Attachment_1_Statement_Of_Work.pdf
PDF 4 MB Posted
- Attached to
- Water Tank Cleaning/Inspection/Repair - LARO
- Solicitation number
- 140P8324Q0040
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to inspect, clean, and potentially repair five potable water storage tanks and one potable water storage reservoir within the Lake Roosevelt National Recreation Area.
The key details are:
- The contractor must provide all personnel, equipment, and services necessary to inspect the interior and exterior of the tanks and reservoir, identify any deterioration or deficiencies, and clean the tank interiors as needed.
- The related federal contract opportunity is a Request for Quotation (RFQ) solicitation number 140P8324Q0040 for "Water Tank Cleaning/Inspection/Repair - LARO". It is a Total Small Business Set-Aside under NAICS code 221310 with a $41 million size standard.
- The National Park Service intends to award a firm-fixed price purchase order to a single vendor. Pricing must include all necessary costs, and quoters must be registered as an active small business in SAM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_WDOL_Service_Contract_Act_Wage_Rates.pdf | ||
| Sol_140P8324Q0040.pdf | ||
| Attachment_3_Experience_and_Past_Performance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Clean and Inspect Water Storage Tanks
PMIS 309661
FY2024
Developed By
Lake Roosevelt National Recreation Area Facility Management
1008 Crest Drive Coulee Dam, WA
Attachment 1: Statement of Work Solicitation (Request for Quote) 140P8324Q0040
TABLE OF CONTENTS
Number Title ....................................................................................... Number of Pages
00 20 00 Table of Contents 00 30 00 Index of Drawings
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 31 00 Project Meetings 01 32 16 Project Schedule 01 33 23 Submittals
DIVISION 13 - SPECIAL REQUIREMENTS
13 21 00 Repair Water Storage Tanks Utilizing Divers 13 32 50 Clean & Inspect Water Storage Tanks Utilizing Divers
SECTION 00 30 00 INDEX OF DRAWINGS
General
Sheet 1 WATER TANK LOCATIONS – GENERAL LOCATION MAP Sheet 2 DETAILED WATER TANK LOCATIONS Attachments SPRING CANYON WATER TANK PHOTOS
PORCUPINE BAY WATER TANK PHOTOS
FORT SPOKANE WATER TANK and RESERVOIR PHOTOS
HUNTERS WATER TANK PHOTOS
_______________________________DIVISION 01
GENERAL REQUIREMENTS
Clean & Inspect Water Storage Tanks 01 11 00-1 SUMMARY OF WORK
SECTION 01 11 00 SUMMARY OF WORK
PART 1: GENERAL
1.1 DESCRIPTION
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tank inspection and cleaning for five (5) potable water storage tanks and one potable water storage reservoir building within Lake Roosevelt National Recreation Area.
A. Inspect the interior and exterior of tanks and reservoir. Inspection shall include structural, sanitary, safety, security, and coating conditions. Items inspected shall include piping (supply, drain, and overflow), ladders, shell, roof, vents, hatches, covers, seals, welds, seams, bolts, foundations, anchors, safety systems, and cathodic protection anodes, where present.
Identify any deterioration or deficiencies that may require repairs.
B. Clean tank interiors as needed, including the removal of sediment or debris build-up from floor, walls, ladder, and piping, without creating turbidity.
Contractor shall be responsible for disposal of sediment and any contaminants in accordance with applicable laws or regulations. Discharge of wastewater shall be filtered and routed through a de-chlorination process with a final chlorine residual of <0.20 ppm for water to be discharged onsite.
C. Repair of minor cracks and corrosion identified during the inspection and cleaning shall be made with NSF/ANSI 61 certified epoxy or polyurethane material in accordance with manufacturer recommendations and as appropriate for the specific tank material.
D. Provide DVDs of interior inspections and provide an electronic and hard copy report summarizing work and findings. Report shall describe any deficiencies (including photographs of deficiencies) and recommend corrective actions, including an estimate of cost for each corrective action not completed with the inspection and cleaning.
E. All interior inspections, cleaning and minor repairs shall be conducted by divers or robotic means while the tanks are in service. Equipment shall be clean and disinfected prior to entering the tanks. Ensure water remains in a potable condition while work is conducted and upon completion of the work.
F. All work will be performed under a single contract.
Clean & Inspect Water Storage Tanks 01 11 00-2 SUMMARY OF WORK
1.2 BACKGROUND
A. The park maintains and annually inspects multiple public water systems and storage tank infrastructure. Over time, tanks accumulate sediment which in turn incurs poor water quality and increased maintenance time and cost.
Inspecting, cleaning, identifying, and correcting any deficiencies will restore water quality and minimize future maintenance requirements.
B. All reservoirs, except Fort Spokane Reservoir Building which has a man door, have top entry hatches that are at least 24” in width with exterior access ladders, if needed. Most but not all sites are accessible to standard four-wheel drive vehicles with support trailers, although some sites have steep access roads with limited turnaround capacity that may require backing up or down narrow service roads. Electrical service is only available at the Fort Spokane Reservoir Building.
1. Spring Canyon: Tank is accessible off the main Spring Canyon Access Road via a 450 lineal foot gated gravel access road with room to turn-around at the water tank. The Spring Canyon tank is less than 15 minutes from Park Headquarters.
2. Porcupine Bay: Tank is accessible via a 450 lineal foot steep gated access road off the main Porcupine Bay Access Road adjacent to the campground entrance road. Typical drive time between Spring Canyon and the Porcupine Bay tank is just over 1 hour (approximately 65 miles).
3. Fort Spokane: Tanks are accessible via a 500 lineal foot relatively flat gated access road with no turn-around off Highway 25. The Reservoir Building is accessible via a 1700 lineal foot gravel road off the Visitor Center Access Road. The last 500 lineal feet is steep and rocky and there is limited turn-around room at the building. Typical drive time between Porcupine Bay and Fort Spokane tanks is about ½ hour (approximately 20 miles).
4. Hunters: Tank is accessible via a 300 lineal foot moderately steep access road with no turn-around. The access road is adjacent to the trailer dump station off the boat launch access road. Expected drive time between Fort Spokane and the Hunters tank is about ½ hour (approximately 20 miles).
C. Table 1 (below) provides basic construction information on the five water storage tanks to be inspected and cleaned, as described in this statement of work. Attachments provided with this solicitation contain photos of the tanks as limited drawings are available. Contractor shall verify and correct any discrepancies with data provided in Table 1 or the drawings. Corrections shall be highlighted in the final report.
Clean & Inspect Water Storage Tanks 01 11 00-3 SUMMARY OF WORK
Table 1. Basic potable water tank construction details for inspection and cleaning.
Tank Developed Area Nominal Date Built Floor SF
Location Material Dimensions Height Capacity
Spring Canyon Tank OG Steel 29’-0” Diam 21’-0” 103,709 Gal Unknown 660 Sq Ft
Porcupine Bay Tank OG Steel 11’-0” Diam 30’-0” 21,326 Gal 1983 95 Sq Ft
Fort Spokane Tank #1 OG Steel 11’-0” Diam 30’-0” 21,326 Gal 1983 95 Sq Ft
Fort Spokane Tank #2 OG Steel 11’-0” Diam 30’-0” 21,326 Gal 1983 95 Sq Ft
Fort Spokane Reservoir BG Concrete 24’ x 81’ 11’-0” 159,963 Gal 1904 1,944 Sq Ft
Hunters Tank OG Steel 15’-0” Diam 16’-0” 21,140 Gal 1966 177 Sq Ft
1.3 LOCATION
A. Construction Camp: Establishment of a camp within the Park is not allowed.
B. Work Hours: Work hours are from 7:00 am to 5:30 pm Monday through
Friday. Weekend or holiday work may be allowed with approval of the Contracting Officer.
C. The following conditions shall be followed during the Contractor's work while in the Park:
1. Prior to entering the Park, all workers shall check boots, tools, equipment, and vehicles for weed seeds, mud that could harbor weed seeds, and plant parts. Any equipment to be used at the site must be pressure cleaned and free of weeds, seed, debris, and mud to prevent the introduction and/or spread of exotic, invasive plants.
2. Pets are prohibited.
3. To prevent unnatural attractants to bears, no food, garbage, drinks, trash, or food and drink containers shall be placed outside vehicles or trailers, except during actual use. Feeding of wildlife is prohibited.
D. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repair or replace damaged trees and plants (per direction by NPS vegetation specialist) at no additional expense to the Government.
E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on Park roads are identical to the State load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on Park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment or materials.
Clean & Inspect Water Storage Tanks 01 11 00-4 SUMMARY OF WORK
F. Access Restrictions: All water tank access roads are secured behind a locked gate. Coordinate with COR for vehicular access to tanks.
1.5 FIELD VERIFICATION: Field verify all new and existing conditions/dimensions affecting the work of this Contract before beginning cleaning or maintenance activities.
1.6 CONTRACTOR-FURNISHED ITEMS: All materials and equipment shall be Contractor-furnished from outside the Park.
PART 2: PRODUCTS Not used.
PART 3: EXECUTION Not used.
END OF SECTION 01 11 00
Clean & Inspect Water Storage Tanks 01 31 00-1 PROJECT MEETINGS
SECTION 01 31 00 PROJECT MEETINGS
PART 1: GENERAL
1.1 PRE-WORK CONFERENCE
Once the contract is awarded and the Contracting Officer (CO) has received necessary documents, the CO will arrange a meeting with the Contractor, Contracting Officers Representative (COR) and/or Project Inspector (PI) before any site work or mobilization is to commence. The meeting will be held via phone or teams. The meeting agenda will include the following as a minimum:
A. Park rules and regulations
B. Authorized Representatives
C. Correspondence procedures
D. Labor standards provisions
E. Payroll reports
F. Modifications
G. Payments to Contractor
H. Acceptance/rejection
I. Subcontractors
J. Documents required under the contract
K. Submittal of project data and approved equals
L. Saturday, Sunday, Holiday and night work
M. Contractor quality control
N. Accident prevention and safety
O. Liquidated damages
P. Notice to proceed
Q. Work schedule
Clean & Inspect Water Storage Tanks 01 31 00-2 PROJECT MEETINGS
1.2 FINAL INSPECTION
A final inspection of the work associated with each tank shall be scheduled as each tank location is completed, on a mutually agreeable date. The COR or Project Inspector will attempt to be onsite and available for final inspection during or immediately following the onsite work at each tank.
PART 2: PRODUCTS Not used.
PART 3: EXECUTION Not used.
END OF SECTION 01 31 00
Clean & Inspect Water Storage Tanks 01 32 16-1 PROJECT SCHEDULE
SECTION 01 32 16 PROJECT SCHEDULE
PART 1: GENERAL
1.1 PROJECT SCHEDULE
After contract award and before the pre-work conference, submit an electronic copy of the proposed work schedule. Contractor shall coordinate and schedule tank cleaning with the COR and limit in-tank operations to Monday through Friday between the hours of 8:00 AM and 4:30 PM unless alternate hours are approved by the Contracting Officer.
Within seven calendar days of receipt of the Contractor’s proposed work schedule, the Contracting Officer, Contracting Officer’s Representative (COR) and Contractor shall jointly review, correct, or adjust the proposed work schedule. Upon acceptance of the work schedule by the Contracting Officer, the work schedule will be used to evaluate the Contractor’s application for payment and schedule final inspections. Park intends to have all onsite project work completed between August 1 and September 30th, 2024.
PART 2: PRODUCTS Not used.
PART 3: EXECUTION Not used.
END OF SECTION 01 32 16
Clean & Inspect Water Storage Tanks 01 33 23-1 SUBMITTALS
SECTION 01 33 23 SUBMITTALS
PART 1: GENERAL
1.1 DESCRIPTION: The work of this section consists of submittal requirements before and during construction.
1.2 PRODUCT AND TECHNICAL DATA
1. General Procedures:
A. As specified in the individual sections, forward electronic submittals to
Contracting Officer at least 15 days before need for approval.
B. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review.
C. List submittals on National Park Service CM-16 Transmittal Form. Identify the front of each sheet or item with the submittal and item number.
D. Submittals will not be accepted for review if identification is missing an incorrect number of submittals are submitted, the transmittal form is incorrectly filled out, submittals are not coordinated, or submittals do not show evidence of Contractor's approval.
E. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
2. Contracting Officer's Review:
A. After approving submittals, Contracting Officer will return one electronic copy to the Contractor.
B. If submittals are not approved, Contracting Officer will return one electronic copy to Contractor with reasons for rejection. Resubmit, identifying changes.
C. Any work done before approval shall be at Contractor's own risk.
PART 2: PRODUCTS (Not used) PART 3: EXECUTION (Not used)
END OF SECTION 01 33 23
Clean & Inspect Water Storage Tanks 01 33 23-2 SUBMITTALS
TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park: Project: Contract No.: Pkg. No.: Date:
Contractor: Subcontractor/Supplier:
NPS ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature Recommended by
Title, Date Title Date I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments Action By Date Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park: Project: Contract No.: Pkg. No.: Date:
Clean & Inspect Water Storage Tanks 01 33 23-3 SUBMITTALS
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16 Rev. 4/00 (Formerly DSC-1(CS)
______________________________DIVISION 13
SPECIAL REQUIREMENTS
Clean & Inspect Water Storage Tanks 13 21 00-1 SPECIAL REQUIREMENTS
SECTION 13 21 00 REPAIR WATER STORAGE TANKS UTILIZING DIVERS
PART 1: GENERAL
1.1 REFERENCE
A. Underwater Operations: All Dive Maintenance Technicians and associated in-tank equipment and repair materials shall be fully disinfected in accordance with AWWA Standard C652-2019. The recommended repairs, materials, and work methods shall meet industry and government standards for potable water systems. This includes the U.S. Department of Agriculture, American Water Works Association, and NSF International.
1.2 REPAIR PROCEDURES
A. Repairs will consist of repair of minor cracks and interior tank corrosion only.
Repair procedure shall combine vigorous brushing of surfaces cleaned, in addition to removing material from reservoir by vacuum or water suction. The potable water reservoir will be in service during repairs, the repair procedures shall not create any visible turbidity in the water column. Repair of cracks and corrosion shall be made with epoxy or polyurethane material in accordance with manufacturer recommendations, and as appropriate for the specific tank material.
1.3 DEFINING WORK
A. Repairs shall be identified and quantified by the Contractor during the inspection and cleaning process. The COR shall be onsite during or immediately following the inspection and cleaning process to review proposed identification and quantification of repairs. Repairs shall be completed at the hourly rate for a total not-to-exceed amount established by the contract only after the COR concurs with the need for and quantification of repairs. Payment for optional repair work actually completed will only be provided with written concurrence and documentation from both the COR and Contractor, up to the not-to-exceed amount established by the contract.
1.4 SUBMITTALS
A. The Contractor shall submit manufacturer's data sheets on all materials that will be used for repairs. Provide documentation of NSF/ANSI 61 certification for all products or materials used in contact with potable water.
PART 2: PRODUCTS (Not used) PART 3: EXECUTION (Not used)
END OF SECTION 13 21 00
Clean & Inspect Water Storage Tanks 13 32 50-1 SPECIAL REQUIREMENTS
Section 13 32 50 CLEAN & INSPECT WATER STORAGE TANKS
UTILIZING DIVERS
PART 1: GENERAL
1.1 UNDERWATER OPERATIONS
A. All dive maintenance technicians and associated in-tank equipment shall be fully disinfected in accordance with American Water Works Association (AWWA) Standard C652-2019. All system entries shall be conducted in accordance with applicable Occupational Safety and Health Administration (OSHA) regulations pertaining to commercial diving and confined space entry. Specialty equipment may include but is not limited to appropriate OSHA climbing and personal fall protection, and AWWA and Association of Diving Contractors (ADC) approved commercial diving equipment dedicated to in-service potable water operations.
B. Dive team shall consist of a minimum of three persons. If two divers are submerged at the same time a minimum of a five-person dive team is required.
All dive team members must have American National Standards Institute / Association of Commercial Diving Educators (ANSI/ACDE) 01-2009 minimum commercial diver training. This requires a certificate of graduation from an ACDE certified commercial diving school or equivalent military or other training (minimum 600 hr.).
C. Dive team must have OSHA approved Standards, Procedures, and Safe Practices Manual present and available for review at each dive location.
1.2 CLEANING PROCEDURES
A. Cleaning procedures shall combine vigorous brushing of surfaces cleaned, in addition to removing material from the reservoir by vacuum or water suction. The potable water reservoir will be in service during cleaning. The cleaning procedures shall not create any visible turbidity in the water column. In addition to cleaning all sediment or other material from the floor of the reservoir, the divers shall ensure that all sediment is removed from the floor to wall seams, support column bases, plumbing fixtures and supports, man entries, or any other areas where the vacuum does not reach during normal floor cleaning.
B. Diving contractor shall clean the vertical wall surfaces with similar equipment and procedures as used in cleaning the floor. Cleaning procedures shall combine vigorous brushing of surfaces cleaned, in addition to removing material from reservoir by vacuum or water suction and must be done in such a manner that does not create turbidity inside the reservoir.
C. Maximum discharge rate during the cleaning operations shall be 200 gallons per minute. The Contractor shall make every effort to minimize the quantity of water discharged. All water discharged during cleaning operations shall be de-
Clean & Inspect Water Storage Tanks 13 32 50-2 SPECIAL REQUIREMENTS chlorinated using ascorbic acid (e.g., Vita-D-Chlor system) or approved equal.
Water may be discharged to the ground to a location within 200 feet of the tank as approved by the Contracting Officer.
1.3 INSPECTION
A. Inspections shall be performed according to National Association of Corrosion Engineers (NACE) and American Society for Nondestructive Testing (ASNT) standards and included as part of the cleaning process and cost. The inspection shall be accomplished as a continuous process by the diver and include a detailed final inspection. Contractor shall submit a comprehensive inspection checklist detailing all areas of inspection. Finished water storage tank inspection/cleaning checklist shall include, at a minimum, the level of detail shown in the EPA Region 8 Storage Tank Finished Water Checklist (12/08/2020). The Government will approve the inspection list or amend the inspection list if necessary.
B. Diver shall have a helmet-mounted high resolution (1080P minimum) camera with adequate lighting capable of supplying live video feed to the surface. The live video will be set up so that surface personnel can view underwater procedures as they are performed and so that procedures can be recorded along with live voice narration. This also provides the Government with a method of monitoring quality control, to ensure job is done completely and that the diver does not create turbidity. The video camera must have infinite focal range.
Cameras with a limited short focal range are not acceptable. Handheld cameras and handheld video cameras, if used, will be used for still or detail images only.
1.4 INSPECTION REPORT
A. Inspection report shall include a high-resolution color video DVD with real time imprint and a time log indicating where each feature or problem area may be found. The DVD shall be narrated live by the divers and/or other personnel (in the control trailer). Provide one hard copy of the computer-generated report with still color images of the fixtures and problem areas, along with a schematic diagram of each tank, and an updated Table 1 with field-verified dimensions.
Identified deficiencies shall be accompanied by an estimated cost for correction.
The contractor shall also provide the complete report in a single Adobe PDF file, and a copy of all editable individual files in the original format/software that was used to make the report on CD medium.
1.5 REPAIRS
A. Repairs will consist of repair of minor cracks and corrosion only. Repair work requirements are outlined in Section 13210.
1.6 SUBMITTALS
A. Contractor shall submit the following: a description of cleaning process; a detailed description of the vacuum cleaner head and equipment; a description of
Clean & Inspect Water Storage Tanks 13 32 50-3 SPECIAL REQUIREMENTS the diver’s equipment; a description of the video and voice communication equipment; a description of the de-chlorination process; and the inspection checklist.
B. The inspection report and other information as described in paragraph 1.4 of this Section.
PART 2: PRODUCTS (Not used) PART 3: EXECUTION (Not used)
END OF SECTION 13 32 50
Spring Canyon Water Tank – Looking North Spring Canyon Water Tank ‐ Shell Manhole
Spring Canyon Water Tank – Interior Ladder Spring Canyon Water Tank – Exterior Ladder
Porcupine Bay Water Tank Porcupine Bay Water Tank
Fort Spokane Water Tanks Fort Spokane Water Tanks
Fort Spokane Reservoir Exterior Fort Spokane Reservoir Interior
Hunters Water Tank
Hunters Water Tank