This document is a Statement of Work (SOW) for a mechanical mesquite reduction treatment project on approximately 686 acres within the Las Cienegas National Conservation Area in Arizona. The project seeks to implement a service contract to grub and remove mesquite trees using tracked equipment. The work is divided into 585 acres of second entry treatment of smaller, regrowth mesquite and 101 acres of first entry treatment of larger, denser mesquite. The contractor will be required to grub all visible mesquite trees, leaving small clusters, and windrow the slash. The project must be completed between October 1, 2024 and June 30, 2025, with possible extensions due to adverse weather conditions. The contracting agency is the Department of the Interior Bureau of Land Management Arizona Region. The related federal contract opportunity is Solicitation Number 140L6424Q0041 for the "HQ Mesquite Thinning" requirement.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Las Cienegas National Conservation Area Grassland Restoration Project
Mechanical Mesquite Reduction HQ Treatment Unit Statement of Work
Background and General Scope
A. General Scope The Bureau of Land Management (BLM) is seeking to perform a mechanical mesquite reduction treatment on approximately 686 acres in the HQ treatment unit, within the Las Cienegas National Conservation Area (LCNCA). The retreatment unit is on lands under the jurisdiction of the BLM and is generally located in T19S R17E S7,8,9,17,18,19 (see Appendix B). This treatment will be implemented using a service contract.
B. Background The BLM is implementing a grassland restoration project on the LCNCA, one aspect of the restoration project is mesquite reduction. The current method of mesquite reduction is mechanically grubbing the mesquite out of the ground with equipment.
This includes removal of the root ball from the ground and ensuring that all roots are broken or severed from the root ball.
Work to be Performed
The BLM is looking to implement a mechanical mesquite reduction contract on a total of 686 acres. The project area consists of 585 acres of second entry treatment where the mesquite is new growth and is generally small mesquite trees (6 foot high or less, 0-100 trees/ac). The area also includes 101 acres of first entry treatment where the mesquite is generally larger and denser (6 foot tall and greater, 100-200 trees/ac).
The contractor may utilize tracked equipment to grub and remove all visible mesquite trees and stumps found within the treatment unit. The contractor will windrow grubbed mesquite slash across the treatment unit.
A. Grubbing
Tracked equipment will be utilized to grub all visible mesquite trees found within the treatment unit, leaving small clusters of 12 foot or taller mesquite trees (4-5 per acre).
Remove root ball from the ground ensuring that all roots are broken or severed from the root ball.
Back fill any holes generated from the grubbing process to ensure that no holes are deeper than 6 inches.
Loosely place slash in a windrow.
The unit is a total of 686 acres with an estimated tree density break out of:
o 585 acres: 0-100 trees per acre, generally 6 ft tall and under (regrowth mesquite).
o 101 acres: 100-200 trees per acre, generally over 6 ft tall.
Equipment Requirements The BLM requires the following equipment specifications as a minimum standard for equipment capabilities, these requirements will allow for sufficient equipment capabilities to handle size class of trees:
Four wheel drive.
Enclosed cab.
96 hp.
Digging force-bucket 14,800 lbs.
Digging force-crowd 8700 lbs.
12” bucket or narrowest bucket available for equipment.
Toothed, heavy duty bucket
Site Visit A site can be scheduled upon request. Please email the Contract Specialist, Rachel Henriques, at rhenriques@blm.gov, to request a site visit.
Safety Concerns The contractor will be responsible for completing the contract in a safe and effective manner that is consistent with any applicable safety regulations, polices, or guidelines.
The project area falls within the international border watchout zone see appendix C. for border watch out guidelines.
Cultural Concerns If any cultural artifacts are uncovered during the grubbing process the contractor will immediately stop digging and contact the BLM Contracting Officer’s Representative (COR). The COR will coordinate with the BLM archaeologist if artifacts are uncovered.
Any known areas of cultural concern will be identified (flagged or marked) prior to the start of the contract. These areas will be excluded from any ground disturbance. A georeferenced map will be provided by the BLM upon award.
Deliveries and Performance The Contractor shall perform in accordance with the specifications of this contract.
Schedule and Calendar Work can be completed between October 1, 2024, and June 30, 2025.
In the event the timeline may not be met due to adverse weather conditions, and/or circumstances outside of the control of the Contractor, extra time may be added to portions of the field work phase (grubbing). The Contractor will be required to inform the COR of any circumstances that may require an extended amount of time. All extensions will be granted on a case-by-case basis at the CO’s discretion, after coordination between the CO and the Contractor.
Deliverables The Contractor shall deliver the following during implementation of the contract:
Grubbing of 100% of visible mesquite trees, leaving small clusters of 12 foot or taller mesquite trees (4-5 per acre).
Government Furnished Property The contractor is responsible for supplying all equipment, labor, supplies, materials, etc needed to complete the contract. The BLM will not furnish any equipment, supplies, materials, or labor. The BLM will provide georeferenced maps of the treatment units.
Coordination The Contractor shall coordinate closely with the assigned BLM Contracting Officer’s Representative (COR) and assigned Project Inspectors (PI) throughout the duration of the project, per the developed timeline and schedule. A pre-work conference will be required at the prior to contract implementation.
The contractor will coordinate with the BLM COR/PI daily or an as needed basis.
Progress will be tracked using GPS units to count the number of acres completed. The contractor and the BLM COR/PI will establish a schedule of progress tracking during the pre-work conference. A completed acre is defined as an acre where all regrowth mesquite has been grubbed and windrowed according to contract specifications.
BLM Points of Contact
Contracting Officer: Contracting Specialist:
Shawna Rogers-Bailey Rachel Henriques Bureau of Land Management Bureau of Land Management Arizona State Office Arizona State Office Email: srogersbailey@blm.gov Email: rhenriques@blm.gov
Appendix A. Photos of mesquite in treatment unit.
Photo 1. Example of mesquite density and size 0-100 stems/ac.
Photo 2. Example of mesquit density and size 0-100 stems/ac.
Photo 3. Example of mesquite density and size 100+ stems/ac.
Photo 4. Example of mesquite density and size 100+ stems/ac (in background).
Appendix B. Project Maps
Map 1. HQ Mesquite Thin Treatment Unit Vicinity Map.
Map 2. HQ Mesquite Thin Treatment Unit Land Status
Map 3. HQ Mesquite thin Treatment Unit Aerial Map.
Appendix C.
BORDER WATCHOUTS
1. Be aware of your surroundings at all times.
2. Expect other drivers to be distracted. Reckless and unsafe driving is common by those engaged in illegal activity.
3. Radio and cell phone dead areas increase risks. Radio frequency interference from Mexico is likely. Cell phone connections to Mexico are likely. When in Watchout Areas, check out and use the satellite cell phones
4. Language and cultural barriers increase risk in encounters.
5. Threats to employees are present all day, every day, everywhere in Watchout
Areas.
6. You are not clearly identified as a BLM employee. While this is intentional for safety purposes, you need to keep that in mind when encountering visitors.
7. Every visitor/individual you contact has potential risk.
8. There may be a higher occurrence of unexpected visitor/individual encounters.
9. Traditional responses may not be appropriate; go with your gut feelings.
10. Use caution if responding to situations inconsistent with assigned authority and training.
11. Unattended vehicles are subject to being damaged or stolen – lock up every time. Travel with your doors locked.
12. Illegal uses in the Watchout area are likely.
13. There is a heightened risk of biological contamination associated with improper waste disposal.
14. Always know your location and be able to describe it.
15. Let others know your expected route and destination(s) (check-in and check-out).
16. Expect to encounter Interagency Law Enforcement and interdiction actions and activity.
17. Expect high speed driving and law enforcement pursuits.
18. All aircraft operations have increased collision risk.
19. Threats to employees are present at all times.
20. Night operations require special considerations.
Remember … Your Safety is Your Responsibility. Take Charge of It!