This document is a Statement of Work (SOW) for the interior painting of two 24' x 60' modular buildings located at the USDA-ARS Pacific Basin Agricultural Research Center in Hilo, Hawaii.
The SOW outlines the scope of work, which includes preparing the surfaces, painting all interior walls, doors, window and door trim, and ensuring a smooth uniform finish. The contractor will be responsible for providing all materials, labor, and equipment necessary to complete the project in a timely manner and in accordance with federal, state, and local codes and standards. The contract period is 60 calendar days from the notice to proceed. Relevant federal agencies involved are the USDA Agricultural Research Service and the Pacific West Area. No government-furnished equipment or services are anticipated, but the government will provide reasonable amounts of electricity and water. The contractor is required to obtain necessary permits, protect the work area, and clean up the site upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
INTERIOR PAINTING OF (2) 24’ x60’
MODULAR BUILDINGS
USDA-ARS
ARS-PBARC-DKI
64 Nowelo St, Hawaii 96720
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
a. Project Title:
Interior Painting of (2) 24’ X60’ Modular Buildings.
b. Project Location:
USDA-ARS-DKI
Pacific Basin Agricultural Research Center
2.0 PROJECT CONTACT PERSONS:
a. CONTRACTING OFFICER (CO):
b. CENTER DIRECTOR (CD):
Marisa Wall Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo Hi 96720
c. ADMINISTRATIVE OFFICER (AO):
Carlee Wehrsig
Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo, HI 96720 Phone: (808) 959-4312 E-mail: carlee.wehrsig@usda.gov
d. LOCATION CONTRACTING OFFICER REPRESENTATIVE (COR):
Pernell Hanoa
Facilities Manager Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo, HI 96720 Phone: (808) 959-4356 Cell: (808) 896-4523 E-mail: Pernell.hanoa@ars.usda.gov
e. SAFETY OFFICER (CDSO) Scott Geib PhD
USDA-ARS Pacific Basin Agricultural Research Center 64 Nowelo Street, Hilo, Hawaii 96720 808-959-4335 E-mail: scott.geib@ars.usda.gov mailto:carlee.wehrsig@usda.gov mailto:scott.geib@ars.usda.gov
3.0 SCOPE OF WORK
The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required service shall be in accordance with the requirements as described herein. See attached drawings for specifications and location.
3.1 Background: The USDA/ARS-PBARC located at 64 Nowelo St. in Hilo
Hawaii requires the interior painting of (2) 24’ x 60’ modular buildings. Building 1 consists of (8) 12’x12’ offices, (2) 8’x24’ common areas, and (1) 20’x4’ hallway.
Building 2 consists of (2) 12’x12’ offices, (1) 24’x30’ work room and (1) 24’x20’ common area and (1) 4’x8’ closet. The project will require the painting of all interior walls, doors, and window and door trim. See below for project description and specifications.
3.2 Contractor shall prepare all surfaces and areas for painting.
3.2.1 All surfaces shall be cleaned and prepped.
3.2,1.1 All surrounding areas to be painted shall be protected from splatters, over sprays and damage during work.
3.2.1.2 Door hardware, light switches, outlets, and communication ports shall be protected from splatters, over sprays and damage.
3.2.1.3 All holes shall be filled, patched, and sanded as needed.
3.2.1.4 Caulk joints and cracks as needed.
3.2.1.5 Spot prime and patch damaged areas.
3.3. The contractor shall paint all interior surfaces to include walls, metal doors, door and window casing and trim.
3.3.1 Paint shall have a smooth surface of uniform finish.
3.3.2 Finish painted surfaces shall be free of cloudiness, spotting, brush marks, laps, runs, sags, ropiness, and other surface imperfections.
3.3,3 Edges adjoining other materials or colors shall be true without overlapping.
3.3.4. The contractor shall be able to apply paint in and or around existing office furniture, cabinets, computers, and communication equipment.
3.3.5. The contractor shall be able to paint the interiors offices in sections to allow for furniture and office equipment to be moved around to allow adequate space for painting to be accomplished.
3.4 All paints shall be of the manufacturer’s premium quality trade sale.
3.4.1 All paints and primers shall be provided by the same manufacturer.
3.4.2 Material Safety Data Sheets (MSDS) and the Technical Data Sheet (TDS) shall be provided by the contractor to the government for all products that the contractor proposes to use in the performance of this work.
3.4.3 Materials shall be delivered to the job site in the manufacturer’s original unopened packages and containers.
4.0 PROJECT REQUIREMENTS:
a. The Contractor will work with site personnel to ensure project is accomplished in a timely manner.
b. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction and services shall comply with applicable federal, state, and local code requirements as well as current industry standards, (ie: EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
c. All work to meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS 242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs.
ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/.
d. This project falls under the DAVIS BACON Wage Act.
4.1 Background & Site Description:
The project site is located at the Daniel K. Inouye, Pacific Basin Agricultural Research Center to paint interior buildings.
4.2 Bid Schedule:
Item Description
Base Item Provide materials, labor, equipment and all associated services necessary to complete project.
4.3 Description of Work:
The Contractor will provide a turn-key project satisfying all Local, State, and Federal requirements.
a. The Contractor will provide all the necessary materials and labor per
Section 3.0 and properly dispose of all material being replaced.
b. The contractor is responsible for any damage to adjacent equipment and miscellaneous objects that may become damaged during construction. The Contractor is responsible for making repairs to meet or exceed conditions prior to damage.
c. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/ https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/ for conditions that would be visible during an on-site visit for people experienced performing this type of work.
4.4 Government Furnished Equipment\Services
a. The Government does not anticipate the need in this project, but the Government will be available to assist with the identification/location of utilities as necessary.
b. The Government will furnish a reasonable amount of electricity and water.
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disturbances that might jeopardize on-going operations and research. Owner reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Owner prior to starting demolition operations. Contractor shall legally dispose all any materials removed that will not be retained.
5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.
5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the COR for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.
5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
5.6 Protection of Work and Property/Safety Requirements:
a. Upon request the contractor shall furnish a Site-Specific Safety Plan (SSSP) or Accident Prevention Plan (APP) 10 days after contract award. SSSP / APP shall be reviewed by the Government before project work commences.
In addition to the usual components of a safety plan, the plan shall include specific procedures to address mold encountered during the project.
b. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the COR.
c. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
d. Contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.
5.7 Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the COR 21 working days prior to the need.
5.8 Materials and Equipment:
a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.
b. All materials and equipment to be incorporated in the work shall be handled and stored by the Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/COR.
c. Government will not furnish any labor or equipment to unload or move materials or supplies.
5.9 Cleanup: The project site shall be always kept clean and free of debris.
Disposal of the old equipment is required. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
5.10 Warranty:
a. Submit data concerning the standard one-year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
b. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.
5.11 Final Payment/Contract Closeout: The following documents are REQUIRED
PRIOR TO FINAL PAYMENT (other documents may also be required):
a. General contractor’s minimum one (1) year warranty on work.
b. Operation and Maintenance Data
c. Release of liens.
d. Final Invoice
6.0 PROJECT SCHEDULE: The Contract time for this project is 60 calendar days from Notice to Proceed.
Bldg1 12’x12’ OFFICES
Bldg 1 HALLWAY AND COMMON AREAS
Bldg 2 12’X12’ OFFICES
Bldg 2 WORK ROOM AND COMMON AREA
| United States Department of Agriculture |
| Agricultural Research Service |
| INTERIOR PAINTING OF (2) 24’ x60’ MODULAR BUILDINGS |
| USDA-ARS |
| ARS-PBARC-DKI |
| 64 Nowelo St, Hawaii 96720 |
File details come from the government source that posted it. Updated .