Attachment 1 - Statement of Work.pdf
PDF 109 KB Posted
- Attached to
- JAWBONE STATION FUEL TANKS Federal contract opportunity
- Solicitation number
- 140L0620Q0073
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0620Q0073_Amd_0003.pdf | ||
| Sol_140L0620Q0073_Amd_0002.pdf | ||
| Attachment 6 - Contractor QAs_0002.pdf | ||
| Sol_140L0620Q0073_Amd_0001.pdf | ||
| Attachment 6 - Contractor QAs_0001.pdf | ||
| Attachment 4 - Project Location.pdf | ||
| Attachment 5 - DOL Wage Determination.pdf | ||
| Attachment 2 - Specifications.pdf | ||
| Sol_140L0620Q0073.pdf | ||
| Attachment 3 - Project Site Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – Statement of Work (SOW) Page 1 of 1
Project Title: Jawbone Station Fuel Tanks
STATEMENT OF WORK
Jawbone Station Fuel Tanks
A. Purpose. This requirement for the procurement and installation of (1) self-contained 1000 gal. AST, 500/500 split fuel tank for Diesel fuel #2 red - Diesel fuel #2 and (1) self-contained 500 gal. AST, Gasoline fuel tank to be furnished and installed at BLM Jawbone Visitor Center at 28111 Jawbone canyon Road, Cantil CA.
B. Authority. Authority for BLM to enter into this contract is contained in Federal Land Policy and
Management Act of 1976 (Public Law 94-579, Section 307 (b)).
C. Benefits. The activity to be undertaken through this contract are in furtherance of the Bureau of Land
Management’s mission by providing the following benefits:
• Provide a Con Vault / Fire Guard style (AST) UL-2085 fuel storage system that meets all
California Health and Safety Codes and Regulations.
• State of California regulations require stationary gasoline tanks with a capacity of 250 gallons or greater, installed after December 31, 1970, to be approved by the District Air Pollution Control
Officer. One exemption to the requirement for approval is if the tank is equipped with a vapor recovery system as described in the California Health and Safety Code (HSC) Division 26 Air
Resources, Section 41952.
• California regulations require two types of vapor recovery systems: Phase I (the vapor recovery system from the delivery truck and the receiving tank, the spill box, and the standpipe) and Phase
II (the dispenser, splitter, hose, and nozzle).
SCOPE OF WORK
• Prepare engineered plan set for project
• Secure Kern County Fire Dept. and Kern Building AST Permit (Including Fees)
• Furnish and install (26) 6” concrete filled bollards
• Furnish and install (2) AST Footing Pads with #4 Rebar @ 16” OC
• Furnish and install (1) self-contained 1000 gal. AST, 500/500 Split
• Furnish and install (1) self-contained 500 gal. AST
• Furnish Crane to offload and spot new AST’s
• Set tank anchors per engineered plans
• Electrical service to AST footing pads is to be provided by customer, (BLM)
• Furnish and install final electrical connection to AST systems
• Arrange and conduct all required final inspections