A114, installing a Grundfos circulator pump, reinstalling temperature sensors, installing a new 2" steam line with insulation, and installing a new steam trap; and (2) BRL B1 Room C120 steam coil replacement for the AHU1-15 unit, which requires removing the old McQuay steam coil and associated components, then installing a new McQuay steam coil (model #5ua1201g018.00x036.00) with new vacuum breakers, gate valve, steam trap, and 2" thick fiberglass insulation. The contractor must provide all copper line insulation at approximately 340 feet of ¾-inch 1-½-inch thick fiberglass pipe insulation. Deliverables require submission within 30 days of award, a work schedule within 60 days, periodic hazardous materials testing, periodic testing throughout commissioning, and a minimum one-year parts and labor warranty. All work must comply with State and Federal building codes. The contractor must have staff experienced in HVAC and electrical work, with the lead worker holding a Journeyman's License in their respective trade. All personnel require U.S. photo identification and must coordinate with facility maintenance staff on the first day of construction for parking permits, badges, and access credentials. The project completion deadline is 60 days after notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Steam Bundle Conversion - Biosciences Research Lab, newest first.
File Type Posted
SF30 - 1232SA26Q0703 - AMENDMENT 001 - SITE VISIT.pdf PDF
SOLICITATION NO. 1232SA26Q0703 - TERMS AND CONDITIONS.pdf PDF
ATTACHMENT 2 - WAGE DETERMINATION.pdf PDF
SF1442 - 1232SA26Q0703.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 - STATEMENT OF WORK

ATTACHMENT 1 - STATEMENT OF WORK

File details come from the government source that posted it. Updated .