This document is a Statement of Work (SOW) for a federal contract opportunity issued by the U.S. Coast Guard Sector Maryland-NCR. The SOW requires a contractor to provide labor and equipment to abrasively blast and remove rust and paint from one steel magazine enclosure measuring approximately 50x10x12 feet located at the Coast Guard Yard in Baltimore, Maryland. The work must be completed within 30 working days after contract award. The SOW includes details on site visits, contractor personnel and vehicle identification requirements, safety and environmental protection regulations, and inspection and acceptance procedures. The related federal contract opportunity has a solicitation number of 70Z0G824QBNCR0029 and a submission deadline of September 16, 2024 at 12:00 PM EDT.

View the file

Other files

File Type Posted
Solicitation Questions and Answers.pdf PDF
Pictures.pdf PDF
RFQ Schedule 70Z0G824QBNCR0029.pdf PDF
Attachment 2 - Pricing Spreadsheet.xlsx XLSX spreadsheet
SF-1449 70Z0G824QBNCR0029.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARMORY OUTDOOR MAG RUST REMOVAL 30AUG2024

SCOPE OF WORK

1. GENERAL REQUIREMENTS:

Sector Maryland-NCR requires rust removal on outdoor magazines near the waterfront in gated the Grove section of the Coast Guard Yard. The service requires a supply of water and electricity, as well as environmental containment of debris and removal of the rust and previous paint. Steel magazine enclosure roughly measures 50x10x12.

Refurbishment of the outdoor magazines by removing rust will increase the longevity of the structure, allowing Sector Maryland-NCR to continue to assist the ordnance needs of visiting cutters for the Coast Guard Yard.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

Upon acceptance the contractor shall commence work NLT fourteen (14) days after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award.

3. SCOPE OF WORK:

Job scope requires labor and equipment to execute the following:

Mobilize to the USCG Yard in Baltimore with vendor provided water source and electric source.

Subcontractors set up and provide containment for the environment around one (1) steel magazine enclosure measuring roughly 50x10x12, currently painted and rusted.

Vendor provided equipment to abrasively blast the steel magazine enclosure, removing paint and rust.

Vendor provided equipment to vacuum all waste and haul offsite for disposal.

Not included in the scope of work is repainting of the structure.

4. SITE VISIT:

All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with GM1 Chase Gillyard, chase.d.gillyard@uscg.mil, 781-584-2054, or LCDR Johnny Upton, jonathon.f.upton@uscg.mil, 410-576-2546.

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)

REPRESENTATIVE:

The designated contracting officer’s QAE representative and Point of Contact for this project is with GM1 Chase Gillyard, chase.d.gillyard@uscg.mil, 781-584-2054, or LCDR Johnny Upton, jonathon.f.upton@uscg.mil, 410-576-2546

6. CONDITIONS AFFECTING THE WORK:

The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT:

The contractor must immediately notify the contracting officer’s QAE representative of the intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION:

No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP:

All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS:

The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP:

All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. Vendor must provide environmental containment to remove of all rust and paint debris from abrasive blasting of 1 steel outdoor magazine, respecting environmental confines of waterfront and requirements. It is the responsibility of the vendor to remove rust and paint offsite and dispose of it legally.

12. WORK OUTSIDE REGULAR HOURS:

If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, they may submit a request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK:

Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES:

The contractor shall provide a detailed list of all employees to the QAE Representatives five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Sector Maryland-NCR Command Security Officer will be given a copy of the employee list and a pass will be issued for entry onto USCG Yard property. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on USCG Yard property shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the USCG Yard Safety Officer, Robert Taylor in his capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Station, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Yard Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on USCG Yard. A USCG Yard authorized representative is required for all contractors Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on USCG Yard property has the right to a safe and healthy workplace. The contractor has the responsibility and right to stop unsafe work.

QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

1. All contractors working on USCG Yard property shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series).

Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, CWO4 Matthew Thornton @ 443-610-8459 prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.

2. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on USCG Station Annapolis.

Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

3. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

4. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

File details come from the government source that posted it. Updated .