Attachment_1_-_Statement_of_Work.docx
DOCX document 73 KB Posted
- Solicitation number
- 140P1422R0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Boiler_configuration.jpeg | JPEG file | |
| Sol_140P1422R0003.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_3_-_Data_tag_on_current_boilers.jpeg | JPEG file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Removal and Installation of LP Gas Fired Water Boilers East Entrance Employee Housing
TABLE OF CONTENTS
Statement of Work General Special Requirements Government Furnished Property General Information Quality Control Hours of Operations Safety Information Period of Performance Location of work to be Performed
Statement of Work:
The work to be performed under this contract consists of furnishing all parts, labor, equipment, instruments, materials, transportation, and incidentals necessary for the removal and installation of eight LP gas fired water boilers at the East Entrance Employee Housing in Yellowstone National Park. The work involves disconnecting and reconnecting primary utility and drain piping, heat tracing, electrical, gas lines, and controls from existing utilities, which are located at the boiler location. The contractor shall remove and dispose of existing non-operational units and the installation of brand name or equal to minimum of 175,000 BTU Stant Fin Victory II boilers. Units shall be fully operational and ready for use by the Government.
The work involves disconnecting and reconnecting primary utility and drain piping, heat tracing, electrical, gas lines, and controls from existing utilities, which are located at the boiler location.
The Contractor shall provide labor and materials necessary to provide removal/disposal of existing non-operational units and the installation of an operational LP gas fired boiler in Unit locations in housing unit 59 and 85: 4 in each housing unit.
The Contractor shall be responsible for identifying the necessary logistical, architectural, structural, mechanical, and electrical work elements required to remove the old systems and install the new systems and assemblies as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the plans or the SOW shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems, ready for use by the Government.
The Contractor will conduct an operational demonstration of all system components and/or functions to test and verify the systems are fully operational, as well as, safe to operate.
New piping shall be tested and pass all American Society of Mechanical Engineers (ASME) testing requirements before insulating and placing the new lines into service.
Special Requirements:
Code Requirements: Contractor shall be required to follow current National Fire Protection Agency (NFPA) 70 National Electric Code (NEC), Unified Facilities Guide Specifications (UFGS) and Unified Facilities Criteria (UFC) requirements for the work to be performed. All LP gas piping shall be in accordance with the requirements of American National Standards Institute (ANSI) and the American Society of Mechanical Engineers (ASME) B31.1 “Power Piping” (which applies to steam piping systems), and B31.1 “Gas Transmission and Distribution Piping Systems.” The Contractor shall provide gas hook up lines including but not limited to gas regulator, drip leg, isolation valves, drains, traps, flanges, bolts, gaskets, fittings, bypass, support and bracing, gauges, valves, and fittings to the boiler. A suitable flex connection shall be used at the boiler connection.
Warranty: The Contractor will warranty the operational status of the units for a minimum of one (1) year.
Specifications for boiler unit: Minimum requirements
1. Pre-assembled cast-iron heat exchanger with built-in air eliminator
2. Insulated Base
3. Pre-assembled insulated flush jacket
4. Gas burners: 175,000 BTU/HR
5. Heating capacity: 153 Mbh
6. Output water: 133 Mbh
7. Maximum water pressure 50 PSI
8. Inlet gas pressure Max. 13.0
9. Electrical input less than 12 amps: 120 VAC 60Hz.
10. High altitude required for installation location (5000 feet above sea level)
11. LPG gas orifices and manifold assembly
12. Combination gas valve - including manual shut-off, pressure regulator and pilot adjustment Intermittent pilot ignition system
13. Pressure and temperature gauge
14. Control w/LED and display
15. Pressure relief valve (ASME)
16. Circulator 1-1/4", Circulator 1-1/4"
17. Drain cock, Inducer assembly
18. Air flow proving switch
19. Built-in condensate drain
20. Trap and stainless-steel vent pipe adapter, and rollout safety switch
21. LPG propane, specify when ordering
22. Horizontal flue discharge capability
23. 3-inch flue connector with integral adapter for easy connection to stainless steel venting.
24. Drain tube for condensate shall be factory installed and pre-configured with water trap
25. Intermittent pilot “spark” ignition. Ignition control
26. Hydrostat temperature control and gas valve included.
27. Junction box for line voltage facilitates placement and wiring of shut-off switch
28. Vent and air inlet wall penetration thickness: (Minimum 2 inches) (Maximum 24 inches)
29. Near zero CO emissions
Government Furnished Property/Equipment:
The Government will not provide any GFP equipment, parts, or materials to the Contractor. The Contractor shall be responsible for safeguarding all Government property provided for Contractor use. Plan information such as floor plan layouts, basic dimensions; design requirements for structural, mechanical, and electrical data; and location of utilities provided by the Government for this installation are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information shall be considered approximate and shall be field verified by the Awarded Contractor. This information will be provided prior to the beginning of the work.
Special Qualifications:
The Contractor shall ensure site supervisory personnel are responsive to emergencies, problems (personnel, workmanship, etc.), or to answer questions, between the hours of 7:00 AM and 4:30 PM. A primary on-site supervisor and an alternate shall be provided to the Contracting Officer (CO) and Government 5 days after contract award to include cell phone numbers.
The Contractor shall require all motorized vehicle operators to possess and maintain current certifications and state driver’s licenses. Vehicle operators shall comply with posted speed limits, the policy of no texting while driving, and mandatory seat belt usage by all vehicle occupants.
Quality Control:
The Contractor shall have established a complete Quality Control Program to ensure the requirements of this contract are provided as specified. The Contractor's QCP shall comply with the minimum quality management systems elements specified in the American National Standards Institute (ANSI) American Standards Organization (ASO standards).
The Awarded Contract Manager are required to meet with the Park Service appointed COR during the Period of Performance (POP) of this contract. Meetings will be as often and as necessary as determined by the COR.
The Government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints.
Inspection and acceptance will be made by COR Randy Froelich, and Technical Expert Claude Long Unsatisfactory performance shall result in re-performance by the Contractor at no additional cost to the Government.
Hours of Operations:
The Contractor shall have access to perform services during normal working hours. Normal working hours at Yellowstone are 7:00AM – 4:00 PM Monday through Friday.
Unless otherwise approved by the Government, the Contractor shall not have access to Government facilities on weekends and Federal holidays.
All visits shall be scheduled by the COR. Schedules may have to be modified in the case of incidents or emergencies, to include natural hazards, furloughs, or similar circumstances.
Government Observation/Site Visits:
Government representatives, other than CO and COR(s), may from time to time with COR coordination observe operations. However, these visits shall not interfere with contractor performance nor are these representatives authorized to make any changes to the contract. The Government Contracting Office is the only authorized entity who can approve changes to the SOW.
Environmental:
Compliance with Laws and Regulations. The Contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection as it relates to the work required in this SOW. In the event environmental laws/regulations change during the term of this contract, the Contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost because of the change, the Contractor shall inform the CO pursuant to notice requirements and negotiate a modification to the contract.
The Contractor shall not use any Class I Ozone Depleting Substances (ODS) as identified. If the Contractor determines that Class I ODS’s will be required under this contract, advance approval from the CO must be obtained before use.
Notification of Environmental Spills. If the Contractor spills or releases any substance contained in 40 CFR 302 “Designation, Reportable Quantities, and Notification”, including hazardous materials, into the environment, the Contractor or its agent shall immediately call 911. The liability for the spill or release of such substance’s rests solely with the Contractor and its agent.
Material Storage and Use. The Contractor shall follow manufacturer’s guidelines and industry standards for control of humidity, temperature, cleanliness, and materials handling to include the handling of hazardous materials
Safety Program:
The Contractor shall implement a safety program that ensures protection of Government personnel and property. As part of the Safety Program the Contractor shall establish a Safety Plan. The Contractor shall include and submit the Safety Plan with the contract proposal.
In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. A written or email copy of the mishap/incident notification shall be sent to the COR within three calendar days. The Government Representative will forward it to The Yellowstone National Park Safety Office.
Occupational Noise Exposure: It may be necessary to control the occupational noise exposure to personnel and to comply with Federal regulations (Title 29, Code of Federal Regulations, Parts 1910.95 and 1926.52). Sound levels at the worksite where personnel may be located shall not exceed 120 decibels (adjusted) (dBA) when measured on the A-scale of a standard sound level meter at slow response.
Manpower Reporting:
The Contractor shall report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract.
Safety Program Requirements.
NOTE: The Contractor will implement a safety program plan that ensures protection of Government personnel and property. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
Mishap Notification The Contractor shall notify Randy Froelich 307 344-2075, randy_froelich@nps.gov, the designated Government Representative COR (Contracting Officer's Representative) one hour afterall mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOI property entrusted by this contract, even if the Government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the COR, who will forward it to Safety Office.
Mishap notifications shall contain, as a minimum, the following information:
| 1) Hydrostat temperature control and gas valve included. | |
| 2) Junction box for line voltage facilitates placement and wiring of shut-off switch | |
| 3) Contract, Contract Number, Name and Title of Person(s) Reporting | |
| 4) Date, Time, and exact location of accident/incident | |
| 5) Brief Narrative of accident/incident (Events leading to accident/incident) | |
| 6) Cause of accident/incident, if known | |
| 7) Estimated cost of accident/incident (material and labor to repair/replace) | |
| 8) Nomenclature of equipment and personnel involved in accident/incident | |
| 9) Corrective actions (taken or proposed) | |
| 10) Other pertinent information |
The Contractor shall cooperate with all Government mishap investigations. Additionally, if requested by Government personnel or designated Government representative COR, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
The Contractor shall provide copies of Contractor data related to mishaps, such as Contractor analyses, test reports, summaries of investigations, etc. as necessary to support the Government investigation.
House Cleaning:
Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.
Period of Performance:
Work shall be completed 90 Days after receiving the Notice to Proceed.
Location of Work to be Performed:
East Entrance, Housing Units 85 and 59, Marmot Drive, Yellowstone National Park, Wyoming 82190 (Highway from Cody to the East Entrance).