This document is a Statement of Work (SOW) for waterline repair at the Hapgood Pond Campground in the Green Mountain National Forest, located in Peru, Vermont. The project scope involves repairing two 1½" waterline shut-off valves and two 1½" curb stops, which includes excavation, furnishing and installing new components, and backfilling the excavation site. The contractor will be responsible for providing all necessary equipment, personnel, materials, and quality control, with a required completion timeline of 30 days and restrictions on working at night, on weekends, or federal holidays without prior authorization.

Key performance requirements include disposing of all waste materials appropriately, protecting adjacent infrastructure, providing own electrical generators, ensuring employee safety with required personal protective equipment, and complying with OSHA regulations and manufacturer installation instructions. Payment will be made at the contract's lump sum price, covering all materials, labor, equipment, and incidental expenses necessary to complete the work. The project is located at the Hapgood Pond Campground, with specific site details provided in attached maps and a detailed curb stop installation diagram.

View the file

Other files

File Type Posted
Solicitation 12444325Q0043.pdf PDF
Attachment 3- Wage Determination.pdf PDF
Attachment 2- Specification Sheet .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Green Mountain National Forest Hapgood Waterline Repair

I. Scope of Work

The Green Mountain National Forest (GMNF) requests services to repair two 1 ½” waterline shut off valves and two 1 ½” curb stops on an existing waterline at the Hapgood Pond Campground.

This work includes but is not limited to excavation, furnishing and installation of the curb stops and shutoff valves including backfill of the excavation. Located at Hapgood Pond Campground in Peru, Vermont. See attached maps for site location and approximate location of waterlines.

The Contractor shall provide all equipment, supplies, personnel, supervision, materials, quality control, and incidentals for the work on this contract.

The Contractor shall be required to complete all work within 30 days. No work shall be performed at night or on weekends or Federal holidays without prior written authorization by the COR.

II. General

All waste material shall become the property of the Contractor and shall be disposed in an appropriate manner off of US Government land.

The contractor will be responsible for protecting all adjacent work, walks, concrete curbs, fences, trees etc. Any damage done by the contractor shall be repaired at no cost to the Government.

Electrical service is not available on the site. Contractor shall provide electric generators or other temporary means where electric service is not readily available.

The contractor shall be responsible for providing employees with all required personal protective equipment including but not limited to hard hats, gloves, hearing protection and fall restraint and shall comply with all OSHA regulations

All work is to be done in accordance with local, state and federal regulations.

Comply with manufacturer's written installation instructions unless more stringent requirements apply.

III. Measurement and Payment

Measurement: Completely in place and functional.

Payment: At the contract lump sum price including all materials, labor, equipment, and incidentals necessary to complete the work.

Detail and Project Picture

Project Location Map

I. Scope of Work
II. General